GE Offshore Wind

Last updated

GE Offshore Wind
IndustryWind turbines
PredecessorAlstom Wind (2010-2015)
Alstom Ecotècnia (2007-2010)
Ecotècnia S.c.c.l. (1981-2007)
Founded1981
Headquarters,
France
Key people
Lars Rytter (CEO)
ProductsAlstom Haliade 150, GE Haliade-X
Owner General Electric
Parent GE Renewable Energy

GE Offshore Wind is a joint venture with Alstom and a subsidiary of GE Renewable Energy, created in 2015 when most of Alstom's electrical power and generation assets were acquired by General Electric. GE's stake in the joint venture is 50% plus 1 share.

Contents

Formerly known as Alstom Wind, originally Alstom Ecotècnia, the company was the wind power company of energy infrastructure company Alstom, within its 'Power' operating division, from 2010 to 2015. The company originated as Ecotècnia S.c.c.l., a Spanish wind power equipment manufacturing and installation company established in 1981, acquired by Alstom 2007 for €350 million.

The subsidiary's main product is the 14MW Haliade-X offshore wind turbine, amongst the most powerful on Earth. [1]

History

Ecotècnia, 1987-2007

Detail of a wind turbine Alstom-Ecotecnica Eco80 in the Spanish Basque Country Badaia - Parque Eolico -BT- 01.jpg
Detail of a wind turbine Alstom-Ecotècnica Eco80 in the Spanish Basque Country

Ecotècnia was a manufacturer and installer of wind turbines established in 1981, headquartered in Barcelona, Spain. In 1999 it became part of the Basque-based cooperative Mondragon Corporation. [2]

The company's first wind generator was a 30 kW machine, developed by 1984 with funding assistance from the Spanish Science Ministry. In 1991 the company developed a 150 kW machine, and in 1992 won its first commercial project - for fifty 150 kW turbines at Tarifa, Spain. [3] The particular demands of installing wind turbines in mountainous regions in Spain which included poor road access and blustery (high turbulence) conditions led to specific design features of Ecotècnia's turbines - including a modular construction of the turbine (three components: rotor and shaft; mainframe and yaw system; and the drive train - each less than 30t), as well as isolation of the gearbox from the main drive, reducing non-torque gearbox loads. [3] [4]

In the first half of the 1990s the company installed wind farms using its ECO20 150 kW model, from 1995 to 2000 the company's primary models were the ECO44 (640 kW) and ECO48 (750 kW) models. [5] After 2003 most of the company's installations used its 1.67MW IEC 61400 class II ECO74, [6] and class IIIA ECO80, [7] three blade turbine models; [5] both typically used a mechanically isolated Winergy AG PEAB 4390.2 planetary gearbox driving a doubly fed induction generator (typically ABB, Siemens, Winergy sourced) with IGBT inverter control, driven by individually pitch controlled LM manufactured blades. [4] [6] [7]

The majority of its installations were in Spain, with approximately 10% in other countries including Portugal, France, Italy as well as installations in Japan and India. [5]

In 2005 the company's estimate world market share (by installed capacity) was 2.1%. [4] By 2007 the company had installed over wind farms with over 1GW total of rate power; [5] the company had increased the power output of its wind turbine offering from 30 kW in 1984 to 1.67MW by 2003. [8]

In mid 2007 Alstom acquired Ecotècnia for 350 million euro. [9] By late 2007 the company employed over 800 people, with sales of approximately €400 million pa., and operated wind turbine assembly plants in Somozas and Buñuel, other sites at Rio del Pozo (control panels) and Coreses (tower manufacturing). [10] The company also manufactured small scale autonomous energy systems for isolated locations (tradename 'CICLOPS') comprising windgenerator (10 kW), photovoltaic solar source (2 to 10 kW), generator, battery and inverter, and was active in small scale photovoltaic cell installation (factory Pla de Santa Maria. [10] ). [11]

Alstom Wind, 2007-2015

The first ECO100 3 MW wind turbine was formally inaugurated at the Vieux Moulin wind farm (Pithiviers, Paris, France) 1 October 2009. [12]

The company was renamed Alstom Wind S.L. in April 2010. [13]

In 2010 Alstom began construction of a turbine nacelle factory in Amarillo, USA, [14] completed in mid 2011. [15] In November 2011 a 300MW per year capacity manufacturing plant in Camaçari near Salvador, Bahia, Brazil was formally opened. [16]

