Natural gas in Canada

Last updated

Natural gas was Canada's third largest source of energy production in 2018, representing 22.3% of all energy produced from fuels in the country. By contrast, the share of fuel-based energy production from natural gas in 2013 was 17.0%, indicating a growth rate of approximately 1.06% per year. [1]

Contents

Reserves

Proved natural gas reserves in Canada (1980-2013) Canada Gas Proved Reserves 1980-2012.png
Proved natural gas reserves in Canada (1980-2013)

As of 2017, Canada's gas reserves were estimated 30.8 trillion cubic metres (1.09×10^15 cu ft), 72% of which is from unconventional tight gas formations in Alberta and British Columbia. [2]

Biogenic gas is produced at shallow depths by microbial activity. The most prolific biogenic gas deposit in Western Canada is the Southeast Alberta Gas Field (SAGF), which is located in southeastern Alberta and southwestern Saskatchewan in the Western Canada Sedimentary Basin [3] and holds an estimated 1.42×1012 m3 of recoverable gas. [4]

Gas hydrates are pure methane deposits formed at low temperature and high pressure conditions. [5] They are typically found in the shallow sea in arctic permafrost regions and continental slopes. [5] In Western Canada, the Mackenzie-Beaufort Sea and the continental slope off Vancouver Island are two areas which have undergone extensive exploration drilling and studies. [6] The gas hydrate deposits in these regions are estimated to hold up to 11×1013 m3 of gas. [6]

Production

Canada natural gas production (1980-2012) Canada Gas Production 1980-2012.png
Canada natural gas production (1980-2012)

As of 2017, Canada was the fifth largest producer of natural gas in the world with a total of 473 million cubic metres per day (16.7×10^9 cu ft/d). [7] in 2017. [8]

Liquefied Natural Gas Production

There are four LNG plants that serve Canada's domestic demand. Two additional LNG facilities are in the planning stages, with Stolt LNGaz slated to open in 2018 in Becancour, Quebec and Northeast Midstream planning two liquefaction plants in Nipigon and Thorold, Ontario. [9]

Three LNG facilities are in operation in Western Canada as of 2018, and one more is slated to begin operations in 2018:

Ferus Elmworth LNG

Ferus Natural Gas Fuels Inc. (Ferus NGF) began operation of their merchant LNG facility in Elmworth, Alberta in May 2014. This facility can currently produce 50,000 gallons of LNG per day with an expansion capacity of 250,000 gallons per day. [11] The facility receives lean gas from a nearby industry host plant. [12]

FortisBC Mt Hayes LNG

FortisBC's Mt Hayes facility is located near Ladysmith, Vancouver Island. The facility was completed in 2011 and is owned in a limited partnership between FortisBC, Stz'uminus First Nation, and the Cowichan Tribes. [13] The facility includes a liquefaction system, vaporization system, and storage tank and is connected to the main transmission line via two pipeline spurs. [14] The primary use of the facility is for peak shaving storage, to ensure a steady supply of gas and maintain lower costs during peak demand periods for local customers. [15]

FortisBC Tilbury LNG

The FortisBC Tilbury Island LNG facility is located in Delta, British Columbia and began operations in 1971. It has the capacity to liquefy 5,000 GJ of gas per day and stores up to 600,000 GJ. Expansion is underway to increase the liquefaction and storage capacities by 34,000 GJ and 1.1 million GJ, respectively. [16]

Pipelines

Across Canada, interprovincial pipelines have the capacity to carry over 1.3 billion cubic metres per day (46×10^9 cu ft/d) of gas and even more within the boundaries of the individual provinces. [17] The construction of new natural gas pipelines is controversial. RCMP enforcement actions against Wet'suwet'en hereditary chiefs in 2020 and 2021 at the Coastal Gas Link pipeline led to wide spread protests across the country.

Domestic consumption

Electricity generation

Brandon Generating Station was converted from burning coal to burning natural gas in 2018. Brandon GS Combustion Turbines.JPG
Brandon Generating Station was converted from burning coal to burning natural gas in 2018.

In 2016 natural gas was used to provide 35% of all energy in Canada, double the amount supplied by electricity. [18] Electricity generated by natural gas was 8.5% of the nation's total. Natural gas is used to supply 50% of space heating, and 65% of water heating in homes, similarly 80% of businesses use natural gas for space and water heating. [19] The industrial sector uses natural gas as a source of process heat, as a fuel for the generation of steam and as a feedstock in the production of petrochemicals and fertilizers. [20] Provincially, Alberta is the largest consumer of natural gas at 3.9 billion cubic feet per day.

