USCGC Tampa (WPG-48)

Last updated

Coast Guard Cutter TAMPA 1921.png
Tampa, 1921
History
Flag of the United States Coast Guard.svgUnited States
NameUSCGC Tampa
Namesake Tampa, Florida
Builder Union Construction Company, Oakland, California
Laid down27 September 1920
Launched19 April 1921 [1]
Commissioned15 September 1921 [1]
Decommissioned1 February 1947 [1]
FateTransferred to United States Navy control as USS Tampa (WPG-48) in November 1941.
NotesServed in U.S. Navy as USS Tampa (WPG-48) 1941–1947.
General characteristics
Class and typeTampa class
Type United States Coast Guard Cutter
Displacement1,955 tons (full load)
Length240 ft (73 m) [1]
Beam39 ft (12 m) [1]
Draft17 ft 9 in (5.41 m) (maximum)
PropulsionGE turbo-electric transmission with 2 boilers [1]
Speed15.5 knots (28.7 km/h)
Complement122
Armament

USCGC Tampa (Coast Guard Cutter No. 48) was a United States Coast Guard Cutter that served in the United States Coast Guard from 1921 to 1941, and then in the United States Navy from 1941 to 1947.

Contents

Construction and design

Tampa was a steel-hulled, single-screw cutter laid down on 27 September 1920 at Oakland, California, by the Union Construction Company. [2] She was launched on 19 April 1921, sponsored by Mrs. Joseph P. Conners.

The cutter was the lead of a series of electric propulsion ships built for the Coast Guard with a contract speed of 16 knots (18.4 mph; 29.6 km/h) that was exceeded on trials with an average speed over a measured mile of 16.3 knots (18.8 mph; 30.2 km/h). The propulsion plant consisted of two oil fired Babcock & Wilcox watertube boilers supplying steam driving a Curtis turbine directly driving a generator that supplied alternating current to a 2,600 horsepower electric drive motor. Propulsion controls were either electronic or by hand and the machinery was self lubricating with the notable result of ease of operation. [3]

History

The cutter was commissioned Tampa on 15 September 1921.

Tampa got underway for the United States East Coast, transited the Panama Canal on 28 October 1921, and arrived at New York City, New York, on 7 November 1921. On 23 November 1921, the cutter shifted to Boston, Massachusetts, her home port. In the ensuing years, Tampa operated as part of the International Ice Patrol established in the aftermath of the RMS Titanic tragedy in 1912. Between March and July – the peak months in which icebergs were regarded as a menace to the northernmost transatlantic sea lanes – Tampa conducted regular patrols, alternating with USCGC Modoc (Coast Guard Cutter No. 39) on 15-day stretches. At the end of each patrol, Tampa would put into Halifax, Nova Scotia, for stores and fuel. Between these cruises in the frigid waters at the northern end of the Atlantic, Tampa operated on exercises and maneuvers, sharpened her skill with target practice and battle drills, and patrolled sailing regattas.

Shifted to the New York division, with headquarters at Stapleton, New York, in August 1932, Tampa arrived at her new home port on 27 August 1932. She operated from this base until the late 1930s. During this time, she participated in the drama which accompanied the tragic fire on board the Ward Line steamer SS Morro Castle.

Morro Castle rescue

At about 0230 on the morning of 8 September 1934, a fire broke out aboard the ocean liner SS Morro Castle as she was returning from a Cuba cruise. The fires spread rapidly, and inept seamanship on the behalf of her captain – who had only taken command after the ship's regular master had died earlier that evening – resulted in the loss of many lives.

Moored at Staten Island, New York, when Morro Castle caught fire, Tampa received word of the disaster at 0436 on the morning of 8 September 1934. She hurriedly recalled her liberty party, got up steam, and put out to sea at 1540. It took two hours to reach the scene of the holocaust, but when she arrived, Tampa assumed direction of the rescue operations which, by that time, were already well underway. Surfboats from the U.S. Coast Guard's Shark River Station – the first help to arrive – had rescued some 120 people before the New York pilot boat and boats from the Sandy Hook Station appeared and joined in the effort. The cutter USCGC Cahoone had also been on station for some time.

