Route 128 station

Last updated

Route 128
Northeast Regional at Route 128 station, June 2017.JPG
Amtrak Northeast Regional at Route 128 station in 2017
General information
Location50 University Avenue
Westwood, Massachusetts
United States
Coordinates 42°12′37″N71°08′50″W / 42.2102°N 71.1472°W / 42.2102; -71.1472
Owned by Amtrak (station and platforms)
MBTA (parking garage and tracks) [1]
Line(s) Attleboro Line (Northeast Corridor)
Platforms2 side platforms
Tracks2
Construction
Parking2,578 spaces; paid [2]
AccessibleYes
Other information
Station code Amtrak: RTE
IATA code ZRU
Fare zone2 (MBTA)
History
OpenedApril 26, 1953 [3]
Rebuilt1965, 1998–2000 [1]
Passengers
20181,721 (MBTA daily boardings) [4]
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Providence Acela Boston Back Bay
toward Boston South
Providence Northeast Regional
Preceding station MBTA.svg MBTA Following station
Canton Junction Providence/​Stoughton Line Hyde Park
Former services
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Providence
toward New Haven
Beacon Hill
1978–1981
Boston South
Terminus
Preceding station New York, New Haven and Hartford Railroad Following station
Canton Junction
toward New Haven
Shore Line Readville
toward Boston
Proposed services
Preceding station MBTA.svg MBTA Following station
Canton Junction South Coast Rail
Phase 2 (2030)
Readville
Canton Junction Providence/​Stoughton Line
Starts May 20, 2024
Location Route 128 station

Route 128 station (sometimes titled Route 128/University Park [6] ) is a passenger rail station located at the crossing of the Northeast Corridor and Interstate 95/US Route 1/Route 128 at the eastern tip of Dedham and Westwood, Massachusetts, United States. The station is shared by Amtrak and the Massachusetts Bay Transportation Authority (MBTA). It is served by most MBTA Commuter Rail Providence/Stoughton Line trains, as well as by all Amtrak Northeast Regional and Acela intercity trains. The station building, platforms, and parking garage are all fully accessible. It is the 23rd busiest Amtrak station in the country and the fifth busiest in New England. [7]

Contents

The Boston and Providence Railroad and its successors Old Colony Railroad and New Haven Railroad served Green Lodge station, at the modern station site, from the 1850s to the 1920s. In 1953, the New Haven opened Route 128 station as a park and ride station adjacent to the Route 128 expressway. The original station buildings were replaced in 1965. Amtrak took over intercity service in 1971; the MBTA began subsidizing commuter service in 1973. The two agencies rebuilt the station from 1998 to 2000 with high-level platforms, a postmodern station building, and a four-story parking garage. The station attracted nearby transit-oriented development, but has suffered from unreliable escalators and elevators.

Station design

Platforms, footbridge, and station building viewed from the garage roof Route 128 station from garage roof, April 2016.JPG
Platforms, footbridge, and station building viewed from the garage roof

Route 128 station is located just south of the Route 128/I-95 beltway near the tripoint of Canton, Dedham, and Westwood, about 11 miles (18 km) south of downtown Boston. [1] The station has two 1,050-foot (320 m)-long side platforms (the standard Amtrak length [8] ) serving the two tracks of the Northeast Corridor. [9] The platforms are connected by a glass-walled footbridge, which connects to the upper level of the three-story station building on the west side of the tracks. [1] An Amtrak waiting room is located on the first floor; ticketing is on the third floor. [1] The second floor is reserved for maintenance purposes. [10] The building is a postmodern design "composed of intersecting volumes", with metal and glass walls. [1]

West of the station is a four-story parking garage with 2,578 spaces. [2] About 550 spaces are reserved for Amtrak (with overnight parking allowed), with an entrance from Blue Hill Drive. [11] [12] The remaining spaces are for daily MBTA parking, with an entrance from University Avenue. Amtrak spaces are on the ground floor for convenient access to the waiting room and the southbound platform; MBTA spaces are on the upper levels for access to the footbridge to the northbound platform. [13] Unlike most MBTA stations, credit cards and even E-ZPass transponders are accepted for payment of parking fees. [14] [15] The station area and platforms are owned by Amtrak, but the MBTA owns the parking garage and tracks. [1]

