Dornier Do 19

Last updated
Do 19
Dornier Do 19 in flight c1938.JPG
Dornier Do 19
Role Heavy bomber
Manufacturer Dornier-Werke GmbH
First flight28 October 1936
StatusCancelled
Primary user Luftwaffe
Number built3

The Dornier Do 19 was a German four-engine heavy bomber that first flew on 28 October 1936. Only one prototype flew, and it was converted to a transport in 1938. The other two were scrapped.

Contents

The Luftwaffe lacked an efficient heavy bomber fleet. Generalleutnant Walther Wever, the Luftwaffe's first Chief of Staff, was the most persistent advocate of a German long-range strategic bomber fleet. The Dornier Do 19 was built for the Luftwaffe's Ural bomber program under General Wever, competing against the Junkers Ju 89. The RLM Technisches Amt issued a specification for a four-engine heavy bomber. But after Wever's death in an airplane crash in June 1936, Wever's successor, Albert Kesselring, canceled Germany's long-range bomber projects to concentrate on tactical bombers.

Both Dornier and Junkers were competitors for the contract, and each received an order for three prototypes in late 1935. The Dornier design was given the project number Do 19, while the Junkers prototype became the Ju 89.

Design and development

The Dornier Do 19 was a mid-wing cantilever design, and was mostly metal in construction. It had a rectangular-section fuselage and the tail had braced twin fins and rudders, mounted on the upper surface of the tailplane, itself set low on the rear fuselage. This was quite similar to the tail of the contemporary British Armstrong Whitworth Whitley medium bomber. It also had retractable landing gear, including the tailwheel. The powerplant, according to some sources, was supposed to be four Bramo 322H-2 radial engines that were mounted in nacelles at the leading edges of the wings.

Its crew of ten would have consisted of a pilot, co-pilot, navigator, bombardier, radio operator, and five gunners.

From late 1935, the poor promised performance of the Do 19 and competing Junkers Ju 89 resulted in the "Ural Bomber" programme being reduced to a technology demonstrator status, with Weaver losing confidence in the designs, with the Bomber A programme for a more advanced heavy bomber with much greater performance launched on 17 April 1936. [1] The Bomber A project led to the development of the Heinkel He 177. [2]

The V1 prototype flew on 28 October 1936. After Generalleutnant Wever died in an airplane crash on 3 June 1936, the heavy bomber program lost its momentum, and never recovered. According to the miltary historian Richard Suchenwirth  [ de ], one of the reasons for the failure of the Luftwaffe in the air offensive against Britain, as well as for the lack of air support for the operations of the U-boat forces, was the absence of a good, reliable strategic bomber. [3] [4] By then, however, it was too late to develop the bombers required.

Albert Kesselring, Wever's successor, believed that what Germany required were more fighters and tactical bombers such as the Junkers Ju-88

Also Kesselring and Hans Jeschonnek had suggested to Göring that it would be better to drop heavy bomber projects due to material shortages. Around 2.5 tactical bombers could be built with the same material as one heavy bomber. In May 1937, the projects were cancelled. Erhard Milch recalled Göring saying, "The Fuehrer does not ask me what kind of bombers I have. He simply wants to know how many!" [5] [6]

Therefore, the V2 and V3 prototypes were scrapped. The original V1 became a transport in 1938. The Dornier Do 19 had a disappointing performance: it was slow, carried only a 1,600 kilograms (3,500 lb) bombload, and had only medium range. In fact, the whole Ural bomber concept had already been abandoned, not only because the required range was impossible, but also because of inadequate navigation[ citation needed ] and bombsights.

Specifications (Do 19 V2)

Dornier Do-19 Technical Specs. Dornier DO-19 V1 Tech Diagram.jpg
Dornier Do-19 Technical Specs.

Data fromAircraft of the Third Reich Volume one. [7]

General characteristics

447 kW (599 hp) maximum continuous power

Performance

Armament

See also

Aircraft of comparable role, configuration, and era

Related lists

Related Research Articles

<span class="mw-page-title-main">Junkers Ju 87</span> 1935 dive bomber aircraft family by Junkers

The Junkers Ju 87, popularly known as the "Stuka", is a German dive bomber and ground-attack aircraft. Designed by Hermann Pohlmann, it first flew in 1935. The Ju 87 made its combat debut in 1937 with the Luftwaffe's Condor Legion during the Spanish Civil War of 1936–1939 and served the Axis in World War II from beginning to end (1939–1945).

