Severn Tidal Power Feasibility Study

Last updated

Severn Tidal Power Feasibility Study is the name of a UK Government feasibility study into a tidal power project looking at the possibility of using the huge tidal range in the Severn Estuary and Bristol Channel to generate electricity.

Contents

On 22 January 2008, the Government launched the feasibility study. [1] The study, previously led by the Department of Business, Enterprise and Regulatory Reform (BERR) is now led by the new Department for Energy and Climate Change and includes representation from the Welsh Assembly Government and the South West Regional Development Agency.

Previous reports on tidal power in the Severn did not—and did not aim to—provide a detailed analysis of all tidal range technologies. This feasibility study aims to consider all tidal range technologies, including barrages and lagoons. The focus is on tidal range technologies as this is where the energy potential in the Severn Estuary is the greatest, as opposed to 'tidal flow' which is the current in moving tidal waters. The tidal range in the Severn Estuary is the second highest in the world and can rise as much as 14 metres, [2] meaning it has the potential to generate more renewable electricity than all other UK estuaries. This could create up to 5% of the UK's electricity, contributing significantly to UK climate change goals as well as European Union renewable energy targets. [3]

The Government is carrying out the feasibility study to look at all the costs, benefits and impacts of a Severn tidal power scheme. The study, often incorrectly called the Severn Barrage, looks at all tidal range technologies—including barrages, lagoons as well as other technologies. A decision whether the Government will support the scheme or not will take place after a second public consultation in 2010. It was decided after much debate that the scheme would be closed forever and that this would not be brought up in future discussions to save time. [4]

The first consultation of the feasibility study [5] was launched on 26 January 2009 and closed on 23 April 2009. It looked at the scope of the Strategic Environmental Assessment, the issues the feasibility study considered and the shortlisted schemes up for more detailed analysis in stage two.

History

Previous schemes and studies

Proposals for damming or barraging the Severn Estuary (and Bristol Channel) have existed since the 19th century for reasons such as transport links and flood protection. [6] In more recent decades however, (1970s and 80s) there were a number of studies considering barraging the Severn estuary for electricity generation reasons.

These studies concluded in 1989 in the government policy document 'Energy Paper 57', [7] which found that an ebb generation scheme (one that generates electricity as the tide goes out) between Lavernock Point and Brean Down, known as the Cardiff-Weston barrage was technically feasible. The annual output of electricity was estimated at approximately 17 terawatt hours (TWh). However, at the time Government decided a Severn Barrage was not a cost-effective option for generating electricity and plans were shelved.

A comprehensive history of studies and plans for a Severn Barrage can be found under Severn Barrage.

The Energy Review and the Sustainable Development Commission study

In May 2006, with the growing evidence of climate change and rising fossil fuel prices, the Government called for a new in-depth study into the potential for tidal power from the Severn. The Sustainable Development Commission (SDC), the Government's independent advisory body on sustainable development, was commissioned to look at the issues arising around tidal power, with a particular focus on the Severn Estuary. Their study, 'Turning the Tide: Tidal Power in the UK', [8] concluded that:

Aims

The study aims to gather and examine evidence which will enable Government to decide whether it could support a tidal power scheme in the Severn Estuary and if so, on what terms. Building on past studies, the feasibility study will provide an up-to-date overview of all the key issues involved.

There are six key work areas which will be looked at closely in the study:

The study will run for roughly two years (until 2010) and will be a two-stage process with a decision point at the end of each. The first stage concluded with a 3-month public consultation launched on 26 January 2009 and focused on the high level issues, the scope of the Strategic Environment Assessment (SEA) and a proposed short-list of potential tidal power project options from the initial 10 schemes. [9] Following consideration of the responses received to the consultation, the gathering of evidence and assessment will continue through phase 2. At the end of phase 2, a second and final public consultation will be launched and Government will make a decision on whether and how a tidal power project could be supported. In doing so Government will consider the costs, benefits, impacts and risks of a Severn tidal power project and whether these are acceptable.