History

Green Lodge station

The Boston and Providence Railroad (B&P) was extended south from Dedham Lodge to Canton on September 12, 1834. [16] :29 The B&P opened Green Lodge station, located at the crossing of the eponymous street near the modern station location, by 1857. [17] [16] :31 The B&P was leased by the Old Colony Railroad in 1888, and in turn by the New York, New Haven and Hartford Railroad in 1893; Green Lodge station was closed in the mid-1920s. [16] :31 The grade crossing was replaced with a road bridge around 1932 as part of the construction of the original Circumferential Highway. [18] A Westwood woman, Marie Spokesfield, was struck by a train below the bridge on September 21, 1934. Her husband, accused of having murdered her and thrown the body from the bridge, was found not guilty by a directed verdict in March 1935. [19] [20]

Route 128 station

A southbound Amtrak train at Route 128 station in November 1974 Amtrak 295 at Route 128, November 1974.jpg
A southbound Amtrak train at Route 128 station in November 1974

The New Haven Railroad opened Route 128 station on April 26, 1953, on the same site as the former Green Lodge station. [21] [3] Intended for intercity passengers driving from the suburbs on the then-under-construction Route 128 expressway, the station had 1,500-foot (460 m)-long platforms to accommodate intercity trains and a 1,200-space parking lot. [21] Two small prefabricated shelters, manufactured as garages, served as waiting rooms. [1] The station was built in one week at a cost of $300,000 (equivalent to $2,730,000in 2023). [21] Opened at the direction of New Haven president Frederic C. Dumaine, Jr., Route 128 station was among the first dedicated park and ride stations built in the country. [1] It quickly became a preferred station for suburban commuters, who represented a majority of station traffic by the 1980s. [16] :31

The original station structures were replaced in 1965 with larger brick buildings. [1] The larger structure, located on the west side of the tracks, was similar to Sharon station built three decades earlier. [22] A pedestrian overpass originally from Wickford Junction was added in 1971. [23] The New Haven was merged into Penn Central at the end of 1968. Amtrak took over intercity service on May 1, 1971, with the former B&P becoming the far northern leg of Amtrak's Northeast Corridor mainline. The Massachusetts Bay Transportation Authority (MBTA), formed in 1964 to subsidize suburban commuter service, gradually took over local trains. [24] The MBTA bought Penn Central's southside lines and stations on January 27, 1973, and began subsidizing service as far as Canton Junction on the Stoughton Branch and Sharon on the Providence Line in June 1973. [24] Penn Central continued to operate the southside lines under contract to the MBTA. The contract passed to Conrail when it took over Penn Central on April 1, 1976, then to other contract operators beginning in 1977. [24]

The bridge that carried Green Lodge Street over the tracks was closed around 1977 and later removed; the abutments still flank the platforms. [25] [26] [27] Plans to rebuild the bridge were delayed in 1992–93 as capital funds were redirected to restoration of the Old Colony Lines. [28] Canton officials, seeking to avoid additional traffic on the residential portion of Green Lodge Street, opposed a new bridge; by 1998, it was no longer planned. [25] From 1989 to 1994, Boston–Foxboro trains for events at Foxboro Stadium operated over the Northeast Corridor, with intermediate stops including Route 128. [29] [30] Boston–Foxboro service was rerouted over the Franklin Line in 1995. [31]

Rebuilt station

The Amtrak waiting room in 2016 Amtrak waiting room at Route 128 station, April 2016.JPG
The Amtrak waiting room in 2016

A late 1980s proposal to construct a parking garage and hotel at the station was scrapped due to local opposition. [32] By 1990, plans for the Northend Electrification Project included the construction of accessible high-level platforms at the station. [33] Conceptual designs for a replacement station were completed in June 1991. [34] By 1995, the parking lot frequently reached capacity, forcing riders to park on nearby streets. [32] [35] In November 1997, the MBTA Board approved plans to replace the aging station. [36] The 850-space surface lot (which usually had 100–200 additional vehicles illegally parked around its perimeter) would be replaced by a 2,750-space, four-level parking garage. Amtrak would pay $22.6 million of the $43.2 million cost, with the MBTA funding the remaining $20.6 million. [37]

