Chadderton Power Station

Last updated

Chadderton A & B power stations
Chadderton Power Station.jpg
Chadderton B Power Station shortly before demolition in 1986
Chadderton Power Station
CountryEngland
Location Chadderton
Coordinates 53°31′54″N2°09′57″W / 53.531640°N 2.165911°W / 53.531640; -2.165911 Coordinates: 53°31′54″N2°09′57″W / 53.531640°N 2.165911°W / 53.531640; -2.165911
StatusDemolished
Construction beganA station: 1925
B station: 1950
Commission date A station: 1927
B station: 1955
Decommission dateA station: 1967–1972
B station: 1982
Operator(s)Oldham Corporation
(1927-1948)
British Electricity Authority
(1948-1955)
Central Electricity Authority
(1955-1957)
Central Electricity Generating Board
(1958-1982)
Thermal power station
Primary fuel Coal
Turbine technologySteam turbines
ChimneysA station 8, B station 2
Cooling towersA station 6, B station 3
Cooling sourceCirculating water cooling towers
Power generation
Units operationalB station:
Four 60 MW Metropolitan-Vickers
Units decommissionedAll decommissioned
Nameplate capacity B station: 240 MW
Annual net output 893.96 GWh (1971), 109.13 GWh (1981)
External links
Commons Related media on Commons

grid reference SD891039

Chadderton Power Station refers to a series of two coal-fired power stations, which were situated at Chadderton, Greater Manchester in North West England.

Contents

Slacks Valley (Chadderton A) Power Station

History

The first power station to be constructed at Chadderton was built around 1925–1929 and was commissioned in November 1929 for the County Borough of Oldham in the Slacks Valley. The station was fueled by coal and had six cooling towers and eight chimneys. This station was decommissioned at some time between 1967 and 1972 it was subsequently demolished. [1]

The principal plant at Chadderton A station comprised: [2]

The electricity output from Chadderton A power station was: [2] [3] [4]

A station electricity sent out, GWh
YearStation output GWhThermal efficiency, %
194697.9117.14
1953/473.1616.83
1954/546.2316.02
1955/619.0314.67
1956/752.7816.91
1957/822.8114.89
1960/15.1211.25
1961/28.8211.57
1962/317.1412.24
1966/726.6512.51

Chadderton B Power Station

History

Development

In 1943, Oldham Corporation investigated the anticipated growth of load on their distribution area, and so a scheme was prepared to replace the existing Slacks Valley station. The preparation plan, drawn up by Kennedy & Donkin, considered other sites for the replacement but decided that the existing site at Chadderton was the most suitable, with an envisaged capacity of 120,000 kW, using four 30,000 kW turbo-alternators, installed at intervals of two at a time. However following discussion with the then Central Electricity Board, this was revised to four 50,000 kW sets, giving the station a capacity of 200,000 kW. This was revised again with the standardisation of unit sizes and operating temperatures and pressures, meaning the sets ended up each being 60,000 kW in size.

Surveying of the site had indicated that the site, some 95-acre (38 ha) in size, was of ample area for the scale of the new development. The site was partly made up of waste ground, having previously been used as an aircraft factory, and later as a cotton storage area by the Cotton Board. It also remained occupied by the low pressure Slacks Valley power station and its 132 kV transformer compound. It was found that suitable rail facilities for the new station were obtainable from the adjacent Caldervale Line. It was also found that effluent from the Oldham Corporation's Sewage Works could be used as make-up for the station's cooling towers. These factors helped in the station going ahead. The station was to be built in two phases, the first phases was granted consent in January 1950, and the second phase in September that year.

Chadderton B Power Station was officially opened on 8 July 1955 by Councillor F. Kenyon, chairman of the North Western Electricity Consultative Council, and member of the North Western Electricity Board. [1] [5] [6] [7] [8] The principal plant comprised: [2]

  • Seven pulverised fuel boilers (Simon-Carves) delivering 360,000 lb/hr (45.4 kg/s) of steam at 900 psi and 900 °F (62.1 bar and 482 °C),
  • Four 60 MW Metropolitan-Vickers turbo-alternators (11.8 kV) with step-up transformers to 33 kV,
  • Three cooling towers each 3.5 million gallons per hour (4.42 m3/s).

