Fillmore Street Tunnel

Last updated
Fillmore Street Tunnel
Fillmore Street Tunnel.svg
Cross-section of proposed Fillmore Street Tunnel (1913)
Overview
Location San Francisco, California
Coordinates 37°47′31″N122°26′04″W / 37.7920°N 122.4345°W / 37.7920; -122.4345
Statusplanned
Route Fillmore Street
StartSutter Street
End Filbert Street
Operation
Opened——
TrafficRailroad, automotive, and pedestrian
Technical
Length4,332 feet (1,320 m)
Tunnel clearance 19 feet (6 m)
Width29 ft (8.8 m) (rail + ped)
25 ft (7.6 m) (vehicle)
Route map
Fillmore Street Tunnel

The Fillmore Street Tunnel was a proposed double-bore tunnel approximately 34 mile (1.2 km) long in San Francisco, California which would have carried Fillmore Street and a new streetcar line underneath Pacific Heights and Russian Hill. The proposed tunnel would have connected the Western Addition and Fillmore Districts, near the south portal at Sutter Street, with Marina and Cow Hollow, near the north portal at Filbert Street. One tunnel would have been reserved for railroad and pedestrian traffic, while the parallel tunnel would have been for vehicles. The tunnel was planned, along with the contemporary Twin Peaks and Stockton Street Tunnels, to serve the traffic that was anticipated from the 1914–15 Panama–Pacific International Exposition.

Contents

The tunnel was first announced in early 1912. However, the preparation of detailed plans and permits delayed the estimated start of construction to July 1914, which meant the tunnel could not be completed in time to service the Exposition, and the project was killed in September 1913.

History

Diagram showing how the Fillmore Tunnel would connect Harbor View with the Western Addition Fillmore Street Tunnel (SF Call, 14 Jul 1913 pg 12).png
Diagram showing how the Fillmore Tunnel would connect Harbor View with the Western Addition

Shortly after the directors of the Panama–Pacific International Exposition (PPIE) selected a site in the Harbor View district, the merchants along Fillmore formed the Fillmore Street Improvement Association (FSIA) to study the possibility of constructing a tunnel along Fillmore Street. [1] The FSIA hired an engineer to prepare preliminary plans and estimates, and FSIA members visited similar contemporary tunnels in Los Angeles to obtain practical advice; an official announcement was scheduled for early January 1912. [2] Fillmore Street had come into prominence following the 1906 San Francisco earthquake, which forced many businesses to relocate from Market to Fillmore. [3] In addition to the temporary benefit to speed traffic to and from the PPIE, the Fillmore Tunnel was expected to spur development along the northern waterfront for trade via the Panama Canal and to shorten the commute from the Marin County suburbs. [4]

The modest cottages, the old-fashioned residences that now dot the Harbor View district will in time give way to modern apartment houses, hotels, office buildings and mercantile structures. Harbor View, once a dreary waste of swamp, the dumping ground of refuse, the "cow hollow" of the past, is destined in a few short years to be the scene of swarming commercial activity. The Fillmore street tunnel is the magician's wand that will work this transformation.

San Francisco Call, Sep 12, 1912 [5]

The Fillmore Street Tunnel and a rival parallel route under Steiner Street, one block to the west, were compared in January 1912. While Steiner Street proponents declared their tunnel would be shorter and less expensive, the FSIA argued that tradition and existing streetcar routes favored their proposal. [6] They pressed the case for Fillmore in a front-page editorial published in January 1912, [7] and the editors of the San Francisco Call agreed with FSIA. [8] By February, the Fillmore alignment was being favored over competing parallel routes along Steiner, Pierce, and Divisadero; however, the land and tunnels committee of the San Francisco Board of Supervisors delayed their official endorsement of the Fillmore Street Tunnel proposal while awaiting the results of consultant Bion J. Arnold's study; [9] Arnold declared his support in March 1912 via telegram. [10] Later that month, the City Attorney determined that rail service could be provided through the tunnel as an alternative to the existing surface streetcar franchise granted to the United Railroads of San Francisco (URR) on Fillmore; [11] URR service was via the 23-line (Fillmore-Valencia) up the south side of Fillmore to Broadway, connecting to the Fillmore Counterbalance funicular on the steep north side down to Green on the Bay waterfront. [12] [13] Arnold followed up with a written report in April 1912 with a more detailed design and a cost estimate of $1.7–1.8 million, depending on configuration. [14]

