Wien Nordwestbahnhof | |
---|---|
General information | |
Location | Vienna-Brigittenau Austria |
Coordinates | 48°13′47″N16°22′59″E / 48.22967°N 16.38303°E |
Owned by | Austrian Federal Railways (ÖBB) |
Tracks | 5 |
Construction | |
Structure type | at-grade |
History | |
Opened | June 1, 1872 |
The Wien Nordwestbahnhof (English: Vienna Northwest Railway Station), abbreviated as Wien NWBH, is the site of a goods station in Brigittenau district of Vienna, Austria. Passenger transport ended in 1959. It served as the southern terminus of the Austrian Northwestern Railway. The northwestern terminus of the line was Prague Těšnov station till 1972. [1] Freight transport is the process of termination. Starting in 2018, the site is being redeveloped into a residential district.
The Northwest Railway Station is hardly anchored in the general awareness although being the second-largest railway station of the formerly six Viennese terminus stations. The Northwest Railway lost its importance due to the dissolution of Austria-Hungary. Passenger traffic was already stopped in 1952 after a phase as a replacement station. Only the remaining post office was known in 1200, the former main post office of Brigittenau on the side of the Nordwestbahnstraße. The railway station has gone down in the history of Vienna rather as the scene of political events.
The railway station is only about four kilometres from the centre of Vienna and since 1900 part of the 20th district. The site borders on Taborstraße in the south, Nordwestbahnstraße in the west, Dresdnerstraße in the east and Stromstrasse in the north. The main entrance to the site is currently located in the Tabor- and Nordwestbahnstraße. The area is the last large urban development area of Vienna. The area is 44 hectares. In the middle, a green park of 10 hectares is to be created. [2] Approximately 800,000 m2 of gross floor space is to be created here by 2030. The urban development model has been completed and initial property sales to developers are expected in 2020/21. [3] The deindustrialization of the city opens up space for a new, more modern use of space in the inner city area.
The use as a railway station and transshipment point for goods is on the way out. The landowner Austrian Federal Railways (ÖBB) only awards short-term contracts. All contracts with tenants and subtenants will expire at the end of 2017 to begin demolition of the site for the construction of a new urban development area. [4] In the north of the railway station on Nordwestbahnstraße still exists a large operating garage, which is used by various companies formerly from such as ÖBB-Postbus or the private bus company Gschwindl, as well as driving schools and the fire department.
In the period before the regulation of the winding Danube, the territory was still unspoilt because of the recurring floods. In 1614, Emperor Matthias had built a small castle for hunting in the Wolfsau (older name of Brigittenau), a part of the former imperial hunting area, which at that time was still an untouched landscape. The area was not only unsafe because of the water, but also military. During the Second Vienna Turkish siege in 1683, the facilities in Augarten were destroyed.
The growth of the city of Vienna also made the tributaries of the river more important for shipping. The station grounds are located in the Fahnenstangenwasser , a filled in arm of the Danube. At this branch of the Danube timber delivered via the river was unloaded. The flagpoles showed the landing stages to the ships and rafts. The site was a peripheral area of the Augarten belonging to the 2nd district. At that time, the Nordwestbahnstraße was still called Augartendamm. The branch of the Danube disappeared with the regulation of the Danube from 1868 onwards. [5] Thus land was won for the station and industrial companies. In the middle of the 19th century due to the lower taxes and the lack of space, public amusement opportunities were established outside the city walls. The area was also popular for carrying out illegal dogfights of rich industrial sons. [6] There were also large amusement centres. The most famous was the "Universum". [7] The owner Ferdinand Bachmaier (1826-1903) demanded the enormous sum of 100,000 florins as compensation for the railway construction. [8]
The fact that such a large infrastructure project as the construction of the Northwest Railway was financed privately must be seen against the background of the public finances of Austria-Hungary. Due to the heavily strained state budget in the years around the Austro-Prussian War of 1866 and the boycott of tax increases by the Imperial Council, which was dominated by the nobility, the state sold existing railway lines to private investors and promoted the expansion and new construction with guaranteed interest for shares. [9]
Subsequently, the railways were intensively expanded, including the Northwest Railway, but also through share speculation by competing railway companies. Not only the regulation of the Danube river, but also the forthcoming Vienna World's Fair in 1873 led to a violent building speculation at the time of the station construction. The financing model ultimately did not bring any relief for the state budget, but rather enormously increased the costs. Nationalization was the only way out. The Nordwestbahn was built by the Imperial Royal Austrian State Railways from October 15, 1909. [10]
