Broadlands Dam

Last updated

Broadlands Dam
UG-LK Photowalk - 2018-03-24 - Broadlands Dam (7).jpg
Country Sri Lanka
Location Kitulgala
Coordinates 06°58′44″N80°27′16″E / 6.97889°N 80.45444°E / 6.97889; 80.45444
Purpose Power
StatusUnder construction
Construction began17 July 2013 (2013-07-17)
Opening date2020
Construction cost US$82 million
Dam and spillways
Type of dam Gravity dam
Impounds Maskeliya Oya
Height (thalweg)24 m (79 ft)
Length114 m (374 ft)
Reservoir
Total capacity198,000 m3 (7,000,000 cu ft)
Catchment area 201 km2 (78 sq mi)
Normal elevation122 m (400 ft)
Coordinates 06°59′01″N80°25′34″E / 6.98361°N 80.42611°E / 6.98361; 80.42611
Operator(s) CEB
Turbines 2 x 17.5 MW
Installed capacity 35 MW
Annual generation 126 GWh
Website
http://www.bhpceb.lk/

The Broadlands Dam (also known as the Broadlands Hydropower Project by the developers) is a 35 MW run-of-the-river hydroelectric complex currently under construction in Kitulgala, Sri Lanka. The project is expected to be completed in 2020, and will consist of two dams, and a power station downstream. [1] [2]

Contents

With an estimated annual generation capacity of 126 GWh , the facility will be the country's last major hydroelectric project, due to the exhaustion of island-wide hydropower potential. Construction of the project was ceremonially inaugurated by the Minister of Power and Energy Mrs. Pavithra Wanniarachchi at the auspicious time of 11:01 on 17 July 2013. [3] [4]

Approximately 85% of the US$82 million project funding was met via credit arrangements made with the Chinese government, with the rest borne via a loan from the local Hatton National Bank. [5] [6] [7] The construction contract of the project was granted to the China National Electric Equipment Corporation (CNEEC). [8]

Dams and reservoirs

The primary gravity dam measuring 24 m (79 ft) in height and 114 m (374 ft) in length is being constructed across the Maskeliya Oya at Kitulgala, and will supply water to the power station via a 3,404.7 m (11,170.3 ft) penstock measuring 5.4 m (17.7 ft) in diameter. [9]

A secondary gravity weir, measuring 19 m (62 ft) and 48 m (157 ft) in height and length, is also to be built in the vicinity, over the nearby Kehelgamu Oya, to provide additional hydroelectric capacity. The weir, to be called the Kehelgamu Weir, will create a catchment area of 176 km2 (68 sq mi), and will provide additional head to the penstock of the main dam via a 811 m (2,661 ft) tunnel. [9]

The penstock from the main dam will feed a power station consisting of two 3-phase synchronous turbines, each of 17.5 MW and a rated discharge of 32 m3 (1,130 cu ft) per second. [9]

The dam under construction in March 2018. UG-LK Photowalk - 2018-03-24 - Broadlands Dam (3).jpg
The dam under construction in March 2018.
Intake structure. UG-LK Photowalk - 2018-03-24 - Broadlands Dam (8).jpg
Intake structure.

See also

Related Research Articles

<span class="mw-page-title-main">Victoria Dam (Sri Lanka)</span> Dam in Teldeniya

Victoria Dam is an arch dam located 130 mi (209 km) upstream of the Mahaweli River's mouth and 4 mi (6 km) from Teldeniya. It is named in honor of Queen Victoria of the United Kingdom.

<span class="mw-page-title-main">Samanala Dam</span> Dam in Balangoda

The Samanala Dam is a dam primarily used for hydroelectric power generation in Sri Lanka. Commissioned in 1992, the Samanalawewa Project is the third-largest hydroelectric scheme in the country, producing 405 GWh of energy annually. It was built with financial support from Japan and the United Kingdom. It is notable for a large leak on its right bank. Power production continues as planned despite the leakage, and the water from the leak now provides two thirds of the water issued by the reservoir for agriculture in downstream areas.

