The track spacing is the distance between the track centres of double-track railway lines. There are standard distances derived from the standard loading gauge in a country. For high-speed trains and in tighter curves that distance needs to be increased.

Contents

The track spacing is also called the centre-to-centre spacing to differentiate it from the edge-to-centre spacing of a railway. These two values may be different depending on how signal masts are added to the overall track geometry.

Description

The distance between the track centres makes a difference in cost and performance of a double-track line. The track centres can be as narrow and as cheap as possible, but maintenance must be done on the side. Signals for bi-directional working cannot be mounted between the tracks so must be mounted on the 'wrong' side of the line or on expensive signal bridges. Track centres are usually wider on high-speed lines, as pressure waves knock each other as high-speed trains pass.

The minimum track spacing can be derived from the loading gauge. The European Berne Gauge has a width of 3,150 mm (10 ft 4 in). The minimal distance to structures on the side of the track is half of it but that is doubled again for double track lines. As the wagon can move within the rail gauge one adds 100 mm (3.9 in) and with a possible displacement of tracks over time one adds some 250 mm (9.8 in) as a security margin. This leads to a minimum centre-to-centre spacing of 3,500 mm (11 ft 6 in). In fact, the first Prussian railways were built to that standard but it soon became apparent that it was too dangerous with some passengers having a hand or their head out of the window.

Narrow track centres might be 4 metres (13 ft) or less. Narrow track centres may have to be widened on sharp curves to allow for long rail vehicles following the arc of the curve, and this increases a surveyor's workload. Widening a track centre to 5 m (16 ft) or so suits high-speed trains passing each other, and eliminates the need to widen the centres on sharp curves. Increasing width of track centres of 6 m (20 ft) or more makes it much easier to mount signals and overhead wiring structures.

In the United Kingdom, the early lines of the Great Western Railway were built to Brunel's broad gauge, which was also associated with a more generous loading gauge. This is still apparent along those lines which remain in use today: structures such as bridges and tunnels are larger, and the distances between opposite platform faces are larger.

Very wide centres at major bridges can have military value. It also makes it harder for rogue ships and barges knocking out both bridges in the same accident.

Railway lines in desert areas affected by sand dunes are sometimes built on alternate routes so that if one is covered by sand, the other(s) are still serviceable.

If the standard track centre is changed, it can take a very long time for most or all tracks to be brought into line.

Regulations

The general standard in Germany and Switzerland had been to build new tracks with a centre-to-centre spacing of 3.8 m (12 ft) and a spacing of 4.5 m (15 ft) in railway stations. Depending on the usage of the tracks it was still possible to build new double track lines with track centres of just 3.5 m (11 ft). With the trains going faster over time, the track centres were increased to 4 m (13 ft) on main lines.

The advent of high-speed trains required a stronger regulation which was regulated in Germany's EBO. The first update of 1982 increased the minimum track centre to 4 m (13 ft) allowing no more exceptions. But by 1991 it was replaced with a table taking into account the maximum speed of the trains on a track as well as the curvature. A distance of 4 m (13 ft) was considered enough for speeds up to 200 km/h. At 250 km/h the tracks have a centre-to-centre distance of 4.5 m (15 ft) (while the first tracks in the 1980s were built with a distance of 4.7 m (15 ft)).

The TGV track construction puts both rail tracks into a common concrete block, so they can disregard a safety margin for track displacement. This allows high-speed rail to have a centre-to-centre distance of just 4.2 m (14 ft). Additionally, these lines are only allowed for high-speed passenger rail where no out-of-gauge loads are expected and the windows in the trains can not be opened.

In Japan, the first high-speed tracks of the Central Japan Railway Company Shinkansen were built with a distance between track centres of 4.3 m (14 ft). [1]

The largest minimum track centre is planned for Indias high-speed network requiring a common distance of 5.3 m (17 ft).

Track centre examples

(in order of size)

Measurement

Measurement of track spacing from the rail head to rail head Track-spacing-measurement-method.png
Measurement of track spacing from the rail head to rail head

By definition, the track spacing is given from centre to centre of a rail track. For an actual construction the distance is measured from the inside of a rail head to the matching one of the other track. As far as both tracks have the same gauge this is the same distance.

