Hydro One

Last updated

Hydro One Limited
Type Public
TSX:  H
Industry Electric utilities
Predecessor Ontario Hydro
Founded Toronto, Ontario, Canada (1999)
Headquarters483 Bay St, Toronto, Ontario, Canada
Area served
Ontario
Key people
  • David Lebeter
    President and CEO
  • Tim Hodgson
    Chair of the Board
Products Transmission and distribution
RevenueDecrease2.svg CA$ 5.990 billion (2017) [1]
Decrease2.svg CA$ 682 million (2017) [1]
Total assets Increase2.svg CA$ 25.701 billion (2017) [1]
Total equity Increase2.svg CA$ 10.231 billion (2017) [1]
Owners
Number of employees
5,422 regular employees (2017)
2,018 temporary, contract and part-time employees (2017)
7,682 pensioners (2014) [5]
Subsidiaries Hydro One Networks Inc.
Hydro One Remote Communities Inc.
Acronym Solutions Inc. (formerly Hydro One Telecom Inc.)
Website www.hydroone.com

Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario (renamed "Ontario Hydro" in 1974). In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.

Contents

Hydro One was established at this time as a corporation under the Business Corporations Act with the Government of Ontario as sole shareholder. [6] Following its initial public offering on the Toronto Stock Exchange in 2015, the Government of Ontario began selling shares to the public with a final goal of 60% of the company being held by private investors. A report released on December 2, 2015, by the Auditor General of Ontario raised concern with the sale, indicating that power outages are increasing and that Hydro One's equipment is aging and "at very high risk of failing". The estimated cost of necessary repairs was $4.472 billion. [7]

Service territory

Hydro One is a holding company with four subsidiaries, the largest being Hydro One Networks. It operates 98% of the high voltage transmission grid throughout Ontario, and serves 1.4 million customers in rural areas across the province in its capacity as Ontario's largest distribution utility.

System information

Hydro One's overhead power lines HydroOneOverheadPowerLines3.jpg
Hydro One's overhead power lines
A pylon leg and warning signage from one of Hydro One's 230,000 volt transmission lines HydroOnePowerTower2.jpg
A pylon leg and warning signage from one of Hydro One's 230,000 volt transmission lines

Hydro One's transmission line voltages are 500,000, 230,000 and 115,000 volts AC. Hydro One has interconnections with Manitoba Hydro, Hydro-Québec, Minnesota Power, DTE Energy/ITC, National Grid (the former Niagara Mohawk Power) and the New York Power Authority.

Generators

Hydro One works with the transmission and distribution network by connecting generating facilities operated by Ontario Power Generation, Bruce Power, and a number of other privately owned companies, to it. The generators deliver the electricity they generate at hydroelectric, natural gas, wind, solar and nuclear facilities to businesses and people across Ontario. The generators have different responsibilities than Hydro One. [8] The power from generators connected to Hydro One's high voltage system is transformed to more than 50 kV (50,000 volts). The transmission-connected generators are registered with the Independent Electricity System Operator (IESO). Transmission lines, strung between metal towers or concrete poles, are not as plentiful as their distribution lines, which are most commonly strung between wooden poles. [9] The distribution system is connected to Hydro One's generating facilities. It delivers the electricity generated at hydroelectric, wind and other facilities to businesses and people across Ontario. These distribution facilities work at voltages of 50 kV or less. [10]

Ontario's electricity grid is made up of a 29,000 km high-voltage transmission network that delivers electricity to large industrial customers and municipal utilities and 123,000 km low-voltage distribution system that serves about 1.3 million end use customers mainly in rural service areas and smaller municipal communities in the province. More than 75% of the applications to connect small generators are in Hydro One's rural service territory along the company's distribution system. While Hydro One has connected thousands of small projects to the grid it is approaching their technical limits of the wires and equipment in some rural locations. In these areas there are two issues that limit the number of projects that Hydro One can safely connect without putting the grid in jeopardy. The first issue is the physical limits of the power lines and the second is a phenomenon called 'islanding'. In larger areas that are densely populated, Hydro One's wires are thicker and designed to deliver larger amounts of electricity. In rural areas, Hydro One's distribution wires are smaller, thinner and deliver a smaller amount of electricity because they were designed to serve a much smaller number of customers than in large urban centers. These thinner lines deliver electricity safely and reliably to rural customers and are able to support the connection of small generation projects spread across the line, but these lines become over loaded when more electricity is fed back to the grid than the line was built to deliver. In some areas where the program is extremely popular, many generators want to connect to the same thin line but the line is not able to support the transfer of so much electricity.