Construction of the new platforms began in August 1998. That month, construction of the garage was delayed until 1999 because Dedham and Westwood objected to potential runoff from the garage, which could pollute nearby wetlands. The towns insisted on a roof over the parking garage (to prevent rainwater from collecting oil and gasoline spills from the garage), which the MBTA claimed would add $1 million to the cost. [38] The Massachusetts Department of Environmental Protection approved the garage project in December 1998. [39] Station construction began in late 1998, but the garage was further delayed due to continued disputes with the towns. [10] Garage construction ultimately began in May 1999. [40]

The first portion of the garage, with 550 spaces, opened on November 1, 1999. [41] [42] The remainder of the garage, except for the top level, opened on January 18, 2000. [13] [12] The new station building, platforms, and footbridge opened in 2000; the older station buildings were demolished that November. [43] :312 [1] The Amtrak Acela Express service (which could only use high-level platforms) began running in December 2000. [1]

The MBTA began planning for transit-oriented development adjacent to the station by the 1980s. [44] [45] :3.18 In 2006, two development companies announced plans for a 30-building, 130-acre (53 ha) project called Westwood Station. [46] The project was controversial with local residents due to traffic concerns and the proximity of an exit ramp to existing residences. [47] The project was shelved in 2010 due to the recession, but construction on the renamed University Station project began in 2013. [48] Most construction was completed by 2019; that year, Citizens Bank agreed to construct an office as a major commercial anchor for the project. [49]

Parking issues

The MBTA entrance to the garage in 2017 MBTA parking garage entrance at Route 128 station, June 2017.jpg
The MBTA entrance to the garage in 2017

The financing plan for the garage controversially relied heavily on customer revenues, which initially failed to meet expectations. [50] This plan caused parking fees to be higher than other MBTA Commuter Rail stations; the daily fee increased from $1 to $3 when the garage opened. [51] [42] By October 2003, only about 1,000 of the garage spaces were used, in part due to the higher fees. [51] In July 2004, the MBTA attempted to sell sponsorship rights for the garage, which is visible from Route 128/I-95. [52] The top floor of the garage was not opened with the rest of the garage in 2000 due to an environmental agreement between the MBTA, Dedham, and Westwood. It opened around 2005 with the completion of a widened ramp from Route 128/I-95 eastbound to I-95 southbound. [12] [53] [54]

Some local commuters continued to park on the east side of the station along Green Lodge Street to avoid parking fees. The MBTA planned to curtail this by shutting off pedestrian access, but abandoned this plan in March 2000 after pressure from Westwood and Dedham officials. [55] [27] The Metropolitan District Commission closed an illegal unpaid dirt lot on the east side of the station in November 2001 due to water pollution concerns, though parking on Green Lodge Street remained. [56] In 2003, Canton began charging for daily parking along Green Lodge Street. [57] [58]

The MBTA issued an $11.1 million contract for repairs to the garage in mid-2021. Notice to proceed was given on July 16, 2021, with completion expected at the end of 2022. [59]

Elevator and escalator issues

The northbound platform elevator in 2016 Platform elevator at Route 128 station, June 2017.JPG
The northbound platform elevator in 2016

The 2000-opened elevators and escalators, which are necessary for many passengers to access the platforms, soon proved unreliable. [60] [61] In early 2013, the escalator serving the southbound platform failed and was not repaired due to lack of funding for replacement. [62] The northbound platform escalator and one elevator failed in early 2015, prompting Amtrak to initiate replacement of both escalators and elevators. The replacement process was originally expected to require both elevators to be out of service until the project was complete in early 2016. [63] The elevators were taken out of service on July 20, 2015; Amtrak provided an accessible shuttle service between both platforms and the station building. [64] The elevators returned to service on September 1, 2015, though the escalators remained out of service for several months longer. [65] However, elevators and escalators inside the station building suffered similar issues for the next several years. Because Amtrak is exempt from state and local building laws, it circumvented normal rules that require regular elevator inspections. [66]

