Sisson Dam

Last updated

The Sisson Dam is a hydroelectric dam built in the Canadian province of New Brunswick and is operated by NB Power corporation. Its power house has a capacity of 9 megawatts with its single turbine. [1] It is located at the southeast corner of the Sisson Branch Reservoir, which it created, in Lorne Parish, Victoria County.

Related Research Articles

<span class="mw-page-title-main">St. Croix River (Maine–New Brunswick)</span> River forming part of the US–Canada border

The St. Croix River is a river in northeastern North America, 71 miles (114 km) in length, that forms part of the Canada–United States border between Maine (U.S.) and New Brunswick (Canada). The river rises in the Chiputneticook Lakes and flows south and southeast, between Calais and St. Stephen. It discharges into Passamaquoddy Bay, in the Bay of Fundy.

<span class="mw-page-title-main">Flathead River</span> River in Montana, United States

The Flathead River, in the northwestern part of the U.S. state of Montana, originates in the Canadian Rockies to the north of Glacier National Park and flows southwest into Flathead Lake, then after a journey of 158 miles (254 km), empties into the Clark Fork. The river is part of the Columbia River drainage basin, as the Clark Fork is a tributary of the Pend Oreille River, a Columbia River tributary. With a drainage basin extending over 8,795 square miles (22,780 km2) and an average discharge of 11,380 cubic feet per second (322 m3/s), the Flathead is the largest tributary of the Clark Fork and constitutes over half of its flow.

<span class="mw-page-title-main">Mactaquac Dam</span> Dam in York County, New Brunswick

The Mactaquac Dam is an embankment dam used to generate hydroelectricity in Mactaquac, New Brunswick. It dams the waters of the Saint John River and is operated by NB Power with a capacity to generate 670 megawatts of electricity from 6 turbines; this represents 20 percent of New Brunswick's power demand.

<span class="mw-page-title-main">NB Power</span> Electric utility company

New Brunswick Electric Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown corporation by the government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.

Belledune is a port village in the Canadian province of New Brunswick. It has a population of 1,325, and straddles the boundary between Restigouche County and Gloucester County, New Brunswick.

The Tobique River is a river in northwestern New Brunswick, Canada. The river rises from Nictau Lake in Mount Carleton Provincial Park and flows for 148 kilometres to its confluence with the Saint John River near Perth-Andover.

The Tobique Narrows Dam is a hydroelectric dam built on the Tobique River in the Canadian province of New Brunswick and operated by NB Power corporation. Its powerhouse has a capacity of 20 megawatts.

The Tinker Dam is a hydroelectric dam built in Tinker on the Aroostook River in the Canadian province of New Brunswick, and operated jointly by WPS Energy and NB Power. Its power house has a capacity of 34 megawatts.

The Beechwood Dam is a hydroelectric dam built on the Saint John River in the Canadian province of New Brunswick and operated by NB Power corporation. Its power house has a capacity of 113 megawatts.

Forest City is a populated place in Washington County, Maine, United States.

South River is an incorporated municipality in the Canadian province of Newfoundland and Labrador, located at the south-southeast side of Bay de Grave, in Conception Bay. The town had a population of 674 according to the 2021 Canadian Census. South River is the site of the western terminus of Newfoundland and Labrador Route 60, also known as the Conception Bay Highway, which proceeds eastward to downtown St. John's. The river itself forms a natural boundary with neighbouring Clarke's Beach and is a scheduled salmon river. A second river, known as the Gould Brook, forms another natural boundary with the unincorporated local service district of Makinsons. South River is home to the Bay de Grave Regional Fire Department, a first step in developing successful regional cooperation amongst municipalities.

<span class="mw-page-title-main">Guadalope</span> River in Spain

The Guadalope is a river in Aragon, Spain. It is a tributary of the Ebro.

<span class="mw-page-title-main">Milltown Dam (St. Croix River)</span> Hydroelectric dam in Canada

The Milltown Dam was a hydroelectric dam on the St. Croix River between St. Stephen, New Brunswick, Canada and Calais, Maine, United States. The dam was operated by NB Power from 1881 to 2023.

<span class="mw-page-title-main">Grand Falls Generating Station</span>

The Grand Falls Generating Station is a hydroelectric dam built on the Saint John River in Grand Falls in the Canadian province of New Brunswick and is operated by NB Power corporation. It was built in 1931 and its power house has a capacity of 66 megawatts with its 4 turbines.

The Nepisiguit (Grand) Falls generating station is a hydroelectric dam built in the Canadian province of New Brunswick and is operated by NB Power corporation. It was purchased by the NB Electric Power Commission in the early 1950s from the Bathurst Power and Paper Company.

<span class="mw-page-title-main">Lorne Parish, New Brunswick</span> Parish in New Brunswick, Canada

Lorne is a geographic parish in Victoria County, New Brunswick, Canada.

Route 385 is a 88-kilometre (55 mi) long mostly east–west secondary highway in the northwest portion of New Brunswick, Canada.

<span class="mw-page-title-main">Harriman Dam</span>

Harriman Dam is a hydroelectric dam in Windham County, Vermont in the town of Whitingham. The water from the dam flows through a penstock to a power generation plant in the adjacent town of Readsboro.

Established in 1914, the Bathurst Power and Paper Company was a combined logging, lumber mill and wood-pulp paper company that supplied its own electric power from Nepisiguit Grand Falls. Its operations were centred at Bathurst, New Brunswick. After changing hands several times over the course of a century, Smurfit-Stone closed the mill located in East Bathurst in 2006, and sold the site to a redevelopment firm. The redeveloper, which was already defunct by January 2016, was fined $150,000 in July 2016 under the New Brunswick Clean Environment Act.

References

47°16′05″N67°14′49″W / 47.26806°N 67.24694°W / 47.26806; -67.24694