The second issue is about islanding. Hydro One's distribution system knows how to protect itself under certain conditions. For instance, during a storm if a tree falls on a line, the system shuts itself down, similar to a circuit breaker. This protects the company's customers and employees from accidentally coming into contact with a live electrical line; it also protects appliances like televisions from uncontrolled surges and drops in voltage. In addition, when there is a fault, the line must be dead. Also when solar panels are attached to such lines, they must also be shut down when there is a fault on the line. If they are not shut down, electricity keeps flowing from the solar panels to all points between the panels. This can create an unsafe condition called islanding, which can put at risk customers, employees, and the equipment drawing power from that line. Hydro One prevents islanding by limiting the amount of generation that the company connects in one area; this ensures that the electrical load is greater than generation at all times. Ontario has moved to smart meters, which could support even more solutions to these problems. By using the company's existing network and working with customers, Hydro One is exploring new ways to deliver the cleaner electricity which Ontarians are helping to generate. [11]

History

Hydro One office in Markham HydroOneNetworksMarkham2.jpg
Hydro One office in Markham
Hydro One Toronto head office HydroOneTorontoHeadOffice.jpg
Hydro One Toronto head office

Hydro One was created out of the Hydro-Electric Power Commission of Ontario (HEPC or Ontario Hydro), which was established in 1906 by the provincial Power Commission Act to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls. The first chairman was Adam Beck, minister without portfolio in the provincial government of Sir James P. Whitney. Beck had been an advocate for a publicly owned electricity grid.

The commission's initial responsibility was to build transmission lines in order to supply municipal utilities with power. The power that was being transferred by HEPC was already being generated at Niagara Falls by private companies. Also during 1906, the company appointed Adam Beck as chairman. A year later, Beck and his colleague William Peyton Hubbard fought for the public ownership of the company. Later in 1908, HEPC purchased power from Niagara Falls and sought to transmit this power over its own lines, which at the time, had not been established. The company continued its steady growth for the next few years. and by 1914 HEPC built its first owned power generating station located on the Severn River.

In the early 1920s, HEPC expanded further and became an electricity distributor itself. The company now transmitted to rural areas in addition to municipal utilities. In 1922 the company's first unit of the Chippawa hydroelectric development on the Niagara River began service. Upon the unit's completion in 1925, it was the largest generating station in the world.

HEPC bought the generation and transmission assets of the Electrical Development Corporation, which was the last remaining private power company. In 1926, HEPC entered into a long-term contract with Gatineau Power Company, located in Quebec. These contracts were needed to accommodate a growing demand for power and electricity. However, these same contracts were to become a source of controversy during the Great Depression when there was an overcapacity in the system. The development of the St. Lawrence and Ottawa rivers was stalled by jurisdictional complications. The development of the rivers would have allowed access to a preferred source of power. In 1939 the Quebec contracts were reinstated and the development of the rivers were continued.

In the late 1940s and early 1950s HEPC took a great leap forward with development of hydro-electric potential along the St. Lawrence River. During the mid-1950s HEPC joined all its power stations and transmission systems into one network in order to become more efficient and flexible. Also during the 1950s, hydro-electric development was supplemented by the construction of thermal coal-fired power stations in Toronto. And by the end of the 1950s HEPC began construction of Canada's first extra-high voltage (500,000-volt) transmission lines. This brought power from northern Ontario to demand in southern Ontario. However, these transmission lines would only come into service in 1967. And by the start of the 1970s all of Ontario's power systems had merged, creating a province-wide grid. [12]

500,000-volt (centre) and 230,000-volt (far left and right) transmission lines in the Greater Toronto Area, for which Hydro One is responsible. Hydro one voltage lines in woodbridge ontario.jpg
500,000-volt (centre) and 230,000-volt (far left and right) transmission lines in the Greater Toronto Area, for which Hydro One is responsible.

In 1974, the Power Corporation Act reorganized the system as a crown corporation called "Ontario Hydro", the name by which it was most usually known.

