TB Flats I & II Wind Farm | |
---|---|
Country | United States |
Location | Wyoming |
Coordinates | 42°11′36.7″N106°7′15.4″W / 42.193528°N 106.120944°W |
Status | Operational |
Construction began | 2019 |
Commission date | 2021 [1] |
Owner | PacifiCorp |
Wind farm | |
Type | Onshore |
Hub height | 80-82 m |
Rotor diameter | 110-136 m |
Power generation | |
Nameplate capacity | 301.1 MW |
TB Flats I & II Wind Farm is a 301.1-megawatt onshore wind farm located in Carbon County and Albany County, Wyoming, United States. [2] The project was developed by Invenergy and later transferred to PacifiCorp as part of their Energy Vision 2020 initiative. It comprises 132 turbines manufactured by Vestas, specifically the V110-2.0 MW and V136-4.3 MW models. [3] [4]
The Aeolus substation near Medicine Bow serves as a critical connection point for TB Flats I & II, linking the wind farm to the broader PacifiCorp transmission grid. PacifiCorp’s Gateway South transmission project facilitates the delivery of wind-generated power to neighboring states. [1] [4]
The construction and operation of TB Flats I & II created between 1,100 and 1,600 jobs during the development phase and is expected to generate approximately $120 million in tax revenue over its lifetime. The wind farm contributes to diversifying Wyoming’s economy while providing clean, renewable energy capable of powering more than 100,000 homes annually. [5] [1]
The development of TB Flats I & II began under Invenergy in 2019. Construction was completed in 2020, with the farm becoming operational in 2021. The wind farm consists of three sections: [3]
Part | County | Turbine Model | Number of Turbines | Unit Power | Total Power | Rotor Diameter | Hub Height |
---|---|---|---|---|---|---|---|
Part 1 | Carbon, Albany | Vestas V110/2000 | 28 | 2 MW | 56 MW | 110 m | 80-82 m |
Part 2 | Vestas V136/4000-4200 | 47 | 4 MW | 202.1 MW | 136 m | ||
Part 3 | Vestas V136/4000-4200 | 57 | 4 MW | 245.1 MW [7] | 136 m |
Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual Total |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2021 | — | — | — | — | — | — | — | — | — | 73,457 | 163,903 | 205,908 | 443,268 |
2022 | 175,066 | 179,232 | 144,418 | 160,605 | 119,589 | 86,417 | 62,146 | 55,642 | 63,942 | 95,795 | 141,891 | 204,243 | 1,488,986 |
2023 | 151,082 | 144,760 | 126,643 | 129,048 | 81,060 | 70,709 | 64,374 | 73,547 | 73,811 | 86,982 | 170,857 | 143,895 | 1,316,768 |
2024 | 131,988 | 132,410 | 140,130 | 122,550 | 122,272 | 126,773 | 63,755 | 88,736 | 59,621 | 71,421 | — | — | 1,059,656 |
The U.S. state of Oregon has large wind energy resources. Many projects have been completed, most of them in rural Eastern Oregon and near the Columbia River Gorge. Wind power accounted for 12.1% of the electricity generated in Oregon in 2016.
Biglow Canyon Wind Farm is an electricity generating wind farm facility in Sherman County, Oregon, United States. It is owned by Portland, Oregon-based Portland General Electric and began operations in 2007. With the completion of phase 3 of the project it has a generating capacity of 450 megawatts. It is located roughly five miles (8 km) northeast of Wasco, Oregon, and about ten miles (16 km) southeast of Rufus, Oregon. Biglow Canyon Wind Farm covers 25,000 acres (10,000 ha) in the Columbia River Gorge.
The Cedar Creek Wind Farm is a 551.3 megawatt (MW) wind farm located about 8 miles east of the town of Grover in north-central Weld County, Colorado. It consists of 397 wind turbines and was constructed in two phases, Cedar Creek I and Cedar Creek II, becoming fully operational in 2010. The electricity is sold to the Public Service Company of Colorado.
Wyoming has one of the highest wind power potentials of any state in the United States. In 2019, Wyoming had wind powered electricity generating capacity of 1,589 MW, which produced 9.85% of its electric generation, with an additional 3,753 MW under construction. However, the wind generation in that year was Wyoming's third-lowest in the 2010s. By 2020, wind capacity increased to 2738 MW and 8448 gigawatt-hours of electricity were produced from wind in 2021, more than double 2019 production. Additional wind capacity and needed transmission lines are under construction or planned, despite political headwinds from Wyoming's strong coal and oil sectors.
