Springfield Union Station (Massachusetts)

Last updated

Springfield Union Station
UnionStation SpringfieldMA.svg
Springfield Union Station, August 2018.JPG
Springfield Union Station in August 2018
General information
Location55 Frank B. Murray Street
Springfield, Massachusetts
United States
Coordinates 42°06′22″N72°35′35″W / 42.106047°N 72.592936°W / 42.106047; -72.592936
Owned by
  • Springfield Redevelopment Authority (main building, bus station, parking garage)
  • Amtrak, CSX (platforms and tracks)
Line(s) New Haven–Springfield Line
Connecticut River Line
Berkshire Subdivision
Platforms1 side platform, 1 island platform
Tracks6
Bus stands26
Connections
Construction
Parking377 spaces (parking garage)
Bicycle facilities
  • Bike racks are available
  • Bike Sharing (ValleyBike Share)
AccessibleYes
Other information
Station code Amtrak: SPG
IATA code ZSF
Website springfieldunionstation.com
History
Opened1839
Rebuilt1851, 1891, 1926, 1973, 1994, 2017
Passengers
FY 2022112,712 [1] (Amtrak)
Services
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Windsor Locks Northeast Regional Terminus
Windsor Locks
toward New Haven
Hartford Line
Valley Flyer Holyoke
toward Greenfield
Pittsfield
toward Chicago
Lake Shore Limited Worcester
toward Boston South
Windsor Locks Vermonter Holyoke
toward St. Albans
Preceding station Hartford Line logo.png CT Rail Following station
Windsor Locks Hartford Line Terminus
Former services
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Hartford Montrealer
19721987
Northampton
toward Montreal
Windsor Locks Atlantic City Express
19911995
Terminus
Preceding station New York Central Railroad Following station
Pittsfield
toward Albany
Boston and Albany Railroad
Main Line
North Wilbraham
toward Boston
West Springfield
toward Albany

Springfield Union Station is a train and bus station in the Metro Center area of Springfield, Massachusetts. Constructed in 1926, Springfield Union Station is the fifth-busiest Amtrak station in the Commonwealth, and the busiest outside of Greater Boston. [2]

Contents

A large-scale $94 million [3] renovation project restored the former station building, and it reopened in late June 2017 as a regional intermodal transit hub. It features not only Amtrak service, but also serves as the new hub for the Pioneer Valley Transit Authority (PVTA), along with Peter Pan Bus Lines, Greyhound Lines, and the CTrail Hartford Line commuter rail. PVTA and intercity bus services began using the renovated station in 2017, and the Hartford Line opened in June 2018. Amtrak moved from a 1994-built structure to the renovated station in June 2019.

History

Springfield's original station, constructed in the Egyptian Revival style in 1839 First Springfield station.JPG
Springfield's original station, constructed in the Egyptian Revival style in 1839
The first so-named Union Station constructed in 1851, ca. 1888 during its dismantlement Depot at Springfield (crop from stereo view).jpg
The first so-named Union Station constructed in 1851, ca. 1888 during its dismantlement
The second Union Station, ca. 1910 Union Station, Springfield, Mass. - 1.jpg
The second Union Station, ca. 1910

Springfield's grand Union Station was constructed in 1926 by the Boston & Albany Railroad to replace an earlier Richardson Romanesque unique dual-station by Shepley, Rutan and Coolidge, the successor firm to that of noted American architect, H. H. Richardson (architect of Trinity Church in Copley Square, Boston). Prior to that, an Egyptian Revival structure served the city until the first so-called Union Station was built in 1851.

The 1926 station was built for $5.87 million. [4] The station opened to the public on December 18, 1926. [5]

Springfield is exactly equidistant to both Boston and Albany at 89 miles (143 km) from each. The New York, New Haven & Hartford (including the Central New England Railway) and Boston & Maine railroads also utilized the station.

