Ministry of Power (India)

Last updated

Ministry of Power
Government of India logo.svg
Branch of Government of India
Ministry of Power India.svg
Ministry of Power
Raj Kumar Singh with PM Modi (cropped).jpg
Raj Kumar Singh
Ministry overview
Formed2 July 1992;31 years ago (1992-07-02)
Preceding Ministry
  • Ministry of Energy Sources
Jurisdiction Government of India
HeadquartersShram Shakti Bhawan, Rafi Marg, New Delhi, India
Annual budget15,046.92 crore (US$1.9 billion) (2018-19 est.) [1]
Minister responsible
Ministry executive
  • Pankaj Agrawal IAS Power Secretary
Website powermin.gov.in

The Ministry of Power is an Indian government ministry. The current Union Cabinet Minister is Raj Kumar Singh. The ministry is charged with overseeing electricity production and infrastructure development, including generation, transmission, and delivery, as well as maintenance projects.

Contents

The ministry acts as a liaison between the central government and state electricity operations, as well as with the private sector. The ministry also oversees rural electrification projects.

History

The Ministry of Power became a ministry on July 2, 1992, during the P. V. Narasimha Rao government. [2] Prior to that time it had been a department (the Department of Power) in the Ministry of Power, Coal and Non-Conventional Energy Sources. That ministry was split into the Ministry of Power, Ministry of Coal, and Ministry of Non-Conventional Energy Sources (renamed the Ministry of New and Renewable Energy in 2006).

In 2012, the Ministry of Power inaugurated the Smart Grid project in Puducherry. [3]

Cabinet Ministers

No.PortraitMinister
(Birth-Death)
Constituency
Term of officePolitical partyMinistryPrime Minister
FromToPeriod
Minister of Works, Mines and Power
1 Narhar Vishnu Gadgil 1985 stamp of India (cropped).jpg Narhar Vishnu Gadgil
(1896–1966)
MCA for Bombay
15 August
1947
26 December
1950
3 years, 133 days Indian National Congress Nehru I Jawaharlal Nehru
Minister of Natural Resources and Scientific Research
2 Sri Prakasa Portrait.jpg Sri Prakasa
(1890–1971)
26 December
1950
13 May
1952
1 year, 139 days Indian National Congress Nehru I Jawaharlal Nehru
3 Maulana Abul Kalam Azad.jpg Maulana Abul Kalam Azad
(1888–1958)
MP for Rampur
13 May
1952
6 June
1952
24 days Nehru II
Minister of Irrigation and Power
4 Gulzarilal Nanda 1.jpg Gulzarilal Nanda
(1898–1998)
MP for Sabarkantha
6 June
1952
17 April
1957
4 years, 315 days Indian National Congress Nehru II Jawaharlal Nehru
5 Miss India Indrani Rehman, S.K. Patil, and two of the sponsors of the contest (cropped).jpg S. K. Patil
(1898–1981)
MP for Mumbai South
17 April
1957
2 April
1958
350 days Nehru III
6 Hafiz Mohamad Ibrahim
(1889–1968)
Rajya Sabha MP for Uttar Pradesh
2 April
1958
10 April
1962
5 years, 85 days
10 April
1962
26 June
1963
Nehru IV
7 O. V. Alagesan Lok Sabha image.gif O. V. Alagesan
(1911–1992)
MP for Chengalpattu

(MoS)
26 June
1963
19 July
1963
23 days
8 Kanuri Lakshmana Rao
(1902–1986)
MP for Vijayawada

(MoS)
19 July
1963
27 May
1964
326 days
27 May
1964
9 June
1964
Nanda I Gulzarilal Nanda
9 H. C. Dasappa official portrait.gif H. C. Dasappa
(1894–1964)
MP for Bangalore
9 June
1964
19 July
1964
40 days Shastri Lal Bahadur Shastri
(8) Kanuri Lakshmana Rao
(1902–1986)
MP for Vijayawada

(MoS)
19 July
1964
11 January
1966
1 year, 189 days
11 January
1966
24 January
1966
Nanda II Gulzarilal Nanda
10 President Fakhruddin Ali Ahmed.jpg Fakhruddin Ali Ahmed
(1905–1977)
MP for Barpeta
24 January
1966
13 November
1966
293 days Indira I Indira Gandhi
11 Kanuri Lakshmana Rao
(1902–1986)
MP for Vijayawada