In March 2012 a prototype of Alstom Haliade 150 6 MW offshore turbine was formally inaugurated; the turbine was developed for large scale offshore wind projects off the French coast; [17] in January 2011 Alstom joined a consortium led by EDF Energies Nouvelles as turbine supplier (also including DONG Energy, Nass & Wind, WPD Offshore) to bid for proposed offshore wind farms in France of 6GW capacity. [18] The Haliade 150 turbine was a development of the previous mechanically isolated transmission designs developed by Ecotècnia; [note 1] the gearbox driven electrically generator was omitted and replaced with a gearless direct drive permanent magnet synchronous generator designed for higher efficiency and greater reliability with fewer moving parts. The turbine uses 73.5m turbine blades from LM Wind Power. [20]

In April 2012 the French state awarded an EDF/DONG Energy/Alstom consortium three contracts for offshore wind farms (Saint-Nazaire, Courseulles-sur-Mer, Fécamp. [21] ) off the northwestern coast of France of total power 1.4 GW. As a result, Alstom confirmed that it would be constructing wind turbine factories at Cherbourg-en-Cotentin (Turbine blades in association with LM Power, wind turbine towers), and at Saint-Nazaire (Nacelles and generators) in the Montoir-de-Bretagne port area. [22]

A 6 MW Haliade turbine began generating electricity in July 2012 during certification testing. The turbine's electrical generator was supplied by partner company, General Electric subsidiary GE Power Conversion (Converteam), who were also expected to establish a production plant in Saint Nazaire. [23]

In late 2012 Alstom announced the intention to construct a wind turbine tower manufacturing facility in Canoas, Rio Grande do Sul, Brazil, on a site adjacent to an established Alstom power transmission factory. [24] The plant was officially inaugurated in August 2013. [25]

In February 2013 the company announced the cut of 35% of its workforce in Spain, due to a collapse in the Spanish wind market because of a change to governmental support for wind developments. [26] [note 2] The facilities at Somozas, Galicia (electrical equipment), and Zamora, Castille and Leon region (towers) were to close with electrical equipment production moved to the plant at Buñuel, Navarra. [26] [29] Total job losses were later reduced from 373 to 265. [30]

A Haliade 150 turbine was installed at the Belwind wind farm in November 2013 for operational tests, at the time being one of the largest operational wind turbines in the world. [31] [32] [note 3]

In December 2014 the St. Nazaire nacelle and generator assembly factory was officially opened. [33] [34]

In early 2015 a wind turbine tower factory was opened in Jacobina, Bahia, Brazil; constructed as a joint venture (51%/49%) between Andrade Gutierrez and Alstom. [35]

Initial orders for the company's Haliade wind turbine included 5 units for the Block Island Wind Farm (USA, March 2015); [36] and 66 units for DEME for the Merkur offshore wind farm (Germany, July 2015). [37]

In November 2015 most of Alstom's energy generation and transmission assets were bought by General Electric. The combined business under GE was named GE Power. [38] The two parties also created three joint ventures, among them a hydro and offshore renewable business unit.

GE Power (offshore wind) (2016-)

In February 2016 the first of a series production of 300 permanent magnet wind generators was completed at the St. Nazaire factory. [39] [40] A long planned test period for the 6MW Haliade is expected to start in Spring 2016 at Østerild Wind Turbine Test Field. [41] [42]

Notes

  1. The Haliade 150 design has separate main rotor and generator bearings, with torque transmitted from rotor to generator via a flexible coupling. [19]
  2. Spanish governmental austerity measures led to subsidies for wind power ending c.2012. Quote: In January 2012 the newly appointed Spanish government announced a temporary suspension in the premium remuneration for renewable energy capacity. ... It's expected that this decision will simply stop the building of new wind in 2013. [27] Support via Feed-in tariffs were to be replaced by subsidies encouraging capital investment, with only intrinsically profitable ventures supported. [28]
  3. An initial Haliade 150 turbine was installed onshore at Le Carnet,France for testing and certification in March 2012. [31]

Related Research Articles

<span class="mw-page-title-main">Alstom</span> French rolling stock manufacturer

Alstom SA is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional and urban trains along with trams.

<span class="mw-page-title-main">Wind power in Spain</span>

Spain is one of the countries with the largest wind power capacity installed, with over 27 GW in 2020. In 2013, it had become the first country in the world to have wind power as its main source of energy.

Siemens Gamesa Renewable Energy, S.A., born in 2017 as the merger of Siemens's Wind Power Division with Gamesa Corporación Tecnológica, S.A., is a Spanish-German wind engineering company based in Zamudio, Biscay, Spain. In Spain, the company has two other main sites in Spain: one in Madrid and the other one in Sarriguren. Other than its headquarters, its onshore business is primarily based in Spain, while the offshore business is based in Germany and Denmark. It is the world's second largest wind turbine manufacturer behind Vestas.

<span class="mw-page-title-main">Wind power in China</span> Overview of wind power in China

China is the world leader in wind power generation, with the largest installed capacity of any nation and continued rapid growth in new wind facilities. With its large land mass and long coastline, China has exceptional wind power resources: Wind power remained China's third-largest source of electricity at the end of 2021, accounting for 7.5% of total power generation.

