Winchester Center | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||||
Location | 29 Waterfield Road Winchester, Massachusetts | |||||||||||||||||||||||||||
Coordinates | 42°27′06″N71°08′16″W / 42.4516°N 71.1378°W | |||||||||||||||||||||||||||
Line(s) | New Hampshire Main Line | |||||||||||||||||||||||||||
Platforms | 2 side platforms | |||||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||||
Connections | MBTA bus: 134 | |||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||
Parking | 237 spaces (town permit required) | |||||||||||||||||||||||||||
Bicycle facilities | 27 spaces | |||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||
Fare zone | 1 | |||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||
Closed | January 8, 2021 (temporarily, reopening 2024) | |||||||||||||||||||||||||||
Rebuilt | December 2021–November 2024 | |||||||||||||||||||||||||||
Passengers | ||||||||||||||||||||||||||||
2018 | 456 (weekday average boardings) [1] | |||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||
|
Winchester Center station is a temporarily closed MBTA Commuter Rail station in Winchester, Massachusetts, normally served by the Lowell Line. The station, located on a viaduct in downtown Winchester, was closed effective January 8, 2021 due to structural deterioration. Winchester Center station was not accessible prior to the closure, but accessible high-level platforms are being added during renovations taking place from December 2021 to November 2024.
The Boston and Lowell Railroad opened between its namesake cities in 1835; local stops were added soon after. [2] [3] Woburn Gates station – later Winchester – was open by 1838. [4] By the 1840s, service on the line was suitable for commuting to Boston. [2] Elimination of the grade crossing at Winchester was considered in 1903 and 1906, and again in 1915. [5] [6] [7] The 1915 proposal called for the tracks to be lowered by 4 feet (1.2 m) and the streets to be raised by 17 feet (5.2 m). [8] The B&M installed bike racks at the station in 1942 in an effort to reduce parking needs. [9]
In the early 1950s, the B&M began planning a project to raise the tracks of the New Hampshire Main Line and the southern end of the Woburn Branch for a mile through Winchester, eliminating troublesome grade crossings downtown. [10] Construction began in 1955; boxy two-story brick stations opened at Wedgemere and Winchester Center in 1957. [3] [11]
Until 1981, the Woburn Branch diverged from the main line just north of the Winchester Center platforms. A short stub is still in place. [12]
Winchester Center station had not been substantially renovated since the viaduct was completed in 1957. In September 2008, the MBTA approved $1.4 million in platform and ramps repairs, as well as electrical and lighting work, at the station. [13] The work was completed in 2010; the MBTA intended to renovate the station before the 5-year life of the platform patches was reached. [14]
On July 7, 2015, the Winchester Department of Public Works discovered a hole in the inbound platform, which prompted the closure of the northern 500 feet (150 m) of the platform and one ramp due to concrete deterioration. One ramp and the remaining section of the platform remained open for service. The MBTA planned to make temporary repairs before the end of the year. [14] Further repairs were made in 2017 to support the platforms and ramps. [15]
Until December 2020, a small number of Haverhill Line trains ran via the Wildcat Branch and the inner Lowell Line, making stops including Winchester Center. [16] [17]
The MBTA is making renovations to the station which will repair water damage and make it fully accessible. The station design was advanced to 15% in December 2011; Jacobs Engineering was then chosen as the contractor for final design in June 2012. [18] Funding issues prevented this design work from beginning until 2013. [18] It was later determined that the mini-high platforms of the 15% design were not sufficient for state accessibility requirements, and that full-length high-level platforms would be required. The town objected to simply changing the design to accommodate these platforms. [18]
After several iterations, a new 15% design was reached in December 2015. The rebuilt station will have 724-foot (221 m)-long high-level platforms; although shorter than the 800-foot (240 m) MBTA standard, they will still be able to platform 9 cars. A gauntlet track may be installed to allow CSX Transportation freight trains to pass. [18] A new interlocking may be built south of the station, which will allow greater flexibility during construction and allow the retirement of the former Woburn Branch interlocking north of the station after completion. [18] Although early designs called for replacement of existing ramps, the new 15% design added two redundant elevators at the southern end of each platform. The 1957-built station was originally to be demolished to make room for the elevators and staircases. [18] The northern ramp to the outbound platform will be moved north of the adjacent rotary; the northern inbound ramp will be rebuilt at its present location south of the rotary, with the possibility of an additional ramp north of the rotary in the future. [18]
Design of the station was then expected to be completed by the end of 2016, with the $25.8 million construction beginning in 2017. [19] [18] By October 2016, bidding was expected to begin that December. [20] The MBTA designated $34 million in funding in 2016, but the projected cost rose to $54 million by 2018. [21] By late 2019, the total project budget was $49.9 million: $7.3 million for design and $42.5 million for construction. [22] By May 2020, the MBTA expected to begin construction in fall 2020, with completion in spring 2023. [23] However, the project was put on hold in 2020 due to budgetary issues caused by the COVID-19 pandemic. [24]
The station was closed effective January 8, 2021 due to deterioration. [25] [26] On January 11, the MBTA reinstated funding for the project due to the closure. [27] The MBTA received a demolition permit on January 25. [28] Demolition of the ramps was completed in June 2021. [29] [30] A $47.6 million construction contract was approved on October 27, 2021. [31] The 28-month construction phase began in December 2021. [32] Site preparation began in March 2022. [33] Demolition of the remaining platforms and ramps took place in May and June 2022. Some demolition and utility work lasted through the remainder of 2022. [34]
A formal groundbreaking ceremony was held on June 30, 2022. [35] Construction was 25% complete by December 2022 and 30% complete by June 2023, with completion expected in April 2024. [36] [37] Work was delayed by plumbing code compliance issues, supply chain issues, and reduced work windows due to a September–November 2023 diversion of Haverhill Line service over the Lowell Line. [38] As of October 2023 [update] , the southern portion of the new station is expected to open in July 2024, with the remaining portion open later that year. [39]
North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by four MBTA bus routes.