(MoS)
13 November
1966
13 March
1967
6 years, 361 days
13 March
1967
18 March
1971
Indira II
18 March
1971
9 November
1973
Indian National Congress (R) Indira II
12 Shri K.C Pant (cropped).jpg K. C. Pant
(1931–2012)
MP for Nainital

(MoS)
9 November
1973
10 October
1974
335 days
Minister of Energy
(12) Shri K.C Pant (cropped).jpg K. C. Pant
(1931–2012)
MP for Nainital

(MoS)
10 October
1974
24 March
1977
335 days Indian National Congress (R) Indira II Indira Gandhi
13 P. Ramachandran
(1921–2001)
MP for Chennai Central
26 March
1977
28 July
1979
2 years, 124 days Janata Party Desai Morarji Desai
14 Shri K.C Pant (cropped).jpg K. C. Pant
(1931–2012)
Rajya Sabha MP for Uttar Pradesh
30 July
1979
14 January
1980
168 days Indian National Congress (Urs) Charan Charan Singh
15 Indian Minister Ghani Khan.jpg A. B. A. Ghani Khan Choudhury
(1927–2006)
MP for Malda
14 January
1980
2 September
1982
2 years, 231 days Indian National Congress (I) Indira IV Indira Gandhi
16 P. Shiv Shankar (cropped).jpg P. Shiv Shankar
(1929–2017)
MP for Secunderabad
2 September
1982
31 October
1984
2 years, 120 days
31 October
1984
31 December
1984
Rajiv I Rajiv Gandhi
17 Vasant Sathe (cropped).jpg Vasant Sathe
(1925–2011)
MP for Wardha
31 December
1984
3 September
1988
3 years, 247 days Rajiv II
18 Makhan Lal Fotedar (cropped).jpg Makhan Lal Fotedar
(1932–2017)
Rajya Sabha MP for Uttar Pradesh
3 September
1988
19 September
1988
16 days
(17) Vasant Sathe (cropped).jpg Vasant Sathe
(1925–2011)
MP for Wardha
19 September
1988
2 December
1989
1 year, 74 days
19 Kerala Governor Khan during an inaugural function in 2023.jpg Arif Mohammad Khan
(born 1951)
MP for Bahraich
6 December
1989
10 November
1990
339 days Janata Dal Vishwanath V. P. Singh
20 Kalyan Singh Kalvi
(born 1933)
MP for Barmer
21 November
1990
21 June
1991
212 days Samajwadi Janata Party (Rashtriya) Chandra Shekhar Chandra Shekhar
Minister of Power
21 Kalpnath Rai
(1941–1999)
MP for Ghosi

(MoS, I/C)
21 June
1991
18 January
1993
1 year, 211 days Indian National Congress (I) Rao P. V. Narasimha Rao
22 N. K. P. Salve
(1921–2012)
Rajya Sabha MP for Maharashtra
18 January
1993
16 May
1996
3 years, 119 days
Atal Bihari Vajpayee tribute image (cropped).jpg Atal Bihari Vajpayee
(1924–2018)
MP for Lucknow

(Prime Minister)
16 May
1996
1 June
1996
16 days Bharatiya Janata Party Vajpayee I Atal Bihari Vajpayee
H. D. Deve Gowda BNC.jpg H. D. Deve Gowda
(born 1933)
Rajya Sabha MP for Karnataka

(Prime Minister)
1 June
1996
21 April
1997
324 days Janata Dal Deve Gowda H. D. Deve Gowda
Inder Kumar Gujral 071.jpg Inder Kumar Gujral
(1919–2012)
Rajya Sabha MP for Bihar

(Prime Minister)
21 April
1997
9 June
1997
49 days Gujral Inder Kumar Gujral
23 Shri Yogendra Alagh.jpg Yoginder K Alagh
(1939–2022)
Rajya Sabha MP for Gujarat

