Power outage

Last updated

Vehicle lights provided the only illumination during the 2009 Ecuador electricity crisis. Calle Larga at night during power cut.jpg
Vehicle lights provided the only illumination during the 2009 Ecuador electricity crisis.

A power outage (also called a powercut, a power out, a power failure, a power blackout, a power loss, or a blackout) is the loss of the electrical power network supply to an end user.

Contents

There are many causes of power failures in an electricity network. Examples of these causes include faults at power stations, damage to electric transmission lines, substations or other parts of the distribution system, a short circuit, cascading failure, fuse or circuit breaker operation.

Power failures are particularly critical at sites where the environment and public safety are at risk. Institutions such as hospitals, sewage treatment plants, and mines will usually have backup power sources such as standby generators, which will automatically start up when electrical power is lost. Other critical systems, such as telecommunication, are also required to have emergency power. The battery room of a telephone exchange usually has arrays of lead–acid batteries for backup and also a socket for connecting a generator during extended periods of outage. During a power outage, there is a disruption in the supply of electricity, resulting in a loss of power to homes, businesses, and other facilities. Power outages can occur for various reasons, including severe weather conditions (such as storms, hurricanes, or snowstorms), equipment failure, grid overload, or planned maintenance.

Types

Blackout PowerOutageBlackout.svg
Blackout
Transient fault PowerOutageDropout.svg
Transient fault

Power outages are categorized into three different phenomena, relating to the duration and effect of the outage:

Rolling blackouts occur when demand for electricity exceeds supply, and allow some customers to receive power at the required voltage at the expense of other customers who get no power at all. They are a common occurrence in developing countries, and may be scheduled in advance or occur without warning. They have also occurred in developed countries, for example in the California electricity crisis of 2000–2001, when government deregulation destabilized the wholesale electricity market. Blackouts are also used as a public safety measure, such as to prevent a gas leak from catching fire (for example, power was cut to several towns in response to the Merrimack Valley gas explosions), or to prevent wildfires around poorly maintained transmission lines (such as during the 2019 California power shutoffs).

Protecting the power system from outages

Tree limbs creating a short circuit in power lines during a storm. This typically results in a power outage in the area supplied by these lines Crossed wires.JPG
Tree limbs creating a short circuit in power lines during a storm. This typically results in a power outage in the area supplied by these lines

In power supply networks, the power generation and the electrical load (demand) must be very close to equal every second to avoid overloading of network components, which can severely damage them. Protective relays and fuses are used to automatically detect overloads and to disconnect circuits at risk of damage.

Under certain conditions, a network component shutting down can cause current fluctuations in neighboring segments of the network leading to a cascading failure of a larger section of the network. This may range from a building, to a block, to an entire city, to an entire electrical grid.

Modern power systems are designed to be resistant to this sort of cascading failure, but it may be unavoidable (see below). Moreover, since there is no short-term economic benefit to preventing rare large-scale failures, researchers have expressed concern that there is a tendency to erode the resilience of the network over time, which is only corrected after a major failure occurs. In a 2003 publication, Carreras and co-authors claimed that reducing the likelihood of small outages only increases the likelihood of larger ones. [2] In that case, the short-term economic benefit of keeping the individual customer happy increases the likelihood of large-scale blackouts.

The Senate Committee on Energy and Natural Resources held a hearing in October 2018 to examine "black start", the process of restoring electricity after a system-wide power loss. The hearing's purpose was for Congress to learn about what the backup plans are in the electric utility industry in the case that the electric grid is damaged. Threats to the electrical grid include cyberattacks, solar storms, and severe weather, among others. For example, the "Northeast Blackout of 2003" was caused when overgrown trees touched high-voltage power lines. Around 55 million people in the U.S. and Canada lost power, and restoring it cost around $6 billion. [3]

Protecting computer systems from power outages

Computer systems and other electronic devices containing logic circuitry are susceptible to data loss or hardware damage that can be caused by the sudden loss of power. These can include data networking equipment, video projectors, alarm systems as well as computers. To protect computer systems against this, the use of an uninterruptible power supply or 'UPS' can provide a constant flow of electricity if a primary power supply becomes unavailable for a short period of time. To protect against surges (events where voltages increase for a few seconds), which can damage hardware when power is restored, a special device called a surge protector that absorbs the excess voltage can be used.