<span class="mw-page-title-main">Electricity sector in Sri Lanka</span>

The electricity sector in Sri Lanka has a national grid which is primarily powered by hydroelectric power and thermal power, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid.

<span class="mw-page-title-main">Upper Kotmale Dam</span> Dam in Talawakele, Nuwara Eliya

The Upper Kotmale Dam is located in Talawakele, within the Nuwara Eliya District, in the Central Province of Sri Lanka. The dam feeds the third largest hydroelectric power station in the country.

Kanungu Power Station is a 6.6 megawatts (8,900 hp) run-of-the-river hydroelectric power station on the Ishasha River in Uganda. The station is sometimes referred to as the Ishasha Power Station.

<span class="mw-page-title-main">D. J. Wimalasurendra</span>

Devapura Jayasena Wimalasurendra was a Sri Lankan engineer and statesman. He played a prominent role in the establishment of hydropower in Sri Lanka and is known as the "Father of Hydropower" and was a member of the State Council of Ceylon.

<span class="mw-page-title-main">Rantembe Dam</span> Dam in Rantembe, Central Province

The Rantembe Dam is a 52-megawatt hydroelectric gravity dam at Rantembe, in the Central Province of Sri Lanka. Construction of the dam began in January 1987, and was completed on schedule in April 1990. The dam was constructed by the German 'Joint Venture Randenigala'; a different German joint venture has built the Randenigala Dam, further upstream.

<span class="mw-page-title-main">Maskeliya Dam</span> Dam in Maskeliya, Central Province

The Maskeliya Dam is a large gravity dam at Maskeliya, in the Central Province of Sri Lanka. Along with the Castlereigh Dam, the dams are the highest point and beginning of the Laxapana Hydropower Complex, involving a number of dams, penstocks, and hydroelectric power stations. The dam creates the Maskeliya Reservoir over the route of Maskeliya Oya, a major tributary of the Kelani River, which is the 4th longest in the country.

<span class="mw-page-title-main">Polgolla Barrage</span> Dam in Polgolla, Central Province

The Polgolla Barrage is a barrage built across the Mahaweli River at Polgolla, in the Central Province of Sri Lanka. The barrage is used to increase the volume of water, for transfer to the hydroelectric power station located 8 km (5 mi) north, via penstock.

<span class="mw-page-title-main">Norton Dam</span> Dam in Norton Bridge, Central Province

The Norton Dam is the gravity dam built across the Kehelgamu Oya, which is a main tributary to the Kelani River. The dam is built at Norton Bridge, in the Central Province of Sri Lanka.

<span class="mw-page-title-main">Canyon Dam (Sri Lanka)</span> Dam in Laxapana Falls, Central Province

The Canyon Dam is a large arch-gravity dam built across the Maskeliya Oya, 4.5 km (2.8 mi) upstream of the iconic Laxapana Falls, in the Central Province of Sri Lanka. The associated power station plays a major role in the national power grid, due to its significant output. The dam is surrounded by steel structures of the substation.

<span class="mw-page-title-main">Laxapana Dam</span> Dam in Laxapana, Central Province

The Laxapana Dam is a gravity dam built across the Maskeliya Oya, 2.8 km (1.7 mi) downstream of the Laxapana Falls, in the Central Province of Sri Lanka.

The Kukule Ganga Dam is a 110 m (360 ft) gravity dam built across the Kukule River in Kalawana, Sri Lanka. The run-of-river dam feeds an underground hydroelectric power station located approximately 5 kilometres (3.1 mi) away, via tunnel.

<span class="mw-page-title-main">Gal Oya Dam</span> Dam in Gal Oya National Park

The Gal Oya Dam is an embankment dam in the Uva Province of Sri Lanka. The dam creates one of the largest reservoirs in the country, the Gal Oya Reservoir. Water from the reservoir is used primarily for irrigation in the Uva and Eastern provinces, in addition to powering a small hydroelectric power station. Construction of the dam and reservoir began in August 24, 1949, completing four years later in 1953.