Tampa passed a towline to the stricken ship, but it soon parted with the sharp crack of a pistol shot and fouled the cutter's screw. Tampa herself drifted perilously close to shore before the cutter USCGC Sebago towed her out of danger. When conducted in smooth seas, operations to save lives are difficult enough; the gale raging off the New Jersey shore on the morning of 8 September 1934 made matters markedly worse. Nevertheless, the Coast Guardsmen performed feats of great heroism in rescuing the liner's passengers and crew from the storm-tossed waves. During the rescue, Tampa had accounted for 140 survivors.

Shifted to Mobile, Alabama, in the late 1930s, Tampa operated in the Gulf of Mexico into 1941.

World War II service

She came under U.S. Navy command in November 1941, a month before Japan attacked Pearl Harbor. Apparently transferred back to the North Atlantic for coastal convoy escort runs in the Greenland area, Tampa departed Narsarssuak, Greenland, on 3 May 1942 to escort the merchantman Chatham to the Cape Cod Canal. The ships stopped briefly at St. John's, Newfoundland, and then pushed on toward the Massachusetts coast. Tampa lost track of Chatham in dense fog on the 16th but regained contact near the eastern entrance of the canal and safely conducted the merchantman on her way. Tampa then searched, unsuccessfully, for a German U-boat reported in the vicinity before she put into Boston on the 17th.

She remained there for repairs and alterations until the 30th when she sailed for Argentia, Newfoundland. While escorting SS Montrose, Tampa picked up a sound contact and dropped depth charges but could not claim a "kill." On 3 June, Montrose ran aground on Moratties Reef. Tampa, assisted by two naval vessels, soon floated the merchantman free; and the cutter continued her escort mission, routed onward to Greenland. Arriving at Sondrestrom fjord on the 10th, Tampa conducted harbor entrance patrols before proceeding to Ivigtut. There, she guarded the cryolite mine—which provided ore vitally needed for the production of aluminum—from the 16th to the 26th.

During the last half of 1942, Tampa – designated WPG-48 in or around February 1942 – conducted 12 more convoy escort missions between Iceland, Greenland, and Nova Scotia. She left Argentia on 1 January 1943 with Tahoma (WPG-80), bound for St. John's where she arrived soon thereafter. Moored until the 6th, Tampa then got underway to escort a convoy routed to Greenland and then screened two groups of merchantmen—GS-18 and ON-161—to Newfoundland.

On 29 January, she got underway, with USCGC Escanaba) and Comanche (WPG-75), to escort Convoy SG-19, which consisted of Army transport SS Dorchester and merchantman SS Biscaya and SS Lutz to Greenland. Bad weather soon hampered the convoy's progress; and the flank escorts, Comanche and Escanaba, soon had difficulties keeping station. Icing had increased their displacement and reduced their speed accordingly. This fact, in turn, slowed the whole convoy. By 2 February, the weather had somewhat improved; but a radio direction finder had discovered the presence of an enemy submarine. Tampa accordingly screened ahead, some 3,000 yards from Dorchester, while Escanaba and Comanche were deployed on each flank, 5,400 yards from Lutz and Biscaya, respectively.

Convoy SG-19 soon came into the periscope sight of German submarine U-223, which maneuvered astern to bring her tubes to bear. The U-boat torpedoed Dorchester astern at 0355. Tampa observed the transport veering hard to port and showing numerous small lights. Biscaya quickly fired two green signal rockets and executed an emergency turn to avoid fouling the mortally stricken Dorchester.

Three minutes after Dorchester had been struck, her master ordered her abandoned. As the ship went down, four Army chaplains gave up their life jackets to soldiers who had none to ensure the survival of others at the expense of themselves. Meanwhile, Escanaba and Comanche searched for U-223, while Tampa escorted Lutz and Biscaya to Skovfjord before returning to assist in the hunt for survivors. Tampa subsequently searched for survivors on the 4th, but sighted only numerous bodies; two swamped lifeboats manned only by corpses; and seven life rafts. She found no signs of life before she returned to Narsarssuak on 6 February.

Tampa resumed convoy operations, performing local escort in the Greenland area for the remainder of February 1943. She continued these operations through the spring. On 12 June 1943, she departed Narsarssuak with four other escorts, escorting a three-ship convoy for Argentia. The next day, at 0508, she observed smoke on the horizon, and received a report that Escanaba was afire. In fact, Escanaba had been blown to bits by an explosion of undetermined origin. Only three survivors were picked up by Raritan (WYT-93), and one of these died. The other two could not explain what had destroyed their ship.