Invisible Square.svg
Mapscaleline.svg
750m
780yds
Red pog.svg
Planned portal locations for Fillmore Street Tunnel
1
North portal (Filbert)
2
South portal (Sutter)

Funding for the tunnel became an issue. Special assessment districts were established to cover the areas at the north and south ends of the tunnel, keeping with precedent established for the contemporary Twin Peaks and Stockton Street Tunnels. [15] Property owners within these districts would be responsible to pay an extra land value tax based on property size; in return, the tunnel was expected to increase the assessed value of the property in the assessment districts after completion. The fairgrounds for PPIE were in the northern special assessment district, but the land had been leased, and the PPIE Company could not agree on a plan to share the cost of the special property tax with the owners. [16] In April 1912, the PPIE Company declined a tunnel assessment cost-sharing proposal, stating their budget was reserved for construction of buildings and grounds for the Exposition. [17] The northern assessment district for the Fillmore Tunnel was projected to overlap with a western assessment district for a planned Broadway Tunnel, which would have caused some property owners to pay for two tunnels. [18] The competing Devisadero [ sic ] Street Improvement Association also filed a protest over their inclusion in the special assessment district, stating they would receive no benefit and promoting their alignment instead. [19] Residents of Harbor View also opposed further industrial development of their neighborhood. [20]

View north along Fillmore towards San Francisco Bay and Marin County, taken north of the intersection with Broadway (2009); the steep grade is apparent. Fillmore Street, between Broadway and Vallejo, looking North, San Francisco.jpg
View north along Fillmore towards San Francisco Bay and Marin County, taken north of the intersection with Broadway (2009); the steep grade is apparent.

By September 1912, the preliminary engineering design was complete and legal work began to acquire the properties needed to widen Fillmore at the north and south portals. [5] In December, the San Francisco Call reported that plans for the Fillmore Street Tunnel were almost completed, and estimated that construction would begin the following Spring; according to City Engineer M.M. O'Shaughnessy, the tunnel would take approximately 11 months to complete and would have been ready by Spring 1914. [21] The Fillmore Street Tunnel Property Owners' association was formed that month to advocate for the tunnel's construction. [22]

On February 24, 1913, the Board of Supervisors unanimously adopted a resolution to build a streetcar line on Van Ness Avenue (completed in 1914 as the D Geary-Van Ness) and construct the Fillmore Street Tunnel. [23] Arnold's report to the City of San Francisco, submitted on March 1913, urged "the Fillmore Street tunnel should be built immediately, extending from Sutter Street to Filbert Street, with the necessary street-widening at portals to preserve the roadways at either side for street-cars, traffic, and sidewalks." The proposed Fillmore tunnel offered the best combination of grade and level despite its relatively long length. [24] :218–9 In May 1913, the lands and tunnels committee were beset by property owners in the special assessment districts demanding to know what their levies would be, bringing further progress to a halt. [25] The number of protests led at least one supervisor to propose the cost should be spread city-wide instead of two special assessment districts. [26] O'Shaughnessy quashed rumors the Fillmore Street Tunnel would cost $6–10 million, stating that his estimate was less than $3 million based on detailed designs his office was preparing in June 1913. [27] [28]

Plan of the Panama-Pacific International Exposition grounds at Harbor View; Fillmore connects just to the right of the phrase "main exhibit palaces". High Points on Four Great High Ways to the California Expositions (1915) (14597207438).jpg
Plan of the Panama–Pacific International Exposition grounds at Harbor View; Fillmore connects just to the right of the phrase "main exhibit palaces".