<span class="mw-page-title-main">Snoqualmie Falls Hydroelectric Plant</span>

The Snoqualmie Falls Hydroelectric Plant is located just north of Snoqualmie in King County, Washington state, US. It is situated about 22 mi (35 km) east of Seattle. Located just below the Snoqualmie Falls, the power plant consists of two power houses, Plant 1 and Plant 2. Plant 1 was completed in 1899 and is located underground. It is the first completely underground hydroelectric power plant ever built in the world. Plant 2 was built in 1910 and is located along the right bank of the Snoqualmie River. Both plants receive water from a small reservoir created by a weir atop the falls. Plant 1 has an installed capacity of 13.7 MW and Plant 2 a capacity of 40.2 MW for a total installed capacity of 53.9 MW, enough to power 40,000 homes.

The Uma Oya Hydropower Complex (also internally called Uma Oya Multipurpose Development Project or UOMDP) is an irrigation and hydroelectric complex currently under construction in the Badulla District of Sri Lanka. Early assessments of project dates back to 1989, when the first studies was conducted by the country's Central Engineering and Consultancy Bureau. The complex involves building a dam across Dalgolla Oya, and channelling water over a 3,975 m (13,041 ft) tunnel to Mathatilla Oya, both of which are tributaries of the Uma Oya. At Mathatilla Oya, another dam is constructed to channel 145,000,000 m3 (5.1×109 cu ft) of water per annum, via a 15,290 m (50,160 ft) headrace tunnel to the Uma Oya Power Station, where water then discharged to the Alikota Aru via a 3,335 m (10,942 ft) tailrace tunnel. The Alikota Aru is a tributary of the Kirindi Oya.

<span class="mw-page-title-main">Erathna Mini Hydro Power Project</span> Dam in Ratnapura, Sabaragamuwa Province

The Erathna Mini Hydro Power Project is one of the run of river mini hydro power projects in Sri Lanka which has the install capacity of 10 MW. The project is located on the Kuru Ganga, a tributary of the Kalu Ganga.

The Moragolla Dam is a planned hydroelectric dam in Moragolla, Sri Lanka. The dam is to be 35 m (115 ft) high and is planned to create the 1,980,000 m3 (70,000,000 cu ft) Moragolla Reservoir with a maximum supply level at 548 m (1,798 ft) MSL. Upon completion, the Moragolla Power Station would have a gross installed capacity of 30 megawatts from two francis turbines, capable of generating approximately 85 GWh annually.

References

  1. "Broadlands Hydropower project work begins on Monday". Ceylon Today. 14 July 2013. Retrieved 2 October 2013.
  2. "Broadlands hydro power project construction work inaugurated". Daily News . 16 July 2013. Retrieved 2 October 2013.
  3. "Broadlands hydro power project to be constructed". Sunday Observer . 14 July 2013. Archived from the original on 4 October 2013. Retrieved 2 October 2013.
  4. "Major Projects: Broadlands Hydro Power Project". Ceylon Electricity Board. Archived from the original on 12 November 2012. Retrieved 2 October 2013.
  5. "Construction of Broadlands Hydropower Project in Sri Lanka to start on 14th July". ColomboPage.com. 10 June 2013. Retrieved 2 October 2013.
  6. "Sri Lanka to speed up the construction of 'Broadland' hydropower project". LBR.lk. 7 May 2013. Archived from the original on 4 October 2013. Retrieved 2 October 2013.
  7. "HNB finances 15% of mega Broadlands Hydro-Power Project". FT.lk. 25 June 2013. Archived from the original on 4 October 2013. Retrieved 2 October 2013.
  8. "Broadlands 35MW hydro power project to begin in May?". The Island . Retrieved 2 October 2013.
  9. 1 2 3 "About the Broadlands Hydropower Project". BHPCEB.lk. Archived from the original on 4 October 2013. Retrieved 2 October 2013.