Trans Europa Naturgas Pipeline | |
---|---|
Location | |
Country | Germany |
General direction | north–south |
From | Aachen |
Passes through | Stolberg Mittelbrunn |
To | Schwörstadt |
General information | |
Type | natural gas |
Partners | Fluxys Open Grid Europe |
Operator | Fluxys TENP GmbH |
Construction started | 1972 |
Commissioned | 1974 |
Technical information | |
Length | 968 km (601 mi) |
Maximum discharge | 15.5 billion cubic meters per year |
Diameter | 950 mm (37 in) |
No. of compressor stations | 4 |
The Trans Europa Naturgas Pipeline (TENP) is a natural gas pipeline which runs from the German-Netherlands border to the German-Swiss border. It carries North Sea natural gas from the Netherlands to Italy and Switzerland. It also provides natural gas for North Rhine-Westphalia, Rhineland-Palatinate and Baden-Württemberg federal states.
The TENP was built in 1972–1974, [1] and upgraded in 1978 and 2009.
The pipeline runs from the German-Netherlands border near Aachen to the German-Swiss border near Schwörstadt. In the German-Swiss border it is connected with the Transitgas Pipeline. [1] En route, in Stolberg the pipeline is connected with the pipeline from Zeebrugge and in Mittelbrunn it is connected with the transport system of the MEGAL pipeline system which transports Russian natural gas from the German-Czech border to German regions and France.
The length of the pipeline is 968 kilometres (601 mi) [1] and it runs in two lines. It has a capacity of 15.5 billion cubic meters per year which the operator intends to increase by 2 billion cubic meters per year. [2] The diameter of pipeline varies from 900 to 950 millimetres (35 to 37 in). The pipeline comprises four compressor stations.
The pipeline is owned and operated by Trans Europa Naturgas Pipeline GmbH & Co. KG, a joint venture of Open Grid Europe (51%) and Fluxys (49%). It is operated by Open Grid Europe.
Since 2007, the European Commission has been probing Eni's alleged restrictive practices on the TAG, Transitgas and TENP pipelines by limiting third parties access to the pipelines. [3] The hearing is set for 27 November 2007. [4]
Sonatrach is the national state-owned oil company of Algeria. Founded in 1963, it is known today to be the largest company in Africa with 154 subsidiaries, and often referred as the first African oil "major". In 2021, Sonatrach was the seventh largest gas company in the world.
Blue Stream is a major trans-Black Sea gas pipeline that carries natural gas to Turkey from Russia. The pipeline has been constructed by the Blue Stream Pipeline B.V., the Netherlands based joint venture of Russian Gazprom and Italian Eni. The Blue Stream Pipeline B.V. is an owner of the subsea section of pipeline, including Beregovaya compressor station, while Gazprom owns and operates the Russian land section of the pipeline and the Turkish land section is owned and operated by the Turkish energy company BOTAŞ. According to Gazprom the pipeline was built with the intent of diversifying Russian gas delivery routes to Turkey and avoiding third countries.
The Nabucco pipeline was a failed natural gas pipeline project from Erzurum, Turkey to Baumgarten an der March, Austria to diversify natural gas suppliers and delivery routes for Europe. The pipeline was to lessen European dependence on Russian energy. The project was backed by several European Union states and the United States and was seen as rival to the Gazprom-Eni South Stream pipeline project. The main supplier was to be Iraq with potential supplies from Azerbaijan, Turkmenistan, and Egypt.
The Trans Austria Gas (TAG) pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System, which branch-off at Weitendorf.
The Baltic Gas Interconnector was a 2001 project of a natural gas submarine pipeline in the Baltic Sea between Germany, Denmark and Sweden. The pipeline would connect the existing pipeline networks of southern Scandinavian and Continental European countries in order to secure uninterrupted supply of natural gas.
The Arab Gas Pipeline is a natural gas pipeline in the Middle East. It originates near Arish in the Sinai Peninsula and was built to export Egyptian natural gas to Jordan, Syria, and Lebanon, with branch underwater and overland pipelines to and from Israel. It has a total length of 1,200 kilometres (750 mi), constructed at a cost of US$1.2 billion.
The Greenstream pipeline, part of the Western Libyan Gas Project, is a natural gas submarine pipeline running from western Libya to the island of Sicily in Italy.
The Trans-Mediterranean Pipeline is a natural gas pipeline from Algeria via Tunisia to Sicily and thence to mainland Italy. An extension of the TransMed pipeline delivers Algerian gas to Slovenia.