Strategic environmental assessment

As part of the feasibility study, A Strategic Environmental Assessment (SEA) will take place. An SEA is a formal environmental assessment of plans or programmes which are likely to have significant effects on the environment. The assessment is produced in the form of an environmental report.

Proposed projects

A list of ten proposed projects was published in July 2008. The feasibility study looked in further detail at the ten schemes and the consultation document published in January 2009 proposed that a short-list of 5 schemes [10] should be the subject of more extensive research in phase two of the study. The 5 schemes are:

The Government response to consultation was published in July 2009. This confirmed detailed study in phase 2 would be carried out on the 5 schemes that were recommended in the consultation document. It also announced work to bring forward 3 further schemes that are currently in the very early stages of development.

A 2009 Paper by Atkins [11] re-evaluated the potential energy which could be generated from the various locations, and concluded that, contrary to earlier studies and computations, the maximum power potential would come from an Ilfracombe-Gower barrage, much further west than any of the schemes the Feasibility Study considered. This different conclusion was attributed to several calculation elements which were neglected in previous numerical models.

Timeline

April to Autumn 2008 – Initial focus on the high level issues and potential tidal power options assessment.

Late 2008 – Government decision on whether there are any issues that mean the project cannot proceed.

January 2009 – Start of a public consultation on recommended short-list of schemes for further assessment, on the process employed to move from the long list to the short list and the scope of the Strategic Environmental Assessment (SEA).

Spring 2009 - Second phase. Subject to the responses made to the consultation, the issues to be considered will be examined in more detail, the short list finalised and narrowed down to a preferred option or combination of options.

2010 – Public consultation on the evidence and conclusions of the study. Following the consultation, Government will make a decision on whether it could support a tidal power scheme, and if so on what terms.

Post 2010 – If the outcome of the feasibility study is a decision to proceed, extensive and further detailed work would be needed to plan and implement a tidal power project, and secure the regulatory consents that would be required. The government concluded it did not see a strategic case for public investment in a tidal energy scheme in the Severn estuary, but the outcome of the feasibility study does not preclude a privately financed scheme. [12]

Related Research Articles

<span class="mw-page-title-main">Severn crossing</span> Set of motorway bridges

Severn crossing is a term used to refer to the two motorway crossings over the River Severn estuary between England and Wales operated by England's National Highways. The two crossings are:

<span class="mw-page-title-main">Bristol Channel</span> Large inlet to the river Severn in southwest Great Britain

The Bristol Channel is a major inlet in the island of Great Britain, separating South Wales and South West England. It extends from the smaller Severn Estuary of the River Severn to the North Atlantic Ocean. It takes its name from the English city and port of Bristol.

<span class="mw-page-title-main">Tidal power</span> Technology to convert the energy from tides into useful forms of power

Tidal power or tidal energy is harnessed by converting energy from tides into useful forms of power, mainly electricity using various methods.

The Renewables Obligation (RO) was designed to encourage generation of electricity from eligible renewable sources in the United Kingdom. It was introduced in April 2002, both in England and Wales and in Scotland albeit in a slightly different form: the Renewables Obligation (Scotland). The RO was later introduced in Northern Ireland in April 2005. In all cases, replacing the Non-Fossil Fuel Obligation which operated from 1990.

<span class="mw-page-title-main">Severn Estuary</span> Estuary and Site of Special Scientific Interest in Great Britain

The Severn Estuary is the estuary of the River Severn, flowing into the Bristol Channel between South West England and South Wales. Its very high tidal range, approximately 50 feet (15 m), creates valuable intertidal habitats and has led to the area being at the centre of discussions in the UK regarding renewable tidal energy.