As early as the 1950s, the New York Central Railroad, which had operated the Boston & Albany since 1900, considered Union Station "a white elephant" and wanted to sell it. The opening of the Massachusetts Turnpike in 1958 was said to have caused a 50% decline in passenger trips to Boston. By 1962, train departures had fallen from a 1920s-30s peak of 97 per day to fewer than 15 per day. The station was sold in 1970 to David Buntzman, a real estate speculator from Larchmont, New York. [6]

Amtrak took over intercity service in 1971. By 1973, there were no longer enough trains calling at Springfield to justify such a large station, and the main station building and baggage building were closed. [5] A new station would have likely been needed in any event. The building had not been well-maintained in several years, and rehabilitating it was deemed too costly. After this, Amtrak opened a makeshift station at street level within the passenger tunnel, with the sole entrance being from Lyman Street. The connection from the tunnel to the old station was sealed. The city of Springfield bought the station in 1989, but planned restoration efforts were hampered by a fire at the nearby Charles Hotel.

In 1994, Amtrak constructed a station building at track level and sealed off the passenger tunnel except for the Lyman Street entrance and the southernmost stairway and elevator shaft to track level. A modern elevator was installed in the remaining open shaft to connect from street level to the new station building above.

Renovation

In October 2008, the Pioneer Valley Transit Authority and the Springfield Redevelopment Authority released a redevelopment plan for Union Station. The plan, estimated to cost $65.2 million, called for restoring the 1926 Union Station Terminal building for reuse as an intermodal rail and bus station and fully building out the first floor and main concourse with rentable commercial space and ticketing and waiting areas for both rail and bus. The baggage/railway express building was to be demolished and baggage tunnel sealed. A parking garage and bus bays for both inter-city and regional bus services (which would replace the Peter L. Picknelly Transportation Center a block away) would go on the footprint of the former baggage building. Additionally the pedestrian tunnel to Lyman Street would be restored, and the platforms raised for handicapped accessibility. [7] The final plan announced in December 2014, at a cost $75.7 million, added restoration and building out the upper floors of the 1926 station building to usable vacant "shell space". This would include only infrastructure and utility work on those floors, with final finishing work to be done by the eventual tenants based on their needs. This space is aimed for use by office or other commercial tenants. [8] By the time the station opened, the full cost had risen to $94 million. [3]

Demolition of the baggage/railway express building began on December 1, 2014, and was completed in early 2015. The only remnant of the baggage facility is a tunnel under the rail viaduct that was used for freight and baggage transport between the warehouse and the trains above. The only remaining entrance to this tunnel (off limits to the public) is a set of doors along the retaining wall in the bus loading area at the location of where the tunnel formerly connected to the warehouse. [9] By February 2016 the parking garage had been assembled and restoration work on the station terminal building had begun, with new windows and roofing installed. [10] The restoration was nearly complete in March 2017 when officials took journalists on a tour and the grand opening occurred on June 24, 2017. [11]

Springfield, Union Station, November 20, 2012 (8204193710).jpg
Springfield Union Station -- Main Concourse 01.jpg
The main concourse as it appeared prior to restoration in 2012, and in service in 2019
Bronze re-dedication plaque at the Union Station Transportation Center in Springfield, Massachusetts. Union Station Rededication Plaque June 2017.jpg
Bronze re-dedication plaque at the Union Station Transportation Center in Springfield, Massachusetts.

The PVTA was the first transportation operator to use the renovated station; it began operations there on June 24, 2017, leasing 18 bus berths. [12] Peter Pan and Greyhound buses began operating out of Union Station on September 6, 2017. The companies ended a two-decade revenue sharing agreement and began operating competing services three weeks later. [13] The CTrail Hartford Line commuter rail service began operating out of the renovated terminal in June 2018.