In the first planning phase around 1869, the project was the subject of numerous political and technical discussions. The focus was on the location between the regulated Danube river and Danube Canal, the elevation of the terrain and crossings for the local residents. Discussion points were how far the groundwater has to be taken into account, as the level of construction work has a significant impact on construction costs. Another point was the number and dimensions of the passageways underneath the station. [11] The structure was initially intended for the western (back) part of the Augarten, but this location would have hindered the connection between the Danube main stream and the city more than the finally selected location. [12] In mid-June 1869, a solution could be found next to the Taborstrasse, after complete reworking of the project. [13]
Stuttgart professor of architecture Wilhelm Sophonias Bäumer was commissioned by the Northwest Railway Construction Department to build the passenger station, after he had been invited to submit a draft in 1869. [14] The specification was a station with five tracks, which can be extended if required. It was not yet clear how the northwest railway would develop. Construction of the hall began in January 1870, [15] with Bäumer being supported in the construction phase until 1873 by Theodor Reuter as site manager, who at that time was chief engineer in the central office for building construction of the Northwest Railway. [16] Bäumer, who moved his residence to Vienna for the project, also developed large residential buildings in the vicinity (Heinestraße 41 / Praterstern 1 / Kleine Stadtgutgasse 12 and 14) as well as some villas in the surrounding area of Vienna and Carinthia during the construction supervision for the construction of the railway station. [17]
The Nordwestbahnhof, the main work of Bäumer, was stylistically inspired by the shapes of Italian Renaissance palaces. In this project, he was able to consistently implement his stylistic ideas in both exterior and interior design. The imposing, monumental and highly regarded building was reminiscent of older station buildings in Paris. The main façade was structured by Risalite. The central main entrance was accentuated by arcades, a large semicircular window and a gable roofing reminiscent of a city gate. On the departure side at the Nordwestbahnstraße there was an elegant spacious semicircular vestibule. On this allegorical figures for the cities were placed, which have moved by the northwest runway closer to how. These were Dresden, Leipzig, Breslau, Berlin, Hamburg and Bremen. There were also four groups of children with the coats of arms of Lower Austria, Bohemia, Vienna and Prague. The figures were made of St. Margarethen sandy limestone by the sculptor Franz Melnitzky. [18]
The vaulted ceiling was designed with shields of various allegories and the names of experts from the painter Pietro Isella from Morcote. The building was very elegantly furnished in terms of interior design and planned down to the last detail by Bäumer. There was plenty of cassetted ceilings, rich wall paintings, wallpapers and pilasters as well as exquisite lighting fixtures. The painter Hermann Burghart designed the waiting room of the first class, which cities and views of the Nordwest-Bahn were concerned. The sculptors Franz Schönthaler and Rudolf Winder worked in the court salon. The station was also the logical place of arrival for the German nobility in Vienna. For the normal people there were waiting rooms II. and III. Great.
The estimated construction costs were 1+1⁄2-2 million florins (converted is about €13 to 17 million). In fact, the costs amounted to ƒ2.3 million including financing, despite an extremely short construction period of around 17 months. [19] The work was complicated by the marshy terrain on which up to four metres of earth had to be piled up. The ground was transported by a special field train over the Danube canal from Heiligenstadt. [20]
On 1 June 1872, the railway station with a 360 tonne iron roof construction was opened in an unfinished state [21] when the section Vienna (Northwestbahnhof)-Jedlersee was opened for the transport of passengers, luggage and express goods by public transport. [22] Long-distance transport with express trains to Dresden and Berlin started. The trip to Berlin lasted 19 hours (today 10 hours), the price for the second class was 15 thalers 26 groschen (approx. €75). The completion was just in time for the 1873 Vienna World's Fair.
The main reception building at the corner of Nordwestbahnstraße and Taborstraße was served by two tram lines. Today's Line 2 (formerly N) served as a transit line connecting the city centre through Taborstrasse. The tangential line Line 5 connects the Nordwestbahnhof (northwest station) with Nordbahnhof, Franz-Josefs-Bahnhof and Westbahnhof (west station).