In 1998, the Progressive Conservative Party (PC) government of Mike Harris passed the Energy Competition Act which authorized the establishment of a market in electricity. In April 1999, Ontario Hydro was re-organized into five successor companies: Ontario Power Generation, the Ontario Hydro Services Company (later renamed Hydro One), the Independent Electricity Market Operator (later renamed the Independent Electricity System Operator), the Electrical Safety Authority, and Ontario Electricity Financial Corporation. The two commercial companies, Ontario Power Generation and Hydro One, were intended to operate as private businesses rather than as crown corporations.

By 2001, Hydro One had acquired 88 municipal utilities. In December 2001 the provincial government announced its intention to sell Hydro One under an initial public offering (IPO), however by April 2002 various groups in opposition to the plan challenged the government in the Ontario Superior Court of Justice, forcing a halt to the IPO. [13]

In 2002, an electricity market began operating. However, critics questioned, among other things, whether the market was truly competitive or could ever become competitive, given that an electricity grid is not a private good. Public dismay at an increase in prices led the government of Harris's successor, Ernie Eves, to freeze electricity prices for residential and small business consumers. This freeze was maintained after the Liberal Party of Dalton McGuinty replaced the PC government in 2003. The freeze was removed and prices were raised in April 2004, and have been increased again subsequently.

In 2017, Hydro One agreed to acquire U.S. energy company Avista for CA$6.7 billion in cash. [14]

In 2018, the annual CA$6.2 million compensation paid to CEO Mayo Schmidt became a campaign issue in the 2018 Ontario election. Progressive Conservative Party leader Doug Ford promised to remove Schmidt if elected, although it was speculated that it would cost CA$10.7 million in severance payments under a clause of "change of control" in Schmidt's contract, which shareholders had approved in May.

The PCs won the election and in July 2018, the newly elected government convinced CEO Mayo Schmidt to retire immediately. News reports indicated that Schmidt would receive a payment of CA$400,000 in lieu of continuing benefits and would also be entitled to receive incentive bonuses for previous years' achievements, Hydro One stock with a value of approximately CA$9 million. His annual pension was estimated as exceeding CA$160,000. [15] The government and other major shareholders in Hydro One then began the process of appointing an entirely new board of directors after accepting the resignation of all previous members. The new Board is searching for a chief executive to replace Schmidt. [16] In the interim, CFO Paul Dobson is serving as acting CEO. [17]

In December 2018 the Washington Utilities and Transportation Commission blocked the purchase of Avista, citing concerns about the independence of Hydro One from the provincial government. [18] Hydro One paid Avista a $103 million termination fee. [19]

Restructuring

Ontario Hydro was restructured on April 1, 1999, into five separate entities: Ontario Power Generation, the Ontario Hydro Services Company, the Independent Electricity System Operator (originally named the Independent Electricity Market Operator), the Electrical Safety Authority, and Ontario Electricity Financial Corporation.

On May 1, 2000, the Ontario Hydro Services Company was renamed "Hydro One Incorporated" and reorganized as a holding company with four subsidiaries:

Between 1998 and 2000, Hydro One acquired 88 municipal electrical utilities. Many local/municipal distribution companies were also consolidated during this time.

In May 2002, the provincial government launched an open electricity market, although generating and distribution remained under control of the government.

From 2000 to 2017, Hydro One directly owned the distribution utility for the city of Brampton. This subsidiary operated separately from the main Hydro One corporation and operated only in the city of Brampton. Hydro One Brampton was acquired by Alectra Utilities on February 28, 2017. [20]

In August 2014, Hydro One acquired the assets and customers of Norfolk Power. [21]

Privatization

On October 29, 2015, Premier Kathleen Wynne confirmed rumours that the province planned to sell 60% of Hydro One [22] ("broadening of ownership"), essentially completing the plan proposed by the PC government decades before. [23] Some of the proceeds from the sale of shares would be used to begin financing of Premier Wynne's 10-year plan for public transit and infrastructure projects in addition to reducing the provincial deficit. [22] [24]

The plan was criticized by many, [25] [26] [27] including Stephen LeClair, the new financial accountability officer for Ontario. LeClair warned that the sale of an entity that generated a $750 million profit [28] in 2014 [29] would lead to a long term negative financial impact for the province.

