Baku trolleybus system | |
---|---|
Operation | |
Locale | Baku, Azerbaijan |
Open | 5 December 1941 |
Close | 1 July 2006 |
Status | Closed |
Lines | ca. 30 (max) |
Statistics | |
Route length | 300 km (190 mi) (mi) |
The Baku trolleybus system was a system of trolleybuses forming part of the public transport arrangements in Baku, the capital city of Azerbaijan, for about 65 years from 1941. [1]
The system's first line was opened on 5 December 1941. It was 7.5 km (4.7 mi) long, and was operated by 15 trolleybuses. Most of the system's development took place in the 1960s and 1970s; by the first half of the latter decade, the system had 10 lines. [2]
In the late 1988s, the system reached its maximum length of 300 km (190 mi), with 32 routes. It also encompassed some neighbouring localities. In 1991, it still had 32 routes, and 110 km (68 mi) of overhead wires. [2]
Despite the fact that the system was intensively developed up to 1990, it lost popularity among the population, due to its lower quality of service compared with road transport, the Baku Metro and even the Baku tramway network. In particular, the system experienced frequent power outages and trolley pole dewirings. [2] Most of the trolleybus lines were unprofitable due to weak demand; only 6 of the 32 routes were busy and profitable.
Following the collapse of the Soviet Union, the trolleybus system was not given a chance to adapt to a market economy and become profitable. The last operating route, no 16, was closed on 1 July 2006, [1] and dismantled soon afterwards.
The first trolleybus models used on the system are not known. The first known models were MTB-82s. In the 1960s, a number of Baku-built BTL-62 vehicles joined the fleet.
From the late 1960s, the system was operated by Škoda 9Trs, from 1979 there were Škoda 9TrHs, and from 1982, Škoda 14Trs.
During the 1980s, the fleet was also augmented by Soviet-built ZiU-9s.
The system had two depots. The original depot was at Darnagul (Дарнагюле), and a second one was opened in about 1987, when the original depot became unable to accommodate the system's growing fleet. [2]
The transport in Azerbaijan involves air traffic, waterways and railroads. All transportation services in Azerbaijan except for oil and gas pipelines are regulated by the Ministry of Transportation of Azerbaijan Republic.
Bucharest has the largest transport network in Romania, and one of the largest in Europe. The Bucharest transport network is made up of a metro network and a surface transport network. Although there are multiple connection points, the two systems operate independently of each other, are run by different organisations (the metro is run by Metrorex and the surface transport network by Societatea de Transport București. The two companies used separate ticketing systems until 2021, when a new smartcard was introduced alongside the old tickets, which allows travel on both the STB and the Underground.
Trams in Saint Petersburg are a major mode of public transit in the city of Saint Petersburg, Russia. Saint Petersburg once had the second-largest tram network in the world, consisting of about 340 kilometres (210 mi) of unduplicated track in the late 1980s. However, since 1995 the tramway network has declined sharply in size as major portions of track were removed, particularly in the city centre. Saint Petersburg lost its record to Melbourne, Australia. While it still had 285 kilometres (177 mi) of length in 2002, by early 2007 the tram network's had declined to just over 220 kilometres (140 mi), and by the 2010s operated on just 205.5 kilometres (127.7 mi) of network.
A Warsaw trolleybus system formed part of the public transport network of Warsaw, the capital city of Poland, during two separate periods. The first trolleybus system was established in 1946 and lasted until 1973. It had a maximum of 10 routes. The second system, comprising only one route, was in operation from 1983 until 1995. Between 1992 and its closure, it was operated by Zarząd Transportu Miejskiego (ZTM), in English the Public Transport Authority (Warsaw).
Rail transport in Azerbaijan is operated by the national state-owned railway company Azerbaijan Railways. The railway network consists of 2,918 km (1,813 mi), its gauge is 1,520 mm, 815 km (506 mi) are double track and 1,272 km (790 mi) are electrified at 3 kV (3,000 V) DC.
Azerbaijan Railways is the national state-owned rail transport operator in the Republic of Azerbaijan. The 2,918 km (1,813 mi), 1,520 mm gauge network is electrified at 3 kV (3,000 V) DC. The headquarters of the Azerbaijan Railways is in the capital Baku.
The Rome trolleybus system forms part of the public transport network of the city and comune of Rome, Italy. In operation since 2005, the current system comprises three routes.
The Dushanbe trolleybus system forms part of the public transport network of Dushanbe, the capital and largest city of Tajikistan. In operation since 1955. The system presently comprises eight routes as of 2006.
The Sofia trolleybus system forms part of the public transport network of Sofia, the capital city of Bulgaria.
The Yerevan trolleybus system forms part of the public transport network in Yerevan, the capital city of Armenia. Since the closure of the Gyumri trolleybus system in 2005, it has been Armenia’s only trolleybus system.
The Urgench trolleybus system links Urgench, the capital city of Xorazm Region in western Uzbekistan, with the neighbouring city of Khiva. Since the closure of the Tashkent trolleybus system in 2010, it has been Uzbekistan's only trolleybus system.
The Córdoba trolleybus system is part of the public transport network in Córdoba, the capital city of Córdoba Province, Argentina.
The Tehran trolleybus system serves Tehran, the capital city of Iran. Opened in 1992, it is the only trolleybus system ever to have existed in Iran. At its maximum extent, the system had five routes, served by at least 65 trolleybuses. The system closed in 2013, but reopened in 2016 with one route and a fleet of around 30 modernised Škoda 15Tr.
The Ruse trolleybus system is a part of the public transport network of the city and municipality of Ruse, the fifth most populous in Bulgaria. Opened in 1988, the system currently has seven lines and forms the backbone of the city's transport system. Its approximate length is 63 km and has been designed to work with 600V DC electricity. Over the years, various models of trolleybuses have been operated in Ruse.
As of 2012 there were around 300 cities or metropolitan areas where trolleybuses were operated, and more than 500 additional trolleybus systems have existed in the past. For complete lists of trolleybus systems by location, with dates of opening and closure, see List of trolleybus systems and the related lists indexed there.
The Mingachevir trolleybus system was a system of trolleybuses forming part of the public transport arrangements in Mingachevir, the fourth most populous city in Azerbaijan, for about 15 years at the turn of the 21st century.
The Sumqayit trolleybus system was a system of trolleybuses forming part of the public transport service in Sumqayit, the third most populous city in Azerbaijan, for most of the second half of the 20th century.
The Ganja trolleybus system was a system of trolleybuses forming part of the public transport arrangements in Ganja, the second most populous city in Azerbaijan, for most of the second half of the 20th century.
Prague was the first city in Czechoslovakia to introduce modern trolleybuses. Only a few other trolleybus systems existed previously in the Czech lands – in České Velenice (Gmünd) and České Budějovice – using the same overhead system as the Electromote, the predecessor of all trolleybuses.
The Kyiv Trolleybus is a trolleybus network in Kyiv, the largest trolleybus network in the world in terms of line length, and the largest in Ukraine in terms of length and number of cars. The network was opened on November 5, 1935.
{{cite web}}
: External link in |work=
(help)(in Russian and English)