Amtrak relocated ticketing and the passenger waiting area to the main concourse of Union Station in June 2019, returning intercity rail to the main station building for the first time in 45 years. [14] [15]

The new platform designated Platform C was installed with direct stairwell and elevator access to the passenger tunnel below. The design was finalized in March 2018. The platform design process had been delayed due to insufficient space between the stairwell head house and the platform edge. The Federal Railroad Administration denied a waiver from the clearance requirement, preventing the design from being finished before the revitalization of the historic station building itself. The project was awarded to a construction contractor in May 2018 and construction began in August 2018. [16] The 328-foot (100 m)-long high-level Platform C opened on January 23, 2020, with a final cost of $10 million. [17] Platform C retains some historic elements of the former low-level platform it replaced, including the existing overhead canopy steel structure.

Services

Valley Flyer train 471 at Springfield Union Station Valley Flyer Amtrak train 471 at SPG 24 Jan 2020.jpg
Valley Flyer train 471 at Springfield Union Station

Amtrak

The primary passenger rail service at Springfield Union Station are the Hartford Line trains connecting Springfield to the Amtrak's Northeast Corridor trains in New Haven. An additional 1–2 daily Northeast Regional round trips start or terminate their service at Springfield.

The station is also served by the Vermonter and Lake Shore Limited trains. The Vermonter currently uses the north-south Connecticut River Line to Connecticut and Vermont, while the Lake Shore Limited makes use of the east–west Boston Line platforms as it continues to and from Albany, New York.

In the past a single Northeast Regional round trip (usually trains 142 and 145) would travel between New Haven and Boston via the so-called "Inland Route" via Springfield and the Boston Line, as opposed to the faster, electrified Northeast Corridor. In 2003, a problem pulled the Acela Express trainsets out of service and in an effort to find substitute rolling stock, Amtrak first curtailed the inland round trip to a three-car shuttle between Boston and New Haven before canceling it completely. Today, all normally scheduled Regional trains using the Inland Route only use the portion between Springfield and New Haven; in the event of a service disruption on the Northeast Corridor, trains may be scheduled to run via the complete Inland Route. One such occasion was the replacement of the Thames River Bridge movable span in June 2008, when Amtrak scheduled three round trips per day over the Inland Route to substitute for the complete suspension of regular Northeast Corridor service.[ citation needed ]

In 1991, Amtrak extended one daily Atlantic City Express round trip to Springfield, which served other destinations such as Washington, D.C. and Harrisburg. [18] The service was discontinued in 1995 due to low ridership. [19]

Hartford Line

Springfield's renovated Union Station is the northern terminus for the CTrail Hartford Line, a commuter rail service which began operating out of Union Station on June 16, 2018. [20] On July 24, 2017 the Connecticut Department of Transportation announced that a joint partnership between TransitAmerica Services and Alternate Concepts Inc. was chosen as the operator for the new service. This partnership operates similar commuter services in other markets. Amtrak continues its present intercity service on the line and will continue to own and maintain the infrastructure on the rail line between New Haven and Springfield. [21] The expanded service to Springfield Union Station from New Haven includes a total of seven additional roundtrips, four of which are commuter trains operated by the new CTrail operator, and the other three of which are additional Amtrak Shuttles which brings the service to eight Amtrak round trips and four CTrail round trips. In September 2019, Amtrak ceased using the Shuttle brand name for the 400 series trains and adopted CTDOT's Hartford Line designation. All Amtrak and CTrail trains that terminate and originate at Springfield (or Hartford) now utilize the Hartford Line designation. [22] On August 30, 2019, Amtrak extended two daily Hartford Line round trips (branded as Valley Flyer ) to Greenfield as a pilot program. [23]

Bus operations

Union Station serves as the region's bus hub. The Pioneer Valley Transit Authority, which operates local buses serving Springfield and surrounding towns and cities, occupies 18 bus berths at the station. Springfield-based Peter Pan Bus Lines uses seven bus berths for intercity buses, and Greyhound Lines uses the remaining two for its intercity service. [3]

