Newtonville station

Last updated
Newtonville
Newtonville station facing west, March 2013.JPG
Newtonville station in March 2013
General information
Location770 Washington Street
Newtonville, Massachusetts
Coordinates 42°21′06″N71°12′19″W / 42.35170°N 71.20525°W / 42.35170; -71.20525
Line(s) Worcester Line
Platforms1 side platform
Tracks2
ConnectionsAiga bus trans.svg MBTA bus: 59, 553, 554,  556
Construction
Parking53 spaces
AccessibleNo
Other information
Fare zone1
History
Opened1842 [1]
Previous namesHull's Crossing [2]
Passengers
2018476 (weekday average boardings) [3]
Services
Preceding station MBTA.svg MBTA Following station
West Newton
toward Worcester
Framingham/​Worcester Line Boston Landing
Former services
Preceding station New York Central Railroad Following station
West Newton
toward Albany
Boston and Albany Railroad
Main Line
Newton
toward Boston
Location
Newtonville station

Newtonville station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located between the Massachusetts Turnpike and Washington Street at Newtonville Square in the village of Newtonville in Newton, Massachusetts. Stairway entrances are located on the bridges over the Turnpike at Walnut Street and Harvard Street. Newtonville station is not accessible; renovations for accessibility are planned.

Contents

History

Newtonville station in the early 1900s Newtonville station postcard.jpg
Newtonville station in the early 1900s

Hulls Crossing station opened as a flag stop on the Boston and Worcester Railroad in the early 1840s. [1] [4] It was first located on the south side of the tracks on the west side of Harvard Street, then later moved to the east side. [5] [6] The first station agent, Joshua Ramsdell, worked at Newtonville from 1844 to 1889, by which time he was "probably the oldest station agent in New England". [7]

A red brick station was constructed slightly to the east in the 1870s, one of a small number of B&A stations built that decade. [8] It ultimately became the first stop outside Boston for long-distance trains on the Boston and Albany Railroad. [9] [10]

The original station was destroyed in the 1960s by the extension of the Massachusetts Turnpike along the railroad's right-of-way, narrowing it from four tracks to two. After Amtrak took over intercity service in 1971, the Bay State briefly stopped at Newtonville. [11]

The present station has one active side platform next to the southern track (Turnpike side); trains on the other track can be boarded via a wooden crossing, as is occasionally done when the southern track is closed for repairs. A second platform, now abandoned, sits aside the northern track. Both platforms are low level.

The station was temporarily closed on October 22–25, 2019, while repairs were made to the stairs. [12] [13] [14]

Renovations

Stairs at Newtonville station in 2013 Walnut Street stairs at Newtonville station, March 2013.JPG
Stairs at Newtonville station in 2013

None of the stations on the Framingham line in Newton — Newtonville, West Newton, and Auburndale — are accessible. All have only one active platform, all low-level, and all are accessed by stairs. The MBTA has proposed three alternative plans to make the Newton stations accessible, so as to comply with the Americans with Disability Act. Plan 1 would add a high level platform on only one track, would cost an estimated $46 million and would take five years to complete. Plan 2 would have high-level side platforms on both tracks, would cost $129 million and take 8 years. The platform on the north side would be built first and used for service while the south platform was rebuilt. Plan 1 could be upgraded to Plan 2 at a later date. All stations would remain in service during construction of both plans. A more elaborate plan 3 would cost 218 million. [15] Plan 3 would have center island platforms at each station and would take 12 years. Each station would have to be closed during its construction. Plans 2 and 3 would permit increased service to Newton, up to 20 inbound trains per day vs the current and Plan 1 limit of 13. [16]

The MBTA opted for Alternative 1, providing a single side platform at each station, and awarded a design contract to Vanasse Hangen Brustlin. The projected timeline had all stations being complete by June 2024. [17] Design reached 30% in November 2020 and was expected to be complete in spring 2022. [18] The designs were later changed to have two platforms to reduce operational impacts. The new design reached 30% completion in early 2022. A ramp was added to the design scope at that time, delaying expected design completion to February 2024. [19] Drilling for geotechnical surveying took place in October–November 2022. [20] [21] Design work for the Newton stations was paused at 75% completion in September 2023 because project costs had risen to $255 million. [22]

In April 2024, the MBTA indicated that it would proceed with Newtonville before the two other stations. Two potential designs were shown – a pair of side platforms close to Walnut Street, or a single island platform further east. Both concepts would have a platform length of just 400 feet (120 m), rather than the standard MBTA length of 800 feet (240 m). [23]

Related Research Articles

<span class="mw-page-title-main">Longwood station (MBTA)</span> Light rail station in Brookline, Massachusetts, US

Longwood station is a light rail station on the MBTA Green Line D branch, located on Chapel Street in Brookline, Massachusetts, on the border with Boston, just north of Longwood Avenue. It serves the Longwood Medical Area, the Colleges of the Fenway, and residential areas of Brookline. The station opened with the rest of the line on July 4, 1959. After renovation work completed in 2009, Longwood station is accessible from both Chapel Street and Riverway Park.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Riverside station (MBTA)</span> Light rail station in Newton, Massachusetts, US

Riverside station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located in the Auburndale village of Newton, Massachusetts. It is the western terminal of the Green Line D branch service. The station is located near the interchange of Interstate 95 and the Massachusetts Turnpike (I-90) and serves as a regional park and ride station. West of the station is Riverside Yard, the main maintenance facility and largest storage yard for the Green Line. The station is fully accessible.