The sale will certainly provide short term benefits, generating an estimated total of $9 billion [27] at a time when the provincial government is "desperate for money" (according to The Globe and Mail ), with one of the largest subsovereign debts in the world. [30] The estimated revenue will not all be a windfall for the provincial coffers however, since roughly $5 billion is earmarked to pay down Hydro One's $8.5 billion debt. [26]

The balance of the revenue from the Hydro One sale would help meet the targets laid out by the provincial Liberal government in its April 2015 budget. Although the budget announced some austerity measures, there was no indication of any new revenue sources. Even so, the plan was to reduce the Province's estimated budget deficit by $2.5 billion to $8.5 billion in the 2015–16 fiscal year, then to $4.8 billion in 2016–17 and to have a balanced budget by 2017–18, according to Finance Minister Charles Sousa. [31] This promise was made in spite of increasing demand for government services due to an aging population, at a time when "... a slowing domestic economy are putting downward pressure on its revenue streams," according to Ed Clark, Wynne's chief advisor on government assets, as quoted in The Globe and Mail. [30]

On November 5, 2015, the province began the first phase of the process, with an initial public offering (IPO) of 81.1 million shares (equivalent to 13.6% of Hydro One) on the Toronto Stock Exchange. It was the largest IPO in Canada since 2000. [32] [33] The estimated proceeds from this IPO were expected to total $1.83 billion. [27] This was the first step in the long-term goal of gradually selling 60% of the utility. Three more offerings, roughly the same size, followed in 2016 and 2017. [27]

Finance Minister Sousa stated on November 4, 2015, that the Hydro One IPO was already "oversubscribed" at that time, with more advance orders than the shares that would be available. [32] On November 5, 2015, the stock closed at $21.62, up 5.46% or $1.12 from the IPO price of $20.50, with more than 18 million shares sold. [26] Although this is not necessarily indicative of a rosy future for the share price, Sousa was optimistic. "Every uptick on the market is an indication the future offerings will net even greater proceeds benefiting all Ontarians." [26] However, shares dropped 3.9% on December 2, 2015, because of Auditor-General Lysyk's warning that the cost of replacing outdated transmission assets was $4.47 billion, information that might continue to depress the share price. Hydro One responded by indicating that steps were under way to increase reliability: "There are several initiatives under way to ensure investments strike the appropriate balance between reliability and cost." [34]

Some consumer advocacy groups and some analysts have raised red flags, concerned with the risk of increasing electricity costs under a privatized Hydro One. [35] [36] "Internal polling done for the Wynne government — released under Access to Information — found that 73 per cent of Ontarians oppose the government's plans to privatize Hydro One, the key transmission arm of the original public utility," noted Linda McQuaig in a 2016 Toronto Star opinion article. [37]

On the other hand, Brady Yauch, executive director of the Consumer Policy Institute [38] discussed the potential benefits in an opinion piece in the Financial Post, including "lower rates for ratepayers". [39] His premise is based on the potential increase in productivity of Hydro One under private control, "something that the government has failed to do adequately", bringing high salaries into line, and reducing pension liabilities in future, with employees contributing higher amounts to their pensions. "Given the government's performance over the last 15 years, it calls for hopeful optimism ...", said Yauch.[ citation needed ]

A secondary offering of 72.4 million Hydro One shares, equivalent to 14.5%, in April 2016 generated $1.7 billion in revenue for the provincial government. Crown corporation Ontario Power Generation purchased 9 million of the shares, giving it a 1.5% stake in Hydro One. [4]

In May 2017, the Ontario government completed the third and final sale of Hydro One shares worth $2.8 billion. [40] After the offering, Ontario held 48.9% of Hydro One's common shares: 47.4% directly held by the government, and 1.5% held by Ontario Power Generation.

First Nations and Métis relations

As part of the partial privatization of Hydro One, the provincial government announced it would sell up to 15 million shares (2.5%) to the indigenous and Métis nations of Ontario for "their collective benefit". [41]

In January 2018 the Ontario government announced it had sold over 14 million shares of Hydro One to OFN Power Holdings, a partnership controlled by 129 First Nations around the province. The shares represented 2.4% of outstanding common shares, reducing the government's stake in the company to approximately 47.4%. [3]

See also

Hydro One - A-Star with AirStair attachment Hydro One A-Star with AirStair attachment.jpg
Hydro One - A-Star with AirStair attachment

Related Research Articles

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Hydro-Québec</span> Canadian hydroelectric utility

Hydro-Québec is a Canadian Crown corporation public utility headquartered in Montreal, Quebec. It manages the generation, transmission and distribution of electricity in Quebec, as well as the export of power to portions of the Northeast United States. More than 40 percent of Canada’s water resources are in Quebec and Hydro-Québec is the fourth largest hydropower producer in the world.