In the period up to 1914, the freight station was extended several times by the construction of tracks (a total of 51), magazines and transfer platforms. Some warehouses are still standing today. Incoming goods at the station were, for example, sea fish from the North Sea from 1899 onwards. [23] The Deutsche Dampffischerei-Gesellschaft Nordsee, which was founded in Bremen in 1896 and is still active today as a restaurant chain Nordsee, set itself the goal of supplying people in the inland with fresh fish in the fastest possible way, set up a fish shop. The North Sea ports were also used to transport the first tropical fruit, the bananas, to Vienna via the Northwest Station. [24] In the core area of the railway area were the forwarding agencies. Unloading and transhipment points for coal and wood, for example, were located on the edges. Companies of different sizes arose in the new development area of the 20th district, as new sources of economic income opened up with the railway traffic. For example, the delivery of milk from the surrounding area of Vienna led to the establishment of several milk processing plants such as NÖM.
The first political event that took place at Nordwestbahnhof was the assassination of social democratic politician Franz Schuhmeier. On 11 February 1913, Paul Kunschak, brother of the Christian-social politician Leopold Kunschak, shot in the station concourse.
Since the beginning of 1923, a traffic contraction plan has been in place for the Northwest and nearby Nordbahnhof. [25] For reasons of economy and because of the two-thirds drop in passenger numbers since 1914, passenger handling at Nordwestbahnhof was discontinued on 1 February 1924; the passenger trains of the Nordwestbahn were then operated from Nordbahnhof. [26]
The now useless station concourse was used for exhibitions, political and sporting events. Even indoor skiing could be done on a snow-covered sloping plain. After the opening of the "snow palace" on 26 November 1927, the Social Democratic mayor of Vienna, Karl Seitz, was attacked by a pistol, which he and his companions survived unharmed. [27] The hall was also used as a storage hall for unused locomotives.
After the "Anschluss" of Austria, Hermann Göring held propaganda speeches on 26 March 1938 and Adolf Hitler, Joseph Goebbels and other leading Nazi politicians on 9 April 1938, the day before the "referendum" on the integration of Austria into the German Reich, in the station hall. [28] The anti-Semitic exhibition "The Eternal Jew" [29] shown in the station was intended to legitimize the persecutions of Jews that had begun.
During the war, the Wehrmacht used the building as a warehouse. In order to relieve the pressure on Nordbahnhof, the Deutsche Reichsbahn demanded the railway station back on December 12, 1942, and provisionally repaired it again. On November 1, 1943, passenger traffic between Nordwestbahnhof and Jedlersdorf was resumed. The Northwest Station was severely damaged by Soviet artillery fire during the Vienna Offensive in April 1945 shortly before the end of the war. The reception building was demolished in 1952. Nevertheless, after the war, the trains of the North railway were also handled here after the war, because this was interrupted by the demolition of the north runway bridge; however, the northwest runway bridge (northern bridge) was already navigable again on August 25, 1945.
The Russian occupying power (Red Army) required a rail link to Russia in order to remove booty from Austria. Therefore, the site was also under secret observation of the United States intelligence service (USIS). [30] The so-called "Russenschleife" was built to connect the north station area and the connecting railway line to the south station with the other bank of the Danube. From April 1945, the higher track position of the northern runway was reached via a ramp. This 652 m long loop of the Russians led from the easternmost corner of the Nordwestbahnhof to the westernmost tracks of the Nordbahnhof (Northern Railway Station) across the confluence of Taborstraße and Nordbahnstraße. It was also used by heavy steam locomotives (e. g. DRB Class 52) and crossed the tracks of the tram line "O" on the same level without technical protection. [31] With the opening of the Nordbahn bridge to traffic on 31 May 1959, the loop was dismantled. [32]
After the resumption of scheduled train services on the North Railway Bridge, the new Praterstern station was provisionally put into operation. As a result, passenger handling at Nordwestbahnhof was finally discontinued (or relocated to Praterstern station) on 31 May 1959 and the Northwest Railway Bridge over the Danube was converted into a road bridge. Since the closure of the Northwest Railway Bridge, the tracks of the station near the freight station Brigittenau, near the former bridge, have been connected to the Danube embankment railway by loops to the north and south.