<span class="mw-page-title-main">Framingham/Worcester Line</span> MBTA commuter railroad line

The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.

<span class="mw-page-title-main">Waban station</span> Light rail station in Newton, Massachusetts, US

Waban station is a surface-level light rail station on the Massachusetts Bay Transportation Authority's Green Line D branch, located just south of Beacon Street at Waban Square in the Waban section of Newton, Massachusetts. The station is located below grade; access to both platforms is via Wyman Street on the outbound side of the tracks or a stairway from Beacon Street. Waban is not accessible.

<span class="mw-page-title-main">Fenway station</span> Light rail station in Boston, Massachusetts, US

Fenway station is a light rail stop on the MBTA Green Line D branch, located under Park Drive near the Riverway in the Fenway–Kenmore neighborhood of Boston, Massachusetts. It opened along with the rest of the D branch on July 4, 1959, when trolleys replaced Highland branch commuter rail service. The station is fully accessible from Park Drive via the Landmark Center parking lot, as well as from Miner Street. Named after the Fenway parkway rather than Fenway Park, it is further from the stadium than Kenmore, though still used during events.

<span class="mw-page-title-main">Brookline Village station</span> Light rail station in Brookline, Massachusetts, US

Brookline Village station is a light rail station on the MBTA Green Line D branch, located in the Brookline Village neighborhood of Brookline, Massachusetts, United States. It was originally a commuter rail station on the Boston and Albany Railroad's Highland branch; it closed with the rest of the line in 1958 and reopened on July 4, 1959 as a light rail station. With 3,230 daily boardings, it is the third-busiest surface station on the D branch and the sixth-busiest surface station overall. Brookline Village station has raised platforms for accessibility with low-floor light rail vehicles.

<span class="mw-page-title-main">Beaconsfield station (MBTA)</span> Light rail station in Brookline, Massachusetts, US

Beaconsfield is an MBTA light rail station in Brookline, Massachusetts. It serves the Green Line D branch. It is located off Dean Road and Beaconsfield Road just south of Beacon Street. Like the other stops on the line, it was a commuter rail station on the Boston and Albany Railroad's Highland branch until 1958, when the line was closed and converted to a branch of what is now the Green Line. The station reopened along with the rest of the line in 1959.

<span class="mw-page-title-main">Natick Center station</span> Train station in Natick, Massachusetts, US

Natick Center station is an MBTA Commuter Rail station in Natick, Massachusetts served by the Framingham/Worcester Line. The station, located below grade in a wide cut adjacent to North Main Street, has two side platforms serving the line's two tracks. The second-busiest non-accessible station on the system, it is undergoing a major accessibility renovation and modernization from 2020 to 2024.

<span class="mw-page-title-main">Newton Highlands station</span> Light rail station in Newton, Massachusetts, US

Newton Highlands station is a surface-level light rail station located in Newton, Massachusetts on the Green Line D branch of the Massachusetts Bay Transportation Authority.

<span class="mw-page-title-main">Woodland station</span> Light rail station in Newton, Massachusetts, US

Woodland station is a light rail stop on the MBTA Green Line D branch, located off Washington Street (MA-16) between the Newton Lower Falls and Auburndale villages of Newton, Massachusetts, United States. It serves as access to the Newton-Wellesley Hospital, as well as a park and ride station for nearby Route 128.

<span class="mw-page-title-main">Lansdowne station (MBTA)</span> Railway station in Boston, Massachusetts, US

Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.

<span class="mw-page-title-main">Brookline Hills station</span> Light rail station in Brookline, Massachusetts, US

Brookline Hills station is a light rail station on the Massachusetts Bay Transportation Authority (MBTA) Green Line D branch in the Brookline Hills neighborhood of Brookline, Massachusetts. The station has two side platforms serving the line's two tracks. It was closed from April 2021 to January 2022 as part of adjacent construction on a Brookline High School building, which included renovations to make the station accessible.

<span class="mw-page-title-main">West Newton station</span>

West Newton station is an MBTA Commuter Rail station in Newton, Massachusetts. It serves the Framingham/Worcester Line, and is located inside the Massachusetts Turnpike Exit 16 rotary in the village of West Newton. West Newton has had continuous rail service since 1834. The station consists of a single low side platform serving one of the line's two tracks, with small crossings to access trains on the far track. West Newton is not accessible; a renovation for accessibility is planned.