Possible future rail service

The Massachusetts Department of Transportation and the Vermont Agency of Transportation have completed a study to examine the opportunities and impacts of more frequent and higher speed intercity passenger rail service between Boston and Montreal. The Boston to Montreal corridor runs from Boston to Springfield Union Station. From Springfield, the rail corridor follows the route of the Vermonter northerly through Holyoke, Northampton, and Greenfield, Massachusetts, and Brattleboro, White River Junction, Essex Junction (Burlington), and St. Albans, Vermont. From St. Albans, the corridor continues to the Canada–US border and onward to Montreal Central Station in Quebec. This study has been designated the Northern New England Intercity Rail Initiative. [24] This would mark the first Boston-Montreal rail service since the Boston & Maine discontinued the Alouette in 1965, which operated via a direct route through Concord, New Hampshire. [25] [26]

Springfield Union Station has been proposed as an intermediate station for East-West Rail; the proposed rail project would restore frequent passenger rail services between Boston and Pittsfield. In December 2022, MassDOT along with Amtrak and CSX applied for $108 million in federal transportation money to help fund improvements along the 53 miles of railroad between Springfield and Worcester. [27] The track upgrades will increase speeds on the corridor up to 80 miles per hour. It is planned to add two daily Amtrak trips between Boston, Worcester and Springfield as an interim phase of inland east-west rail service. [28] No timeline has been set for service implementation.

Station layout

Springfield Union Station layout
Berkshire Subdivision
to Worcester
BSicon vCONTg.svg
BSicon numN315.svg
BSicon vUSTr.svg
BSicon dSTR.svg
BSicon vSHI2gl-.svg
Chestnut Street
BSicon lhSTRae+L.svg
BSicon RP4q.svg
BSicon vSTR.svg
BSicon dSTR2.svg
BSicon lhSTRae+R.svg
BSicon dSTRc3.svg
BSicon RP4q.svg
BSicon lENDE@F.svg
BSicon vSTR.svg
BSicon dSTRc1.svg
BSicon dSTR+4.svg
BSicon STR2+4.svg
BSicon STRc3.svg
BSicon dSTR.svg
BSicon vSTR.svg
BSicon ABZg2.svg
BSicon cSTRc3.svg
BSicon cSTRc1.svg
BSicon STR2+4.svg
BSicon dSTRc3.svg
BSicon dSTR.svg
BSicon vSTR.svg
BSicon STR+c1.svg
BSicon STR+4.svg
BSicon cSTRc1.svg
BSicon v-STR.svg
BSicon SPL+4.svg
Dwight Street
BSicon lhSTRae+L.svg
BSicon RP4q.svg
BSicon dPLTl.svg
BSicon vSTR.svg
BSicon dPLTr.svg
BSicon dSTR.svg
BSicon dPLT.svg
BSicon dSTR.svg
BSicon dPLT.svg
BSicon vSTR.svg
BSicon dPLTr.svg
BSicon lhSTRae+R.svg
BSicon RP4q.svg
BSicon dPLTl.svg
BSicon vSTR.svg
BSicon dPLTr.svg
BSicon dSTR.svg
BSicon dPLT.svg
BSicon dSTR.svg
BSicon dPLT.svg
BSicon vSTR.svg
BSicon dPLTr.svg
Renovated station
BSicon exBUILDING.svg
BSicon dPLTl.svg
BSicon vSTR.svg
BSicon dPLTr.svg
BSicon dSTR.svg
BSicon dPLT.svg
BSicon dSTR.svg
BSicon dPLT.svg
BSicon vSTR.svg
BSicon dPLTr.svg
Current station
1
2
BSicon dPLTl.svg
BSicon vSTR.svg
BSicon dPLTr.svg
BSicon dSTR.svg
4
BSicon dPLT.svg
BSicon dSTR.svg
6
8
BSicon dPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon BUILDING.svg
BSicon cSTR~L.svg
BSicon STR+c2.svg
BSicon STR~R.svg
BSicon STR3.svg
BSicon STR.svg
BSicon cSTRc2.svg
BSicon SPLg+3.svg
BSicon cSTR~L.svg
BSicon ABZg+1.svg
BSicon STR~R.svg
BSicon cSTRc4.svg
BSicon STRc2.svg
BSicon dSTR3.svg
BSicon STR3+1.svg
BSicon STRc4.svg
BSicon vSTR.svg
BSicon dSTRc2.svg
BSicon STR3+1.svg
BSicon STRc4.svg
Main Street
BSicon lhSTRae+L.svg
BSicon RP4q.svg
BSicon vSTR.svg
BSicon dSTR+1.svg
BSicon lhSTRae+R.svg
BSicon STRc4.svg
BSicon RP4q.svg
BSicon vUSTl.svg
BSicon dSTR.svg
E. Columbus Avenue
BSicon lhSTRae+L.svg
BSicon STRc2.svg
BSicon RP4q.svg
BSicon dABZg3.svg
BSicon dABZg2.svg
BSicon STRc3.svg
BSicon dSTR2.svg
BSicon lhSTRae+R.svg
BSicon STRc3.svg
BSicon RP4q.svg
BSicon STRc2.svg
BSicon hRP4q.svg
BSicon hSKRZ-G4q3+1.svg
BSicon vSKRZ-G4h.svg
BSicon STRc14.svg
BSicon hSKRZ-G4q2+4.svg
BSicon dSTRc1.svg
BSicon hSKRZ-G4q2+4.svg
BSicon dSTRc3.svg
BSicon STRc3.svg
BSicon hRP4q.svg
New Haven–
Springfield Line
BSicon dSTRc2.svg
BSicon -STR3+l.svg
BSicon STR3+1.svg
BSicon STRc4.svg
BSicon -STRq.svg
BSicon vSTR.svg
BSicon -STRq.svg
BSicon STRc1.svg
BSicon -STRq.svg
BSicon -STRq.svg
BSicon -STRl+4.svg
BSicon dSTRc1.svg
BSicon STRl+4-.svg
BSicon vUSTlq.svg
BSicon -SHI2g+lq.svg
BSicon POINTERf@g.svg
BSicon -CONTfq.svg
BSicon dWSTRc2.svg
BSicon dCONT1-.svg
BSicon STRc4.svg
BSicon WASSER3+l.svg
BSicon WASSERq.svg
BSicon vWBRUCKE1.svg
BSicon WASSERq.svg
BSicon WASSERq.svg
BSicon WASSERq.svg
BSicon WASSERq.svg
BSicon dWASSER3+1-.svg
BSicon WSTRc4.svg
BSicon vSTR.svg
Berkshire Subdivision
to Albany–Rensselaer
BSicon vCONTf.svg