Proposed changes

Extension of the Orange Line rapid transit service from Forest Hills to Route 128 has been considered on several occasions. The 1966 Program for Mass Transportation recommended a bifurcated Orange Line, with one branch to West Roxbury or Bird's Hill and another to either Readville or Route 128 via Hyde Park. [67] Various reports over the next two decades continued to recommend various combinations of the extensions; however, due to cost, the 1987 relocation of the Orange Line to the Southwest Corridor was terminated at Forest Hills. [68] The 2004 Program for Mass Transportation listed an extension to Route 128 with intermediate stops at Mount Hope, Hyde Park, and Readville at a cost of $342.8 million. The extension was listed as low priority due to environmental issues with crossing the wetlands south of Readville, and because the corridor already has commuter rail service. [69]

Planning for the Northend Electrification Project indicated that a third track between Readville and Route 128 would be required by 2008 to allow Amtrak trains to pass MBTA trains. [45] :A.38 [70] In the 2010 Northeast Corridor Master Plan, Amtrak indicated medium-term plans to add this third track. The third track would be located west of the southbound platform, with it converted to an island platform. [71]

Related Research Articles

<span class="mw-page-title-main">Alewife station</span> Rapid transit station in Cambridge, Massachusetts, US

Alewife station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the North Cambridge neighborhood of Cambridge, Massachusetts. It is the northwest terminal of the rapid transit Red Line and a hub for several MBTA bus routes. The station is at the confluence of the Minuteman Bikeway, Alewife Linear Park, Fitchburg Cutoff Path, and Alewife Greenway off Alewife Brook Parkway adjacent to Massachusetts Route 2, with a five-story parking garage for park and ride use. The station has three bike cages. Alewife station is named after nearby Alewife Brook Parkway and Alewife Brook, themselves named after the alewife fish.

<span class="mw-page-title-main">Porter station</span> Transit station in Cambridge, Massachusetts, US

Porter station is a Massachusetts Bay Transportation Authority (MBTA) transit station in Cambridge, Massachusetts. It serves the Red Line rapid transit line, the MBTA Commuter Rail Fitchburg Line, and several MBTA bus lines. Located at Porter Square at the intersection of Massachusetts and Somerville Avenues, the station provides rapid transit access to northern Cambridge and the western portions of Somerville. Porter is 14 minutes from Park Street on the Red Line, and about 10 minutes from North Station on commuter rail trains. Several local MBTA bus routes also stop at the station.

<span class="mw-page-title-main">North Station</span> Train station in Boston, Massachusetts, US

North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.

<span class="mw-page-title-main">Oak Grove station</span> Transit station in Malden, Massachusetts, US

Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by three MBTA bus routes.

<span class="mw-page-title-main">Riverside station (MBTA)</span> Light rail station in Newton, Massachusetts, US

Riverside station is a Massachusetts Bay Transportation Authority (MBTA) Green Line light rail station located in the Auburndale village of Newton, Massachusetts. It is the western terminal of the Green Line D branch service. The station is located near the interchange of Interstate 95 and the Massachusetts Turnpike (I-90) and serves as a regional park and ride station. West of the station is Riverside Yard, the main maintenance facility and largest storage yard for the Green Line. The station is fully accessible.

<span class="mw-page-title-main">Sullivan Square station</span> Rapid transit station in Boston, Massachusetts, US

Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 12 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.

<span class="mw-page-title-main">South Attleboro station</span> Railway station in Attleboro, Massachusetts, US

South Attleboro station is a temporarily closed MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station had two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot.

<span class="mw-page-title-main">Braintree station (MBTA)</span> Transit station in Braintree, Massachusetts, US

Braintree station is an intermodal transit station in Braintree, Massachusetts. It serves the MBTA's Red Line and the MBTA Commuter Rail Old Colony Lines as well as MBTA buses.

<span class="mw-page-title-main">Quincy Adams station</span> Rapid transit station in Quincy, Massachusetts, US

Quincy Adams station is a rapid transit station in Quincy, Massachusetts. It serves the Braintree Branch of the MBTA's Red Line. Located in southern Quincy on Burgin Parkway near the Braintree Split, the station features a large park and ride garage, with space for 2,538 automobiles, built over the station tracks and platforms. It is fully accessible.