(MoS, I/C)
9 June
1997
19 March
1998
283 days
24 Rangarajan Kumaramangalam
(1952–2000)
MP for Tiruchirappalli
19 March
1998
13 October
1999
2 years, 157 days Bharatiya Janata Party Vajpayee II Atal Bihari Vajpayee
13 October
1999
23 August
2000 [†]
Vajpayee III
Atal Bihari Vajpayee tribute image (cropped).jpg Atal Bihari Vajpayee
(1924–2018)
MP for Lucknow

(Prime Minister)
23 August
2000
30 September
2000
38 days
25 Suresh Prabhu (cropped).jpg Suresh Prabhu
(born 1953)
MP for Rajapur
30 September
2000
24 August
2002
1 year, 328 days Shiv Sena
Atal Bihari Vajpayee tribute image (cropped).jpg Atal Bihari Vajpayee
(1924–2018)
MP for Lucknow

(Prime Minister)
24 August
2002
26 August
2002
2 days Bharatiya Janata Party
26 Anant Geete in April 2017.jpg Anant Geete
(born 1951)
MP for Ratnagiri
26 August
2002
22 May
2004
1 year, 270 days Shiv Sena
27 P.M. Sayeed.jpg P. M. Sayeed
(1941–2005)
Rajya Sabha MP for NCT of Delhi
23 May
2004
18 December
2005 [†]
1 year, 209 days Indian National Congress Manmohan I Manmohan Singh
Manmohan Singh in 2009.jpg Manmohan Singh
(born 1932)
Rajya Sabha MP for Assam

(Prime Minister)
18 November
2005
29 January
2006
72 days
28 Sushilkumar Shinde.jpg Sushilkumar Shinde
(born 1941)
Rajya Sabha MP for Maharashtra, until 2009
MP for Solapur, from 2009
29 January
2006
22 May
2009
3 years, 113 days
28 May
2009
31 July
2012
3 years, 64 days Manmohan II
29 M. Veerappa Moily addressing a Press Conference on Electoral Reforms (cropped).jpg Veerappa Moily
(born 1940)
MP for Chikballapur
31 July
2012
28 October
2012
89 days
30 Jyotiraditya Scindia (cropped).jpg Jyotiraditya Scindia
(born 1971)
MP for Guna

(MoS, I/C)
28 October
2012
26 May
2014
1 year, 210 days
31 Piyush Goyal.jpg Piyush Goyal
(born 1964)
Rajya Sabha MP for Maharashtra
27 May
2014
3 September
2017
3 years, 99 days Bharatiya Janata Party Modi I Narendra Modi
32 Raj Kumar Singh with PM Modi (cropped).jpg Raj Kumar Singh
(born 1952)
MP for Arrah

(MoS, I/C until 7 July 2021)
3 September
2017
30 May
2017
6 years, 202 days
31 May
2019
Incumbent Modi II

Ministers of State

No.PortraitMinister
(Birth-Death)
Constituency

(Department)
Term of officePolitical partyMinistryPrime Minister
FromToPeriod
Minister of State for Irrigation and Power
1 O. V. Alagesan Lok Sabha image.gif O. V. Alagesan
(1911–1992)
MP for Chengalpattu
8 May
1962
19 July
1963
1 year, 72 days Indian National Congress Nehru IV Jawaharlal Nehru
2 Kanuri Lakshmana Rao
(1902–1986)
MP for Vijayawada
9 June
1964
19 July
1964
40 days Shastri Lal Bahadur Shastri
24 January
1966
13 November
1966
293 days Indira I Indira Gandhi
Minister of State for Energy
3Fazlur Rahman
MP for Bettiah
14 August
1977
26 January
1979
1 year, 165 days Janata Party Desai Morarji Desai
4 Janeshwar Mishra
(1933–2010)
MP for Prayagraj
26 January
1979
15 July
1979
170 days
5 Vikram Chand Mahajan
(1933–2016)
MP for Kangra
8 June
1980
29 January
1983
2 years, 235 days Indian National Congress (I) Indira IV Indira Gandhi
6 Gargi Shankar Mishra
(born 1919)
MP for Seoni