Tampa escorted convoys for the remainder of 1943 before returning to Boston on the last day of the year for an overhaul which extended through January 1944. She resumed convoy escort operations in the North Atlantic, between Boston and Greenland—primarily in the Argentia and Narsarssuak vicinities—and continued the task through 1944 and into 1945.

Post war service and fate

With the cessation of hostilities in Europe in May 1945, Tampa resumed ice patrols off the Grand Banks in June through August, alternating with Modoc (WPG-46) and Mojave (WPG-47). Leaving Argentia on 6 September 1945, less than a month after the war against Japan ended, Tampa operated between there and Boston, receiving a 30-day availability at the Coast Guard yard in Boston in November and December.

Tampa subsequently cruised on North Atlantic ice patrol duties into August 1946. She was decommissioned on 1 February 1947. The former Tampa was turned over to the Maritime Commission's War Shipping Administration which sold her to Charles M. Barnett, Jr., on 22 September 1947.

The name was taken on 27 May 1947 by the former USCGC Saranac of 1930 that had served during the war as HMS Banff (Y 43) and later as the Coast Guard's Sebec commissioned Tampa (WPG-164). [4] [5]

Citations

  1. 1 2 3 4 5 6 7 Canney, p 83
  2. Union Construction Company
  3. International Marine Engineering (November 1921), p 825
  4. Saranac, 1930
  5. Tampa, 1921

Related Research Articles

SS <i>Dorchester</i> World War II troop ship

Dorchester was a coastal passenger steamship requisitioned and operated by the War Shipping Administration (WSA) in January 1942 for wartime use as a troop ship allocated to United States Army requirements. The ship was operated for WSA by its agent Atlantic, Gulf & West Indies Steamship Lines (Agwilines). The ship was in convoy SG 19 from New York to Greenland transiting the Labrador Sea when it was torpedoed by a German U-boat on February 3, 1943. The ship sank with loss of 674 of the 904 on board with one of the 230 survivors lost after rescue. The story of four Army chaplains, known as the "Four Chaplains" or the "Immortal Chaplains," who all gave away their life jackets to save others before they died, gained fame and led to many memorials.

USCGC <i>Storis</i> U.S.Coast Guard cutter and icebreaker (1942–2007)

USCGC Storis (WAGL-38/WAG-38/WAGB-38/WMEC-38) was a light icebreaker and medium endurance cutter which served in the United States Coast Guard for 64 years and 5 months, making her the oldest vessel in commission with the Coast Guard fleet at the time of her decommissioning.

USCGC <i>Modoc</i>

USCGC Modoc (WPG-46) was a 240-foot Tampa-class United States Coast Guard cutter designed for multi-mission roles. She had a top speed of sixteen knots, and was armed with a pair of 5-inch deck guns. With the breakout of war she was armed with depth charges, additional guns, sonar, and radar and transferred to the Navy. Modoc, along with her sister ships Mojave and Tampa joined the Greenland Patrol.

USCGC <i>Escanaba</i> (WPG-77)

The USCGC Escanaba (WPG-77) was a 165 ft (50 m) "A" type United States Coast Guard cutter stationed on the Great Lakes from her commissioning in 1932 until the start of U.S. military involvement in World War II in 1941. With the outbreak of war, Escanaba redeployed to participate in the Battle of the Atlantic, during the course of which she was ultimately lost with nearly all hands. Struck by either a torpedo or mine in the early morning of 13 June 1943, while serving as a convoy escort, Escanaba suffered a fiery explosion and sank within minutes, leaving only two survivors and one body out of her 105-man crew to be found on the surface by rescuers.

USCGC <i>Duane</i> United States Coast Guard cutter

USCGC Duane (WPG-33/WAGC-6/WHEC-33) was a cutter in the United States Coast Guard. Her keel was laid on May 1, 1935, at the Philadelphia Navy Yard, Philadelphia, Pennsylvania. She was launched on June 3, 1936, as a search and rescue and law enforcement vessel.

USS <i>Biscayne</i> Tender of the United States Navy

USS Biscayne (AVP-11), later AGC-18, was a United States Navy Barnegat-class seaplane tender in commission as a seaplane tender from 1941 to 1943 and as an amphibious force flagship from 1943 to 1946. She saw service during World War II. Transferred to the United States Coast Guard after the war, she was in commission as the Coast Guard cutter USCGC Dexter (WAGC-385), later WAVP-385 and WHEC-385, from 1946 to 1952 and from 1958 to 1968.