The Union Station building, bus bays, and parking garage are located on the north side of the rail viaduct adjacent to Frank B. Murray Street. The stairwells and elevators to the boarding platforms is located on the south side of the viaduct next to Lyman Street. A tunnel leads under the viaduct, allowing Union Station to be accessed from Lyman Street. The main hall in Union Station includes a waiting area for rail passengers, restaurants, retail spaces, and ticket windows for rail and intercity bus services; a PVTA local bus waiting area and an intercity bus waiting area are located in an adjacent room. [29] Commercial space is located on the second and third floors. [30]

The rail viaduct holds six tracks, which are numbered 1, 2, 2a, 4, 6, and 8 from north to south. Tracks 1 and 2 are primarily used by CSX Transportation for freight service on their Berkshire Subdivision and are served by platforms A and B; track 2 is also used for boarding and disembarking of the daily Lake Shore Limited train. Track 2a, which connects with both the New Haven–Springfield Line and the CSX tracks, is owned by Amtrak is used mainly for storing train equipment and is not normally used for boarding. Tracks 4 through 8 (serving platforms C and D) are currently used for most Amtrak service; they connect directly to the New Haven–Springfield Line west of the station, but only connect to the CSX tracks east of the station. (The Lake Shore Limited uses the CSX tracks for this reason.) West of the station, the New Haven–Springfield Line curves to the south while the Berkshire Subdivision continues on to cross the Connecticut River on a twin truss bridge. The Connecticut River Line connects to both lines west of the station, although it requires a backup move to reach tracks 4 though 8.