<span class="mw-page-title-main">Sheringham Shoal Offshore Wind Farm</span>

Sheringham Shoal Offshore Wind Farm is a Round 2 wind farm in North Sea off the coast of Norfolk. A lease for use of the sea bed was obtained in 2004 by Scira Offshore Energy, the development gained offshore planning consent in 2008, and was constructed 2009–2011, being officially opened in 2012.

<span class="mw-page-title-main">Burbo Bank Offshore Wind Farm</span>

The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.

<span class="mw-page-title-main">GE Power</span> American energy technology company

GE Power was an American energy technology company owned by General Electric (GE). In April 2024, GE completed the spin-off of GE Power into a separate company, GE Vernova. Following this, General Electric ceased to exist as a conglomerate and pivoted to aviation, rebranding as GE Aerospace.

Neart Na Gaoithe is an offshore wind farm under construction in the outer Firth of Forth, 30 kilometres (19 mi) north of Torness. It has a potential capacity of 450 MW. It is being developed by EDF Renewables and ESB. Offshore work began in 2020, with completion originally planned for 2023 but delayed due to supply chain challenges until 2024.

<span class="mw-page-title-main">EDF Renewables</span>

EDF Renewables is a wholly owned subsidiary of the French utility EDF Group, specializing in renewable energy production. As an integrated operator, the Group develops and finances the construction of renewable energy facilities, and manages operations and maintenance for its own account and for third parties.

GE Wind Energy is a branch of GE Renewable Energy, a subsidiary of General Electric. The company manufactures and sells wind turbines to the international market. In 2018, GE was the fourth largest wind turbine manufacturer in the world.

Ming Yang Wind Power Group Limited is the largest private wind turbine manufacturer in China and the fifth largest overall in the country. The company was listed on the New York Stock Exchange from 1 October 2010 to June 22, 2016. It is developing the world's largest wind turbine with a capacity of 18 MW.

<span class="mw-page-title-main">Nacelle (wind turbine)</span>

A nacelle is a cover housing that houses all of the generating components in a wind turbine, including the generator, gearbox, drive train, and brake assembly.

<span class="mw-page-title-main">Vestas V164</span> Three-bladed offshore wind turbine

The Vestas V164 is a three-bladed offshore wind turbine, produced by Vestas, with a nameplate capacity of up to 10 megawatts, a world record. Vestas revealed the V164's design in 2011 with the first prototype unit operated at Østerild in northern Denmark in January 2014. The first industrial units were installed in 2016 at Burbo Bank, off the west coast of the United Kingdom. By 2021, Vestas had produced 500 of the series.

<span class="mw-page-title-main">Østerild Wind Turbine Test Field</span> Wind turbine testing area in Denmark

Østerild Wind Turbine Test Field is a facility managed by the DTU Risø Campus of the Technical University of Denmark (DTU) for testing of offshore wind turbines with a pinnacle height up to 330 metres (1,080 ft) near Thisted-Østerild, Denmark.

Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2023, a total of 277 turbines are expected to be built and produce a capacity of 3.6 GW, enough to power 6 million homes.

<span class="mw-page-title-main">Block Island Wind Farm</span>

Block Island Wind Farm was the first commercial offshore wind farm in the United States, located 3.8 mi (6.1 km) from Block Island, Rhode Island in the Atlantic Ocean. The five-turbine, 30 MW project was developed by Deepwater Wind, now known as Ørsted US Offshore Wind.

<span class="mw-page-title-main">GE Renewable Energy</span>

GE Renewable Energy is a manufacturing and services division of the American company General Electric. It is headquartered in Boulogne-Billancourt, France and focuses on the production of energy systems that use renewable sources. Its products include wind, hydroelectric and solar power generating facilities.

Ocean Wind was a proposed utility-scale 2,248 MW offshore wind farm to be located on the Outer Continental Shelf approximately 15 miles (24 km) off the coast of Atlantic City, New Jersey. It was being developed by Ørsted US Offshore Wind in conjunction with Public Service Enterprise Group (PSE&G). Construction and commissioning were planned for the mid-2020s. The closed Oyster Creek Nuclear Generating Station and B.L. England Generating Station would provide transmission points for energy generated by the wind farm.