Operations

The electricity output from Chadderton B power station was: [2] [9] [10] [3]

B station electricity sent out, GWh
YearStation output, GWhThermal efficiency, %
1953/48.5926.72
1954/5543.5226.91
1955/6770.2727.50
1956/7555.2327.09
1957/8929.8627.61
1960/11226.627.41
1961/21109.326.84
1962/31231.727.15
1966/71325.127.79
1971/2893.9625.47
1978/9545.30724.71
1981/2109.12821.57

In 1971 the 7 boilers at Chadderton’B’ had a combined steam generating capacity of 2.52 million pounds per hour (317.5 kg/s). [9] The steam conditions were 900 psi (62.1 bar) and 482 °C. The station generated electricity using four turbo-alternators, each with a capacity of 63 megawatts (MW), giving the station a total generating capacity of 252 MW. The station was planned to use eight boilers, but only seven were ever installed. [1]

The railway sidings that serviced the previous station were extended. Four locomotives worked the coal yard. [11]

Closure and demolition

Structural changes to the National Grid made the power station redundant in 1982. [12] It closed on 1 November 1982 with a generating capacity of 236 MW. [13] The station and site were sold by the Central Electricity Generating Board in 1984, and demolished in April 1986. [1] [6] The station was demolished by MJ Finnigan & Co. [14] Much of the site has been redeveloped with European Union and UK Government funding to become Oldham Broadway Business Park.

The electrical substation was left in place after the demolition of the main generating station but, because of the deteriorating concrete structure and poorly performing switchgear, it has been replaced by a £25million indoor gas insulated switchgear substation on the same site. [15] [16]

See also

Related Research Articles

<span class="mw-page-title-main">West Ham Power Station</span> Former coal-fired power station in London, England

West Ham Power Station was a coal-fired power station on Bow Creek at Canning Town, in east London. It was often referred to informally as Canning Town Power Station.

Rotherham power station was a coal-fired power station sited close to the centre of Rotherham in South Yorkshire.

Hartshead Power Station was a coal-fired power station situated at Heyrod, Greater Manchester in North West England.

Sunderland Power Station was a coal-fired power station situated on the bank of the River Wear, in the city centre of Sunderland, in Tyne and Wear, North East England. The station was initially built in 1901 by the Sunderland Corporation and had several extensions added.

Stuart Street Power Station was a coal-fired power station in Bradford, Manchester, England.

Meaford Power Station was a coal-fired power station situated on the River Trent at Meaford near Stone in Staffordshire.

<span class="mw-page-title-main">Kirkstall Power Station</span> Former coal-fired power station in Leeds, England

Kirkstall power station was a coal-fired unit opened in 1930, serving the city of Leeds, West Yorkshire, England.

<span class="mw-page-title-main">Newton Abbot power station</span>

The Newton Abbot power station was a power station originally built in 1898 at Jetty Marsh, Newton Abbot as a small station to serve the local community. It was subsequently significantly expanded, and changed from direct current to alternating current when bought by the Torquay corporation in the 1920s to provide power across a wider area towards the coast.

Ribble Power Station was a coal-fired electricity generating station on the River Ribble in Penwortham near Preston, Lancashire, England. The station was built by the Corporation of Preston to replace a small privately-run generating station in the town. It supplied electricity to Preston and the surrounding area from 1923 until 1976. The station was expanded with new equipment in 1943–47 which remained in operation until the power station was closed in 1976 and was subsequently demolished.

<span class="mw-page-title-main">Huncoat Power Station</span> Former electricity generating station

Huncoat Power Station was located in Huncoat near Accrington, Lancashire. It was a 150 MW, coal-fired, electricity generating station in operation from 1952 to 1984. It has since been demolished. Huncoat power station replaced the earlier Accrington power station that had supplied electricity to the town since 1900.

<span class="mw-page-title-main">Leicester power station</span>

Leicester power stations are a series of electricity generating stations that have provided electric power to the City of Leicester and the wider area from 1894. The first station, located within Aylestone gas works, supplied electricity for street lighting. The city’s new electric tram system was supplied from 1904 by a station at Lero which operated until 1930. A large coal-fired power station was constructed at Freemans Meadow in 1922 and was operational until 1976. Finally a gas turbine power plant was commissioned in 1976.

Carlisle power stations were two electricity generating stations that supplied electricity to Carlisle and the surrounding area from 1899 until 1980. The first power station (1899–1927) was in the centre of the city near Nelson Bridge, and the second larger station was at Willow Holme North-West of the city (1923–1980).

The Lancaster power stations provided electricity to the Lancashire town and city of Lancaster and the surrounding area from 1894 to 1976. The first power station was built and operated by Lancaster Corporation and started generating electricity in April 1894. The second power station was built during the First World War near the Lune Aqueduct to provide electric power for a munitions factory. When the factory closed after the war the power station was purchased by the corporation to provide electric power throughout its supply area.