The four current platforms were once all island platforms, with stairways to the under-track tunnel and cargo elevators to a separate tunnel serving the baggage/railway express building. Platform C, between tracks 4 and 6, was demolished and rebuilt as a high-level boarding platform. Platform C is served by its own elevator and stairwell from the passenger tunnel. Platform D, which serves track 8 and is adjacent to the former 1994 station building, is accessed from the older elevator and stairwell closest to the Lyman Street entrance. Platform B/track 2 is accessed via a paved walkway from the west end of platform D that crosses tracks 2A, 4, 6, and 8. [31]

Station services

The station offers a Commuter Variety newsstand that sells quick necessities, Dunkin' Donuts and Subway restaurants. [32]

On June 6, 2017, Dietz & Company Architects, the largest architecture firm in the region, announced they would be occupying approximately 8,200 square feet (760 m2) on the second floor. [33]

On November 20, 2017, Peter Pan Bus Lines announced the signing of a lease for 21,000 square feet (2,000 m2) of office space at Union Station for the company's corporate headquarters. The company occupies the entire third floor of the building. [34]

Related Research Articles

<span class="mw-page-title-main">Northeast Corridor</span> Electrified railroad line in the Northeastern U.S.

The Northeast Corridor (NEC) is an electrified railroad line in the Northeast megalopolis of the United States. Owned primarily by Amtrak, it runs from Boston in the north to Washington, D.C. in the south, with major stops in Providence, New Haven, Stamford, New York City, Newark, Trenton, Philadelphia, Wilmington, and Baltimore. The NEC closely parallels Interstate 95 for most of its length. Carrying more than 2,200 trains a day, it is the busiest passenger rail line in the United States by ridership and by service frequency.

<span class="mw-page-title-main">South Station</span> Rail station in Boston, Massachusetts, US

South Station, officially The Governor Michael S. Dukakis Transportation Center at South Station, is the largest railroad station and intercity bus terminal in Greater Boston and New England's second-largest transportation center after Logan International Airport. Located at the intersection of Atlantic Avenue and Summer Street in Dewey Square, Boston, Massachusetts, the historic station building was constructed in 1899 to replace the downtown terminals of several railroads. Today, it serves as a major intermodal domestic transportation hub, with service to the Greater Boston region and the Northeastern and Midwestern United States. It is used by thousands of commuter rail and intercity rail passengers daily. Connections to the rapid transit Red Line and bus rapid transit Silver Line are made through the adjacent subway station.

<span class="mw-page-title-main">Union Station (New Haven)</span> Railroad station in Connecticut

New Haven Union Station is the main railroad passenger station in New Haven, Connecticut. It is the third such station in the city of New Haven, preceded by both an 1848 built station in a different location, and an 1879 built station near the current station's location. Designed by noted American architect Cass Gilbert, the present beaux-arts Union Station was completed and opened in 1920 after the previous Union Station was destroyed by fire. It served the New York, New Haven and Hartford Railroad for the next five decades, but fell into decline following World War II along with the United States railroad industry as a whole.

<span class="mw-page-title-main">New Haven–Springfield Line</span> Railroad line in Connecticut and Massachusetts, U.S.

The New Haven–Springfield Line is a railroad line owned by Amtrak from New Haven, Connecticut, north to Springfield, Massachusetts, serving the Knowledge Corridor. As a branch of the Northeast Corridor just north of New Haven State Street station, it is served by approximately seven daily Northeast Regional round trips, some continuing from New Haven to Washington, D.C., along the Corridor and others terminating at New Haven as shuttles. On weekends, there is one train daily to Roanoke, Virginia. It is also served by the daily Vermonter, which starts in Washington, D.C., and continues north from Springfield, finally terminating in St. Albans, Vermont. The line is part of the Inland Route connecting Boston and New York via Hartford, Springfield, and Worcester, in contrast to the "Shore Line" along the Connecticut Shore and through Rhode Island.

