Ural bomber

Last updated

The Ural bomber was the initial aircraft design program/competition to develop a long-range bomber for the Luftwaffe, created and led by General Walther Wever in the early 1930s. Wever died in an air crash on June 3, 1936, and his successor Albert Kesselring continued the project until he left office.

Contents

One of the Dornier Do 19 prototypes in flight Dornier Do 19 in flight c1938.JPG
One of the Dornier Do 19 prototypes in flight

Wever, the chief of staff of the newly formed Luftwaffe in 1933, realized the importance that strategic bombing would play in a war. In a war with the Soviet Union, he expected that German forces would not attempt to move very far east of Moscow, which would leave much of Joseph Stalin's recently relocated industry out of reach of existing bombers. Wever proposed using a strategic bomber to target those factories, hampering the Soviet ability to fight, without the need for ground forces to advance.

Development

Under the Ural bomber program, he began secret talks with Dornier and Junkers, requesting designs for a long-range bomber. They responded with the Dornier Do 19 and the Junkers Ju 89 and the Reich Ministry of Aviation (RLM; Reichsluftfahrtministerium) ordered prototypes of both aircraft in 1935. The program was not successful and was eventually canceled.[ clarification needed ]

The Dornier Do 19 V1 first flew on October 28, 1936, some six months before the Ju 89. It was a nine-seat, four-engine monoplane, powered by four BMW/Bramo 322H nine-cylinder radials of only some 650 hp output each. The Do 19 V1 had dorsal and ventral defensive armament using turrets for the first time on a German bomber in such locations — these innovations could not save the design, and only the V1 prototype was completed. [1]

A Junkers Ju 89 prototype in flight Bundesarchiv Bild 141-2409, Flugzeug Junkers Ju 89.jpg
A Junkers Ju 89 prototype in flight

When the Ural bomber program was canceled, the partially completed 3rd prototype was converted to passenger layout and served as a Ju 90 prototype instead. The Ju 90 was later pressed into military service as a patrol aircraft, as it was one of the few really long-range designs available in Germany. The Ju 90, in turn, led to the small-production series of Junkers Ju 290 four engined maritime patrol and long-range reconnaissance aircraft.

Cancellation

James Corum contends that it was not Kesselring who cancelled the Ural bomber project; rather it was Hermann Göring who halted strategic bomber development before the start of World War II, following the advice of Kesselring, Ernst Udet and Erhard Milch. Milch wanted the project cancelled simply because at that stage the German airplane industry was incapable of building a large fleet of heavy bombers and would remain so. Thus, Göring shelved the project and is later supposed to have said, "The Führer will never ask me how big our bombers are, but how many we have."[ citation needed ]

However, after pleas from the Chief of Branch 1 of the Luftwaffe Operations Staff, Major Paul Deichmann, to Göring, an about face occurred in late 1937, when specifications were issued to develop an aircraft to deliver a five-ton bomb load to New York. By March 1942, the Amerika Bomber project was initiated as a resuscitation of the Ural Bomber idea, with the Messerschmitt Me 264, Junkers Ju 390 the Heinkel He 277 becoming the major competitors.

As 1943 progressed, Göring bemoaned the lack of a heavy bomber fleet and cursed those who had told him the medium bomber was superior to the heavy bomber. "Well, those inferior heavy bombers of the other side are doing a wonderful job of wrecking Germany from end to end," was his response.[ citation needed ] — but since the A-version of Heinkel's "heavy" had the Daimler-Benz DB 606 and 610 powerplants weighing around 1.5 tonnes each.[ clarification needed ] The Greif also had inadequately designed and engine accommodation for such complex and heavy "power systems" to operate safely within them. One month later, in September 1942, Göring cancelled the dive-bombing requirement for the He 177A, which had proven to be an unrealistic demand. The He 177B development of the A-version was an attempt to match the capability of the Allies' four-engined strategic bombers, and was well underway by the summer of 1943. Four prototypes of the Daimler-Benz DB 603-powered B-version were commissioned, with three of them built and two flying by the end of 1943. [2]