(Coal)
15 January
1982
2 September
1982
230 days
7 Chaudhary Dalbir Singh
(1926–1987)
MP for Sirsa
2 September
1982
29 January
1983
149 days
8Chandra Pratap Narain Singh
MP for Padrauna
(Non-Conventional Energy Sources)
2 September
1982
2 February
1983
153 days
(6) Gargi Shankar Mishra
(born 1919)
MP for Seoni
6 September
1982
29 January
1983
1 year, 32 days
(7) Chaudhary Dalbir Singh
(1926–1987)
MP for Sirsa

(Coal)
29 January
1983
31 October
1984
1 year, 276 days
(6) Gargi Shankar Mishra
(born 1919)
MP for Seoni

(Petroleum)
29 January
1983
31 October
1984
1 year, 276 days
9 Chandrashekhar Singh
(1927–1986)
MP for Banka

(Power)
29 January
1983
14 August
1983
197 days
10 Kerala Governor Khan during an inaugural function in 2023.jpg Arif Mohammad Khan
(born 1951)
MP for Bahraich
7 February
1984
31 October
1984
267 days
(7) Chaudhary Dalbir Singh
(1926–1987)
MP for Sirsa

(Coal)
4 November
1984
31 December
1984
57 days Rajiv I Rajiv Gandhi
(6) Gargi Shankar Mishra
(born 1919)
MP for Seoni

(Petroleum)
4 November
1984
31 December
1984
57 days
(10) Kerala Governor Khan during an inaugural function in 2023.jpg Arif Mohammad Khan
(born 1951)
MP for Bahraich
12 November
1984
31 December
1984
49 days
11 Arun Nehru
(1944–2013)
MP for Raebareli

(Power)
31 December
1984
25 September
1985
268 days Rajiv II
(10) Kerala Governor Khan during an inaugural function in 2023.jpg Arif Mohammad Khan
(born 1951)
MP for Bahraich

(Power)
25 September
1985
26 February
1986
154 days
12 Sushila Rohatgi Lok Sabha photo.jpg Sushila Rohatgi
(1921–2011)
MP for Uttar Pradesh (Rajya Sabha)

(Power)
12 May
1986
9 May
1988
1 year, 363 days
13 Kalpnath Rai
(1941–1999)
MP for Ghosi

(Power)
25 June
1988
2 December
1989
1 year, 160 days
14 Veteran Leader Ck jaffer Sharief on a Hartal (cropped).JPG C. K. Jaffer Sharief
(1933–2018)
MP for Bangalore North
14 February
1988
2 December
1989
1 year, 291 days
15 Babanrao Dhakne
(born 1937)
MP for Beed
21 November
1990
21 June
1991
212 days Samajwadi Janata Party (Rashtriya) Chandra Shekhar Chandra Shekhar
Minister of State for Power
16 P. V. Rangayya Naidu (cropped).jpg P. V. Rangayya Naidu
(born 1933)
MP for Khammam
18 January
1993
10 February
1995
2 years, 23 days Indian National Congress Rao P. V. Narasimha Rao
17 Urmilaben Patel Rajya Sabha MP.jpg Urmilaben Chimanbhai Patel
(1932–2016)
MP for Gujarat (Rajya Sabha)
10 February
1995
16 May
1996
1 year, 96 days
18 Samudrala Venugopal Chary (cropped).jpg Samudrala Venugopal Chary
(born 1959)
MP for Adilabad
1 June
1996
21 April
1997
1 year, 8 days Telugu Desam Party Deve Gowda H. D. Deve Gowda
21 April
1997
9 June
1997
Gujral Inder Kumar Gujral
19 Jayawantiben Mehta at an event (cropped).jpg Jayawantiben Mehta
(1938–2016)
MP for Mumbai South
13 October
1999
22 May
2004
4 years, 222 days Bharatiya Janata Party Vajpayee III Atal Bihari Vajpayee
20 Jairam ramesh.jpg Jairam Ramesh
(born 1954)
MP for Andhra Pradesh (Rajya Sabha)
6 April
2008
25 February
2009
325 days Indian National Congress Manmohan I Manmohan Singh
21 Bharatsinh Solanki assuming office as MoS, Railways in January 2011 (cropped).jpg Bharatsinh Solanki
(born 1953)
MP for Anand
28 May
2009
19 January
2011
1 year, 236 days Manmohan II
22 K.C. Venugopal.JPG K. C. Venugopal
(born 1963)
MP for Alappuzha
19 January
2011
28 October
2012
1 year, 283 days
23 Krishan Pal Gurjar assuming office in 2014 (cropped).jpg Krishan Pal Gurjar
(born 1957)
MP for Faridabad
7 July
2021
Incumbent2 years, 260 days Bharatiya Janata Party Modi II Narendra Modi