Sharp curves

Track centre may need to be widened on sharp curves. [3] Gauge may also need to be widened, requiring special sleepers if made of concrete.

Accidents

If track centres are "narrow" then a problem on one track may affect other track(s). This is called a "common mode" failure. It affects rail, road, and canals.

River accident damages bridge in both directions.

Related Research Articles

<span class="mw-page-title-main">Narrow-gauge railway</span> Railway line with a gauge less than the standard of 1435 mm (4 ft 8 1⁄2 in)

A narrow-gauge railway is a railway with a track gauge narrower than standard 1,435 mm. Most narrow-gauge railways are between 600 mm and 1,067 mm.

<span class="mw-page-title-main">Shinkansen</span> Japanese high-speed rail system

The Shinkansen, colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network. It is owned by the Japan Railway Construction, Transport and Technology Agency and operated by five Japan Railways Group companies.

<span class="mw-page-title-main">Broad-gauge railway</span> Rail track gauge wider than standard gauge (1435 mm, 4 ft 8 1⁄2 in)

A broad-gauge railway is a railway with a track gauge broader than the 1,435 mm used by standard-gauge railways.

<span class="mw-page-title-main">Track gauge</span> Spacing of the rails on a railway track

In rail transport, track gauge is the distance between the two rails of a railway track. All vehicles on a rail network must have wheelsets that are compatible with the track gauge. Since many different track gauges exist worldwide, gauge differences often present a barrier to wider operation on railway networks.

<span class="mw-page-title-main">Loading gauge</span> Maximum dimensions for railway vehicles and their loads

A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and keep clear of platforms, trackside buildings and structures. Classification systems vary between different countries, and gauges may vary across a network, even if the track gauge is uniform.

In railway engineering, "gauge" is the transverse distance between the inner surfaces of the heads of two rails, which for the vast majority of railway lines is the number of rails in place. However, it is sometimes necessary for track to carry railway vehicles with wheels matched to two different gauges. Such track is described as dual gauge – achieved either by addition of a third rail, if it will fit, or by two additional rails. Dual-gauge tracks are more expensive to configure with signals and sidings, and to maintain, than two separate single-gauge tracks. It is therefore usual to build dual-gauge or other multi-gauge tracks only when necessitated by lack of space or when tracks of two different gauges meet in marshalling yards or passenger stations. Dual-gauge tracks are by far the most common configuration, but triple-gauge tracks have been built in some situations.

<span class="mw-page-title-main">Rail transport in Australia</span> Transportation system in Australia

Rail transport in Australia is a component of the Australian transport system. It is to a large extent state-based, as each state largely has its own operations, with the interstate network being developed ever since Australia's federation in 1901. As of 2022, the Australian rail network consists of a total of 32,929 kilometres (20,461 mi) of track built to three major track gauges: 18,007 kilometres (11,189 mi) of standard gauge, 2,685 kilometres (1,668 mi) of broad gauge, and 11,914 kilometres (7,403 mi) of narrow gauge lines. Additionally, about 1,400 kilometres (870 mi) of 610 mm / 2 ft gauge lines support the sugar-cane industry. 3,488 kilometres (2,167 mi), around 11 per cent of the Australian heavy railways network route-kilometres are electrified.

<span class="mw-page-title-main">Break of gauge</span> Meeting place of different width rail lines

With railways, a break of gauge occurs where a line of one track gauge meets a line of a different gauge. Trains and rolling stock generally cannot run through without some form of conversion between gauges, leading to passengers having to change trains and freight requiring transloading or transshipping; this can add delays, costs, and inconvenience to travel on such a route.

<span class="mw-page-title-main">Double-track railway</span> Route where trains traveling in each direction can quickly pass each other

A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track.

<span class="mw-page-title-main">Rail transport in Finland</span> Railway network in Finland

The Finnish railway network consists of a total track length of 9,216 km (5,727 mi). The railways are built with a broad 1,524 mm track gauge, of which 3,249 km (2,019 mi) is electrified. Passenger trains are operated by the state-owned enterprise VR that runs services on 7,225 km (4,489 mi) of track. These services cover all major cities and many rural areas, though the coverage is less than the coverage provided by the bus services. Most passenger train services originate or terminate at Helsinki Central railway station, and a large proportion of the passenger rail network radiates out of Helsinki. VR also operates freight services. Maintenance and construction of the railway network itself is the responsibility of the Finnish Rail Administration, which is a part of the Finnish Transport Agency. The network consists of six areal centres, that manage the use and maintenance of the routes in co-operation. Cargo yards and large stations may have their own signalling systems.