<span class="mw-page-title-main">Severn Barrage</span> Conceptual dam between England and Wales

The Severn Barrage is any of a range of ideas for building a barrage from the English coast to the Welsh coast over the Severn tidal estuary. Ideas for damming or barraging the Severn estuary have existed since the 19th century. The building of such a barrage would constitute an engineering project comparable with some of the world's biggest. The purposes of such a project have typically been one or several of: transport links, flood protection, harbour creation, or tidal power generation. In recent decades it is the latter that has grown to be the primary focus for barrage ideas, and the others are now seen as useful side-effects. Following the Severn Tidal Power Feasibility Study (2008–10), the British government concluded that there was no strategic case for building a barrage but to continue to investigate emerging technologies. In June 2013 the Energy and Climate Change Select Committee published its findings after an eight-month study of the arguments for and against the Barrage. MPs said the case for the barrage was unproven. They were not convinced the economic case was strong enough and said the developer, Hafren Power, had failed to answer serious environmental and economic concerns.

<span class="mw-page-title-main">Renewable energy in Scotland</span>

The production of renewable energy in Scotland is a topic that came to the fore in technical, economic, and political terms during the opening years of the 21st century. The natural resource base for renewable energy is high by European, and even global standards, with the most important potential sources being wind, wave, and tide. Renewables generate almost all of Scotland's electricity, mostly from the country's wind power.

<span class="mw-page-title-main">Renewable energy in the United Kingdom</span>

Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.

<span class="mw-page-title-main">Low-carbon electricity</span> Power produced with lower carbon dioxide emissions

Low-carbon electricity or low-carbon power is electricity produced with substantially lower greenhouse gas emissions over the entire lifecycle than power generation using fossil fuels. The energy transition to low-carbon power is one of the most important actions required to limit climate change.

Marine Current Turbines Ltd (MCT), was a United Kingdom-based company that developed tidal stream generators, most notably the 1.2 MW SeaGen turbine. The company was bought by the German automation company, Siemens in 2012, who later sold the company to Atlantis Resources in 2015.

<span class="mw-page-title-main">Tidal farm</span> Group of tidal stream generators used for production of electric power

A tidal farm is a group of tidal stream generators used for production of electric power. The potential of tidal farms is limited by the number of suitable sites across the globe as there are niche requirements to make a tidal farm cost effective and environmentally conscious.

Greenhouse gas emissions are one of the environmental impacts of electricity generation. Measurement of life-cycle greenhouse gas emissions involves calculating the global warming potential of energy sources through life-cycle assessment. These are usually sources of only electrical energy but sometimes sources of heat are evaluated. The findings are presented in units of global warming potential per unit of electrical energy generated by that source. The scale uses the global warming potential unit, the carbon dioxide equivalent, and the unit of electrical energy, the kilowatt hour (kWh). The goal of such assessments is to cover the full life of the source, from material and fuel mining through construction to operation and waste management.

<span class="mw-page-title-main">Tidal barrage</span> Dam-like structure

A tidal barrage is a dam-like structure used to capture the energy from masses of water moving in and out of a bay or river due to tidal forces.

<span class="mw-page-title-main">Hydroelectricity in the United Kingdom</span>

As of 2018, hydroelectric power stations in the United Kingdom accounted for 1.87 GW of installed electrical generating capacity, being 2.2% of the UK's total generating capacity and 4.2% of UK's renewable energy generating capacity. This includes four conventional hydroelectric power stations and run-of-river schemes for which annual electricity production is approximately 5,000 GWh, being about 1.3% of the UK's total electricity production. There are also four pumped-storage hydroelectric power stations providing a further 2.8 GW of installed electrical generating capacity, and contributing up to 4,075 GWh of peak demand electricity annually.

Hafren Power was a tidal energy business formed to promote construction of a Severn Barrage between Wales and England.

<span class="mw-page-title-main">Renewable energy in Bangladesh</span>

Renewable energy in Bangladesh refers to the use of renewable energy to generate electricity in Bangladesh. The current renewable energy comes from biogas that is originated from biomass, hydro power, solar and wind.