Ruggles station is an intermodal transfer station in Boston, Massachusetts. It serves Massachusetts Bay Transportation Authority (MBTA) rapid transit, bus, and commuter rail services and is located at the intersection of Ruggles and Tremont streets, where the Roxbury, Fenway–Kenmore, and Mission Hill neighborhoods meet. It is surrounded by the campus of Northeastern University. Ruggles is a station stop for the Orange Line subway, as well as the Providence/Stoughton Line, Franklin/Foxboro Line, and Needham Line of the MBTA Commuter Rail system. Thirteen MBTA bus routes stop at Ruggles.
Malden Center station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in Malden, Massachusetts. Located on an elevated grade above Pleasant Street in downtown Malden, it serves the rapid transit Orange Line and the MBTA Commuter Rail Haverhill Line. The station has one island platform for the two Orange Line tracks and a single side platform for the single commuter rail track. Two busways are used by 13 MBTA bus routes.
The Lowell Line is a railroad line of the MBTA Commuter Rail system, running north from Boston to Lowell, Massachusetts. Originally built as the New Hampshire Main Line of the Boston & Lowell Railroad and later operated as part of the Boston & Maine Railroad's Southern Division, the line was one of the first railroads in North America and the first major one in Massachusetts.
Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 13 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.
South Attleboro station is an MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station had two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot.
Wollaston station is a rapid transit station in Quincy, Massachusetts. Located in the Wollaston neighborhood, it serves the MBTA's Red Line. It was opened in September 1971 as the second of three stations in the original South Shore Extension, replacing a mainline rail station which had been located there from 1845 to 1959. Wollaston station was closed from January 8, 2018, to August 16, 2019, for renovations to the station, including flood mitigation and accessibility improvements.
Natick Center station is an MBTA Commuter Rail station in Natick, Massachusetts served by the Framingham/Worcester Line. The station, located below grade in a wide cut adjacent to North Main Street, has two side platforms serving the line's two tracks. The second-busiest non-accessible station on the system, it is undergoing a major accessibility renovation and modernization from 2020 to 2024.
Newtonville station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located between the Massachusetts Turnpike and Washington Street at Newtonville Square in the village of Newtonville in Newton, Massachusetts. Stairway entrances are located on the bridges over the Turnpike at Walnut Street and Harvard Street. Newtonville station is not accessible; renovations for accessibility are planned.
Auburndale station is an MBTA Commuter Rail station in Auburndale, Massachusetts. It serves the Framingham/Worcester Line. It is located next to the Massachusetts Turnpike near Lasell College. The modern station platform, built around 1961, replaced a highly acclaimed 1881 depot building designed by H. H. Richardson. A full renovation of the station for accessibility is planned.
Wedgemere station is an MBTA Commuter Rail station in the southeast portion of Winchester, Massachusetts, served by the Lowell Line. The station has two side platforms serving the line's two elevated tracks. The 1957-built station building, largely unused, is adjacent to the inbound platform. After several years of work, the station was made fully accessible in February 2013.
Mishawum station is an MBTA Commuter Rail Lowell Line station located in the north part of Woburn, Massachusetts just north of the Route 128/I-95 beltway. The station has two side platforms serving the line's two tracks. Mishawum is a limited-service flag stop intended for reverse commuting to the adjacent office park, with no weekend service. With just 32 boardings on an average weekday in 2018, Mishawum is one of the least busy stations on the commuter rail system.
Medford/Tufts station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located off Boston Avenue near College Avenue in Medford, Massachusetts, adjacent to Tufts University. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is the northern terminus of the E branch.
Ball Square station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located at Ball Square in Somerville and Medford, Massachusetts. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is served by the E branch.
Magoun Square station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located at Lowell Street south of Magoun Square in Somerville, Massachusetts. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is served by the E branch.
Gilman Square station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located at Gilman Square in Somerville, Massachusetts. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is served by the E branch.
East Somerville station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line located in southeastern Somerville, Massachusetts. The accessible station has a single island platform serving the two tracks of the Medford Branch. It opened on December 12, 2022, as part of the Green Line Extension (GLX), which added two northern branches to the Green Line, and is served by the E branch.
Cross Street station was an MBTA Commuter Rail station in northern Winchester, Massachusetts, on the border with Woburn. The station first opened in the mid-1840s as Richardson Row on the Woburn Branch Railroad, part of the Boston and Lowell Railroad (B&L). It was renamed Cross Street in 1876. The Boston and Maine Railroad (B&M) leased the B&L in 1887, built a new depot at Cross Street in 1893, and replaced it with a concrete shelter in 1955. The Massachusetts Bay Transportation Authority (MBTA) began subsidizing service on the Woburn Branch in 1965 and purchased the line in 1976. The station was closed along with the Woburn Branch in 1981.