Restoring power after a wide-area outage

Restoring power after a wide-area outage can be difficult, as power stations need to be brought back online. Normally, this is done with the help of power from the rest of the grid. In the total absence of grid power, a so-called black start needs to be performed to bootstrap the power grid into operation. The means of doing so will depend greatly on local circumstances and operational policies, but typically transmission utilities will establish localized 'power islands' which are then progressively coupled together. To maintain supply frequencies within tolerable limits during this process, demand must be reconnected at the same pace that generation is restored, requiring close coordination between power stations, transmission and distribution organizations.

Blackout inevitability and electric sustainability

Comparison of duration of power outages (SAIDI value), in 2014. V4 Web BOeLL-FF Energiewende (page 8 crop) - Stromausfall.jpg
Comparison of duration of power outages (SAIDI value), in 2014.

Self-organized criticality

It has been argued on the basis of historical data [4] and computer modeling [5] [6] that power grids are self-organized critical systems. These systems exhibit unavoidable [7] disturbances of all sizes, up to the size of the entire system. This phenomenon has been attributed to steadily increasing demand/load, the economics of running a power company, and the limits of modern engineering. [8]

While blackout frequency has been shown to be reduced by operating it further from its critical point, it generally is not economically feasible, causing providers to increase the average load over time or upgrade less often resulting in the grid moving itself closer to its critical point. Conversely, a system past the critical point will experience too many blackouts leading to system-wide upgrades moving it back below the critical point. The term critical point of the system is used here in the sense of statistical physics and nonlinear dynamics, representing the point where a system undergoes a phase transition; in this case the transition from a steady reliable grid with few cascading failures to a very sporadic unreliable grid with common cascading failures. Near the critical point the relationship between blackout frequency and size follows a power-law distribution. [6] [8]

Cascading failure becomes much more common close to this critical point. The power-law relationship is seen in both historical data and model systems. [8] The practice of operating these systems much closer to their maximum capacity leads to magnified effects of random, unavoidable disturbances due to aging, weather, human interaction etc. While near the critical point, these failures have a greater effect on the surrounding components due to individual components carrying a larger load. This results in the larger load from the failing component having to be redistributed in larger quantities across the system, making it more likely for additional components not directly affected by the disturbance to fail, igniting costly and dangerous cascading failures. [8] These initial disturbances causing blackouts are all the more unexpected and unavoidable due to actions of the power suppliers to prevent obvious disturbances (cutting back trees, separating lines in windy areas, replacing aging components etc.). The complexity of most power grids often makes the initial cause of a blackout extremely hard to identify.

Leaders are dismissive of system theories that conclude that blackouts are inevitable, but do agree that the basic operation of the grid must be changed. The Electric Power Research Institute champions the use of smart grid features such as power control devices employing advanced sensors to coordinate the grid. [9] Others advocate greater use of electronically controlled high-voltage direct current (HVDC) firebreaks to prevent disturbances from cascading across AC lines in a wide area grid. [10]

OPA model

In 2002, researchers at Oak Ridge National Laboratory (ORNL), Power System Engineering Research Center of the University of Wisconsin (PSerc), [11] and the University of Alaska Fairbanks proposed a mathematical model for the behavior of electrical distribution systems. [12] [13] This model has become known as the OPA model, a reference to the names of the authors' institutions. OPA is a cascading failure model. Other cascading failure models include Manchester, Hidden failure, CASCADE, and Branching. [14] The OPA model was quantitatively compared with a complex networks model of a cascading failure – Crucitti–Latora–Marchiori (CLM) model, [15] showing that both models exhibit similar phase transitions in the average network damage (load shed/demand in OPA, path damage in CLM), with respect to transmission capacity. [16]

Mitigation of power outage frequency

The effects of trying to mitigate cascading failures near the critical point in an economically feasible fashion are often shown to not be beneficial and often even detrimental. Four mitigation methods have been tested using the OPA blackout model: [2]

In addition to the finding of each mitigation strategy having a cost-benefit relationship with regards to frequency of small and large blackouts, the total number of blackout events was not significantly reduced by any of the above-mentioned mitigation measures. [2]

A complex network-based model to control large cascading failures (blackouts) using local information only was proposed by A. E. Motter. [17]

In 2015, one of the solutions proposed to reduce the impact of power outage was introduced by M. S. Saleh. [9]

Key performance indicators

Utilities are measured on three specific performance measures:

See also

Major power outages

Related Research Articles

<span class="mw-page-title-main">Electric power transmission</span> Bulk movement of electrical energy

Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines that facilitate this movement form a transmission network. This is distinct from the local wiring between high-voltage substations and customers, which is typically referred to as electric power distribution. The combined transmission and distribution network is part of electricity delivery, known as the electrical grid.