In the 1970s, the site of the Northwest Station was expanded into a then modern freight and container terminal with cranes and warehouses. On 29 September 1974, the electrification of the railway lines at the station and the approach tracks was put into operation.
In 2006, the ÖBB as landowner decided to gradually move the goods terminal from the Nordwestbahnhof area (after the Wien-Inzersdorf terminal to be completed by 2017). [33] This is intended to facilitate a new use of the site in stages: according to the 2009 forecast, a new district will be created here in the period 2020–2025. The barrier Northwest Station, which now divides the 20th district into two parts, is to be removed. In recent years, there has been a large company garage in the north of the station area on Nordwestbahnstrasse, which is used by various companies such as ÖBB-Postbus or Verkehrsbetriebe Gschwindl as well as driving schools and the fire brigade.
Until mid-2007, an urban planning model was initially developed. On the basis of this, an Architectural design competition was held in March 2008, in which the Swiss firm ernst niklaus fausch Architekten (referred to as ENF Architekten Zürich in 2009) won first prize.
On a total of 44 hectares, apartments are planned for 12,000 people, workplaces for 5,000 people and a large park. [34] The area will be divided into smaller areas for this purpose, which will be used by different developers. A tram line could run through the area on a street between Wallensteinstraße and Traisengasse, otherwise there are no continuous roads planned. In the autumn of 2017 it is expected that by 2030, approximately 800,000 m2 of gross floor area will be created. The first property sales to developers are planned for 2020/21.
A re-use concept based on the High Line Park in New York was developed for the approach route of the former Nordwestbahnhof (northwest station), the siding of the Nordwestbahnhof to the Donauuferbahn (Nussdorf to Wiener Hafen) and the High Line Park in New York. The almost 2 km long railway embankment would provide an uninterrupted pedestrian and bicycle connection to the Danube and would link the entire catchment area to the planned Nordwestbahnhof-Park and Augarten.
Leopoldstadt is the 2nd municipal district of Vienna in Austria. As of 1 January 2016, there are 103,233 inhabitants over 19.27 km2 (7 sq mi). It is situated in the heart of the city and, together with Brigittenau, forms a large island surrounded by the Danube Canal and, to the north, the Danube. It is named after Leopold I, Holy Roman Emperor. Due to its relatively high percentage of Jewish inhabitants before the Holocaust, Leopoldstadt gained the nickname Mazzesinsel. This context was a significant aspect for the district twinning with the New York City borough Brooklyn in 2007.
Brigittenau is the 20th district of Vienna. It is located north of the central districts, north of Leopoldstadt on the same island area between the Danube and the Danube Canal. Brigittenau is a heavily populated urban area with many residential buildings.
Wien Westbahnhof is a major Austrian railway station, the original starting point of the West railway (Westbahn) and a former terminus of international rail services. In 2015, its role changed with the opening of Vienna's new main station and Westbahnhof is now mainly a commuter station and the terminus of private rail operator WESTbahn's intercity service from Bregenz and Munich. Locally, Wien Westbahnhof is served by S-Bahn line S50 and U-Bahn lines U3 and U6. Six tram lines converge on Europaplatz in front of the station, although none go into the city centre. There are also buses to the airport.
Vienna has an extensive transport system that includes roads, railways, trams, metro, and buses.
The Vienna S-Bahn is a suburban commuter rail network in Vienna, Austria. As opposed to the city-run urban metro network, the Vienna U-Bahn, it extends beyond the borders of the city, is operated by the ÖBB, and consists of many branch lines. S-Bahn is short for Schnellbahn, which can be translated as "rapid railway".
Wien Praterstern is one of Vienna's main railway stations, used by 35,000 people daily. It is located on the roundabout Praterstern in Leopoldstadt, in the north of the city. Vienna's two most recognisable structures, the Wiener Riesenrad and the Stephansdom (cathedral), are both visible from the platforms. Underneath the station is the Praterstern U-Bahn station, which is on U1 and U2 of the Vienna U-Bahn.
Wien Südbahnhof was Vienna's largest railway terminus. It closed in December 2009 and was demolished in 2010 to be replaced with a new station, Wien Hauptbahnhof. It was located in Favoriten, in the south-east of the city. The East-bound rail services of Südbahnhof remained in operation until 2012 at a temporary train station "Südbahnhof (Ostbahn)".