<i>Luftwaffe</i> Aerial-warfare branch of the German military during World War II

The Luftwaffe was the aerial-warfare branch of the Wehrmacht before and during World War II. Germany's military air arms during World War I, the Luftstreitkräfte of the Imperial Army and the Marine-Fliegerabteilung of the Imperial Navy, had been disbanded in May 1920 in accordance with the terms of the 1919 Treaty of Versailles which banned Germany from having any air force.

<span class="mw-page-title-main">Dornier Do 17</span> World War II German light bomber

The Dornier Do 17 is a twin-engined light bomber produced by Dornier Flugzeugwerke for the German Luftwaffe during World War II. Designed in the early 1930s as a Schnellbomber intended to be fast enough to outrun opposing aircraft, the lightly built craft had a twin tail and "shoulder wing". Sometimes referred to as the Fliegender Bleistift or the Eversharp it was popular among its crews due to its handling, especially at low altitude, which made the Do 17 harder to hit than other German bombers.

<span class="mw-page-title-main">Dornier Do 215</span> Type of aircraft

The Dornier Do 215 was a light bomber, aerial reconnaissance aircraft and later a night fighter, produced by Dornier originally for export, but in the event most served in the Luftwaffe. Like its predecessor, the Dornier Do 17, it inherited the title "The Flying Pencil" because of its slim fuselage. The successor of the Do 215 was the Do 217.

<span class="mw-page-title-main">Dornier Do 335</span> Fighter aircraft family by Dornier

The Dornier Do 335Pfeil (Arrow) is a heavy fighter built by Dornier for Germany during World War II. The Pfeil's performance was predicted to be better than other twin-engine designs due to its unique push-pull configuration and the lower aerodynamic drag of the in-line alignment of the two engines. It was Nazi Germany's fastest piston-engined aircraft of World War II. The Luftwaffe was desperate to get the design into operational use, but delays in engine deliveries meant that only a handful were delivered before the war ended.

<span class="mw-page-title-main">Junkers Ju 88</span> German twin engine multirole combat aircraft

The Junkers Ju 88 is a German World War II Luftwaffe twin-engined multirole combat aircraft. Junkers Aircraft and Motor Works (JFM) designed the plane in the mid-1930s as a so-called Schnellbomber that would be too fast for fighters of its era to intercept. It suffered from technical problems during its development and early operational periods but became one of the most versatile combat aircraft of the war. Like a number of other Luftwaffe bombers, it served as a bomber, dive bomber, night fighter, torpedo bomber, reconnaissance aircraft, heavy fighter and at the end of the war, as a flying bomb.

<span class="mw-page-title-main">Dornier Do 23</span> German medium bomber

The Dornier Do 23 was a German medium bomber of the 1930s.

<span class="mw-page-title-main">Junkers Ju 89</span> 1930s German prototype heavy bomber

The Junkers Ju 89 was a heavy bomber designed for the Luftwaffe prior to World War II. Two prototypes were constructed, but the project was abandoned without the aircraft entering production. Elements of its design were incorporated into later Junkers aircraft.

<span class="mw-page-title-main">Dornier Do 24</span> 1937 multi-role flying boat family by Dornier

The Dornier Do 24 is a 1930s German three-engine flying boat designed by the Dornier Flugzeugwerke for maritime patrol and search and rescue. A total of 279 were built among several factories from 1937 to 1945.

<span class="mw-page-title-main">Junkers Ju 86</span> Airliner and medium bomber aircraft

The Junkers Ju 86 was a German monoplane bomber and civilian airliner designed in the early 1930s, and employed by various air forces on both sides during World War II. The civilian model Ju 86B could carry ten passengers. Two were delivered to Swissair and five to Deutsche Luft Hansa. In addition a single civilian Ju 86Z was delivered to Sweden's AB Aerotransport.