Although the tunnel had not started construction by June 1913, the Call confidently predicted that work would begin that fall; upon completion, 80% of San Francisco's residents would have direct access to the central gate for the Panama–Pacific Exposition via the proposed tunnel. [29] Plans were also announced that Robert Dollar Steamship Company would add large concrete docks to Harbor View once the fair had concluded, giving more support for the Fillmore Street Tunnel, leading to notable real estate speculation along Fillmore. [30] [31]

Cutaway profile of Fillmore Street Tunnel project (1913) Fillmore Tunnel elevation and geology (1913) (15577635314).png
Cutaway profile of Fillmore Street Tunnel project (1913)

However, the final design for the tunnel continued to be delayed until August, [32] leaving little time for construction to complete prior to the exposition. [33] In addition, costs were expected to be relatively high: while the Twin Peaks tunnel had been contracted for $4 million, the shorter Fillmore tunnel was expected to cost $2.9 million because of its greater complexity and width. [34] [35] Tunnel advocates appealed directly to Mayor Rolph and asserted the $2.9 million estimate was overly conservative, meaning the special assessment, estimated at $1 per square foot of property, should be closer to $0.08/ft2 instead. [36] In a late push to build support, The Call ran stories throughout 1913 featuring supportive citizens, businessmen, and property owners in the assessment districts. [37] [38] [39] [40] [41]

Despite these efforts, by September the directors of the PPIE firmly opposed the tunnel, saying that construction activities would disrupt the exposition and that it would not be ready by 1915. [42] One of the original advocates for the tunnel, Samuel Adelstein, now also opposed the tunnel's construction, as he felt the improvement district levies for his property was disproportionately large. [43] [44] Believing that it could not be finished in time for the exposition, the Board of Supervisors adopted a resolution to abandon the Fillmore Tunnel project in mid-September; [45] by that time, the estimated start of construction had slipped to July 1914. [46] [47]

Design

Fillmore Street Tunnel portal (SF Call, 28 Jun 1913).png
South portal (at Sutter)
Fillmore Street Tunnel - N portal (SF Call, 22 Sep 1912, pg 19).png
North portal (at Filbert)
Artist's renditions of the Fillmore Street Tunnel portals (1912–3)

The tunnel was to run 4,332 feet (1,320 m) from Sutter to Filbert, including approaches. Its design was divided into two bores: one was 29 feet (8.8 m) wide for pedestrian and rail traffic, and the other bore was 25 feet (7.6 m) wide with three vehicle lanes. [21] The maximum vertical clearance within the tunnel as designed was 19 feet (5.8 m) at the center of each bore. When completed, the maximum grade along Fillmore would have been reduced to 2.3 percent; an alternative, constructing a balanced cable way on the surface, would require a maximum 25.4 percent grade. [24] :220,Table 15 Arnold's study, which included considering alternative routes for both low-level tunnels along Steiner (from Pine to Union) and Divisadero (from Pine to Lombard), and high-level tunnels along Divsiadero (Sacramento to Greenwich) and Broadway (Mason to Larkin), concluded the Fillmore tunnel offered the best (low-level) approach and grade, but would cost significantly more than the similar Stockton Street Tunnel due to its additional length and bore size. [24] :223–4

The design would have widened Fillmore along the two blocks at either end (between Bush and Sutter on the south, and between Union and Filbert on the north) to accommodate the approaches; the existing URR Fillmore line would continue to run over the hill. In the initial plan, the tunnel was to be bored from the north using a tunneling shield, with the material removed to be used as fill to reclaim land at Harbor View. [2]

Several test wells were drilled along the proposed route to determine the composition of the hill. Although most of the test bores encountered only sand and clay, near the crest of the hill at Broadway, the drill encountered broken rock 23 feet (7.0 m) below the surface and would not go further. [48]