Wien Franz-Josefs-Bahnhof is a train station in the Alsergrund district of Vienna, Austria. It serves as the southern terminus of the Franz-Josefs-Bahn.
Railjet is a high-speed rail service in Europe operated by Austrian Federal Railways (ÖBB) and Czech Railways (ČD). Branded as Railjet Express (RJX) for the fastest services and as Railjet (RJ) for services with additional stops, it was introduced in 2008 and operates at speeds of up to 230 km/h (143 mph). Railjet is ÖBB's premier service and operates both domestically within Austria and on international services to adjacent major cities in the Czech Republic, Germany, Switzerland, Italy, Hungary and Slovakia.
The Western Railway is a two-track, partly four-track, electrified railway line in Austria that runs from Vienna to Salzburg via St. Pölten and Linz Hauptbahnhof and is one of the major lines of Austria. It was originally opened as the Empress Elisabeth Railway in 1858 (Vienna–Linz). The line is owned and operated by Austrian Federal Railways (ÖBB).
Bolzano/Bozen railway station is the main station of Bolzano, capital of the autonomous province of South Tyrol, in northeastern Italy.
Lindau-Insel station is the largest station in the city of Lindau (Bodensee) and was its most important station until passenger service resumed at Lindau-Reutin station on December 13, 2020. In the urban area there is also Lindau-Aeschach station and Lindau-Reutin freight yard. Formerly there were also Lindau-Siebertsdorf, Lindau Langenweg, Lindau Strandbad, Schoenau, Oberreitnau and Rehlings.
The Vindobona is an international named passenger train which began service in 1957 between Berlin and Vienna via Dresden and Prague. In later years the route was extended to run from Hamburg via Berlin, Dresden, Prague, Brno and Vienna to Villach. It was named after the ancient settlement of Vindobona on the site of the modern city of Vienna. Labelled as a EuroCity train connection from 1993, services discontinued in 2014.
The Wels–Passau railway—also called the Passauer Bahn in German—is a two-track, electrified main line railway mainly in Austria, which was originally owned and operated by the k.k. privilegierte Kaiserin Elisabeth-Bahn company. It runs from Wels in Upper Austria to Passau in Bavaria and is part of the core network of the Austrian Federal Railways.
The S1 is a railway service of the Vienna S-Bahn that operates between Marchegg and Wien Meidling. ÖBB operates the service.
District Museum Brigittenau is a local museum in Brigittenau a district of Vienna, Austria / EU. It is located at the address Dresdner Straße 79.
The Rudolf Railway refers to a railway in Austria connecting Amstetten and the Italian border near Tarvisio, along with a branch from Kastenreith to St. Valentine. Its name is derived from the k.k. priv. Kronprinz Rudolf-Bahn Gesellschaft. The main line, which was opened from 1868 to 1873, ran on the St. Valentin–Kastenreith–Kleinreifling–Selzthal–Schoberpass–St. Michael–Neumarkt saddle–St. Veit an der Glan–Feldkirchen in Kärnten–Villach–Tarvisio Centrale route. The section of the line within the current borders of Italy now runs over the new Tarvisio–Udine railway through Tarvisio Boscoverde. It replaced a very windy route to Udine that originally formed part of the Rudolf Railway.
The Franz-Josefs-Bahn is a standard gauge railway line in the Austrian state of Lower Austria. It runs 163.1 kilometres (101.3 mi) from Vienna, the Austrian capital, to the border with the Czech Republic at Gmünd. The line was originally built by the Emperor Franz Joseph Railway and is today owned and operated by Austrian Federal Railways (ÖBB).
The Donauuferbahn is a railway line in Vienna, Austria. It runs 12.8 kilometres (8.0 mi) along the west bank of the Danube river. At the northern end, the line connects with the Franz-Josefs-Bahn and Suburban line. At the southern end, the line continues as the Donauländebahn near the Winterhafenbrücke. The line is owned and operated by Austrian Federal Railways (ÖBB) and is mostly freight-only.
The Northwest railway line is an electrified railway line that runs 95.9 kilometres (59.6 mi) from Wien Floridsdorf, in the vicinity of Vienna, to Znojmo in the Czech Republic.
Citations
Sources
Media related to Category:Nordwestbahnhof, Vienna at Wikimedia Commons