Tidal Lagoon Swansea Bay was a proposed tidal lagoon power plant that was to be constructed in Swansea Bay off the south coast of Wales, United Kingdom. Development consent was granted by the UK government in June 2015, and in June 2018 the Welsh Government approved the plan and offered to invest £200 million; however, later that month the UK government withdrew its support on value-for-money grounds. Other options to enable the proposal to go ahead were reportedly still being explored.

<span class="mw-page-title-main">Mersey Barrage</span> Tidal barrage proposal in North West England

The Mersey Barrage is a proposed scheme for building a tidal barrage across the Mersey Estuary. In December 2022, the Liverpool City Region mayor announced cooperation between the City Region and K-water of South Korea, who built and operates the Sihwa Lake Tidal Power Station, in order to construct a similar operation on the River Mersey.

<span class="mw-page-title-main">Renewable energy in Wales</span> Overview of renewable energy in Wales

In 2019, Wales generated 27% of its electricity consumption as renewable electricity, an increase from 19% in 2014. The Welsh Government set a target of 70% by 2030. In 2019, Wales was a net exporter of electricity. It produced 27.9 TWh of electricity while only consuming 14.7 TWh. The natural resource base for renewable energy is high by European standards, with the core sources being wind, wave, and tidal. Wales has a long history of renewable energy: in the 1880s, the first house in Wales with electric lighting powered from its own hydro-electric power station was in Plas Tan y Bwlch, Gwynedd. In 1963, the Ffestiniog Power Station was constructed, providing a large scale generation of hydroelectricity, and in November 1973, the Centre for Alternative Technology was opened in Machynlleth.

<span class="mw-page-title-main">Centre Port</span>

Centre Port is a proposed development across The Wash in Eastern England, which would link Norfolk and Lincolnshire by road. The plan is to link Hunstanton in Norfolk, with Gibraltar Point in Lincolnshire, creating an 11-mile (18 km) road, with a port and a railway at the midway point. Additionally the development would be a tidal barrage to prevent sea flooding, and would use tidal power to create enough electricity to power 600,000 homes. Whilst no formal plans have yet been submitted, the scheme has come under widespread criticism from those living in the area and from wildlife groups.

References

  1. "New Study for Severn Energy Plan". BBC News. 25 September 2007. Retrieved 28 August 2008.
  2. "Severn Estuary Barrage" (PDF). UK Environment Agency. 31 May 2006. Retrieved 28 August 2008.[ dead link ]
  3. "Severn tidal power feasibility study: BERR appoints contractors". BERR . Archived from the original on 12 June 2008. Retrieved 27 August 2008.
  4. "Severn tidal power". Welsh Assembly Government . Archived from the original on 13 January 2009. Retrieved 27 August 2008.
  5. "Severn Tidal Power Consultation". Department for Energy and Climate Change. 26 January 2009. Archived from the original on 20 April 2009. Retrieved 2 April 2009.
  6. "History of Severn Barrage". R-Energy. Archived from the original on 4 June 2004. Retrieved 28 August 2008.
  7. "The UK Climate Change Programme". UK Parliament . 15 January 1999. Archived from the original on 3 March 2016. Retrieved 28 August 2008.
  8. "Tidal Power". The Sustainable Development commission. 1 October 2007. Archived from the original on 12 May 2008. Retrieved 28 August 2008.
  9. "UK Government Releases Severn Government Proposals". Renewable energy World.com. 11 August 2008. Retrieved 28 August 2008.
  10. "Severn Tidal Power Consultation". DECC. Archived from the original on 20 April 2009. Retrieved 5 May 2009.
  11. Atkins, R Rainey. "Technical Note: The optimum position for a tidal power barrage in the Severn estuary, Reference CJ0040.6680/TN-001r3" (PDF). Atkins. Retrieved 20 May 2012.
  12. "Severn tidal power: feasibility study conclusions". Department for Business, Energy & Industrial Strategy. 2013.