Related Research Articles

<span class="mw-page-title-main">San Francisco Municipal Railway</span> Public transport agency in San Francisco, California, USA

The San Francisco Municipal Railway ( MEW-nee; SF Muni or Muni), is the primary public transit system within San Francisco, California. It operates a system of bus routes, the Muni Metro light rail system, three historic cable car lines, and two historic streetcar lines. Previously an independent agency, the San Francisco Municipal Railway merged with two other agencies in 1999 to become the San Francisco Municipal Transportation Agency (SFMTA). In 2018, Muni served 46.7 square miles (121 km2) with an operating budget of about $1.2 billion. Muni is the seventh-highest-ridership transit system in the United States, with 142,168,200 rides in 2023, and the second-highest in California after the Los Angeles County Metropolitan Transportation Authority.

<span class="mw-page-title-main">Panama–Pacific International Exposition</span> 1915 worlds fair held in San Francisco, California, United States

The Panama–Pacific International Exposition was a world's fair held in San Francisco, California, United States, from February 20 to December 4, 1915. Its stated purpose was to celebrate the completion of the Panama Canal, but it was widely seen in the city as an opportunity to showcase its recovery from the 1906 earthquake. The fair was constructed on a 636 acre(1 sq. mi., 2.6 km2) site along the northern shore, between the Presidio and Fort Mason, now known as the Marina District.

<span class="mw-page-title-main">L Taraval</span> San Francisco light rail line

The L Taraval is a hybrid light rail/streetcar line of the Muni Metro system in San Francisco, California, mainly serving the Parkside District. Since 2021, the line has been suspended and replaced by buses until the end of 2024 for an improvement project along Taraval Street.

<span class="mw-page-title-main">K Ingleside</span> San Francisco light rail line

The K Ingleside is a hybrid light rail/streetcar line of the Muni Metro system in San Francisco, California. It mainly serves the West Portal and Ingleside neighborhoods. The line opened on February 3, 1918, and was the first line to use the Twin Peaks Tunnel.

<span class="mw-page-title-main">Sunset Tunnel</span> Streetcar tunnel in San Francisco, California, U.S.

The Sunset Tunnel, originally known as the Duboce Tunnel, is a 4,232 ft (1,290 m)-long light rail/streetcar tunnel in San Francisco, California. The tunnel runs under the steep hill adjacent to Buena Vista Park and is used exclusively by the N Judah Muni Metro line.

<span class="mw-page-title-main">Twin Peaks Tunnel</span> Light rail tunnel in San Francisco, California

The Twin Peaks Tunnel is a 2.27-mile-long (3.65 km) light rail/streetcar tunnel in San Francisco, California. The tunnel runs under Twin Peaks and is used by the K Ingleside, M Ocean View and S Shuttle lines of the Muni Metro system.

<span class="mw-page-title-main">Geary Boulevard</span> Thoroughfare in San Francisco, United States

Geary Boulevard is a major east–west 5.8-mile-long (9 km) thoroughfare in San Francisco, California, United States, beginning downtown at Market Street near Market Street's intersection with Kearny Street, and running westbound through downtown, the Civic Center area, the Western Addition, and running for most of its length through the predominantly residential Richmond District. Geary Boulevard terminates near Sutro Heights Park at 48th Avenue, close to the Cliff House above Ocean Beach at the Pacific Ocean. At 42nd Avenue, Geary intersects with Point Lobos Avenue, which takes through traffic to the Cliff House, Ocean Beach and the Great Highway. It is a major commercial artery through the Richmond District; it is lined with stores and restaurants, many of them catering to the various immigrant groups who live in the area. The boulevard borders Japantown between Fillmore and Laguna Streets.