Wind power in Illinois provided nearly 10% of the state's generated electrical power in 2020 powering 1,231,900 homes. At the end of 2020, Illinois had 6,300 megawatts (MW) of wind power installed, ranking fifth among states for installed wind turbine capacity. An additional 1,100 MW of wind power was under construction across the state at the end of 2020.
The Leaning Juniper Wind Project is an electricity generating wind farm facility located in Gilliam County, Oregon, United States with a total generating capacity of 301.5 megawatts. It is owned by PacifiCorp and began operations in 2006. Leaning Juniper I became operational in September 2006 with 67 1.5 MW wind turbines with a capacity of 100.5 megawatts. "Leaning Juniper II includes 133 GE 1.5 MW wind turbines with a capacity of 201 MW. This phase came online in 2011." The Jones Canyon Substation was built as part of this project and to support other wind projects in the area.
Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.
In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.
Alta Wind Energy Center (AWEC), also known as Mojave Wind Farm, is the third largest onshore wind energy project in the world. The Alta Wind Energy Center is a wind farm located in Tehachapi Pass of the Tehachapi Mountains, in Kern County, California. As of 2022, it is the largest wind farm in the United States, with a combined installed capacity of 1,550 MW (2,080,000 hp). The project, being developed near Tehachapi Pass Wind Farm— site of the first large-scale wind farms installed in the U.S. in the 1970s and 1980s—is "a powerful illustration of the growing size and scope of modern wind projects".
The US state of Colorado has vast wind energy resources and the installed electricity capacity and generation from wind power in Colorado has been growing significantly in recent years. The growth has been sustained due to a combination of falling costs, continuing federal incentives, and the state's aggressive renewable portfolio standard that requires 30% of the state's electricity to come from renewable sources by 2020.
Wind power in Michigan is a developing industry. The industrial base from the automotive industry has led to a number of companies producing wind turbine parts in the state. The development of wind farms in the state, however, has lagged behind. In January 2021, there were a total of 1,481 wind turbines in the state with a nameplate capacity of 2,549 MW. The nameplate total exceeded 2,000 MW when Pine River came online in March 2019. Wind provided 4.2% of the state's electricity in 2016.
The U.S. State of Oklahoma has high potential capacity for wind power in the western half of the state. In 2021, Oklahoma's installed wind generation capacity was almost 10,500 megawatts, supplying over 40% of the state's generated electricity and 85% of Oklahoma's total generating capacity from all renewable resources.
The Limon Wind Energy Center is a 600.6 megawatt (MW) wind farm in eastern Colorado near the town of Limon. It became the largest wind facility in the state when construction completed in 2014. The electricity is being sold to Xcel Energy under long-term power purchase agreements.
Cedar Point Wind Farm is a 252.3 megawatt (MW) wind farm in eastern Colorado, United States, north of the town of Limon. It was the second largest wind facility in the state when it was completed in 2011. The electricity is being sold to Xcel Energy under a 20-year power purchase agreement.
The Rush Creek Wind Project is a 600 megawatt (MW) wind facility in eastern Colorado, located west of the town of Limon. It increased the wind generating capacity in the state by 20% when it came online in late 2018. The facility is financed, owned, and operated by Xcel Energy, the largest public utility in the state. The project was developed primarily for its numerous economic benefits since Xcel previously met the minimum 30% requirement of Colorado's 2020 renewable portfolio standard.
The Flat Ridge Wind Farm is an electricity generating wind facility spanning the intersection of Barber, Harper and Kingman County in the U.S. state of Kansas, located about 50 miles (80 km) southwest of the city of Wichita. It was constructed in two phases and has a total generating capacity of 570.4 megawatts (MW), becoming the largest such facility in the state upon its completion in 2012.
The Bison Wind Energy Center is a 496.6 megawatt (MW) wind farm spanning southwest Oliver County and north-central Morton County in the U.S. state of North Dakota. It became the largest wind generating facility in the state upon completion of the fourth construction phase in early 2015. The facility allowed the investor-owned utility company, Minnesota Power, to obtain more than 25% of its electricity generation from renewable sources, exceeding Minnesota's 2025 renewable portfolio standard requirement.
'Cedar Springs Wind Farm Complex is a 531.56-megawatt onshore wind farm located in Converse County, Wyoming, United States. The $600 million project consists of three phases with a total of 192 turbines and became operational in 2020.