In 2018, the government of Canada announced the goal of phasing out the use of coal-fired power stations in favour of less polluting alternatives for electricity generation by 2030. [21] In response, companies such as TransAlta and Capital Power began planning the conversion of their coal-fired power stations to burning natural gas. [22] [23] This transition is expected to increase overall domestic consumption of natural gas.

LNG consumption

Remote communities

In Canada there are approximately 188,525 people residing in 265 remote communities with a combined total annual electrical usage of 1,850 GW. [24] [25] [26] The majority of these communities rely on diesel with a total annual fuel consumption of approximately 289 million L. [24] Today, two of Canada's remote communities use natural gas as their primary fuel source.

  • Norman Wells, NT purchases excess electricity from a natural gas-fueled power plant operated by Imperial Oil that taps into its field for gas. [26] [27]
  • Inuvik, NT has one natural-gas run power plant which until recently was sourced locally from the Ikhil gas well in the Mackenzie Delta. The transition to LNG occurred in 2014 as production ceased in the well. The LNG was initially transported over 3,500 km from the Delta Tillbury plant. [26] [27] Today, Ferus’ Elmworth facility supplies LNG to Inuvik, as well as the city of Whitehorse, which uses natural gas generators. [26]

Industries

Industrial consumers use LNG to smooth or peak shave the sudden lower/higher demand periods that arise due to extremely cold or warm weather. [2] The Tilbury LNG FortisBC facility currently operates as a peak shaving facility in Western Canada. [2] LNG is also used in heavy drilling, mining machinery operation, and fueling gas-fired electrical generating stations in remote mining locations. [2]

  • Caterpillar Inc.: An agreement was announced in 2013 between Caterpillar and Shell Canada to test new LNG hybrid mining trucks in their oil sands mining operations [28] In 2017, Caterpillar Inc. released a dual fuel (LNG-diesel) retrofit kit for their 785C mining truck. [29]
  • Teck Resources began a pilot LNG project at their Fording River operation in 2015. Two hauling trucks were converted to dual diesel/LNG engines and LNG was provided by FortisBC. [30]
  • Stornoway Diamond Corporation has developed an LNG fueled power plant for the Renard diamond mine in Quebec. [31]

Transportation

Some Canadian organizations have begun to transition away from diesel and gasoline and towards LNG fuel.

  • BC Ferries signed an agreement with FortisBC in 2015 to supply 300,000 GJ of LNG annually to fuel three new passenger ferries equipped with dual fuel capacity (natural gas and diesel). The LNG is transported from the Tilbury facility by truck. [32]
  • Seaspan Ferries Corp purchased two hybrid (diesel-LNG-battery) ferries in 2017 to add to its fleet of vessels which deliver cargo from mainland Vancouver to Vancouver Island. [33] LNG for Seaspan Ferries is also supplied by FortisBC's Tilbury facility. [34]
  • Vedder Transport of Abbotsford, BC owns a fleet of 65 LNG transport tractors, some of which were purchased from a failed LNG pilot project by Bison Transport. [35] [36] [37] Vedder refuels their fleet using a private station which is supplied with LNG by FortisBC. [38]
  • Denwill Enterprises (Burnaby, BC), Sutco Transportation Services (Salmo, BC) and Arrow Transportation Systems (Kamloops, BC), own LNG transportation vehicles in their fleet and are supplied by FortisBC's Tilbury LNG facility [39] [40]
  • ENN Canada (a subsidiary of ENN Group) owns three LNG fueling stations in Chilliwack, BC; Merrit, BC and Grande Prairie, AB which service trucking fleets. [41] [42]
  • the Canadian National Railway took part in North America's first pilot study using two hybrid (LNG-diesel)powered locomotives from 2012-2013 and in 2015, which transported freight from Edmonton to Fort McMurray. [43] As of 2018, the project has not yet been adopted.