<span class="mw-page-title-main">Quincy Center station</span> Transit station in Quincy, Massachusetts, US

Quincy Center station is an intermodal transit station in Quincy, Massachusetts. It is a transfer station between the MBTA Red Line subway, MBTA Commuter Rail's Old Colony Lines and Greenbush Line, and a number of MBTA bus routes. It is located between Hancock Street and Burgin Parkway in the Quincy Center district. Opened in 1971, the station was covered by a large parking garage which was closed in 2012 due to structural problems and removed several years later. The station is accessible on all modes.

<span class="mw-page-title-main">Providence/Stoughton Line</span> Line of the Boston MBTA Commuter Rail system

The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.

<span class="mw-page-title-main">Hyde Park station (MBTA)</span> Train station in Boston, Massachusetts, US

Hyde Park station is an MBTA Commuter Rail station in Boston, Massachusetts. It primarily serves the Providence/Stoughton Line, and also serves rush-hour Franklin/Foxboro Line trains. It is located on the Northeast Corridor in the Hyde Park neighborhood.

<span class="mw-page-title-main">Readville station</span> Railway station in Boston, Massachusetts, US

Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by MBTA Commuter Rail Fairmount Line and Franklin/Foxboro Line. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin/Foxboro Line trains. The station is located at a multi-level junction, with the Northeast Corridor tracks at ground level and the Dorchester Branch above; Franklin/Foxboro Line trains use a connecting track with a separate platform. Platforms are available for the Providence/Stoughton Line on the Northeast Corridor tracks, but they are not regularly used. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.

<span class="mw-page-title-main">Dedham Corporate Center station</span> Railroad station in Dedham, Massachusetts

Dedham Corporate Center station is an MBTA Commuter Rail station in Dedham, Massachusetts. It serves the Franklin/Foxboro Line, and is located just off exit 28 of Interstate 95/Route 128. It serves mostly as a park-and-ride location. The station consists of two platforms serving the Franklin/Foxboro Line's two tracks. Previous stations named Dedham Junction and Rust Craft (1955-1977) were located near the modern site.

<span class="mw-page-title-main">Norwood Depot</span> Rail station in Norwood, Massachusetts, US

Norwood Depot is an MBTA Commuter Rail Franklin/Foxboro Line station located in downtown Norwood, Massachusetts. The station has two side platforms serving the two tracks of the Franklin Branch, each with a mini-high section for accessibility. The Norfolk County Railroad opened through South Dedham in 1849, with a station at the modern location. It was renamed Norwood in 1872. The line came under control of the New York, New Haven and Hartford Railroad in 1895. The Massachusetts Bay Transportation Authority (MBTA) began subsidizing service in 1966 and purchased the line in 1973. Under the MBTA, renovations to the station were made around 1977 and 1992.

<span class="mw-page-title-main">Forge Park/495 station</span> Rail station in Franklin, Massachusetts, US

Forge Park/495 station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station served by the Franklin/Foxboro Line. It is located off Route 140 near Interstate 495 in Franklin, Massachusetts, United States. A park and ride station serving southwestern Boston suburbs and northeastern Rhode Island, it is the outer terminus of the Franklin/Foxboro Line. The station has two side platforms serving a single track, with an accessible mini-high platform and a station building on the south platform.

<span class="mw-page-title-main">Lynn station</span> MBTA rail station in Lynn, Massachusetts, US

Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system. The rail station and parking garage temporarily closed on October 1, 2022, pending a reconstruction project, while the busway remained open. Interim platforms nearby opened in December 2023.

<span class="mw-page-title-main">Salem station</span> Commuter rail station in Salem, Massachusetts

Salem station is an MBTA Commuter Rail station served by the Newburyport/Rockport Line. The station is located off Bridge Street near its interchange with North Street at the north end of downtown Salem, Massachusetts. The station has a single accessible full-length high-level platform serving the single track of the Eastern Route. Just south of the station is the Salem Tunnel, which carries the line under Washington Street. Salem is a major park and ride center, with a 700-space parking garage, as well as an MBTA bus terminal. It is the busiest commuter rail station in the MBTA system outside of the central Boston stations, with an average of 2,326 daily boardings in a 2018 count.

