"},"trains":{"wt":"1"},"passengers":{"wt":"155"},"crew":{"wt":"7"},"deaths":{"wt":"2"},"injuries":{"wt":"61 (8 serious)"},"route_map":{"wt":"{{Routemap\n|inline=yes\n|text-width=65\n|legend=track\n|map=\nto [[Shepparton railway station|Shepparton]]~~ ~~ ~~! !\\vCONTg\\\\uvCONTg-~~ ~~ ~~to [[Albury railway station|Albury]]\n\\vBRÜCKE1\\\\uvBRÜCKE1-~~{{small|[[Merri Creek]]}}\n\\vBUE\\\\uvBUE-~~{{small|Epping–Kilmore Road}}\n\\vSTR\\\\uvSTR-\n\\vSTR\\\\uvSHI2gl-\n\\vSTR\\\\uvSTR!~INCIDO~~Wallan passing loop\n{{rws|Wallan}}~~! !\\vBHF\\\\uvSTR\n\\vSTR\\\\uvSHI2g+l-\n\\vBUE\\\\uvBUE-~~{{small|Wallan–Whittlesea Road}}\nto [[Southern Cross railway station|Melbourne]]~~ ~~ ~~! !\\vCONTf\\\\uvCONTf-~~ ~~ ~~to [[Southern Cross railway station|Melbourne]]\n{{BS-AUSgauge|red=|blue=}}\n}}"},"route_map_state":{"wt":""},"route_map_name":{"wt":"Route diagram"},"footnotes":{"wt":""}},"i":0}}]}" id="mwCQ">.mw-parser-output .infobox-subbox{padding:0;border:none;margin:-3px;width:auto;min-width:100%;font-size:100%;clear:none;float:none;background-color:transparent}.mw-parser-output .infobox-3cols-child{margin:auto}.mw-parser-output .infobox .navbar{font-size:100%}body.skin-minerva .mw-parser-output .infobox-header,body.skin-minerva .mw-parser-output .infobox-subheader,body.skin-minerva .mw-parser-output .infobox-above,body.skin-minerva .mw-parser-output .infobox-title,body.skin-minerva .mw-parser-output .infobox-image,body.skin-minerva .mw-parser-output .infobox-full-data,body.skin-minerva .mw-parser-output .infobox-below{text-align:center}@media screen{html.skin-theme-clientpref-night .mw-parser-output .infobox-full-data:not(.notheme)>div:not(.notheme)[style]{background:#1f1f23!important;color:#f8f9fa}}@media screen and (prefers-color-scheme:dark){html.skin-theme-clientpref-os .mw-parser-output .infobox-full-data:not(.notheme) div:not(.notheme){background:#1f1f23!important;color:#f8f9fa}}@media(min-width:640px){body.skin--responsive .mw-parser-output .infobox-table{display:table!important}body.skin--responsive .mw-parser-output .infobox-table>caption{display:table-caption!important}body.skin--responsive .mw-parser-output .infobox-table>tbody{display:table-row-group}body.skin--responsive .mw-parser-output .infobox-table tr{display:table-row!important}body.skin--responsive .mw-parser-output .infobox-table th,body.skin--responsive .mw-parser-output .infobox-table td{padding-left:inherit;padding-right:inherit}}
Wallan derailment | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Details | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Date | 20 February 2020 19:43 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Wallan, Victoria, Australia | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 37°24′15″S145°01′06″E / 37.40417°S 145.01833°E | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | North East | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator | NSW TrainLink | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Australian Rail Track Corporation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ST23 07:40 Sydney to Melbourne | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Incident type | Derailment | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cause | Management error: Poor risk assessment procedures. Driver unaware of change of route through loop. [1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Trains | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Passengers | 155 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Crew | 7 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Deaths | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Injured | 61 (8 serious) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
On 20 February 2020, a NSW TrainLink XPT passenger train derailed while passing through a turnout at Wallan, Victoria, Australia. Of the 162 total on board, there were two fatalities and 61 passengers were injured, eight of whom sustained serious injuries.
The service was running from Sydney to Melbourne and was passing through Wallan. The interim report into the accident indicated that the train had entered the turnout, with a specified speed limit of 15 kilometres per hour (9.3 mph), at more than 115 kilometres per hour (71 mph). An investigation into the accident is ongoing.