<span class="mw-page-title-main">Ōu Main Line</span> Railway line in Japan

The Ōu Main Line is a railway line in Japan, operated by the East Japan Railway Company. It connects Fukushima Station through Akita Station to Aomori Station. Since the opening of the Yamagata Shinkansen on July 1, 1992, the Fukushima–Yamagata section is sometimes referred to as the Yamagata Line. The name of the line as a whole refers to the ancient provinces of Mutsu (陸奥) and Dewa (出羽), as it connects both ends of Mutsu by passing north–south through Dewa.

<span class="mw-page-title-main">Structure gauge</span> Minimum clearance, height and width of railway infrastructure

A structure gauge, also called the minimum structure outline, is a diagram or physical structure that sets limits to the extent that bridges, tunnels and other infrastructure can encroach on rail vehicles. It specifies the height and width of station platforms, tunnels and bridges, and the width of the doors that allow access to a warehouse from a rail siding. Specifications may include the minimum distance from rail vehicles to railway platforms, buildings, lineside electrical equipment cabinets, signalling equipment, third rails or supports for overhead lines.

The African Union of Railways is an organisation under the auspices of the new African Union dealing with railways. It is similar to the International Union of Railways (UIC).

<span class="mw-page-title-main">Rail transport in Turkey</span> Overview of rail transport in Turkey

Turkey has a state-owned railway system built to standard gauge which falls under the remit of the Ministry of Transportation and Infrastructure. The primary rail carrier is the Türkiye Cumhuriyeti Devlet Demiryolları (TCDD) which is responsible for all long-distance and cross-border freight and passenger trains. A number of other companies operate suburban passenger trains in urban conurbations.

The Berne Gauge or Berne Convention Gauge is an informal but widely used term for the railway loading gauge considered the standard minimum loading gauge in most of Europe. The term arises from the international railway conference held and consequent convention signed in Bern, Switzerland in 1912. The official name of this gauge is the Gabarit passe-partout international, and it came into force in 1914.

The South Kensington–West Footscray line is a railway line in the inner western suburbs of Melbourne, Australia. Linking South Kensington station on the Werribee line and associated freight terminals to Tottenham Yard and other freight lines, it is a primarily freight only line with no overhead wires, passenger stations or platforms. The most visible part of the line is where it dives under Footscray station and into a tunnel under nearby Bunbury Street.

The Sydney–Melbourne rail corridor is an approximately 953-kilometre (592-mile) standard-gauge railway corridor that runs between Sydney and Melbourne (Victoria), the two largest cities in Australia. Freight and passenger services operate along the route, including the NSW TrainLink XPT passenger service.

<span class="mw-page-title-main">Minimum railway curve radius</span> Shortest allowable design radius for the centerline of railway tracks

The minimum railway curve radius is the shortest allowable design radius for the centerline of railway tracks under a particular set of conditions. It has an important bearing on construction costs and operating costs and, in combination with superelevation in the case of train tracks, determines the maximum safe speed of a curve. The minimum radius of a curve is one parameter in the design of railway vehicles as well as trams; monorails and automated guideways are also subject to a minimum radius.

<span class="mw-page-title-main">Mini-shinkansen</span> Conversion of track gauge for use by Shinkansen trains

Mini-shinkansen (ミニ新幹線) is the name given to the concept of converting 1,067 mm narrow gauge railway lines to 1,435 mm standard gauge for use by shinkansen train services in Japan. Unlike the high-speed Shinkansen lines, the mini-Shinkansen lines have a maximum speed of only 130 km/h (80 mph). Two mini-Shinkansen routes have been constructed: the Yamagata Shinkansen and Akita Shinkansen.

Super Tokkyū (スーパー特急) is the name given to the concept of building new high-speed narrow gauge railway lines in Japan to extend the Shinkansen network of high-speed lines.

References