<span class="mw-page-title-main">Mishawum station</span> Commuter rail station in Woburn, Massachusetts

Mishawum station is an MBTA Commuter Rail Lowell Line station located in the north part of Woburn, Massachusetts just north of the Route 128/I-95 beltway. The station has two side platforms serving the line's two tracks. Mishawum is a limited-service flag stop intended for reverse commuting to the adjacent office park, with no weekend service. With just 32 boardings on an average weekday in 2018, Mishawum is one of the least busy stations on the commuter rail system.

<span class="mw-page-title-main">Back Bay station</span> Railway station in Boston, Massachusetts, US

Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 "Westwood - Route 128 Station, MA (RTE)". Great American Stations. Amtrak. Retrieved July 28, 2015.
  2. 1 2 "Route 128". Massachusetts Bay Transportation Authority. Retrieved November 10, 2020.
  3. 1 2 Baer, Christopher T. "PRR Chronology: 1953" (PDF). Pennsylvania Railroad Technical & Historical Society.
  4. Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  5. "Amtrak Fact Sheet, Fiscal Year 2022: Commonwealth of Massachusetts" (PDF). Amtrak. June 2023. Retrieved August 30, 2023.
  6. "Route 128/University Park Station Intermodal Transportation Facility Opens" (PDF). TRANSreport. Boston Metropolitan Planning Organization. March 2000. p. 3.
  7. "Amtrak Company Profile (FY 2019)" (PDF). Amtrak. March 31, 2019. p. 2. Retrieved February 10, 2021.
  8. "Chapter 1 – Introduction, and Purpose and Need". South Station Expansion Draft Environmental Assessment and Draft Section 4(f) Determination. Massachusetts Department of Transportation. March 2017. p. 1.13.
  9. Held, Patrick R. (2010). "Massachusetts Bay Colony Railroad Track Charts" (PDF). Johns Hopkins Association for Computing Machinery. p. 73. Archived from the original (PDF) on October 8, 2013.
  10. 1 2 Preer, Robert (March 28, 1999). "Amtrak rail riders may need taxi first". Boston Globe. pp. B1, B4 via Newspapers.com. Open Access logo PLoS transparent.svg
  11. "Overnight Parking". Massachusetts Bay Transportation Authority.
  12. 1 2 3 Palmer, Thomas C. Jr (December 13, 1999). "Easton residents debate MBTA proposal to extend rail service". Boston Globe. p. 22 via Newspapers.com. Open Access logo PLoS transparent.svg
  13. 1 2 Palmer, Thomas C. Jr. (January 17, 2000). "Mayor's transportation study unlikely to cure many commuter ills". Boston Globe. p. 18 via Newspapers.com. Open Access logo PLoS transparent.svg
  14. Forman, Judith (April 23, 2003). "Winter's over, but potholes go on forever". Boston Globe. p. 127 via Newspapers.com. Open Access logo PLoS transparent.svg
  15. Kath, Ryan (January 18, 2018). "I-Team: MBTA Commuters Sprint To Their Cars To Avoid Garage Gridlock". CBS Boston. Retrieved November 10, 2020.
  16. 1 2 3 4 Humphrey, Thomas J. & Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. ISBN   9780685412947.
  17. "Boston and Providence Railroad". The Boston Directory. George Adams. 1857. p. 480.
  18. "Truck Driver Killed in Crossing Crash". Boston Globe. November 25, 1931. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  19. "Dead Before She Hit Train, Charge". Boston Globe. March 5, 1935. p. 15 via Newspapers.com. Open Access logo PLoS transparent.svg
  20. "Verdict Frees Spokesfield". Boston Globe. March 9, 1935. p. 2 via Newspapers.com. Open Access logo PLoS transparent.svg
  21. 1 2 3 "New Dedham R.R. Station Ready for Rte. 128 Traffic Tomorrow". Boston Globe. April 26, 1953. p. 27 via Newspapers.com. Open Access logo PLoS transparent.svg
  22. Carolan, Jane (September 1988). "Historic Structure Inventory Form". MBTA Historical Property Survey, Phase II. McGinley Hart & Associates via Massachusetts Cultural Resource Information System.