The Percival Lane power station in Runcorn was built and operated by the Mersey Power Company Limited. It comprised two stations A and B commissioned in 1921 and 1941. The station supplied electricity to commercial, industrial and domestic users over a wide area of 95 square miles around the River Mersey including Widnes, Ellesmere Port and Runcorn.

The Thornhill power station generated and supplied electricity to the town of Dewsbury and the wider regional area from 1902 to 1982, and again from 1998. The first generating station on the site was owned and operated by the Yorkshire Electric Power Company. Following nationalisation of the British electricity supply industry in 1948 Thornhill power station was operated by a succession of state owned bodies. The power station was redeveloped with new plant in 1915, 1925, 1932–37 and 1950–54. The coal-fired steam station was decommissioned in 1982, and was subsequently demolished. A gas turbine power station on the site was commissioned in 1998.

Lister Drive power station was a series of generating stations that supplied electricity to the City of Liverpool and the wider area from 1900 until 1980. They were owned and collaboratively operated by Liverpool Corporation and Marcus Kemp Coal Limited until the nationalisation of the British electricity supply industry in 1948. The power station was developed in several phases: designated No. 1, No. 2, and No. 3 stations. A gas turbine station was commissioned in March 1965.

The two Coventry power stations supplied electricity to the county borough of Coventry and the wider Warwickshire area from 1895 to 1976. They were owned and operated by Coventry Corporation until the nationalisation of the British electricity supply industry in 1948. The first power station was established in 1895 off Sandy Lane north of the city centre. A new larger power station was built at Longford / Hawksbury Junction in 1928 and was extended in 1938 and 1941. The Longford station was decommissioned in October 1976.

Halifax power station supplied electricity to the town of Halifax and the wider area from 1894 to the 1960s. It was owned and operated by Halifax Corporation until the nationalisation of the electricity supply industry in 1948. The power station was redeveloped several times and at its peak had a generating capacity of 48 MW.

Greenhill power station supplied electricity to the town of Oldham, England and the surrounding area from 1921 to 1960. It replaced the older Rhodes Bank generating station and was superseded by Chadderton B power station. Greenhill power station was owned and operated by Oldham Corporation until the nationalisation of the British electricity supply industry in 1948. The power station was built over the period 1921–24 and was decommissioned in 1960.

Neepsend power station supplied electricity to the City of Sheffield and the surrounding area from 1910 to 1976. The power station was owned and operated by the Sheffield Corporation Electricity Department prior to the nationalisation of the British electricity supply industry in 1948. It was operated in conjunction with Blackburn Meadows and Kelham power stations and was closed in 1976.

References

  1. 1 2 3 4 Department of the Environment (1994), Documentary Research on Industrial Sites: CLR Report 3 (PDF), eugris.info
  2. 1 2 3 4 Garrett, Frederick C., ed. (1959). Garke's Manual of Electricity Supply vol.56. London: Electrical Press. pp. A-44, A-117.
  3. 1 2 GEGB Annual report and accounts, various years
  4. Electricity Commission, Generation of Electricity in Great Britain year ended 31st December 1946. London: HMSO, 1947.
  5. Chadderton B Power Station, Central Electricity Authority, 1955
  6. 1 2 Lawson & Johnson 1997 , p. 2.
  7. India-Rubber Journal, vol. 125, July–December 1953, p. 291
  8. Museum of Science and Industry in Manchester (2001). "Power Stations in Greater Manchester" (PDF). msim.org.uk. Archived from the original (PDF) on 25 October 2007. Retrieved 23 December 2008.
  9. 1 2 CEGB (1972). CEGB Statistical Yearbook 1972. London: CEGB. p. 17.
  10. CEGB (1982). CEGB Statistical Yearbook 1981-82. London: CEGB. p. 8. ISBN   0902543695.
  11. Wells , p. 86
  12. Lawson & Johnson 1997 , p. 73.
  13. Mr. Redmond (16 January 1984). "Coal-fired Power Stations". Hansard . Retrieved 1 September 2009.
  14. "MJ Finnigan Demolition". mjfdemolition.co.uk. Archived from the original on 6 October 2011. Retrieved 18 April 2011.
  15. "£25m power plan sparks into action", Oldham Evening Chronicle, 29 October 2008
  16. "Whitegate 132kV Substation" (PDF). United Utilities. Retrieved 27 February 2009.[ dead link ]

Bibliography