Trade

A large portion of Canada's gas is exported to the United States; in 2006, 9.9 billion cubic feet (280,000,000 m3) per day. [44] In 2018, Canada's annual net exports of natural gas totaled 57.5 billion cubic meters. [45]

LNG export and import facilities

As of 2018, the Canaport LNG facility in New Brunswick, which opened in 2009, is Canada's only large-scale LNG terminal. The plant functions as a regasification facility. The plant receives LNG from the North Sea and the Caribbean and redistributes it to Atlantic Canada and Northeastern US. [2] According to the International Gas Union's 2017 World LNG Report, Canada received 0.06 and 0.18 metric tonnes per annum (MTPA) from Norway and Trinidad, respectively, in 2016. [46]

Since 2010, the National Energy Board (NEB) has received 48 applications for LNG import/export facilities in Canada. Of those applications, 24 LNG export projects were approved to service the Asian market demand. [2] Canada's first LNG export to China occurred on November 22, 2017 by True North Energy, which transported 17 tonnes of LNG from Fortis BC's Tilbury plant in Vancouver. [47] [48] Because most of Canada's LNG export proposals are greenfield projects, the upfront capital costs are high compared to other international projects. [46] However, small-scale LNG facilities are finding opportunities in Canada's domestic markets.

Policy

Alberta Legislation and Public Agencies

The public agency governing the energy and electrical distribution in Alberta is the Alberta Utilities Commission (AUC). The AUC is an independent and quasi-judicial agency that regulates transmission lines, electric substations, power generation facilities (i.e. power plants including wind turbines), and gas utility pipelines. According to the AUC Act (SA 2007), [49] the Commission is made up of nine members appointed by the Lieutenant Governor in Council and each hold terms of up to 5 years. In Section 8(5), the Act outlines that the commission may make an order on appeals relating to disputes and are responsible for holding hearings and determining if utility projects are in the public interest. [50] Ultimately, the approval for any LNG plant or project needs approval from the AUC.

Another important statute in Alberta is the Hydro and Electric Energy Act (RSA 2000). [51] Under Section 11 of the Act, the AUC must approve the construction and operation of any LNG plant before production can begin. [51] Section 19 explains that the AUC is responsible for granting or denying approvals, permits, and licenses. [51] Additionally, the commission may demand modifications to the plans, specifications, or locations for LNG plants, before allowing a project to proceed. [51] If the applicant wants to make minor alterations to a power plant, then the corporation must submit a Letter of Enquiry containing the need for the project, timing of construction, and environmental impacts. These provisions are specified in the Hydro and Electric Energy Regulation (409/83) under Section 12. [51]

The Isolated Generating Units and Customer Choice Regulation (165/2003) [52] enables Alberta to govern the provision of energy to areas separate from the interconnected electric system, as well as isolated communities. In Section 2, the regulations clearly state that the owner of the electric distribution system where an isolated community is located must get approval for the pricing and costs associated with providing energy to those communities. [53] In order to develop an LNG fueled power plant in remote communities, utility companies need to follow a robust approval process established by the AUC. [49] During this procedure, the utility companies are required to follow an intensive nine step process involving public consultations, hearings, appeals, and a final decision from the AUC. As part of the process, community support is required before proceeding with energy projects. In the nine step approval process, [54] the first step is public consultation, which involves the applicant addressing concerns from various stakeholders. Next, the utility company is required to make an official application to the AUC. Then, the AUC issues a notice of hearing to any members of the public who wishes to participate in the approval process. The fourth step involves interested parties making submissions or objections to the application. The next step is an opportunity for consultation and negotiation. Shortly after, the AUC holds public hearings and makes the decision to either deny the project, approve it, or put conditions on the approval. The final two steps involve an appeal process for dissatisfied participants and the ultimate construction and operation of the LNG facility.

See also

Related Research Articles

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Liquefied natural gas</span> Form of natural gas for easier storage and transport

Liquefied natural gas (LNG) is natural gas (predominantly methane, CH4, with some mixture of ethane, C2H6) that has been cooled down to liquid form for ease and safety of non-pressurized storage or transport. It takes up about 1/600th the volume of natural gas in the gaseous state (at standard conditions for temperature and pressure).

Fortis Inc. is a St. John's, Newfoundland and Labrador-based international diversified electric utility holding company. It operates in Canada, the United States, Central America, and the Caribbean. In 2015, it earned CA$6.7 billion.

<span class="mw-page-title-main">Natural gas vehicle</span> Vehicle powered by natural gas

A Natural Gas Vehicle (NGV) is an alternative fuel vehicle that uses compressed natural gas (CNG) or liquefied natural gas (LNG). Natural gas vehicles should not be confused with autogas vehicles powered by liquefied petroleum gas (LPG), mainly propane, a fuel with a fundamentally different composition.