<span class="mw-page-title-main">Auburndale station (MBTA)</span> Commuter rail station in Newton, Massachusetts

Auburndale station is an MBTA Commuter Rail station in Auburndale, Massachusetts. It serves the Framingham/Worcester Line. It is located next to the Massachusetts Turnpike near Lasell College. The modern station platform, built around 1961, replaced a highly acclaimed 1881 depot building designed by H. H. Richardson. A full renovation of the station for accessibility is planned.

<span class="mw-page-title-main">Wellesley Square station</span> Railroad station in Wellesley, Massachusetts, US

Wellesley Square station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located just north of the MA 16-MA 135 intersection in downtown Wellesley, Massachusetts. It serves both walk-up and park-and-ride commuters, with a 224-space parking lot for the latter group. The station has low-level platforms and is not accessible.

<span class="mw-page-title-main">Union Station (Worcester, Massachusetts)</span> Railway station in Worcester, Massachusetts, US

Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.

<span class="mw-page-title-main">Back Bay station</span> Railway station in Boston, Massachusetts, US

Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.

<span class="mw-page-title-main">Boston Landing station</span> Railway station in Brighton, Massachusetts, US

Boston Landing station is an MBTA Commuter Rail station in Boston, Massachusetts, United States. It serves the Framingham/Worcester Line. It is located in the Brighton neighborhood just west of the Everett Street bridge, next to the Massachusetts Turnpike. It serves the Allston-Brighton area as well as the Boston Landing development including Warrior Ice Arena. The station is fully accessible, with a single full-length high-level island platform. Elevators and stairs lead to Arthur Street and to the Everett Street bridge.

<span class="mw-page-title-main">Newton Corner station</span> Transit hub in Newton, Massachusetts, US

Newton Corner is an MBTA bus transfer point in the Newton Corner neighborhood of Newton, Massachusetts, located on the rotary where Washington Street crosses the Massachusetts Turnpike. The Newton Corner station, known simply as Newton for much of its lifetime, served commuters on the Worcester Line from 1834 to 1959. A streetcar stop, located on the surface streets, served a number of routes beginning in 1863, including the Green Line A branch until 1969. Newton Corner is now a stop and transfer point for MBTA routes 52, 57, 501, 504, 553, 554, 556, and 558, which include express routes to downtown Boston as well as local routes, with stops on the north and south sides of the rotary.

References

  1. 1 2 Fleishman, Thelma (1999). Images of America: Newton. Arcadia Publishing. p. 33. ISBN   9780738537740 via Google Books.
  2. Burrows, F.W. (January 1909). "The Newtons". New England Magazine. 39 (5): 555.
  3. Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  4. Report of the Directors of the Boston and Worcester Railroad. Boston and Worcester Railroad. June 2, 1845. p. 10.
  5. Woodward, E.F.; Ward, W.F. (April 1848). "Map of the Town of Newton".
  6. "Part of Newtonville". Atlas of Newton. J.B. Beers & Co. 1874 via Ward Maps.
  7. "Our New England Letter". The Station Agent. Vol. 1, no. 6. August 1889. p. 188 via Google Books.
  8. Ochsner, Jeffrey Karl (June 1988). "Architecture for the Boston & Albany Railroad: 1881-1894". Journal of the Society of Architectural Historians. 47 (2): 112, 120. doi:10.2307/990324. JSTOR   990324.
  9. "Newtonville Railroad Station. Boston & Albany Railroad sign. Newton, MA". 19 February 1956 via Digital Commonwealth.
  10. "Boston and Albany" (PDF). New York Central Railroad. April 27, 1941. pp. 7–14.
  11. Nationwide Schedules of Intercity Passenger Service. Amtrak. January 16, 1972. p. 48 via Museum of Railway Timetables.
  12. Saric, Sofia (October 22, 2019). "Newtonville Commuter Rail Station temporarily closed, MBTA says". Boston Globe.
  13. "Alerts: Commuter Rail". Massachusetts Bay Transportation Authority. Archived from the original on October 23, 2019.
  14. "Alerts: Commuter Rail". Massachusetts Bay Transportation Authority. Archived from the original on October 25, 2019.
  15. Cohen, Julie M. (July 31, 2019). "Rail plan costs $46M". Newton Tab.
  16. "Newton commuter rail accessibility". MBTA. July 2019.
  17. https://cdn.mbta.com/sites/default/files/2019-08/2019-07-25-newton-cr-stations-public-meeting-presentation.pdf [ bare URL PDF ]
  18. Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 6.
  19. "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. p. 6.
  20. "Drilling Activities Continue at Newton Commuter Rail Stations". Massachusetts Bay Transportation Authority. September 26, 2022. Archived from the original on September 27, 2022.
  21. "Drilling Activities Continue at Newton Commuter Rail Stations". Massachusetts Bay Transportation Authority. November 7, 2022.
  22. "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. pp. 6–7.
  23. "Newton Stations Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority. April 10, 2024.