The He 177B, the later Heinkel He 274 high-altitude design, and, by February 1943, the paper-only Heinkel He 277 Bomber (Heinkel's trans-Atlantic design project), formed a trio of development programs emerging from the He 177A design, each entirely separate from the others — came the closest to providing the Luftwaffe with a true heavy bomber from the Heinkel firm's engineering departments.[ clarification needed ] The original He 177A design was the basis for the He 177B and He 274 and the initial inspiration for the BMW 801 radial powered He 277, whose design resembled an enlarged Heinkel He 219.[ citation needed ]. The prototypes of the first three He 177B prototypes were conversions of four He 177As and were built in Austria. A pair of He 274 prototypes were to be built in France. Both the quartet of commissioned He 177B prototype airframes and pair of He 274 prototypes had four individual Daimler-Benz DB 603 engines, with the 274's powerplants having additional turbocharging for high-altitude flight. These would have provided the Luftwaffe with a bombing capability on par with RAF Bomber Command's Avro Lancaster.[ citation needed ]

The offensive against Germany's petroleum, oil and lubricant resources and infrastructure effectively ended any hope of supporting a strategic bombing capability. By early July 1944 the Jägernotprogramm ended all development of German military aircraft not capable of defensive purposes, focusing solely on fighter designs.

See also

Related Research Articles

<i>Luftwaffe</i> Aerial-warfare branch of the German military during World War II

The Luftwaffe was the aerial-warfare branch of the Wehrmacht before and during World War II. Germany's military air arms during World War I, the Luftstreitkräfte of the Imperial Army and the Marine-Fliegerabteilung of the Imperial Navy, had been disbanded in May 1920 in accordance with the terms of the 1919 Treaty of Versailles which banned Germany from having any air force.

<span class="mw-page-title-main">Heinkel He 219</span> German night fighter of World War II

The Heinkel He 219 Uhu ("Eagle-Owl") is a night fighter that served with the German Luftwaffe in the later stages of World War II. A relatively sophisticated design, the He 219 possessed a variety of innovations, including Lichtenstein SN-2 advanced VHF-band intercept radar, also used on the Ju 88G and Bf 110G night fighters. It was also the first operational military aircraft to be equipped with ejection seats and the first operational German World War II-era aircraft with tricycle landing gear. Had the Uhu been available in quantity, it might have had a significant effect on the strategic night bombing offensive of the Royal Air Force; however, only 294 of all models were built by the end of the war and these saw only limited service. Ernst-Wilhelm Modrow was the leading night fighter ace on the He 219. Modrow was credited with 33 of his 34 night air victories on the type.

<i>Amerikabomber</i> Nazi German projects for long-range bomber aircraft

The Amerikabomber project was an initiative of the German Ministry of Aviation (Reichsluftfahrtministerium) to obtain a long-range strategic bomber for the Luftwaffe that would be capable of striking the United States from Germany, a round-trip distance of about 11,600 km (7,200 mi). The concept was raised as early as 1938, but advanced plans for such a long-range strategic bomber design did not begin to appear before Reichsmarschall Hermann Göring until early 1942. Various proposals were put forward, but these plans were all eventually abandoned as they were too expensive, too reliant on rapidly-diminishing materiel and production capacity, and/or technically unfeasible.

<span class="mw-page-title-main">Heinkel He 177 Greif</span> German heavy bomber during WW2

The Heinkel He 177 Greif (Griffin) was a long-range heavy bomber flown by the Luftwaffe during World War II. The introduction of the He 177 to combat operations was significantly delayed, by both problems with the development of its engines and frequent changes to its intended role. Nevertheless, it was the only long-range, heavy bomber to become operational with the Luftwaffe during the war. The He 177 had a payload/range capability similar to that of four-engined heavy bombers used by the Allies in the European theatre.

<span class="mw-page-title-main">Heinkel He 274</span> Prototype bomber aircraft by Heinkel

The Heinkel He 274 was a German heavy bomber design developed during World War II, purpose-designed for high-altitude bombing with pressurized crew accommodation. Due to the Allied advance through Northwest Europe, the prototypes were abandoned at the French factory where they were being built. They were completed after the war by the French and used for high-altitude research.

<span class="mw-page-title-main">Heinkel He 277</span> German strategic bomber design during WW2.

The Heinkel He 277 was a four-engine, long-range heavy bomber design, originating as a derivative of the He 177, intended for production and use by the German Luftwaffe during World War II. The main difference was in its engines. While the He 177 used four engines in two coupled pairs which proved troublesome, the He 277 was intended to use four unitized BMW 801E 14-cylinder radial engines, in single nacelle installations.