Puget Sound Energy (PSE) is an energy utility company based in the U.S. state of Washington that provides electrical power and natural gas to the Puget Sound region. The utility serves electricity to more than 1.1 million customers in Island, King, Kitsap, Kittitas, Pierce, Skagit, Thurston, and Whatcom counties, and provides natural gas to 750,000 customers in King, Kittitas, Lewis, Pierce, Snohomish and Thurston counties. The company's electric and natural gas service area spans 6,000 square miles (16,000 km2).

<span class="mw-page-title-main">Electricity sector in India</span> Power generation and distribution

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2021–22, the total electricity generation in the country was 1,719 TWh, of which 1,484 TWh was generated by utilities.

<span class="mw-page-title-main">TC Energy</span> Canadian energy company

TC Energy Corporation is a major North American energy company, based in the TC Energy Tower building in Calgary, Alberta, Canada, that develops and operates energy infrastructure in Canada, the United States, and Mexico. The company operates three core businesses: Natural Gas Pipelines, Liquids Pipelines and Energy.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">TransAlta</span> Canadian electricity generation company

TransAlta Corporation is an electricity power generator and wholesale marketing company headquartered in Calgary, Alberta, Canada. It is a privately owned corporation and its shares are traded publicly. It operates 76 power plants in Canada, the United States, and Australia. TransAlta operates wind, hydro, natural gas, and coal power generation facilities. The company has been recognized for its leadership in sustainability by the Dow Jones Sustainability North America Index, the FTSE4Good Index, and the Jantzi Social Index. TransAlta is Canada's largest investor-owned renewable energy provider. The company is not without controversy as the Alberta Utility Commission ruled in 2015 that TransAlta manipulated the price of electricity when it took outages at its Alberta coal-fired generating units in late 2010 and early 2011.

<span class="mw-page-title-main">Enmax</span> Calgary, Alberta municipal energy utility

Enmax Corporation is a vertically integrated utility with operations across Alberta, Canada, and in Maine, U.S. Through its subsidiaries, ENMAX Power Corporation and Versant Power, ENMAX owns and operates transmission and distribution utilities that deliver electricity to customers in Calgary, Alberta, and northern and eastern Maine. Through ENMAX Energy Corporation, ENMAX owns and operates power generation facilities and offers electricity and natural gas products and services to residential, commercial and industrial customers across Alberta.

The energy policy of India is to increase the locally produced energy in India and reduce energy poverty, with more focus on developing alternative sources of energy, particularly nuclear, solar and wind energy. Net energy import dependency was 40.9% in 2021-22.

<span class="mw-page-title-main">Energy policy of Canada</span> About Canadas federal and provincial energy policies

Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.

FortisBC is a Canadian owned, British Columbia based regulated utility focused on providing safe and reliable energy, including natural gas, Renewable Natural Gas, electricity and propane. FortisBC has approximately 2,600 employees serving more than 1.2 million customers in 135 B.C. communities and 58 First Nations communities across 150 Traditional Territories.

Through the 1996 Electric Utilities Act the Alberta's deregulated electricity market began.

<span class="mw-page-title-main">Capital Power Corporation</span> Canadian power generation

Capital Power is an independent power generation company based in Edmonton, Alberta, Canada. Capital Power develops, acquires, owns and operates power generation facilities using a variety of energy sources. Capital Power owns approximately 6,600 megawatts of power generation capacity at 27 facilities across North America.

Veresen Inc. was a Calgary, Alberta-based energy infrastructure company with three main lines of business: pipelines, natural gas and power generation. It was a publicly-traded company on the Toronto Stock Exchange, and was known as Fort Chicago Energy Partners L.P. In 2017, it was acquired by Pembina Pipeline for $9.7 billion.

<span class="mw-page-title-main">Natural gas in the United States</span>

Natural gas was the United States' largest source of energy production in 2016, representing 33 percent of all energy produced in the country. Natural gas has been the largest source of electrical generation in the United States since July 2015.

LNG Canada is a large industrial energy project that will build and operate a terminal for the liquefaction, storage, and loading of liquefied natural gas (LNG) in the port of Kitimat, British Columbia, Canada. It will export LNG produced by the project's partners in the Montney Formation gas fields near Dawson Creek, B.C.