<span class="mw-page-title-main">Ontario Hydro</span> Defunct Canadian provincial utility corporation, 1906–2015

Ontario Hydro, established in 1906 as the Hydro-Electric Power Commission of Ontario, was a publicly owned electricity utility in the Province of Ontario. It was formed to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls, and soon developed its own generation resources by buying private generation stations and becoming a major designer and builder of new stations. As most of the readily developed hydroelectric sites became exploited, the corporation expanded into building coal-fired generation and then nuclear-powered facilities. Renamed as "Ontario Hydro" in 1974, by the 1990s it had become one of the largest, fully integrated electricity corporations in North America.

<span class="mw-page-title-main">Emera</span> Canadian energy company

Emera Incorporated is a publicly traded Canadian multinational energy holding company based in Halifax, Nova Scotia. Created in 1998 during the privatization of Nova Scotia Power, a provincial Crown corporation, Emera now invests in regulated electricity generation as well as transmission and distribution across North America and the Caribbean.

Fortis Inc. is a St. John's, Newfoundland and Labrador-based international diversified electric utility holding company. It operates in Canada, the United States, Central America, and the Caribbean. In 2015, it earned CA$6.7 billion.

<span class="mw-page-title-main">Manitoba Hydro</span> Electric power and natural gas utility company in Manitoba, Canada

The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Board and the Manitoba Hydro Act. Today the company operates 16 interconnected generating stations. It has more than 527,000 electric power customers and more than 263,000 natural gas customers. Since most of the electrical energy is provided by hydroelectric power, the utility has low electricity rates. Stations in Northern Manitoba are connected by a HVDC system, the Nelson River Bipole, to customers in the south. The internal staff are members of the Canadian Union of Public Employees Local 998 while the outside workers are members of the International Brotherhood of Electrical Workers Local 2034.

<span class="mw-page-title-main">NB Power</span> Electric utility company

New Brunswick Electric Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown corporation by the government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

Snowy Hydro Limited is an electricity generation and retailing company in Australia that owns, manages, and maintains the Snowy Mountains Hydro-electric Scheme that consists of nine hydro-electric power stations and sixteen large dams connected by 145 kilometres (90 mi) of tunnels and 80 kilometres (50 mi) of aqueducts located mainly in the Kosciuszko National Park. Snowy Hydro also owns and operates two gas-fired power stations in Victoria and one in New South Wales, three diesel power stations in South Australia and owns two electricity retailing businesses, Red Energy and Lumo Energy.

<span class="mw-page-title-main">Mercury Energy</span> New Zealand electricity generating and retailing company

Mercury NZ Limited is a New Zealand electricity generation and multi-product utility retailer of electricity, gas, broadband and mobile telephone services. All the company's electricity generation is renewable. Mercury has a pre-paid electricity product sub-brand GLOBUG. Mercury Energy is also the largest electricity retailer in New Zealand.

<span class="mw-page-title-main">TANESCO</span>

The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO.

Nova Scotia Power Inc. is a vertically integrated electric utility in Nova Scotia, Canada. It is privately owned by Emera and regulated by the provincial government via the Nova Scotia Utility and Review Board (NSUARB). Nova Scotia Power Inc provides electricity to 520,000 residential, commercial and industrial customers in Nova Scotia.

<span class="mw-page-title-main">Energy policy of Canada</span> About Canadas federal and provincial energy policies

Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.

<span class="mw-page-title-main">Hydro-Québec's electricity transmission system</span> International power transmission system centred in Quebec, Canada

Hydro-Québec's electricity transmission system is an international electric power transmission system centred in Quebec, Canada. The system pioneered the use of very high voltage 735-kilovolt (kV) alternating current (AC) power lines that link the population centres of Montreal and Quebec City to distant hydroelectric power stations like the Daniel-Johnson Dam and the James Bay Project in northwestern Quebec and the Churchill Falls Generating Station in Labrador.