References

  1. "World's Most Powerful Offshore Wind Platform: Haliade-X | GE Renewable Energy". www.ge.com. Retrieved 3 March 2021.
  2. Ecotècnia S.c.c.l, "Perfil Corporativo", 2003, company website
  3. 1 2 Elizabeth Nash (15 May 2002), "Spanish turbines catch winds of change", evolution.skf.com
  4. 1 2 3 M. Ragheb (28 February 2010), "Modern Wind Generators" (PDF), netfiles.uiuc.edu, "Ecotècnia wind turbines", also Table 1. "Wind turbine manufacturers share of installed capacity as of 2005", archived from the original (PDF) on 18 December 2012
  5. 1 2 3 4 "List of principal installations carried out by Ecotècnia" (PDF), www.ecotecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  6. 1 2 "Technical characteristics: 74/1.6" (PDF), www.econtecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  7. 1 2 "Technical Characteristics: 80/1.6" (PDF), www.econtecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  8. Alstom and Ecotècnia, June 2008, "Evolución tecnológica", p.23
  9. Sources:
  10. 1 2 Alstom and Ecotècnia, June 2008, "Current Footprint", pp.26-7
  11. Ecotècnia S.c.c.l, "Activities", June 2007, company website
  12. "OnSite: The Ecotècnia 100 Launch", www.internationalresourcejournal.com, November–December 2009, archived from the original on 13 March 2016, retrieved 26 March 2012
  13. "Company Overview of ALSTOM Wind, S.L.", investing.businessweek.com, Bloomberg LP, archived from the original on 27 April 2010
  14. "Alstom se développe dans l'éolien aux Etats-Unis", www.boursier.com (in French), 31 May 2010
  15. Yann Ranaivo (26 July 2010), "Wind-power firms to employ 70 to 80 workers this year", amarillo.com
  16. Sources:
  17. Sources:
  18. Sources:
  19. de Vries, Eize (11 July 2012), "Close up - Alstom Haliade 6MW prototype", www.windpowermonthly.com
  20. Haliade 150–6MW Offshore Wind Turbine (PDF), Alstom [ permanent dead link ]
  21. "Désignation des lauréats du premier appel d'offres "éolien en mer"", www.developpement-durable.gouv.fr (in French), 6 April 2012
  22. Sources:
  23. Sources:
  24. Alstom intends to set up a wind tower factory in Canoas, Rio Grande do Sul, Brazil, Alstom, 1 October 2012, archived from the original on 16 November 2012, retrieved 2 October 2012
  25. Alstom inaugurates its first wind tower factory in Latin America, Alstom, 9 August 2013, archived from the original on 14 December 2013, retrieved 11 December 2013
  26. 1 2 "Alstom Wind cuts 35% of jobs in Spain", www.windpowermonthly.com, 27 February 2013
  27. Annual report 2011 (PDF), EDP Renováveis, 2001, Wind Energy Regulation (by Country) - Spain, p.35, archived from the original (PDF) on 12 February 2013, retrieved 11 December 2013
  28. McGovern, Michael (19 July 2013), "Analysis - Reform pushes Spanish renewables to the edge", www.windpowermonthly.com
  29. Alstom presents an adjustment plan for its wind power business in Spain, Alstom, 26 February 2013
  30. Alstom Wind reaches an agreement with workers to implement the adjustment plan, Alstom, 5 July 2013
  31. 1 2 "First offshore installation of Alstom's Haliade 150", www.modernpowersystems.com, 22 November 2013
  32. De MonicaultMis, Frédéric (21 November 2013), "Alstom installe sa première éolienne en mer", www.lefigaro.fr (in French)
  33. "Alstom cuts ribbon in Saint-Nazaire", renews.biz, 2 December 2014, archived from the original on 8 December 2014, retrieved 2 December 2014
  34. "Alstom inaugurating France's first offshore wind turbine production plants in Saint-Nazaire", www.alstom.com (Press release), 2 December 2014
  35. "Alstom opens third Brazilian factory", renews.biz, 30 January 2015, archived from the original on 11 February 2015, retrieved 11 February 2015
  36. Alstom announces a major milestone for Deepwater's Block Island Offshore Wind Project (press release), Alstom, 9 March 2015, archived from the original on 18 May 2015, retrieved 10 May 2015
  37. Alstom, DEME and Merkur Offshore sign a contract for the delivery and installation of 66 Haliade offshore wind turbines in Germany (press release), Alstom, July 2015, archived from the original on 27 July 2015, retrieved 11 August 2015
  38. "Alstom closes sale of energy business to GE (UPDATE 1)", www.reuters.com, 2 November 2015
  39. "GE completes Haliade heart", renews.biz, 10 February 2016
  40. GE's 6-Megawatt Wind Generator Leaves Factory, Destined to Accelerate Offshore Wind Growth (press release), GE, 10 February 2016, archived from the original on 7 October 2016, retrieved 10 February 2016
  41. "Haliade 150-6MW - Østerild (onshore) - 4C Offshore".
  42. "Key project dates for Haliade 150-6MW - Østerild (onshore) - 4C Offshore". Archived from the original on 8 April 2016. Retrieved 28 March 2016.

Sources