<span class="mw-page-title-main">Electric power industry</span> Industry that provides the production and delivery of electric energy

The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.

<span class="mw-page-title-main">Cascading failure</span> Systemic risk of failure

A cascading failure is a failure in a system of interconnected parts in which the failure of one or few parts leads to the failure of other parts, growing progressively as a result of positive feedback. This can occur when a single part fails, increasing the probability that other portions of the system fail. Such a failure may happen in many types of systems, including power transmission, computer networking, finance, transportation systems, organisms, the human body, and ecosystems.

<span class="mw-page-title-main">National Grid (Great Britain)</span> High-voltage electric power transmission network in Great Britain

The National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.

<span class="mw-page-title-main">Rolling blackout</span> Intentionally engineered electrical power shutdown

A rolling blackout, also referred to as rota or rotational load shedding, rota disconnection, feeder rotation, or a rotating outage, is an intentionally engineered electrical power shutdown in which electricity delivery is stopped for non-overlapping periods of time over different parts of the distribution region. Rolling blackouts are a last-resort measure used by an electric utility company to avoid a total blackout of the power system.

Electric power quality is the degree to which the voltage, frequency, and waveform of a power supply system conform to established specifications. Good power quality can be defined as a steady supply voltage that stays within the prescribed range, steady AC frequency close to the rated value, and smooth voltage curve waveform. In general, it is useful to consider power quality as the compatibility between what comes out of an electric outlet and the load that is plugged into it. The term is used to describe electric power that drives an electrical load and the load's ability to function properly. Without the proper power, an electrical device may malfunction, fail prematurely or not operate at all. There are many ways in which electric power can be of poor quality, and many more causes of such poor quality power.

The 2003 Italy blackout was a serious power outage that affected all of the Italian Peninsula for 12 hours and part of Switzerland near Geneva for 3 hours on 28 September 2003. It was the largest blackout in the series of blackouts in 2003, involving about 56 million people.

A microgrid is a local electrical grid with defined electrical boundaries, acting as a single and controllable entity. It is able to operate in grid-connected and in island mode. A 'stand-alone microgrid' or 'isolated microgrid' only operates off-the-grid and cannot be connected to a wider electric power system. Very small microgrids are called nanogrids.

<span class="mw-page-title-main">Transmission system operator</span> Energy transporter

A transmission system operator (TSO) is an entity entrusted with transporting energy in the form of natural gas or electrical power on a national or regional level, using fixed infrastructure. The term is defined by the European Commission. The certification procedure for transmission system operators is listed in Article 10 of the Electricity and Gas Directives of 2009.

Electrical devices are considered grid friendly if they operate in a manner that supports electrical grid reliability through demand response. Basic grid-friendly devices may incorporate features that work to offset short-term undesirable changes in line frequency or voltage; more sophisticated devices may alter their operating profile based on the current market price for electricity, reducing load when prices are at a peak. Grid-friendly devices can include major appliances found in homes, commercial building systems such as HVAC, and many industrial systems.

Advanced Distribution Automation (ADA) is a term coined by the IntelliGrid project in North America to describe the extension of intelligent control over electrical power grid functions to the distribution level and beyond. It is related to distribution automation that can be enabled via the smart grid. The electrical power grid is typically separated logically into transmission systems and distribution systems. Electric power transmission systems typically operate above 110kV, whereas Electricity distribution systems operate at lower voltages. Normally, electric utilities with SCADA systems have extensive control over transmission-level equipment, and increasing control over distribution-level equipment via distribution automation. However, they often are unable to control smaller entities such as Distributed energy resources (DERs), buildings, and homes. It may be advantageous to extend control networks to these systems for a number of reasons:

<span class="mw-page-title-main">Northeast blackout of 2003</span> Major power outage in August 2003 in North America

The Northeast blackout of 2003 was a widespread power outage throughout parts of the Northeastern and Midwestern United States, and most parts of the Canadian province of Ontario on Thursday, August 14, 2003, beginning just after 4:10 p.m. EDT.

Islanding is the intentional or unintentional division of an interconnected power grid into individual disconnected regions with their own power generation.