On 3 February 2020, a vehicle had struck overhead wiring at Wallan, [2] leading to a fire in a signalling hut which caused extensive damage to wiring and affecting signalling on the North East line between Donnybrook and Kilmore East. Trains were signalled through the affected section using Caution Orders. On 6 February, this was changed to using Train Orders, [2] [3] [4] a manual safe-working system. [5] The points at the Wallan Loop were set to the straight ahead position and locked. No speed restriction was put in place. [2] V/Line services in the Wallan area had been delayed in the weeks leading up to the accident due to the ongoing faults. [5] On 20 February, trains were routed through the Wallan Loop for rail cleaning purposes. A speed limit of 15 kilometres per hour (9.3 mph) entering the loop and 35 kilometres per hour (22 mph) exiting the loop was put in place. Two V/Line trains passed through the loop before the XPT. [2]
The accident occurred at 19:43, when NSW TrainLink's 07:40 Sydney-to-Melbourne service operated by an XPT set entered a turnout near Wallan, about 45 kilometres (28 mi) north of Melbourne, and derailed. The train, comprising power car XP2018 (leading), five carriages and power car XP2000, [6] was carrying 155 passengers and seven crew members. [2] [7] The train was running about two hours behind schedule at the time of the accident. [8] As the train passed through the turnout, leading power car XP2018 and the first four carriages derailed, with one carriage and rear power car XP2000 remaining on the track. [9] The train had entered the loop at a speed of between 114 and 127 kilometres per hour (71 and 79 mph). [2]
The first 000 call was made at 19:45. [2] Two people were killed: the train's driver and the pilot. [5] Emergency services confirmed that 12 people had been taken to hospital. [8] The injured were taken to the Kilmore Hospital, Kilmore and The Northern Hospital, Epping; [8] one person was airlifted to the Royal Melbourne Hospital.
The derailment caused the closure of the North East line and the adjacent broad gauge line, impacting freight services and V/Line services to Seymour, Shepparton and Albury. [10] On 23 February, the Australian Rail Track Corporation commenced removal of the train from the rail corridor. [11] Seymour and Shepparton V/Line services resumed on 1 March, followed by Albury services on 2 March. [12] Major speed restrictions were in turn enforced on the North East line, with NSW TrainLink temporarily terminating services at Albury. [13] Passengers reported that the train had been gaining speed at the time of the accident, after being stopped due to a signalling issue. [8]
In the days preceding the accident, trains were scheduled to pass through the turnout in the straight ahead position. On that day, trains were instead diverted into a passing loop while work was carried out on the adjacent track. The Victorian branch of the Australian Rail Tram and Bus Industry Union reported that V/Line drivers were refusing to traverse through the section of track that the XPT service derailed on. [14]
Regularly scheduled XPT services between Sydney and Melbourne resumed on 4 June. Of the two power cars, XP2000 was returned to service while XP2018 remained in store as at May 2021 at Maintrain, Auburn pending the completion of investigations. [9]
On 24 February 2023 after being rebuilt and rail tested XP2019 (formerly XP2018) returned to revenue service operating a Sydney-to-Dubbo service.[ citation needed ] The renumbering of the power car occurred as it was involved in a fatal accident with rail tradition to never use the same number after a fatal incident.[ citation needed ] Its return to service followed a rebuild and rail trial of XP2019.[ citation needed ]
The Australian Transport Safety Bureau (ATSB) opened an investigation into the accident on 20 February. It is being led by the Victorian Government's Chief Investigator, Transport Safety, assisted by the ATSB and the New South Wales Office of Transport Safety Investigations in accordance with the Transport Safety Investigation Act 2003. [15] The train's data logger was recovered as part of the investigation. [6]
A preliminary report was published on 3 April. It was found that the train was travelling in excess of 100 kilometres per hour (62 mph) when it derailed. In the hours before the accident, a notice was circulated that trains on the North East line were to be routed via the Wallan passing loop, with a specified 15-kilometre-per-hour (9.3 mph) speed limit for entry into the loop. [16] The train had approached the loop at "about the track's line speed" of 130 kilometres per hour (81 mph), and an emergency brake application was made shortly before the train entered the turnout into the passing loop. [3]
The ATSB issued an interim report on 10 June 2021. [2] The final report was released on 9 August 2023. The investigation concluded that the basic cause of the accident was a management error, with poor risk assessment, particularly of the change of tracks in use at the Wallan loop, meaning that the train driver was unaware that the loop was being used. [1]
WorkSafe Victoria is also investigating the death of the train's pilot, a 49-year-old man from Castlemaine. [17]
In April 2024 NSW Trains and the Australian Rail Track Corporation were convicted in the Melbourne Magistrates Court and fined a total of $525,000 over the derailment. [18]
Broadmeadows railway station is located on the North East line in Victoria, Australia. It serves the northern Melbourne suburb of Broadmeadows, and opened on 1 February 1873.
Rail transport in Australia is a component of the Australian transport system. It is to a large extent state-based, as each state largely has its own operations, with the interstate network being developed ever since Australia's federation in 1901. As of 2022, the Australian rail network consists of a total of 32,929 kilometres (20,461 mi) of track built to three major track gauges: 18,007 kilometres (11,189 mi) of standard gauge, 2,685 kilometres (1,668 mi) of broad gauge, and 11,914 kilometres (7,403 mi) of narrow gauge lines. Additionally, about 1,400 kilometres (870 mi) of 610 mm / 2 ft gauge lines support the sugar-cane industry. 3,488 kilometres (2,167 mi), around 11 percent of the Australian heavy railways network route-kilometres are electrified.
The Violet Town rail accident, also known as the Southern Aurora disaster, was a railway accident that occurred on 7 February 1969 following the incapacitation of the driver of one of the trains, near the McDiarmids Road crossing, approximately 1 km south of Violet Town, Victoria, Australia. The crash resulted in nine deaths and 117 injuries.
