Toronto Zoo Domain Ride

Last updated
Toronto Zoo Domain Ride
Toronto zoo monorail.jpg
Overview
StatusClosed and partially dismantled
Owner Metro Toronto Zoo
Locale Scarborough, Ontario, Canada
Stations3 (expanded to 5)
Service
Type Automated guideway transit
Operator(s) Metro Toronto Zoo
Rolling stock Bendix-Dashaveyor AGT
History
Opened1976
Closed1994
Technical
Line length5.6 km (3.48 mi)
Highest elevationElevated

The Toronto Zoo Domain Ride (also known as the Canadian Domain Ride) was an automated guideway transit (AGT) service used to carry visitors between sections, or "domains", of the Toronto Zoo. Though technologically closer to a simple rubber-tired metro, it was almost universally referred to as a "monorail".

Contents

The train began running in 1976, and closed in 1994, after a train lost power and rolled backwards down the track into a second train, injuring about 30 people. Parts of the line were subsequently taken over by the Zoomobile, an open-air tractor-drawn vehicle with five stations (Main Station, Canadian Domain Station, Africa Station, Americas Station) [1] which had been operating since 1980. [2]

Ride details

Map of the Toronto Zoo, with the partial Zoo Domain Ride sections shown as they exist in July 2013. Toronto Zoo map.png
Map of the Toronto Zoo, with the partial Zoo Domain Ride sections shown as they exist in July 2013.

The vehicle was a rubber-wheeled AGT prototype [3] developed by American firm Bendix-Dashaveyor. [4] The train operated on a concrete guideway with electricity supplied by rails located above one side of the guideway. Passengers entered and left via doors located at each double row of facing seats. A secondary set of controls was available in the last car of the train to allow it to be reversed into the storage/service area located towards the north end of the zoo property.

Details of the Dashaveyor's running gear are visible in this photo. The small horizontal wheels at the front steer the larger running wheels just visible behind them. The electrical supply uses a small 3rd rail shaped like a V with a pickup that pushes up on the bottom of it. The operator can also be seen in the front left of the cabin. Toronto Zoo Domain Ride enters main station.jpg
Details of the Dashaveyor's running gear are visible in this photo. The small horizontal wheels at the front steer the larger running wheels just visible behind them. The electrical supply uses a small 3rd rail shaped like a V with a pickup that pushes up on the bottom of it. The operator can also be seen in the front left of the cabin.

In addition to being a quick way to travel between sections of the zoo, the ride provided the only way to view several animals, in remote areas of the zoo. Moose, white-tailed deer and several other exhibits were not accessible from walking paths. The ride operator would provide commentary on the animals visible from the train during the ride.

Plans to scrap the vehicle and tracks dragged well past 1999. Portions of the guideway have now been removed, while others remain in place (overgrown by vegetation in many areas), but the electrical supply rails have been removed from the remaining portions of the guideway. Three stations remain in place: the Americas station stands behind closed gates, and the Weston station is still accessible for washrooms—the crumbling station platform can be seen from behind the chain barriers.

The Ruins of Weston Station in the Canadian Domain in May 2010. Weston station domain ride.jpg
The Ruins of Weston Station in the Canadian Domain in May 2010.

The Main Station still remains to this day and is now used for several purposes: the Peacock Cafe, and the Main Zoomobile station. [5]

Accidents

During March break of 1991, nine people [6] were injured when a train crashed into the rear of a second train that was stopped between stations. [7] In December of that year, the Metro Zoo board of directors was warned that the monorail needed repair to its braking and propulsion systems in order to prevent future accidents. [8]

On July 11, 1994, 37 [9] people suffered injuries (including broken bones and whiplash) when one train crashed into a second that was in the process of loading. Upon leaving the Weston station, a train would have to climb a hill; however, at the top of the hill, the train lost power and rolled back into the station at an estimated 40 km/h [10] (25 mph), slamming into the front of a second train that was loading. In general, trains would be spaced out by 15–20 minutes; however, due to a larger-than-usual attendance, trains were operating more frequently, [11] and were more crowded too – the first train was carrying 60 passengers. [10] As a result, the Zoo was fined C$43,000, and trial evidence indicated that the ride operator was "inadequately trained to handle the 'unusual situation'". [9]

Zoomobile

The current Zoomobile is a Chance Coach Sunliner tram with four cars set (carrying 103 passengers, 1 driver and 1 tour guide) that replaced the Domain Ride and vehicles have rubber tires running on along paved paths in the zoo. Unlike the Domain Ride, the Zoomobile uses open air cars.

Successor

Zoo management has looked into plans for a maglev train operation replacing the Toronto Zoo Domain Ride. The Edmonton-based maglev consortium Magnovate, which includes Magna and Lockheed Martin, would pay for the construction, as well as the first five years of operation, while the zoo would pay for the operation afterwards. [12] In November 2018, the deal was modified to the first 15 years of operation. [13] The plan was approved by the Toronto Zoo board in December 2018. Construction was to begin after Magnovate raised sufficient funding to cover the estimated CA$25 million cost. The firm hoped to complete construction by 2021. [14] However, this project is delayed due to the COVID-19 pandemic in Toronto.