An independent power producer (IPP) or non-utility generator (NUG) is an entity that is not a public utility but owns facilities to generate electric power for sale to utilities and end users. NUGs may be privately held facilities, corporations, cooperatives such as rural solar or wind energy producers, and non-energy industrial concerns capable of feeding excess energy into the system.

Through the 1996 Electric Utilities Act the Alberta's deregulated electricity market began.

According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2019, Canada produced 632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources).

Énergir, formerly known as Gaz Métro, is an energy company with 520,000 customers in Quebec and the northeastern United States. It is the largest natural gas distribution company in Quebec, and, through subsidiaries, also produces electricity from wind. In the United States the company operates through subsidiaries in seventeen states, where it produces electricity from hydroelectric, wind and solar sources, in addition to being the leading electricity distributor and the sole natural gas distributor in Vermont.

<span class="mw-page-title-main">Kenya Power and Lighting Company</span> Kenyan public utility company

Kenya Power and Lighting Company, commonly referred to as Kenya Power or shortened KPLC, is a public liability company which transmits, distributes and retails electricity to customers throughout Kenya.

Cornwall Street Railway Light and Power Company Limited, operating as Cornwall Electric, is an electricity transmission and distribution utility, licensed by the Ontario Energy Board (OEB) to operate in Cornwall, Ontario, Canada. Originally established in 1887 as the Stormont Electric Light and Power Company and merged with the Cornwall Electric Street Railway Company in 1905, it is one of the oldest utilities in Canada.