References

  1. "Electricity from fuels, annual generation by electric utility thermal plants". www150.statcan.gc.ca. Retrieved 2020-01-24.
  2. 1 2 3 4 5 6 National Energy Board (July 2017). Canada's role in the global LNG market : energy market assessment (PDF). Canada: National Energy Board. ISBN   978-0-660-08993-5.
  3. Chen, Z.; Shuai, Y.; Osadetz, T.; Hamblin, T.; Grasby, S. (2015), "Comparison of biogenic gas fields in the Western Canada Sedimentary Basin and Qaidam Basin: implications for essential geological controls on large microbial gas accumulations", Bulletin of Canadian Petroleum Geology, 63 (1): 33–52, doi:10.2113/gscpgbull.63.1.33
  4. Chen, Z.; Zhang, S.; Grasby, S.E.; Shuai, Y. (2015), "Biogenic gas accumulations in Canada and China: geological characteristics and new insights", Bulletin of Canadian Petroleum Geology, 63 (1): 1–3, doi:10.2113/gscpgbull.63.1.1
  5. 1 2 Grace, J.; Collett, T.; Colwell, F.; Englezos, P.; Jones, E.; Mansell, R.; Meekison, J.P.; Ommer, R. (2008), "Energy from gas hydrates - assessing the opportunities and challenges for Canada", Report of the Expert Panel on Gas Hydrates, Council of Canadian Academies
  6. 1 2 Majorowicz, J.A; Osadetz, K.G. (2001), "Gas hydrate distribution and volume in Canada", Bulletin of Canadian Petroleum Geology, 85 (7): 1211–1230
  7. "Natural Gas". Canadian Association of Petroleum Producers.
  8. "Marketable Natural Gas Production in Canada" . Retrieved 2018-03-15.
  9. "Northeast Midstream" . Retrieved 2018-03-15.
  10. "Énergir | Entreprise québécoise, leader en énergie". www.energir.com (in French). Retrieved 2018-04-08.
  11. "Ferus Natural Gas Fuels makes Canadian energy history by commissioning the first merchant LNG facility in Canada". Ferus Inc. Retrieved April 1, 2018.
  12. Turner, Jocelyn (Oct 28, 2014). "Ferus LNG plant in Elmworth a first for Canada". Daily Herald Tribune. Retrieved 16 April 2018.
  13. "FortisBC partners with Stz'uminus (Chemainus) First Nation and Cowichan Tribes in the ownership of Mt. Hayes natural gas storage facility". FortisBC. Retrieved 16 April 2018.
  14. Stobart, Matthew. "ENGINEERING, PROCUREMENT, AND CONSTRUCTION CHALLENGES OF THE MOUNT HAYES LNG PEAKSHAVING FACILITY" (PDF). Gas Technology Institute. Retrieved 16 April 2018.
  15. "Mt Hayes LNG Facility". FortisBC. Retrieved 16 April 2018.
  16. "Tilbury LNG expansion project". FORTISBC. Retrieved 16 April 2018.
  17. National Energy Board (2016). "Canada's Pipeline Transportation System". NEB. Retrieved 1 April 2018.
  18. "NEB – Provincial and Territorial Energy Profiles – Canada". www.neb-one.gc.ca. National Energy Board - Government of Canada. 7 December 2017.
  19. "NORTH AMERICAN NATURAL GAS MARKET: 2015-2016 HEATING SEASON OUTLOOK". Nrcan.gc.ca. 19 November 2015. Retrieved 4 July 2018.
  20. "Natural Gas: A Primer". Nrcan.gc.ca. 18 January 2011. Retrieved 4 July 2018.
  21. Naidu-Ghelani, Rajeshni (21 May 2019). "Canada a leader among G20 for plan to phase out coal, says report". cbc.ca. Retrieved 27 January 2020.{{cite web}}: CS1 maint: url-status (link)
  22. "Coal-to-Gas Conversions Project". TransAlta. 2019. Retrieved 24 January 2020.{{cite web}}: CS1 maint: url-status (link)
  23. "Dual-Fuel Flexibility". Capital Power. Retrieved 2020-01-24.
  24. 1 2 Natural Resources Canada, Remote Communities Database, 12 September 2016, retrieved 2018-03-15
  25. Arriaga, M.; Cañizares, C.A.; Kazerani, M. (2014), "Northern lights: Access to electricity in Canada's northern and remote communities", IEEE Power and Energy Magazine, 12 (4): 50–59, doi:10.1109/MPE.2014.2317963, S2CID   44236179