Central public sector undertakings

Related Research Articles

<span class="mw-page-title-main">CLP Group</span> Hong Kong electric power company

CLP Group and its holding company, CLP Holdings Ltd, also known as China Light and Power Company, Limited, is an electricity company in Hong Kong. Incorporated in 1901 as China Light & Power Company Syndicate, its core business remains the generation, transmission, and retailing of electricity. It also has businesses in a number of Asian markets as well as EnergyAustralia in Australia. It is one of the two main electricity power generation companies in Hong Kong, the other being Hongkong Electric Company.

<span class="mw-page-title-main">Electricity sector in India</span> Power generation and distribution

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2022–23, the total electricity generation in the country was 1,844 TWh, of which 1,618 TWh was generated by utilities.

<span class="mw-page-title-main">NLC India Limited</span> Central Public Sector Undertaking

NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.

Nova Scotia Power Inc. is a vertically integrated electric utility in Nova Scotia, Canada. It is privately owned by Emera and regulated by the provincial government via the Nova Scotia Utility and Review Board (NSUARB). Nova Scotia Power Inc provides electricity to 520,000 residential, commercial and industrial customers in Nova Scotia.

<span class="mw-page-title-main">Ministry of Petroleum and Natural Gas</span> Ministry of government of India

The Ministry of Petroleum and Natural Gas (MOP&NG) is a ministry of the government of India responsible for the exploration, production, refining, distribution, marketing, import, export, and conservation of petroleum, natural gas, petroleum products, and liquefied natural gas in the country. The ministry is headed by the Cabinet Minister Hardeep Singh Puri. M. M. Kutty is the Secretary of the Ministry. Dharmedndra Pradhan serving as the minister from 26 May 2014 to 7 July 2021 is the longest serving minister till date.

<span class="mw-page-title-main">Ministry of New and Renewable Energy</span> Indian government ministry

The Ministry of New and Renewable Energy (MNRE) is a ministry of the Government of India, headed by current Union Cabinet Minister Raj Kumar Singh, that is mainly responsible for research and development, intellectual property protection, and international cooperation, promotion, and coordination in renewable energy sources such as wind power, small hydro, biogas, and solar power.

<span class="mw-page-title-main">Energy in Queensland</span> Overview of the production, consumption, import and export of energy and electricity in Queensland

Queensland's energy policy is based on the year 2000 document called the Queensland Energy Policy: A Cleaner Energy Strategy. The Queensland Government assists energy development through the Department of Energy and Water Supply. The state is noted for its significant contribution to coal mining in Australia. The primary fuel for electricity generation in the state is coal with coal seam gas becoming a significant fuel source. Queensland has 98% of Australia's reserves of coal seam gas. An expansion of energy-intensive industries such as mining, economic growth and population growth have created increased demand for energy in Queensland.

<span class="mw-page-title-main">Super grid</span> Wide-area electricity transmission network

A super grid or supergrid is a wide-area transmission network, generally trans-continental or multinational, that is intended to make possible the trade of high volumes of electricity across great distances. It is sometimes also referred to as a "mega grid". Super grids typically are proposed to use high-voltage direct current (HVDC) to transmit electricity long distances. The latest generation of HVDC power lines can transmit energy with losses of only 1.6% per 1,000 km.

<span class="mw-page-title-main">Renewable energy in India</span>

India is the world's 4th largest consumer of electricity and the world's 3rd largest renewable energy producer with 40% of energy capacity installed in the year 2022 coming from renewable sources. Ernst & Young's (EY) 2021 Renewable Energy Country Attractiveness Index (RECAI) ranked India 3rd behind USA and China. In FY2023-24, India is planning to issue 50 GW tenders for wind, solar and hybrid projects. India has committed for a goal of 500 GW renewable energy capacity by 2030. In line with this commitment, India's installed renewable energy capacity has been experiencing a steady upward trend. From 94.4 GW in 2021, the capacity has gone up to 119.1 GW in 2023 as of Q4.