See also

Related Research Articles

<span class="mw-page-title-main">Monorail</span> Railway with a single rail or beam

A monorail is a railway in which the track consists of a single rail or beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurately, the term refers to the style of track. Monorail systems are most frequently implemented in large cities, airports, and theme parks.

<span class="mw-page-title-main">Linear motor</span> Electric motor that produces a linear force

A linear motor is an electric motor that has had its stator and rotor "unrolled", thus, instead of producing a torque (rotation), it produces a linear force along its length. However, linear motors are not necessarily straight. Characteristically, a linear motor's active section has ends, whereas more conventional motors are arranged as a continuous loop.

<span class="mw-page-title-main">People mover</span> Fully automated transit systems, generally serving relatively small areas

A people mover or automated people mover (APM) is a type of small scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks.

<span class="mw-page-title-main">Rubber-tyred metro</span> Form of rapid transit

A rubber-tyred metro or rubber-tired metro is a form of rapid transit system that uses a mix of road and rail technology. The vehicles have wheels with rubber tires that run on rolling pads inside guide bars for traction, as well as traditional railway steel wheels with deep flanges on steel tracks for guidance through conventional switches as well as guidance in case a tyre fails. Most rubber-tyred trains are purpose-built and designed for the system on which they operate. Guided buses are sometimes referred to as 'trams on tyres', and compared to rubber-tyred metros.

<span class="mw-page-title-main">Transrapid</span> German developed high-speed monorail train

Transrapid is a German-developed high-speed monorail train using magnetic levitation. Planning for the system started in the late 1960s, with a test facility in Emsland, Germany inaugurated in 1983. In 1991, technical readiness for application was approved by the Deutsche Bundesbahn in cooperation with renowned universities.

<span class="mw-page-title-main">Automated guideway transit</span> Fully automated transit system

An automated guideway transit (AGT) or automated fixed-guideway transit or automatic guideway transit system is a type of fixed guideway transit infrastructure with a riding or suspension track that supports and physically guides one or more driverless vehicles along its length. The vehicles are often rubber tired or steel wheeled, but other traction systems including air cushion, suspended monorail and maglev have been implemented. The guideway provides both physical support, like a road, as well as the guidance. An automated line can be cheaper to run than a conventional line, due to the shorter trains and stations.

<span class="mw-page-title-main">Innovia Metro</span> Automated rapid transit system

Innovia Metro is an automated rapid transit system manufactured by Alstom. Innovia Metro systems run on conventional metal rails and pull power from a third rail but are powered by a linear induction motor that provides traction by using magnetic force to pull on a "fourth rail" placed between the running rails. However, newer versions of the technology are available with standard electric rotary propulsion.

<span class="mw-page-title-main">Maglev</span> Train system using magnetic levitation

Maglev is a system of rail transport whose rolling stock is levitated by electromagnets rather than rolled on wheels, eliminating rolling resistance.

<span class="mw-page-title-main">Terminal Link</span> Automated people mover at Torontos Pearson Airport

The Terminal Link is an automated people mover (APM) at Toronto Pearson International Airport in Mississauga, Ontario, Canada. The wheelchair-accessible train runs 24 hours a day, seven days a week and is completely free-of-charge to ride. In 2012, it transported 17,000 passengers daily, 60 to 70% of whom were airport staff.

<span class="mw-page-title-main">SCMaglev</span> Japanese maglev system

The SCMaglev is a magnetic levitation (maglev) railway system developed by Central Japan Railway Company and the Railway Technical Research Institute.

On 22 September 2006, a Transrapid magnetic levitation train collided with a maintenance vehicle near Lathen, Germany, killing 23 people and wounding 11. It was the first fatal crash involving a maglev train.

<span class="mw-page-title-main">Cable Liner</span> Cable-propelled automated people mover system

The Cable Liner is a range of automated people mover products designed by Doppelmayr Cable Car for use at airports, in city centers, intermodal passenger transport connections, park and ride facilities, campuses, resorts and amusement parks.

The ACT, acronym for Automatically Controlled Transportation or Activity Center Transit, was a people mover system developed during the 1970s. One feature of the ACT is that it allowed bi-directional travel on a single rail—cars passed each other by switching onto short bypass lanes on the track, distributed where space allowed. ACT was a contender in the Urban Mass Transportation Administration's plan to deploy three or four systems in cities in the United States, as well as the GO-Urban project in Toronto, Canada. One ACT system was installed as a part of a Ford-funded real estate development near their headquarters in Dearborn, MI, and although they proposed to install ACT in several other locations, no additional systems were ever installed and the project was put on indefinite hold.

Krauss-Maffei's Transurban was a 12-passenger automated guideway transit (AGT) mass transit system based on a maglev guideway. Development started in 1970 as one of the many AGT and PRT projects that followed in the wake of the HUD reports of 1968. Its selection as the basis of the GO-Urban system in Toronto in 1973 made it well known in the industry; it would have been the basis of the first large-area AGT mass transit network in the world. Technical problems cropped up during the construction of the test track, and the sudden removal of funding by the West German government led to the project's cancellation in late 1974. The Ontario government completed development and installation of a non-maglev version, today known as the Bombardier Advanced Rapid Transit.

