You can help expand this article with text translated from the corresponding article in Japanese. (October 2010)Click [show] for important translation instructions.
|
Yoshinodani Dam | |
---|---|
Location | Ishikawa Prefecture, Japan |
Coordinates | 36°16′25″N136°41′12″E / 36.27361°N 136.68667°E |
Yoshinodani Dam is a dam in the Ishikawa Prefecture of Japan, completed in 1926. [1]
Mattō was a city in Ishikawa Prefecture, Japan.
Mikawa was a town located in Ishikawa District, Ishikawa Prefecture, Japan.
Tsurugi was a town located in Ishikawa District, Ishikawa Prefecture, Japan.
Kawachi was a village located in Ishikawa District, Ishikawa Prefecture, Japan.
Yoshinodani was a village located in Ishikawa District, Ishikawa Prefecture, Japan.
Torigoe was a village located in Ishikawa District, Ishikawa Prefecture, Japan.
Oguchi was a village located in Ishikawa District, Ishikawa Prefecture, Japan.
Ishikawa was a district located in Ishikawa Prefecture, Japan.
Dainichigawa Dam (大日川ダム) is a multipurpose concrete gravity dam in the city of Hakusan, Ishikawa Prefecture, Japan, completed in 1967.
Oguchi Dam is a dam in the Ishikawa Prefecture of Japan, completed in 1938.
Tedorigawa Dam (手取川ダム) is a dam on the Tedori River in Ishikawa Prefecture, Japan, completed in 1979.
Iō Dam is a dam in Kanazawa, Ishikawa Prefecture, Japan, completed in 2001.
Kitakawachi Dam is a dam in the Ishikawa Prefecture of Japan, completed in 2010.
Saigawa Dam is a dam in the Ishikawa Prefecture of Japan, completed in 1965.
Tatsumi Dam is a dam in the Ishikawa Prefecture of Japan, completed in 2012.
Uchikawa Dam is a dam in the Ishikawa Prefecture of Japan, completed in 1974.
Mikohara Dam(Japanese: 神子原ダム) is an earthfill dam located in Ishikawa Prefecture in Japan. The dam is used for irrigation. The dam impounds about 3 ha of land when full and can store 478 thousand cubic meters of water. The construction of the dam was completed in 1942.
Shingu Dam(Japanese: 新宮ダム) is an earthfill dam located in Ishikawa Prefecture in Japan. The dam is used for irrigation. The catchment area of the dam is 6 km2. The dam impounds about 6 ha of land when full and can store 424 thousand cubic meters of water. The construction of the dam was completed in 1955.