The Central Asia–China gas pipeline is a natural gas pipeline system from Central Asia to Xinjiang in the People's Republic of China. By connecting Turkmenistan to China’s domestic grid, this pipeline makes it possible to transport gas some 7000 km from Turkmenistan to Shanghai. More than half of Turkmen natural gas exports are delivered to China through the pipeline.
The OPAL (Ostsee-Pipeline-Anbindungsleitung) is a natural gas pipeline in Germany alongside the German eastern border. The OPAL pipeline is one of two projected pipelines connecting the Nord Stream 1 pipeline to the existing pipeline grid in Middle and Western Europe, the other one being the NEL pipeline.
The Transitgas Pipeline is a 293-kilometre (182 mi) long natural gas pipeline in Switzerland, which connects Trans Europa Naturgas Pipeline (TENP) from Wallbach at the German border and Gaz de France gas grid from Rodersdorf/Oltingue at the French border with the Snam Rete Gas S.p.A. owned gas grid in Gries Pass, Italy.
South Stream was a canceled pipeline project to transport natural gas of the Russian Federation through the Black Sea to Bulgaria and through Serbia, Hungary and Slovenia further to Austria. It was never finished.
Trans Adriatic Pipeline (TAP) is a natural gas pipeline proposed in 2003, constructed in 2016, and operational since 2020, from Azerbaijan at the Caspian Sea to Europe from Greece through Albania and the Adriatic Sea to Italy. It is a European section of the Southern Gas Corridor. As of 2022 capacity is 10 bcm per year.
Snam S.p.A. is an Italian energy infrastructure company. As of 31 December 2022, it had a market capitalization of €15.2 billion. Snam was originally a subsidiary of Italian energy company Eni. It has since become an independent company, whose largest shareholder is CDP Reti, a holding company controlled by the Italian state. The utility operates in Italy and, through associated companies, in Albania (AGSCo), Austria, China, France (Terēga), Greece (DESFA), the UAE and the United Kingdom. It is one of the main shareholders of the Trans Adriatic Pipeline (TAP). Snam is the main Italian operator for the transport and dispatching of natural gas in Italy, having almost all the transport infrastructures in Italy, with 32,727 km of gas pipelines in operation in high and medium pressure and over 41,000 km including international activities. First in Europe for natural gas storage capacity, the company is also one of the main continental operators in regasification for a total pro quota capacity of approximately 8.5 billion cubic meters per year. Snam is one of Europe's main regulated gas companies - leading Italy in gas transport and storage, while ranking third in regasification. Snam also aims to invest in new energy transition businesses to reduce environmental impact and decarbonisation: sustainable mobility, energy efficiency, renewable gases such as biomethane and hydrogen. The company is listed on the FTSE MIB index of the Borsa Italiana since 6 December 2001.
The Urengoy–Pomary–Uzhhorod pipeline is one of Russia's main natural gas export pipelines, partially owned and operated by Ukraine. It was part of the "gas in exchange for pipes program" and the Soviet-controlled bank "Ost-West Handelsbank" was opened in Frankfurt on 1 March 1973 to support the project.
The MEGAL pipeline is a major natural gas pipeline system in southern Germany. It transports natural gas from the Czech–German and Austrian–German borders to the German–French border.
Romania has proven natural gas reserves of 726 billion cubic meters and is ranked 30th among countries with proved reserves of natural gas. About 75% of Romania's natural gas resources are located in Transylvania, especially in Mureș and Sibiu counties. The largest natural gas field in Romania is the Deleni gas field discovered in 1912 and located in the Băgaciu commune in Mureș County with proven reserves of 85 billion cubic meters or 3 trillion cubic feet. Other important gas fields include the Filitelnic gas field, the Roman-Secuieni gas field, the Voitinel gas field, the Ghercești gas field and the Sărmașel gas field all with reserves larger than 10 billion cubic meters or 350 billion cubic feet. Currently Romania has the second largest natural gas reserves in the European Union just after the Netherlands.
Gas Interconnector Greece–Bulgaria is a natural gas pipeline from the Greek to the Bulgarian natural gas pipeline network. It became operational on 1 October 2022.
The natural gas transmission system of Ukraine is a complex of natural gas transmission pipelines for gas import and transit in Ukraine. It is one of the largest gas transmission systems in the world. The system is linked with natural gas transmission systems of Russia and Belarus on one hand, and with systems of Poland, Romania, Moldova, Hungary and Slovakia on the other hand. The system is owned by Government of Ukraine and operated by Ukrtransgaz. Some local transmission lines together with distribution sets are owned by regional gas companies.