  26. 1 2 3 4 Knowles, J. (2016). "Power shift: Electricity for Canada's remote communities". Conference Board of Canada: 68. Retrieved 2018-03-15.
  27. 1 2 Standing Senate Committee on Energy, the Environment and Natural Resources. "Powering Canada's Territories": 64.{{cite journal}}: Cite journal requires |journal= (help)
  28. "SHELL CANADA & CATERPILLAR SIGN AGREEMENT EXPLORING LNG FUELLING OPTIONS FOR MINING TRUCKS". Shell Canada. Retrieved 16 April 2018.
  29. "CATERPILLAR TO OFFER DUAL FUEL RETROFIT KIT FOR 785C MINING TRUCK". Caterpillar. Retrieved 16 April 2018.
  30. "Behind the Pilot: LNG Truck Conversion at Fording River Operations". Teck. Retrieved 16 April 2018.
  31. Matt Manson. Stornoway To Proceed With Liquefied Natural Gas (LNG) Power Plant For Renard Diamond Project; 2013.
  32. "FortisBC finalizes LNG supply agreement with BC Ferries to fuel new vessels" . Retrieved 2018-04-05.
  33. Press Release. "Seaspan Ferries Corporation Announces Arrival of Second New Liquefied Natural Gas (LNG) Fuelled Vessel". Seaspan. Retrieved 16 April 2018.
  34. "Marine Bunkering". FortisBC. Retrieved 16 April 2018.
  35. Menzies, James (August 4, 2015). "Why Vedder Transport jumped at opportunity to buy Bison's LNG trucks". Truck News. Retrieved 16 April 2018.
  36. "1 year & 1,000,000 LNG miles later." (PDF). Bison Transport. Retrieved 16 April 2018.
  37. Bakx, Kyle (Jan 25, 2016). "LNG replacing diesel? Not for a long, long while". CBC News. Retrieved 16 April 2018.
  38. "Western Canada's first large-scale liquefied natural gas fuelling station will help reduce B.C.'s greenhouse gases by over 3,500 tonnes a year". FortisBC. Retrieved 16 April 2018.
  39. "Tilbury LNG Facility". FortisBC. Retrieved 16 April 2018.
  40. "Liquid natural gas powers Sutco". Wood Business. May 16, 2014. Retrieved 16 April 2018.
  41. "Trucking solutions" . Retrieved 2018-04-05.
  42. Gao, Aaron (April 3, 2014). "ENN Canada Marks Important Milestone with New Chilliwack LNG Station". Birkshire Hathaway. Business Wire. Retrieved 16 April 2018.
  43. Railway Association of Canada (May 31, 2016). "How railways can be part of Canada's climate change solution" (PDF). Retrieved 16 April 2018.{{cite journal}}: Cite journal requires |journal= (help)
  44. "Canadian Association of Petroleum Producers". Capp.ca. Archived from the original on 23 July 2007. Retrieved 4 July 2018.
  45. "Natural Gas Annual Trade Summary - 2018". Canada Energy Regulator. Government of Canada. 2019-03-15. Retrieved 2019-09-23.{{cite web}}: CS1 maint: url-status (link)
  46. 1 2 International Gas Union (2017). 2017 World LNG Report (PDF). Retrieved 16 April 2018.
  47. "True North Energy" . Retrieved April 15, 2018.
  48. "Canada's first LNG export to China on its way by container". Reuters. Nov 22, 2017. Retrieved 15 April 2018.
  49. 1 2 Alberta Utilities Commission (2017). "Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments" (PDF). Alberta Utilities Commission. p. 60. Retrieved 1 April 2018.
  50. Alberta Utilities Commission. Alberta Utilities Commission Act: c A-37.2; 2007.
  51. 1 2 3 4 5 Province of Alberta. Hydro and Electric Energy Act: RSA 2000; 2017.
  52. Isolated Generating Units and Customer Choice Regulation: Alberta Regulation 165/2003; 2018.
  53. Province of Alberta. Isolated Generating Units and Customer Choice Regulation: Alberta Regulation 165/2003; 2018.
  54. ATCO Electric. SHAPE the conversation: Fort Chipewyan Third Lake Generation Unit Maintenance.