<span class="mw-page-title-main">Balboa Park station</span> Transit station in San Francisco, California, US

Balboa Park station is a Bay Area Rapid Transit (BART) station and Muni Metro complex in the Mission Terrace neighborhood of San Francisco, California, located near the eponymous Balboa Park. It is an intermodal hub served by four BART routes, three Muni Metro lines, and a number of Muni bus routes. The station complex also includes two rail yards, Cameron Beach Yard and Green Light Rail Center, where Muni maintains Muni Metro trains and heritage streetcars. BART uses a below-grade island platform on the west side of the complex; Muni Metro routes use several smaller side platforms located on surface-level rail loops around the yards.

<span class="mw-page-title-main">Market Street Railway (transit operator)</span> California transit operator

The Market Street Railway Company was a commercial streetcar and bus operator in San Francisco. The company was named after the famous Market Street of that city, which formed the core of its transportation network. Over the years, the company was also known as the Market Street Railroad Company, the Market Street Cable Railway Company and the United Railroads of San Francisco. Once the largest transit operator in the city, the company folded in 1944 and its assets and services were acquired by the city-owned San Francisco Municipal Railway. Many of the former routes continue to exist into the 2020s, but served by buses.

<span class="mw-page-title-main">E Embarcadero</span> San Francisco heritage streetcar line

The E Embarcadero is a historic streetcar line that is the San Francisco Municipal Railway's second heritage streetcar line in San Francisco, California. Trial service first ran during the Sunday Streets events on The Embarcadero in 2008. The line initially ran on weekends only, but expanded to weeklong service in late April 2016.

<span class="mw-page-title-main">Michael O'Shaughnessy</span>

Michael Maurice O'Shaughnessy was an Irish civil engineer who became city engineer for the city of San Francisco during the early twentieth century and developed both the San Francisco Municipal Railway (Muni) and the Hetch Hetchy water system.

<span class="mw-page-title-main">Broadway Tunnel (San Francisco)</span> Road underpass in San Francisco, California, U.S.

The Broadway Tunnel is a roadway tunnel in San Francisco, California. The tunnel opened in 1952, and serves as a high-capacity conduit for traffic between Chinatown and North Beach to the east and Russian Hill and Van Ness Avenue to the west. In a proposal of the city's 1948 Trafficways Plan, the tunnel was to serve as a link between the Embarcadero Freeway and the Central Freeway.

The San Francisco and San Mateo Electric Railway (SF&SM) was the first electric streetcar company in San Francisco, California. The company was only in business for ten years, starting from 1892 until it was merged into the United Railroads of San Francisco (URR) in 1902.

<span class="mw-page-title-main">Stockton Street Tunnel</span> Road tunnel in San Francisco

The Stockton Street Tunnel is a tunnel in San Francisco, California, which carries its namesake street underneath a section of Nob Hill near Chinatown for about three blocks. It was opened in 1914. The south portal is located just shy of Bush Street, which is about two blocks to the north of Union Square. The north portal is located just to the south of the Sacramento Street intersection.

<span class="mw-page-title-main">Duboce and Church station</span>

Duboce and Church is a light rail stop on the Muni Metro J Church and N Judah lines, located in the Duboce Triangle neighborhood of San Francisco, California. Just east of the station, the two lines enter the Market Street subway. The stop originally opened with the 22 Fillmore line in 1895. The station has complex layout with two side platforms in the middle of Duboce Avenue for the N Judah, one side platform in the middle of Church Street for northbound J Church trains entering the Market Street subway, and two mini-high platforms at the subway portal which provides access to both lines for people with disabilities.

<span class="mw-page-title-main">St. Francis Circle station</span>

St. Francis Circle is a light rail stop on the Muni Metro K Ingleside and M Ocean View lines, located in the St. Francis Wood neighborhood of San Francisco, California. It opened around 1907 when the United Railroads (URR) expanded its Ocean Avenue line west to Ocean Beach; Muni service followed with the K in 1918 and the M in 1925.