USCGC <i>Tahoma</i> (WPG-80)

USCGC Tahoma (WPG-80) was a United States Coast Guard Cutter built by the Defoe Shipbuilding Company in Bay City, Michigan. Completed in 1934, the steel-hulled cutter operated on the Great Lakes between 1934 and 1941, attached to the 9th Coast Guard District and homeported at Cleveland, Ohio. She was named after the Tahoma Glacier on the western slope of Mount Rainier in the state of Washington.

USCGC <i>Escanaba</i> (WHEC-64)

USCGC Escanaba (WHEC-64) was an Owasco-class high endurance cutter built for World War II service with the United States Coast Guard. The war ended before the ship was completed and consequently she never saw wartime service.

USCGC <i>Tallapoosa</i> United States Coast Guard cutter

USCGC Tallapoosa (WPG-52) was a United States Coast Guard cutter of the Tallapoosa-class and was designed to replace the revenue cutter Winona. Her hull was reinforced for light icebreaking. She was initially stationed at Mobile, Alabama, with cruising grounds to Lake Pontchartrain, Louisiana, and Fowey Rocks, Florida. During World War I she escorted convoys out of Halifax, Nova Scotia. After the war she served with the Bering Sea Patrol before returning to Savannah, Georgia, before World War II. During the war Tallapoosa assisted with convoy escort duty and anti-submarine patrols.

USCGC <i>Northland</i> (WPG-49) United States Coast Guard ship

USCGC Northland (WPG-49) was a United States Coast Guard cruising class of gunboat especially designed for Arctic operations in commission from 1927 to 1938 and from 1939 to 1946. She served during World War II. She was the last cruising cutter built for the Coast Guard equipped with a sailing rig.

USCGC Mojave (WPG-47) was a 240-foot Tampa-class United States Coast Guard cutter in commission from 1921 until 1947.

USS <i>Manhasset</i> Patrol vessel of the United States Navy

USS Manhasset (AG-47/YAG-8) – later known as USCGC Manhasset (WIX-276) – was a commercial cargo ship leased by the U.S. Navy during World War II. She was armed with guns and depth charges and was used as a weather patrol ship, a convoy escort, and as a patrol craft. She experienced action in the dangerous North Atlantic Ocean, but returned home safely after war's end.

USCGC Tampa has been the name of four cutters of the United States Revenue Cutter Service and United States Coast Guard:

<span class="mw-page-title-main">Forrest O. Rednour</span> United States Coast Guard Navy and Marine Corps Medal recipient

Forrest O. Rednour (1923–1943) was a United States Coast Guardsman who received the Navy and Marine Corps Medal posthumously for his actions during World War II.

USCGC <i>Comanche</i> (WPG-76) Coast guard cutter

USCGC Comanche (WPG-76) was a United States Coast Guard cutter built by Pusey & Jones Corporation, Wilmington, Delaware, and launched 6 September 1934. She was commissioned on 1 December 1934. She was used extensively during World War II for convoy operations to Greenland and as a part of the Greenland Patrol.

USCGC Haida (WPG-45) was a 240-foot Tampa-class United States Coast Guard cutter in commission from 1921 until 1947.

USCGC <i>Charles David Jr.</i>

USCGC Charles David Jr is the seventh Sentinel-class cutter. Upon her commissioning she was assigned to serve in Key West, Florida, as the first of six vessels to be based there. She was delivered to the Coast Guard, for testing, on August 17, 2013. She was officially commissioned on November 16, 2013.

USCGC <i>North Star</i>

The USCGC North Star was a United States Coast Guard Cutter during the Second World War. It was originally built for the U.S. Interior Department and served in the United States Coast Guard (USCG) before being acquired by the U.S. Navy.

<span class="mw-page-title-main">Greenland Patrol</span>

The Greenland Patrol was a United States Coast Guard operation during World War II. The patrol was formed to support the U.S. Army building aerodrome facilities in Greenland for ferrying aircraft to the British Isles, and to defend Greenland with special attention to preventing German operations in the northeast. Coast Guard cutters were assisted by aircraft and dog sled teams patrolling the Greenland coast for Axis military activities. The patrol escorted Allied shipping to and from Greenland, built navigation and communication facilities, and provided rescue and weather ship services in the area from 1941 through 1945.

<i>Algonquin</i>-class patrol boat

The Algonquin-class patrol boat were a class of cutters built for the United States Coast Guard in the early 1930s. These ships were placed under United States Navy control during World War II.

References