  23. Humphrey, Thomas J. & Clark, Norton D. (1986). Boston's Commuter Rail: Second Section. Boston Street Railway Association. p. 54.
  24. 1 2 3 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  25. 1 2 Bushnell, Davis (March 1, 1998). "Route 128 station is meeting topic". Boston Globe. p. 23 via Newspapers.com. Open Access logo PLoS transparent.svg
  26. "Ask The Globe". Boston Globe. October 22, 1982. p. 43 via Newspapers.com. Open Access logo PLoS transparent.svg
  27. 1 2 Ellement, John (March 13, 2000). "MBTA delays vow to cut pedestrian access to Route 128 station". Boston Globe. p. B2 via Newspapers.com. Open Access logo PLoS transparent.svg
  28. Grunwald, Michael (January 3, 1993). "Commuter rail project sidetracks road work". Boston Globe. pp. 19, 22 via Newspapers.com. Open Access logo PLoS transparent.svg
  29. Ackerman, Jerry (September 18, 1989). "The latest words from the streets". Boston Globe. p. 15 via Newspapers.com.
  30. "How to get to the game". Boston Globe. December 4, 1994. p. 63 via Newspapers.com.
  31. "How to get to the game". Boston Globe. September 10, 1995. p. 93 via Newspapers.com.
  32. 1 2 "This lot full". Boston Globe. November 27, 1995. pp. 1, 15 via Newspapers.com. Open Access logo PLoS transparent.svg
  33. Rosenberg, Ronald (July 31, 1990). "$125m recommended for Boston-N.Y. rail". Boston Globe. p. 15 via Newspapers.com. Open Access logo PLoS transparent.svg
  34. Sanborn, George M. (1992). A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived from the original on June 7, 2017 via Massachusetts Institute of Technology.
  35. Preer, Robert (January 1, 1995). "Rail commuters caught in MBTA parking snarl". Boston Globe. pp. 15, 19 via Newspapers.com. Open Access logo PLoS transparent.svg
  36. Palmer, Thomas C. Jr. (November 10, 1997). "MBTA approves plan to revamp Route 128 station". Boston Globe via Newspapers.com. Open Access logo PLoS transparent.svg
  37. Brems, Lisa (December 21, 1997). "Rail station plan gives towns pause". Boston Globe. pp. B1, B6 via Newspapers.com. Open Access logo PLoS transparent.svg
  38. Bushnell, Davis (August 23, 1998). "Wetland concerns put new Amtrak garage on hold". Boston Globe. p. B8 via Newspapers.com. Open Access logo PLoS transparent.svg
  39. Palmer, Thomas C. Jr. (December 28, 1998). "Poor aim at the Pike's toll booths? Your miss is state's gain". Boston Globe. p. 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  40. Palmer, Thomas C. Jr. (May 10, 1999). "A bright idea: red strobes to save energy, get drivers' attention". Boston Globe. p. 22 via Newspapers.com. Open Access logo PLoS transparent.svg
  41. Preer, Robert (November 21, 1999). "MBTA set to expand station parking". Boston Globe. pp. 21, 32 via Newspapers.com. Open Access logo PLoS transparent.svg
  42. 1 2 Palmer, Thomas C. Jr (December 6, 1999). "Explaining the insurance system's ups and downs to drivers". Boston Globe. p. 26 via Newspapers.com. Open Access logo PLoS transparent.svg
  43. Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. ISBN   9780942147087.
  44. "T pushes development of its land to cut deficit". Boston Globe. January 29, 1983. p. 19 via Newspapers.com.
  45. 1 2 Commuter-Intercity Rail Improvement Study (Boston-New York) (PDF). United States Department of Transportation. November 1992.
  46. Palmer, Thomas C. Jr (January 17, 2006). "Mini-city would be an antidote to sprawl". Boston Globe. p. D1 via Newspapers.com. Open Access logo PLoS transparent.svg
  47. Schworm, Peter (May 13, 2007). "Neighbors: Exit ramp plan violates deal". Boston Globe. p. S4 via Newspapers.com. Open Access logo PLoS transparent.svg
  48. Ross, Casey (November 13, 2013). "Vast project revived in Westwood". Boston Globe. pp. A1, A10 via Newspapers.com. Open Access logo PLoS transparent.svg