Rail transport in the Australian state of Victoria is provided by a number of railway operators who operate over the government-owned railway lines. The network consists of 2,357 km of Victorian broad gauge lines, and 1,912 km of standard gauge freight and interstate lines; the latter increasing with gauge conversion of the former. Historically, a few experimental 762 mm gauge lines were built, along with various private logging, mining and industrial railways. The rail network radiates from the state capital, Melbourne, with main interstate links to Sydney and to Adelaide, as well as major lines running to regional centres, upgraded as part of the Regional Fast Rail project.
The Zanthus train collision occurred at a crossing loop on the Trans-Australian Railway between Perth and Sydney on 18 August 1999. It is located 739 km (459 mi) east northeast of Perth and 202 km (126 mi) east of Kalgoorlie in Western Australia, on the Nullarbor Plain.
The South Coast Line (SCO) is an intercity rail service operated by NSW TrainLink that services the Illawarra region of New South Wales, Australia. The service runs from Central, and runs the entire length of the eponymous South Coast railway line to Bomaderry. The service also runs along the Eastern Suburbs railway line at peak hours and the Port Kembla railway line to Port Kembla. It is operated with NSW TrainLink H sets and Sydney Trains T sets, with Endeavour railcars operating the service on the non-electrified line between Kiama and Bomaderry.
Wallan railway station is located on the North East line in Victoria, Australia. It serves the town of Wallan, and opened on 18 April 1872.
The V/Line VLocity, sometimes called the VLocity 160, is a diesel multiple unit train built by Bombardier Transportation and later Alstom in Dandenong for V/Line, the regional rail operator in the Australian state of Victoria. Continuously in production since 2003, the VLocity is the highest-speed train in the V/Line fleet, with a top speed of 160 km/h (99 mph). As of August 2024 with set 119 entering service, 118 3-car sets are in revenue service, one collision damaged set is in storage, and 22 more are under construction on the current confirmed orders.
The Spirit of Progress was the premier express passenger train on the Victorian Railways in Australia, running from Melbourne to the New South Wales border at Albury, and later through to Sydney.
Wangaratta railway station is located on the North East line in Victoria, Australia. It serves the town of the same name, and opened on 28 October 1873.
The North East railway line is a railway line in Victoria, Australia. The line runs from Southern Cross railway station on the western edge of the Melbourne central business district to Albury railway station in the border settlement of Albury-Wodonga, serving the cities of Wangaratta and Seymour, and smaller towns in northeastern Victoria.
There have been a number of train accidents on the railway network of Victoria, Australia. Some of these are listed below.
The railways of New South Wales, Australia have had many incidents and accidents since their formation in 1831. There are close to 1000 names associated with rail-related deaths in NSW on the walls of the Australian Railway Monument in Werris Creek. Those killed were all employees of various NSW railways. The details below include deaths of employees and the general public.
The New South Wales XPT is a class of diesel-powered passenger trains built by Comeng and ABB. Based on the British Rail-designed High Speed Train, each XPT set comprises two XP power cars in a push-pull configuration and, between them, between four and seven passenger carriages.
High-speed rail in Australia has been under investigation since the early 1980s. Every federal government since this time has investigated the feasibility of constructing high-speed rail with speeds above 200 km/h, but to date nothing has ever gone beyond the detailed planning stage. Various corridors have been proposed for a potential high-speed line. The most commonly suggested route is between Australia's two largest cities, Sydney and Melbourne, which, as of 2023, is the world's sixth busiest air corridor.
The Sprinter is a diesel railcar built by A Goninan & Co in Broadmeadow, NSW for V/Line between 1993 and 1995.
The Sydney–Melbourne rail corridor consists of the 953-kilometre (592-mile) long 1435 mm standard-gauge main line between the Australian state capitals of Sydney and Melbourne (Victoria) and the lines immediately connected to it. Freight and passenger services operate along the route, including the NSW TrainLink XPT passenger service.
The Albury line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves passengers between the state capital of Melbourne and the regional cities of Benalla, Wangaratta, Wodonga, and the NSW border city of Albury.
On 3 February 2003, a Comeng electric multiple unit train rolled away from Broadmeadows station in Melbourne, Australia, before it ran for nearly 17 kilometres (11 mi) out of control without a driver and eventually crashed into another train about to depart Spencer Street station. Train controllers attempted several times to stop or redirect the train, but were limited in their ability to intervene, instead being forced to alter the route of other trains to avert a more serious collision. Eleven people on board the stationary train were injured; authorities did not know until after the crash if any passengers were on board the runaway. An investigation identified driver error as the cause of the accident, but the runaway event prompted significant debate about the role of government authorities and private operators in ensuring safety and reliability on the Melbourne rail network.
The Livraga derailment is the only railway accident to date on the Italian high speed rail network. It took place on 6 February 2020 when a high-speed train derailed at Livraga, Lombardy, Italy. Two people died and 31 were injured.
The service is currently terminating at Albury for all south and northbound travellers. Transport NSW has arranged road coaches to transport passengers to and from Albury.