<span class="mw-page-title-main">Fillmore Counterbalance</span> Streetcar device

The Fillmore Counterbalance was a streetcar device operated by the Market Street Railway (MSRy) in San Francisco. It aided the company's 22 Fillmore line in traversing the steep northern slope of Fillmore Street from 1895 to 1941. The weight of a descending car helped lift ascending cars. It was a unique operation for its use of mechanical cable haulage for an otherwise electrically-powered route.

The Geary Subway is a proposed rail tunnel underneath Geary Boulevard in San Francisco, California. Several plans have been put forward as early as the 1930s to add a grade separated route along the corridor for transit. San Francisco Municipal Railway bus routes on the street served 52,900 daily riders in 2019, the most of any corridor in the city.

<span class="mw-page-title-main">22 Fillmore</span> Trolleybus route in San Francisco, California

22 Fillmore is a trolleybus line operated by the San Francisco Municipal Railway (Muni). It connects the Marina District to Mission Bay in San Francisco.

References

  1. Adams, C.F. (August 26, 1911). "Fillmore Street Tunnel necessary for access to Harbor View". San Francisco Call. Retrieved 19 August 2020.
  2. 1 2 Adams, Charles Francis (December 23, 1911). "Fillmore Hill to be pierced by two tubes". San Francisco Call. Retrieved 19 August 2020.
  3. "Tunnel Through Fillmore Street Hill". San Francisco Call. December 24, 1911. Retrieved 19 August 2020.
  4. "Great Building Activity in this City During 1912". San Francisco Call. January 5, 1913. Retrieved 20 August 2020.
  5. 1 2 "Way Being Paved for Fillmore St. Tunnel". San Francisco Call. September 22, 1912. Retrieved 19 August 2020.
  6. "Rival Tunnel Factions Meet in a Powwow". San Francisco Call. January 12, 1912. Retrieved 18 August 2020.
  7. "Fillmore Street Tunnel is Urged". San Francisco Call. January 14, 1912. Retrieved 18 August 2020.
  8. "Locate the Tunnel in Fillmore Street". San Francisco Call. January 16, 1912. Retrieved 19 August 2020.
  9. "Committee postpones decision on tunnel". San Francisco Call. February 24, 1912. Retrieved 19 August 2020.
  10. "Leading events of week among improvement clubs". San Francisco Call. March 2, 1912. Retrieved 20 August 2020.
  11. "U.R.R. Can't Bar Fillmore Tunnel". San Francisco Call. March 10, 1912. Retrieved 19 August 2020.
  12. "'Fair, Please': Streetcars to the 1915 Panama-Pacific Exposition". Market Street Railway. January 10, 2005. Retrieved 20 August 2020.
  13. Menzies, Jeremy (March 3, 2016). "The 22 Fillmore - SF's Forgotten Funicular". San Francisco Municipal Transportation Agency. Retrieved 20 August 2020.
  14. "Expert Reports on Tunnel Plan". San Francisco Call. April 12, 1912. Retrieved 20 August 2020.
  15. "Drive Ahead With the City Tunnels". San Francisco Call. March 3, 1912. Retrieved 20 August 2020.
  16. "Tunnel work brought near starting point". San Francisco Call. March 16, 1912. Retrieved 20 August 2020.
  17. "P.P.I.E. Co. Won't Pay Assessment". San Francisco Call. April 16, 1912. Retrieved 20 August 2020.
  18. "Bore Assessment District Overlaps". San Francisco Call. May 12, 1912. Retrieved 20 August 2020.
  19. "Present conditions are a menace to health". San Francisco Call. July 27, 1912. Retrieved 20 August 2020.
  20. Dyl, Joanna L. (2017). Seismic City: An Environmental History of San Francisco's 1906 Earthquake. Seattle, Washington: University of Washington Press. p. 253. ISBN   9780295742472 . Retrieved 21 August 2020.