GO-Urban was a planned mass transit project for Greater Toronto to be operated by GO Transit. The system envisioned the use of automated guideway transit vehicles set up in hydro corridors and other unused parcels of land to provide rapid transit services without the expense of constructing tunnels. GO-Urban would serve high-density areas in the downtown core, but also be able to accelerate to high speed between distant stations in the outskirts of the city. Similar deployments were planned for Hamilton and Ottawa.

<span class="mw-page-title-main">Dashaveyor</span> Automated guideway transit (AGT) system developed during the 1960s and 70s

The Dashaveyor was an automated guideway transit (AGT) system developed during the 1960s and '70s.

<span class="mw-page-title-main">UP Diliman Automated Guideway Transit System</span>

The University of the Philippines Diliman AGT was an automated guideway transit (AGT) system constructed for technology demonstration within the campus of the University of the Philippines (UP) in Diliman, Quezon City in the Philippines. It served as a test track for the first mass transit system to be built and developed in the country by local engineers.

Minitram was an automated guideway transit system studied by the Transport and Road Research Laboratory (TRRL), part of the UK Department of the Environment's Ministry of Transport. The system was based on small, completely automated tram-like vehicles of about 25 passengers that could be connected together into three-car trains to increase capacity. Proposed designs were submitted by Hawker Siddeley Dynamics (HSD) and EASAMS. HSD's system used rubber wheels and EASAMS' steerable steel ones, but the projects were otherwise similar and notably shared a linear motor for propulsion and most braking. A series of failed sales efforts in the UK and to the GO-Urban system in Toronto, combined with decreased government spending in the 1970s, led to the concept being abandoned.

<span class="mw-page-title-main">Tampa International Airport People Movers</span>

The Tampa International Airport People Movers are a set of automated people mover systems operating within Tampa International Airport. The primary set of people movers are automated guideway transit (AGT) systems that connect the airport's main terminal to four satellite airside concourses. Opened in 1971, the landside/airside shuttles were the first people movers used to transport passengers within an airport terminal and it is today Bombardier Transportation's longest running people mover system. A fifth people mover line known as SkyConnect, which began operating in 2018, connects the main terminal with the airport's economy parking garage and rental car center. In addition, a monorail once connected the main terminal and the long-term parking garage from 1991 until its closure in 2020.

References

  1. "Wild Rides". Toronto Zoo. Archived from the original on December 30, 2006.
  2. "About the Toronto Zoo: History". Toronto Zoo. Archived from the original on February 20, 2007. 1980 Official opening of guar house and Zoomobile ride.
  3. "Report Of The Panel On Current Developments in the United States" (PDF). Princeton University. 1975. Retrieved June 12, 2022.
  4. "Automated Guideway Transit: An Assessment of PRT and Other New Systems (Part 6 of 16)" (PDF). Princeton University. Retrieved 2022-02-20.
  5. The Rise and Fall of The Toronto Zoo Domain Ride , retrieved 2021-12-02
  6. van Rijn, Nicolaas (July 12, 1994). "Monorail got off to bumpy beginning 9 others injured in 1991 accident" (Archive). Toronto Star . p. A3.
  7. Taylor, Sterling (July 13, 1994). "Zoo told of faulty monorail in 1991 Staff report cited problems with braking system". Toronto Star. p. A1. Archived from the original (Archive) on September 12, 2012. Retrieved July 7, 2017.
  8. Josey, Stan (November 3, 1994). "Zoo told of faulty monorail in 1991 Staff report cited problems with braking system". Toronto Star. p. A2. Archived from the original (Archive) on September 12, 2012. Retrieved July 7, 2017.
  9. 1 2 van Rijn, Nicolaas (May 11, 1996). "Zoo fined $43,000 in monorail crash". Toronto Star. p. A8. Archived from the original (Archive) on April 20, 2013. Retrieved July 7, 2017.
  10. 1 2 Josey, Stan (July 14, 1994). "Driver relives 30-second terror ride Runaway train 'most terrifying experience' ever". Toronto Star. p. A6. Archived from the original (Archive) on September 12, 2012. Retrieved July 7, 2017.
  11. Henry-Cotnam, Calvin (July 12, 1994). "Monorail Accident at Metro Toronto Zoo" (Newsgroup). Newsgroup:  rec.railroad.
  12. Sachgau, Oliver (April 10, 2016). "Toronto zoo eyes monorail after Edmonton firm's proposal". Toronto Star. Retrieved August 15, 2017.
  13. Naccarato, Lisa (November 27, 2018). "Yes, it's a monorail ... and the Toronto Zoo could get it for free". CBC News . Retrieved June 12, 2022.
  14. Chan, Kenneth (December 3, 2018). "Toronto Zoo approves magnetic levitation monorail project". Daily Hive . Retrieved January 29, 2019.