<span class="mw-page-title-main">Bomber B</span> Failed 1939-1943 Luftwaffe medium bomber program

Bomber B was a German military aircraft design competition organised just before the start of World War II intended to develop a second-generation high-speed bomber for the Luftwaffe. The new designs would be a direct successor to the Schnellbomber philosophy of the Dornier Do 17 and Junkers Ju 88, relying on high speed as its primary defence. Bomber B would be a much larger and more capable aircraft, with range and payload far greater than the Schnellbomber, surpassing the largest conventional designs then under consideration. The winning design was intended to form the backbone of the Luftwaffe's bomber force, replacing the wide collection of semi-specialized designs then in service. The Reich Air Ministry was so optimistic that more modest projects were generally cancelled; when the project failed the Luftwaffe was left with hopelessly outdated aircraft.

<span class="mw-page-title-main">Junkers Ju 288</span> German World War II bomber prototype

The Junkers Ju 288, originally known within the Junkers firm as the EF 074, was a German bomber project designed during World War II, which only ever flew in prototype form. The first aircraft flew on 29 November 1940; 22 development aircraft were eventually produced.

<span class="mw-page-title-main">Ural bomber</span> 1930s German aircraft design program

The Ural bomber was the initial aircraft design program/competition to develop a long-range bomber for the Luftwaffe, created and led by General Walther Wever in the early 1930s. Wever died in an air crash on June 3, 1936, and his successor Albert Kesselring continued the project until he left office.

<span class="mw-page-title-main">Junkers Ju 252</span> German transport aircraft

The Junkers Ju 252 was a German cargo aircraft that made its first flight in late October 1941. The aircraft was planned as a replacement for the Junkers Ju 52/3m in commercial airline service, but only a small number were built as cargo aircraft for the Luftwaffe.

<span class="mw-page-title-main">Heinkel He 50</span> German World War II-era dive bomber

The Heinkel He 50 was a German World War II-era dive bomber, originally designed for the Imperial Japanese Navy. Serving in Luftwaffe prewar dive-bombing units, the He 50 served until almost the end of World War II as a night harassment bomber.

The Dornier Do 29 was a proposed zerstörer, or heavy fighter, designed by Dornier as a competitor to the Messerschmitt Bf 110.

The Hütter Hü 211 was a German prototype long-range reconnaissance and heavy night fighter commissioned by the Reich Air Ministry in late 1944. The project stopped after an air raid destroyed the prototypes before they were finished.

<span class="mw-page-title-main">Walther Wever (general)</span> Luftwaffe Chief of Staff

Walther Wever was a pre-World War II Luftwaffe Commander. He was an early proponent of the theory of strategic bombing as a means to wage war, while supporting the theories of Giulio Douhet. He died in an air crash in 1936.

The Dornier Do 417 was a twin-engine multirole combat aircraft. Developed in 1942, it resulted from the Luftwaffe's request for a medium bomber, a contest in which Dornier, Junkers, Heinkel, and Blohm & Voss competed. In the end, the Junkers Ju 188 was chosen by the Luftwaffe, and the Do 417 never entered production.

References

  1. Hooton 1994, pp. 108–109.
  2. Hooton 1994, pp. 156–157.
  3. Suchenwirth, Richard (1969). Fletcher, Harry (ed.). Command and Leadership in the German Air Force. USAF Historical Studies No. 174. Aerospace Studies Institute: Air University. p. 35.
  4. Suchenwirth, Richard (1959). Kennedy, Edward P. (ed.). Historical Turning Points in the German Air Force War Effort. USAF Historical Studies No. 189. Aerospace Studies Institute: Air University. pp. 40–45.
  5. Irving, D. (1973) The Rise and Fall of the Luftwaffe, p. 54. London: Cox and Wyman ISBN 0 297 76532 9
  6. Suchenwirth, Richard (1969), Fletcher, Harry (ed.), Command and Leadership in the German Air Force, USAF Historical Studies No. 174, Aerospace Studies Institute: Air University, p. 36, The Fuehrer does not ask me what kind of bombers I have. He simply wants to know how many!
  7. Green, William (2010). Aircraft of the Third Reich Volume one. London: Crecy. pp. 235–237. ISBN   9781900732062.

Bibliography