  21. 1 2 "Fillmore St. Tunnel to be Begun Early in Spring". San Francisco Call. December 21, 1912. Retrieved 18 August 2020.
  22. "Tunnel Association Organized". San Francisco Call. December 12, 1912. Retrieved 20 August 2020.
  23. "Municipal Road Bill Passes by a Unanimous Vote". San Francisco Call. February 25, 1913. Retrieved 19 August 2020.
  24. 1 2 3 Arnold, Bion J. (March 1913). "10. Tunnels into Harbor View". Report on the Improvement and Development of the Transportation Facilities of San Francisco (Report). Retrieved 17 April 2018.
  25. "Fillmore tunnel report ordered". San Francisco Call. May 24, 1913. Retrieved 20 August 2020.
  26. "Fillmore tunnel fate is delayed pending report". San Francisco Call. May 26, 1913. Retrieved 20 August 2020.
  27. "Fillmore Bore to Cost $3,000,000, says expert". San Francisco Call. June 7, 1913. Retrieved 20 August 2020.
  28. "The Fillmore Street Tunnel". San Francisco Call. June 25, 1913. Retrieved 20 August 2020.
  29. "Fillmore Street Tunnel Opens Up Great Possibilities for City's Growth". San Francisco Call. June 28, 1913. Retrieved 18 August 2020.
  30. "Great Docks planned for Harbor View after Fair". San Francisco Call. July 12, 1913. Retrieved 20 August 2020.
  31. "Big Docks for Law Brothers' Land at Harbor View". San Francisco Call. July 14, 1913. Retrieved 19 August 2020.
  32. "Plans for Fillmore St. Bore ready Aug. 1". San Francisco Call. July 10, 1913. Retrieved 20 August 2020.
  33. "Tunnels offer opportunity for City's growth". San Francisco Call. August 9, 1913. Retrieved 19 August 2020.
  34. "Tunnels will be built cheaply". San Francisco Call. August 2, 1913. Retrieved 19 August 2020.
  35. "San Francisco's New Tunnels". The Architect and Engineer. Vol. XXXIV, no. 1. August 1913. p. 140. Retrieved 21 August 2020.
  36. "Tunnel Association urges Mayor to act". San Francisco Call. August 29, 1913. Retrieved 19 August 2020.
  37. "Events of the week among civic clubs". San Francisco Call. January 12, 1913. Retrieved 20 August 2020.
  38. "Fillmore Street Chiefs favor tax for Tunnel". San Francisco Call. July 2, 1913. Retrieved 20 August 2020.
  39. "Tunnel to help city many ways". San Francisco Call. July 5, 1913. Retrieved 20 August 2020.
  40. "Harbor View Section Setting the Pace". San Francisco Call. July 26, 1913. Retrieved 20 August 2020.
  41. "Tunnels will cause real estate revival". San Francisco Call. September 6, 1913. Retrieved 20 August 2020.
  42. "Directors assert Tunnel would hurt Fair". San Francisco Call. September 9, 1913. Retrieved 20 August 2020.
  43. "Fillmore Tunnel Advocates Urge Quick Action". San Francisco Call. September 10, 1913. Retrieved 19 August 2020.
  44. "Adelstein Guilty in Tunnel Deal, Vote Fillmore Improvers". San Francisco Call. October 7, 1913. Retrieved 19 August 2020.
  45. "Board of Supervisors Abandons Fillmore Street Tunnel Proceedings". Municipal Record. Vol. VI, no. 38. September 18, 1913. p. 1. Retrieved 21 August 2020.
  46. "Fillmore Tunnel Fate Up Today". San Francisco Call. September 15, 1913. Retrieved 20 August 2020.
  47. "Fillmore Tunnel will not be built". San Francisco Call. September 16, 1913. Retrieved 19 August 2020.
  48. Bartell, M. J. (May 1913). "Logs of San Francisco Wells: Harbor View District". Report on the Underground Water Supply of San Francisco County (Report). City and County of San Francisco. pp. 111–112. Retrieved 21 August 2020.