The Australian Energy Market Operator (AEMO) performs an array of gas and electricity market, operational, development and planning functions. It manages the National Electricity Market (NEM), the Wholesale Electricity Market (WA) (WEM) and the Victorian gas transmission network. AEMO also facilitates electricity and gas full retail contestability, overseeing these retail markets in eastern and southern Australia. It is additionally responsible for national transmission planning for electricity and the establishment of a Short Term Trading Market (STTM) for gas.

<span class="mw-page-title-main">Ceylon Electricity Board</span> Sri Lankan electricity company

The Ceylon Electricity Board - CEB, is the largest electricity company in Sri Lanka. With a market share of nearly 100%, it controls all major functions of electricity generation, transmission, distribution and retailing in Sri Lanka. It is one of the only two on-grid electricity companies in the country; the other being Lanka Electricity Company (LECO). The company earned approximately Rs 204.7 billion in 2014, with a total of nearly 5.42 million consumer accounts. It is a government-owned and controlled utility of Sri Lanka that takes care of the general energy facilities of the island. The Ministry of Power and Energy is the responsible ministry above the CEB. Ceylon Electricity Board (CEB), established by the CEB Act No. 17 of 1969, is under the legal obligation to develop and maintain an efficient, coordinated and economical system of electricity supply in accordance with any licenses issued.

<span class="mw-page-title-main">Electricity sector in Sri Lanka</span>

The electricity sector in Sri Lanka has a national grid which is primarily powered by hydroelectric power and thermal power, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid.

<span class="mw-page-title-main">Power System Operation Corporation</span> Division of Ministry of Power (India)

Grid Controller of India Limited (GRID-INDIA) is a division of the Ministry of Power, Government of India. The new name of Power System Operation Corporation Limited (POSOCO) is Grid Controller of India Limited (Grid-India) since 09th November 2022. It is responsible to monitor and ensure round the clock integrated operation of Indian Power System. It consists of 5 Regional Load Despatch Centres (RLDCs) and the National Load Despatch Centre (NLDC).

<span class="mw-page-title-main">NTPC Limited</span> National Thermal Power Corporation, Central Public Sector Undertaking coal mining

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">Energy in Bhutan</span>

Energy in Bhutan has been a primary focus of development in the kingdom under its Five-Year Plans. In cooperation with India, Bhutan has undertaken several hydroelectric projects whose output is traded between the countries. Though Bhutan's many hydroelectric plants provide energy far in excess of its needs in the summer, dry winters and increased fuel demand makes the kingdom a marginal net importer of energy from India.

<span class="mw-page-title-main">Smart grid in China</span>

China is the world's largest consumer of electricity, and its demand is expected to double by the next decade, and triple by 2035. In 2010, 70 percent of the country's electricity generation came from coal-fired power plants, but the Chinese government is investing heavily in renewable energy technologies. As of 2013, 21 percent of China's electricity generation comes from renewable sources. This represents only 9 percent of overall primary energy consumption in the country. China's latest goal is to increase renewable energy to 9.5 percent of overall primary energy use by 2015. To implement China's new clean energy capacity into the national power grid, and to improve the reliability of the country's existing infrastructure, requires significant upgrades and ultimately, a smart grid.

Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.

<span class="mw-page-title-main">Vallur Thermal Power Station</span> Coal-fired power station in Tamil Nadu

Vallur Thermal Power Station is a power plant located in Vallur, Thiruvallur district, India. The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each.

The Ministry of Power, Energy and Mineral Resources or Ministry of Energy is a ministry of the Government of Bangladesh. It is mainly responsible for all policies and matters relating to electricity generation, transmission, and distribution from conventional and non-conventional energy sources including hydro electricity. It also deals with the Import, Distribution, Exploration, Extraction, Pricing, and other policy related details of the primary fuels.

References

  1. "Budget data" (PDF). www.indiabudget.gov.in. 2019. Archived from the original (PDF) on 4 March 2018. Retrieved 15 September 2018.
  2. About ministry, Ministry of Power (India), archived from the original on 26 October 2012
  3. "Smart grid project inaugurated". Puducherry. The Hindu. 20 October 2012. Retrieved 23 October 2012.