<span class="mw-page-title-main">Messerschmitt Me 264</span> German strategic bomber prototype

The Messerschmitt Me 264 was a long-range strategic bomber developed during World War II for the German Luftwaffe as its main strategic bomber. The design was later selected as Messerschmitt's competitor in the Reichsluftfahrtministerium's Amerikabomber programme, for a strategic bomber capable of attacking New York City from bases in France or the Azores.

<span class="mw-page-title-main">Junkers Ju 89</span> 1930s German prototype heavy bomber

The Junkers Ju 89 was a heavy bomber designed for the Luftwaffe prior to World War II. Two prototypes were constructed, but the project was abandoned without the aircraft entering production. Elements of its design were incorporated into later Junkers aircraft.

<span class="mw-page-title-main">Bomber B</span> Failed 1939-1943 Luftwaffe medium bomber program

Bomber B was a German military aircraft design competition organised just before the start of World War II intended to develop a second-generation high-speed bomber for the Luftwaffe. The new designs would be a direct successor to the Schnellbomber philosophy of the Dornier Do 17 and Junkers Ju 88, relying on high speed as its primary defence. Bomber B would be a much larger and more capable aircraft, with range and payload far greater than the Schnellbomber, surpassing the largest conventional designs then under consideration. The winning design was intended to form the backbone of the Luftwaffe's bomber force, replacing the wide collection of semi-specialized designs then in service. The Reich Air Ministry was so optimistic that more modest projects were generally cancelled; when the project failed the Luftwaffe was left with hopelessly outdated aircraft.

<span class="mw-page-title-main">Junkers Ju 288</span> German World War II bomber prototype

The Junkers Ju 288, originally known within the Junkers firm as the EF 074, was a German bomber project designed during World War II, which only ever flew in prototype form. The first aircraft flew on 29 November 1940; 22 development aircraft were eventually produced.

<span class="mw-page-title-main">Focke-Wulf Fw 191</span> Prototype bomber

The Focke-Wulf Fw 191 was a prototype German bomber of World War II, as the Focke-Wulf firm's entry for the Bomber B advanced medium bomber design competition. Two versions were intended to be produced, a twin-engine version using the Junkers Jumo 222 engine and a four-engine variant which was to have used the smaller Daimler-Benz DB 605 engine. The project was eventually abandoned due to technical difficulties with the engines.

<span class="mw-page-title-main">Dornier Do 19</span> Prototype bomber

The Dornier Do 19 was a German four-engine heavy bomber that first flew on 28 October 1936. Only one prototype flew, and it was converted to a transport in 1938. The other two were scrapped.

<span class="mw-page-title-main">Emergency Fighter Program</span> Fighter aircraft design competition in Germany during WW2.

The Emergency Fighter Program was the program that resulted from a decision taken on July 3, 1944 by the Luftwaffe regarding the German aircraft manufacturing companies during the last year of the Third Reich.

<span class="mw-page-title-main">Daimler-Benz DB 603</span> German aircraft engine

The Daimler-Benz DB 603 was a German aircraft engine used during World War II. It was a liquid-cooled 12-cylinder inverted V12 enlargement of the 33.9 Liter DB 601, which was in itself a development of the DB 600. Production of the DB 603 commenced in May 1942, and with a 44.5 liter displacement figure, was the largest displacement inverted V12 aviation engine to be produced and used in front line aircraft of the Third Reich during World War II.

The Focke-Wulf Ta 400 was a large six-engined heavy bomber design developed in Nazi Germany in 1943 by Focke-Wulf as a serious contender for the Amerikabomber project. One of the first aircraft to be developed from components from multiple countries, it was also one of the most advanced Focke-Wulf designs of World War II, though it never progressed beyond a wind tunnel model.

<span class="mw-page-title-main">Walther Wever (general)</span> Luftwaffe Chief of Staff

Walther Wever was a pre-World War II Luftwaffe Commander. He was an early proponent of the theory of strategic bombing as a means to wage war, while supporting the theories of Giulio Douhet. He died in an air crash in 1936.

References

  1. Wagner, Ray; Nowarra, Heinz (1971). German Combat Planes. New York, NY: Doubleday & Company, Inc. p. 303. ASIN   B0006C2THY.
  2. Griehl, Manfred; Dressel, Joachim (1998). Heinkel He 177 - 277 - 274. Shrewsbury, UK: Airlife Publishing. p. 163. ISBN   1-85310-364-0.