  49. Chesto, Jon (June 16, 2019). "A decade later, University Station's train is finally pulling in". Boston Globe. Archived from the original on June 17, 2019.
  50. Palmer, Thomas C. Jr. (January 13, 2001). "T Garage's Unpopularity Spurs Bond Watch". Boston Globe. p. C2 via Newspapers.com. Open Access logo PLoS transparent.svg
  51. 1 2 Forman, Judith (October 9, 2003). "T promotes benefits of low-use stations". Boston Globe via Newspapers.com. Open Access logo PLoS transparent.svg
  52. Massachusetts Bay Transportation Authority (July 22, 2004). "Request for Letters of Interest". Boston Globe. p. 7 via Newspapers.com. Open Access logo PLoS transparent.svg
  53. Daniel, Mac (December 12, 2004). "Work underway on Route 128 widening project". Boston Globe.
  54. Tan, L. Kim (July 22, 2004). "T to ramp up parking at 128, nowhere else". Boston Globe. pp. S2, S13 via Newspapers.com. Open Access logo PLoS transparent.svg
  55. "T changes its plan for Route 128 station". Boston Globe. March 14, 2000 via Newspapers.com. Open Access logo PLoS transparent.svg
  56. Smith, Shawn Michael (November 11, 2001). "MDC shuts lot to parking by T commuters". Boston Globe. pp. S1, S9 via Newspapers.com. Open Access logo PLoS transparent.svg
  57. "Canton". Boston Globe. June 15, 2003. p. 84 via Newspapers.com. Open Access logo PLoS transparent.svg
  58. "Canton". Boston Globe. October 16, 2003. p. 154 via Newspapers.com. Open Access logo PLoS transparent.svg
  59. "University Park/Route 128 Garage Restoration Project, Dedham, Massachusetts". Massachusetts Bay Transportation Authority. July 16, 2021.
  60. Pazzanese, Christina (August 15, 2011). "Broken elevator, escalator are downers". Boston Globe. p. B2 via Newspapers.com. Open Access logo PLoS transparent.svg
  61. Forman, Judith (March 16, 2003). "Amtrak elevator, escalator service lacking". Boston Globe. p. 55 via Newspapers.com. Open Access logo PLoS transparent.svg
  62. Powers, Martine (November 2, 2015). "Going up? For one escalator, not anytime soon". Boston Globe. Archived from the original on January 10, 2014.
  63. Dungca, Nicole (May 1, 2015). "Amtrak taking steps to fix Route 128 Station in Westwood". Boston Globe. Archived from the original on May 5, 2015.
  64. "Commuter Rail Service Alerts: Providence/Stoughton Line". Massachusetts Bay Transportation Authority. July 21, 2015. Archived from the original on July 28, 2015.
  65. "Commuter Rail Service Alerts: Providence/Stoughton Line". Massachusetts Bay Transportation Authority. September 1, 2015. Archived from the original on October 2, 2015.
  66. Donnelly, Ally (January 25, 2018). "Escalating Frustration: Years Later, Amtrak Station Still in Disrepair". New England Cable News.
  67. MBTA planning staff (May 3, 1966). "A Comprehensive Development Program for Public Transportation in the Massachusetts Bay Area: 1966". Massachusetts Bay Transportation Authority. p. V-9.
  68. Central Transportation Planning Staff (November 15, 1993). "The Transportation Plan for the Boston Region - Volume 2". National Transportation Library. Archived from the original on May 5, 2001.
  69. Central Transportation Planning Staff (January 2004) [May 2003]. "Chapter 5C: Service Expansion" (PDF). 2004 Program for Mass Transportation. Boston Metropolitan Planning Organization. p. 5C-83. Archived from the original (PDF) on February 20, 2012. Retrieved March 17, 2013.
  70. "Appendix C: Description of Individual Projects" (PDF). The Northeast Corridor Transportation Plan: New York City to Boston. Vol. 2. Office of Railroad Development. July 1994. p. C.29.
  71. The NEC Master Plan Working Group (May 2010). "The Northeast Corridor Infrastructure Master Plan" (PDF). Amtrak. p. 7.