You can help expand this article with text translated from the corresponding article in Croatian. (April 2017)Click [show] for important translation instructions.
|
Senj Hydroelectric Power Plant | |
---|---|
Country | |
Coordinates | 44°56′31″N14°55′58″E / 44.942°N 14.9329°E |
Power generation | |
Nameplate capacity |
|
Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each [1] having a total capacity of 220 MW.
It is operated by Hrvatska elektroprivreda. [2] [3]
Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. [4]
Plomin Power Station is a coal-fired power station near Plomin, Croatia. As of 2021, its production corresponded to 7.6% of Croatia's electricity needs.
The Krško Nuclear Power Plant is located in Vrbina in the City Municipality of Krško, Slovenia. The plant was connected to the power grid on October 2, 1981, and went into commercial operation on January 15, 1983. It was built as a joint venture by Slovenia and Croatia which were both part of Yugoslavia at the time.
The Rama Dam is a concrete-face rock-fill dam on the Rama river, a tributary of the Neretva river, about 4 km (2.5 mi) southwest of the town of Prozor in the Herzegovina-Neretva Canton of Bosnia and Herzegovina.
Vinodol Hydro Power Plant is a large power plant in Croatia that has three turbines with a nominal capacity of 30 MW each having a total capacity of 90 MW.
Zakučac Hydroelectric Power Plant is a large power plant in Croatia that has four turbines with a nominal capacity of 122 megawatts (164,000 hp) each having a total capacity of 488 megawatts (654,000 hp).
Dubrava Hydro Power Plant is a large power plant in Croatia that has four turbines with a nominal capacity of 21 MW each, amounting to a total capacity of 84 MW.
Čakovec Hydroelectric Power Plant is a large hydroelectric power plant in Croatia that has four turbines with a total nominal capacity of 78 MW. According to the type of power plant, it is a flow, low-pressure, derivation hydroelectric power plant with an accumulation (area of 10.5 km2 and volume of 51.6 [hm^3] for daily and partial weekly flow regulation. Units A and B of the power plant have horizontal pipe turbines and the generators are "in the bulb".
Dubrovnik Hydro Power Plant is a large power plant in Croatia that has two turbines with a nominal capacity of 125 MW each having a total capacity of 250 MW.
Wind power in Croatia has been growing since the first wind farm was installed in the country in 2004. During 2021, the energy produced from wind farms amounted to 1,904 GWh. The total wind power grid-connected capacity in Croatia was 1,143 MW as of 2023.
Jaruga Hydroelectric Power Plant is a hydroelectric power plant on river Krka, located in Šibenik-Knin County, in central Dalmatia, Croatia.
Miljacka Hydroelectric Power Plant is a hydroelectric power plant on the river Krka, located in Šibenik-Knin County, in central Dalmatia, Croatia.
Krčić Hydroelectric Power Plant is a hydroelectric power plant on river Krka, located in Šibenik-Knin County, in central Dalmatia, Croatia.
Gojak Hydroelectric Power Plant is a hydroelectric power plant on river Dobra, near the town of Ogulin, in Karlovac County, Croatia. Its total capacity is 55.5 MW.
On the territory of Kabardino-Balkaria republic a number of minor hydro-electric plants are located.
Energy in Croatia describes energy and electricity production, consumption and import in Croatia.
The Rijeka Thermal Power Station is an oil-fired power station east of Rijeka at Kostrena, Croatia. It was built between 1974 and 1978 and it has one generation unit with capacity of 320 MW. The height of the boiler house including its rooftop flue gas stack is 250 metres (820 ft).
The Dhauliganga Dam was a concrete face rock and earth-fill embankment dam on the Dhauliganga River near Dharchula in Uttarakhand, India, close to the borders with Tibet and Nepal. It had very little pondage and operated as run-of-the-river. It was constructed by a joint venture of Kajima Construction Corporation, Ltd., and Daewoo Engineering & Construction with Bauer Maschinen. HRT & PH was constructed by JV of [HCC, Hindustan Construction Company] and Samsung Corporation [E&C] Group. It generates 280 MW(4x70 MW) of hydro power.
In 2021, hydroelectricity generated 11% of Bulgaria’s electricity. As of 2020, the country's total installed electricity capacity was approximately 12,839 MW, with hydropower contributing 25%, or 3,213 MW.
Jorethang Loop Hydroelectric project is a 96 megawatts (129,000 hp), run-of-the-river hydroelectric power station on the Rangit river in South Sikkim district of Sikkim state in India. The dam is located near village Piple and power station is located about 13 km downstream near village Majhitar. Dans Energy Private Limited was awarded contract for construction of the project. The project was officially inaugurated on 29 October 2015. The project was built at a cost of Rs 1,182 crores.