References

  1. 1 2 3 4 "Hydro One Reports Positive Fourth Quarter Results" (PDF). Archived (PDF) from the original on February 20, 2018. Retrieved February 19, 2018.
  2. "Ontario Completes Sale of Hydro One Shares to First Nations". www.newswire.ca. Archived from the original on January 4, 2018. Retrieved January 4, 2018.
  3. 1 2 "Ontario completes sale of Hydro One shares to First Nations". BayToday.ca. Archived from the original on January 4, 2018. Retrieved January 4, 2018.
  4. 1 2 "Ontario raises $1.7B with new Hydro One share issue". Toronto Star. The Canadian Press. April 14, 2016. Archived from the original on April 16, 2016. Retrieved April 15, 2016.
  5. "Hydro One". Archived from the original on December 8, 2015. Retrieved November 27, 2015.
  6. Public Accounts of Ontario, Ministry of Finance (November 2000). "Public Accounts 1999-2000 Financial Statement". Ontario Ministry of Finance . Schedule of Financial Statements, Schedule 6: Government Business Enterprises and Other Government Organizations. Archived from the original on March 20, 2012.
  7. Morrow, Adrian (December 2, 2015). "Ontarians paid $37-billion above market for electricity over eight years, Auditor-General's report says". Globe and Mail. Toronto, Ontario, Canada. Archived from the original on November 28, 2017. Retrieved December 3, 2015.
  8. "Connect Your Generator". Archived from the original on April 1, 2012. Retrieved March 28, 2012.
  9. "Transmission". Archived from the original on May 5, 2012. Retrieved March 28, 2012.
  10. "distribution". Archived from the original on March 25, 2012. Retrieved March 28, 2012.
  11. "Available Capacity". Archived from the original on March 30, 2012. Retrieved March 28, 2012.
  12. "Historical Timeline". Archived from the original on August 4, 2011. Retrieved July 27, 2011.
  13. "Unsupported database type". Archived from the original on January 25, 2004. Retrieved September 12, 2007.
  14. "Hydro One signs blockbuster deal to buy Avista for $6.7B in cash". CBC News. Archived from the original on November 16, 2017. Retrieved November 15, 2017.
  15. Ferguson, Rob (July 13, 2018). "As the share price falls, retiring Hydro One CEO to get millions". Toronto Star . Archived from the original on July 13, 2018. Retrieved July 13, 2018.
  16. Zochodne, Geoff (July 11, 2018). "Majority of new Hydro One board will go to major shareholders". Financial Post . Archived from the original on July 14, 2018. Retrieved July 13, 2018.
  17. "Hydro One shares down after Ontario government says CEO, board out". Canadian Broadcasting Corporation . July 11, 2018. Archived from the original on July 13, 2018. Retrieved July 13, 2018.
  18. "Final Order Denying Joint Application for Transfer of Property". Washington Utilities and Transportation Commission . December 5, 2018. Archived from the original on December 14, 2018. Retrieved December 10, 2018.
  19. "Hydro One and Avista terminate deal". Wall Street Journal . January 3, 2019. Archived from the original on December 1, 2021. Retrieved January 3, 2019.
  20. "Alectra Inc. Acquires Hydro One Brampton" (PDF). February 28, 2017. Archived from the original (PDF) on April 22, 2017. Retrieved April 21, 2017.
  21. "Hydro One". Archived from the original on April 19, 2015. Retrieved June 6, 2015.
  22. 1 2 Csanady, Ashley (October 29, 2015). "'Worst deal in the province's history': Opposition slam Ontario's 'ludicrous' Hydro One sell-off". National Post . Retrieved July 26, 2022.
  23. Brennan, Richard J.; Benzie, Robert (October 29, 2015). "'It's going,' Kathleen Wynne says of the looming sale of Hydro One despite watchdog warning". Toronto Star . Archived from the original on December 9, 2016. Retrieved August 31, 2017.
  24. 10-year, $130-billion transit and infrastructure plan.
  25. "Hydro One announces share issue hours after critical report released". CBC News . October 29, 2015. Archived from the original on June 10, 2022. Retrieved July 25, 2022.
  26. 1 2 3 4 "Hydro One makes solid Toronto Stock Exchange debut". November 5, 2015. Archived from the original on November 17, 2015. Retrieved November 6, 2015.
  27. 1 2 3 4 "Hydro One shares rise in Toronto trading debut". The Globe and Mail. November 5, 2015. Archived from the original on April 20, 2017. Retrieved August 31, 2017.
  28. "Five things to know about Hydro One: Big revenues, big profits and big salaries". November 5, 2015. Archived from the original on December 8, 2015. Retrieved November 6, 2015.
  29. "Hydro One sale will negatively impact Ontario budget: Watchdog". October 29, 2015. Archived from the original on October 30, 2015. Retrieved November 6, 2015.
  30. 1 2 Taber, Jane (June 17, 2015). "Former TD president ed Clark advising Kathleen Wynne". The Globe and Mail. Archived from the original on February 20, 2017. Retrieved August 31, 2017.
  31. "Latest Breaking News, Headlines & Updates | National Post".
  32. 1 2 Crawley, Mike (November 5, 2015). "Hydro One shares on sale in biggest TSX IPO since 2000". CBC News . Archived from the original on November 12, 2020. Retrieved July 25, 2022.
  33. "Hydro One Ltd makes its debut on the Toronto Stock Exchange in biggest IPO in 15 years". Financial Post . The Canadian Press. November 5, 2015. Archived from the original on November 8, 2020. Retrieved July 26, 2022.
  34. Lam, Eric (December 2, 2015). "Hydro One Drops on Report C$4.5 Billion in Repairs Needed". Bloomberg. Bloomberg L.P. Archived from the original on March 4, 2016. Retrieved December 3, 2015.
  35. "Groups call on Ontario Energy Board to do its job, review plan to sell Hydro One". Newswire.ca. November 2, 2015. Archived from the original on March 4, 2016. Retrieved November 29, 2021.
  36. "Got a problem? Privatize it (And pay the price for selling off Hydro…". Archived from the original on November 3, 2015. Retrieved November 6, 2015.
  37. "Opinion | The case against privatizing Hydro One: McQuaig". August 4, 2016. Archived from the original on September 25, 2018. Retrieved September 25, 2018 via Toronto Star.
  38. "Consumer Policy Institute | Consumer Policy Institute is dedicated to fair value for Canadian consumers, excellence and efficiency within public service institutions". Cpi.probeinternational.org. Archived from the original on November 14, 2015. Retrieved November 29, 2021.
  39. Yauch, Brady (November 4, 2015). "The Hydro One sale's upsides". Financial Post . Retrieved July 26, 2022.
  40. Ferguson, Rob (May 8, 2017). "Ontario to sell Hydro One shares worth $2.8B". Toronto Star . ISSN   0319-0781. Archived from the original on November 16, 2017. Retrieved November 15, 2017.
  41. "Ontario Raises $2.8 Billion from Final Hydro One Share Offering". Newsroom. Government of Ontario. Archived from the original on July 13, 2017. Retrieved September 17, 2017.