<span class="mw-page-title-main">Load management</span> Process of balancing the supply of electricity on a network

Load management, also known as demand-side management (DSM), is the process of balancing the supply of electricity on the network with the electrical load by adjusting or controlling the load rather than the power station output. This can be achieved by direct intervention of the utility in real time, by the use of frequency sensitive relays triggering the circuit breakers, by time clocks, or by using special tariffs to influence consumer behavior. Load management allows utilities to reduce demand for electricity during peak usage times, which can, in turn, reduce costs by eliminating the need for peaking power plants. In addition, some peaking power plants can take more than an hour to bring on-line which makes load management even more critical should a plant go off-line unexpectedly for example. Load management can also help reduce harmful emissions, since peaking plants or backup generators are often dirtier and less efficient than base load power plants. New load-management technologies are constantly under development — both by private industry and public entities.

<span class="mw-page-title-main">Smart grid</span> Type of electrical grid

The smart grid is an enhancement of the 20th century electrical grid, using two-way communications and distributed so-called intelligent devices. Two-way flows of electricity and information could improve the delivery network. Research is mainly focused on three systems of a smart grid – the infrastructure system, the management system, and the protection system. Electronic power conditioning and control of the production and distribution of electricity are important aspects of the smart grid.

<span class="mw-page-title-main">Electrical grid</span> Interconnected network for delivering electricity from suppliers to consumers

An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids.

<span class="mw-page-title-main">2010 Chile blackout</span> Power outage in Chile

The 2010 Chile blackout was an electric power outage that affected most of Chile on March 14, 2010. It began at 8:44 pm on Sunday and continued into the next day. The power was restored in a few hours in some areas, and by midnight in most areas, except in the Biobío Region.

A distribution management system (DMS) is a collection of applications designed to monitor and control the electric power distribution networks efficiently and reliably. It acts as a decision support system to assist the control room and field operating personnel with the monitoring and control of the electric distribution system. Improving the reliability and quality of service in terms of reducing power outages, minimizing outage time, maintaining acceptable frequency and voltage levels are the key deliverables of a DMS. Given the complexity of distribution grids, such systems may involve communication and coordination across multiple components. For example, the control of active loads may require a complex chain of communication through different components as described in US patent 11747849B2

<span class="mw-page-title-main">2011 Southwest blackout</span> Power Outage In Southern California

The 2011 Southwest blackout, also known as the Great Blackout of 2011, was a widespread power outage that affected the San Diego–Tijuana area, southern Orange County, Imperial Valley, Mexicali Valley, Coachella Valley, and parts of Arizona. It occurred on Thursday, September 8, 2011, beginning at about 3:38pm PDT, and was the largest power failure in California history.

Power resilience refers to a company's ability to adapt to power outages. Frequent outages have forced businesses to take into account the "cost of not having access to power" in addition to the traditional "cost of power". Climate-related issues have intensified the attention on energy sustainability and resilience. In the United States, electric utility firms have registered over 2500 significant power outages since 2002, with almost half of them attributed to weather events, including storms, hurricanes, and other unspecified severe weather occurrences. These incidents often lead to significant economic losses.

References

  1. Petermann, Thomas; Bradke, Harald; Lüllmann, Arne; Poetzsch, Maik; Riehm, Ulrich (2011). What happens during a blackout – Consequences of a prolonged and wide-ranging power outage. Berlin: Office of Technology Assessment at the German Bundestag. doi:10.5445/IR/1000103292. ISBN   978-3-7322-9329-2.
  2. 1 2 3 Carreras, B. A.; Lynch, V. E.; Newman, D. E.; Dobson, I. (2003). "Blackout Mitigation Assessment in Power Transmission Systems" (PDF). 36th Hawaii International Conference on System Sciences. Hawaii. Archived from the original (PDF) on April 1, 2011.
  3. Kovaleski, Dave (October 15, 2018). "Senate Hearing Examines Electric Industry's Ability to Restore Power after System-wide Blackouts". Daily Energy Insider. Retrieved October 23, 2018.
  4. Dobson, I.; Chen, J.; Thorp, J.; Carreras, B.; Newman, D. Examining Criticality of Blackouts in Power System Models with Cascading Events. 35th Annual Hawaii International Conference on System Sciences (HICSS'02), January 7–10, 2002. Big Island, Hawaii. Archived from the original on September 12, 2003. Retrieved August 17, 2003.
  5. Carreras, B. A.; Lynch, V. E.; Dobson, I.; Newman, D. E. Dynamics, Criticality and Self-organization in a Model for Blackouts in Power Transmission Systems (PDF). Hawaii International Conference on Systems Sciences, January 2002, Hawaii. Archived from the original (PDF) on August 21, 2003.
  6. 1 2 Hoffmann, H.; Payton, D. W. (2014). "Suppressing cascades in a self-organized-critical model with non-contiguous spread of failures" (PDF). Chaos, Solitons and Fractals. 67: 87–93. Bibcode:2014CSF....67...87H. doi:10.1016/j.chaos.2014.06.011. Archived (PDF) from the original on March 4, 2016.
  7. Carreras, B. A.; Newman, D. E.; Dobson, I.; Poole, A. B. (2000). Initial Evidence for Self-Organized Criticality in Electric Power System Blackouts (PDF). Proceedings of Hawaii International Conference on System Sciences, January 4–7, 2000, Maui, Hawaii. Archived from the original (PDF) on March 29, 2003. Retrieved August 17, 2003.
  8. 1 2 3 4 Dobson, Ian; Carreras, Benjamin A.; Lynch, Vickie E.; Newman, David E. (2007). "Complex systems analysis of series of blackouts: Cascading failure, critical points, and self-organization". Chaos: An Interdisciplinary Journal of Nonlinear Science. 17 (2): 026103. Bibcode:2007Chaos..17b6103D. doi: 10.1063/1.2737822 . PMID   17614690.
  9. 1 2 Saleh, M. S.; Althaibani, A.; Esa, Y.; Mhandi, Y.; Mohamed, A. A. (October 2015). Impact of clustering microgrids on their stability and resilience during blackouts. 2015 International Conference on Smart Grid and Clean Energy Technologies (ICSGCE). pp. 195–200. doi:10.1109/ICSGCE.2015.7454295. ISBN   978-1-4673-8732-3. S2CID   25664994.
  10. Fairley, Peter (2004). "The Unruly Power Grid". IEEE Spectrum. 41 (8): 22–27. doi:10.1109/MSPEC.2004.1318179. S2CID   19389285 . Retrieved June 24, 2012.
  11. "Power Systems Engineering Research Center". Board of Regents of the University of Wisconsin System. 2014. Archived from the original on June 12, 2015. Retrieved June 23, 2015.
  12. Carreras, B. A.; Lynch, V. E.; Dobson, I.; Newman, D. E. (2002). "Critical points and transitions in an electric power transmission model for cascading failure blackouts" (PDF). Chaos: An Interdisciplinary Journal of Nonlinear Science. 12 (4): 985–994. Bibcode:2002Chaos..12..985C. doi:10.1063/1.1505810. ISSN   1054-1500. PMID   12779622. Archived (PDF) from the original on March 5, 2016.
  13. Dobson, I.; Carreras, B. A.; Lynch, V. E.; Newman, D. E. (2001). "An initial model for complex dynamics in electric power system blackouts". Proceedings of the 34th Annual Hawaii International Conference on System Sciences. p. 710. doi:10.1109/HICSS.2001.926274. ISBN   978-0-7695-0981-5. S2CID   7708994.
  14. Nedic, Dusko P.; Dobson, Ian; Kirschen, Daniel S.; Carreras, Benjamin A.; Lynch, Vickie E. (2006). "Criticality in a cascading failure blackout model". International Journal of Electrical Power & Energy Systems. 28 (9): 627. CiteSeerX   10.1.1.375.2146 . doi:10.1016/j.ijepes.2006.03.006.
  15. Crucitti, P.; Latora, V.; Marchiori, M. (2004). "TModel for cascading failures in complex networks" (PDF). Physical Review E. 69 (4 Pt 2): 045104. arXiv: cond-mat/0309141 . Bibcode:2004PhRvE..69d5104C. doi:10.1103/PhysRevE.69.045104. PMID   15169056. S2CID   3824371. Archived from the original (PDF) on April 24, 2017.
  16. Cupac, V.; Lizier, J.T.; Prokopenko, M. (2013). "Comparing dynamics of cascading failures between network-centric and power flow models". International Journal of Electrical Power and Energy Systems. 49: 369–379. doi:10.1016/j.ijepes.2013.01.017.
  17. Motter, Adilson E. (2004). "Cascade Control and Defense in Complex Networks". Physical Review Letters. 93 (9): 098701. arXiv: cond-mat/0401074 . Bibcode:2004PhRvL..93i8701M. doi:10.1103/PhysRevLett.93.098701. PMID   15447153. S2CID   4856492.