<span class="mw-page-title-main">New Haven State Street station</span> Railroad station in Connecticut

New Haven State Street station is a commuter rail station located on State Street in downtown New Haven, Connecticut. The secondary railroad station in the city, it is located 0.8 miles (1.3 km) northeast of the much larger New Haven Union Station and is intended to offer easier access to New Haven's downtown business district. It is served by Shore Line East and Hartford Line commuter trains, Amtrak Hartford Line trains, Springfield-terminating Northeast Regional trains, and Valley Flyer trains, and a limited number of Metro-North Railroad New Haven Line trains. Originally proposed in 1996, State Street opened on June 7, 2002. A second platform opened on June 8, 2018, in time for the beginning of Hartford Line service.

<span class="mw-page-title-main">Joseph Scelsi Intermodal Transportation Center</span> Transit facility in Massachusetts, US

The Joseph Scelsi Intermodal Transportation Center is a transit facility located in downtown Pittsfield, Massachusetts. The $11 million facility is named after Joseph Scelsi, a longtime State Representative who represented Pittsfield. Owned by the Berkshire Regional Transit Authority (BRTA), it is serviced by local BRTA bus services, Amtrak intercity rail service, and Peter Pan intercity bus service. The second floor of the building houses two classrooms used by Berkshire Community College and Massachusetts College of Liberal Arts.

<span class="mw-page-title-main">Hartford Union Station</span> Train station in Hartford, Connecticut, US

Hartford Union Station is a railroad station in Hartford, Connecticut, United States on the New Haven–Springfield Line. It is served by Amtrak Hartford Line, Northeast Regional, Valley Flyer, and Vermonter intercity rail service, plus CT Rail Hartford Line commuter rail service and CTfastrak bus rapid transit service.

<span class="mw-page-title-main">New London Union Station</span> Railway station in New London, Connecticut, US

New London Union Station is a railroad station on the Northeast Corridor located in downtown New London, Connecticut, United States. Union Station is a station stop for most Amtrak Northeast Regional trains and all CTrail Shore Line East commuter rail trains, making it the primary railroad station in southeastern Connecticut. It serves as the centerpiece of the Regional Intermodal Transit Center, with connections to local and intercity buses as well as ferries to Long Island and Fishers Island, New York, and Block Island, Rhode Island. The station has one side platform and one island platform serving the two-track Northeast Corridor; the latter platform also serves a siding track that connects to the New England Central Railroad mainline.

<span class="mw-page-title-main">Hartford Line</span> CTrail commuter rail service in the US

The Hartford Line is a commuter rail service between New Haven, Connecticut, and Springfield, Massachusetts, using the Amtrak-owned New Haven–Springfield Line. The project is a joint venture between the states of Connecticut and Massachusetts, with support from the federal government as well. CT Rail-branded trains provide service along the corridor, and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices. The service launched on June 16, 2018.

<span class="mw-page-title-main">Windsor station (Connecticut)</span> Rail station in Windsor, Connecticut, US

Windsor station is a historic railroad station on Amtrak's New Haven–Springfield Line, located in downtown Windsor, Connecticut. It is served by Amtrak Northeast Regional and Valley Flyer intercity service and CT Rail's Hartford Line commuter rail service. The nearby Hartford & New Haven Railroad-Freight Depot serves as the home of the Windsor Arts Center.

<span class="mw-page-title-main">Enfield station (Connecticut)</span>

Enfield station is a planned CTrail Hartford Line station in Enfield, Connecticut. As of September 2023, construction is expected to begin in 2025. A previous station at the site was open from 1844 to 1986.

<i>Hartford Line</i> (Amtrak) Amtrak service between Springfield, MA and New Haven, CT

The Hartford Line is a train service run by Amtrak primarily between Springfield, Massachusetts, and New Haven, Connecticut, along Amtrak's New Haven–Springfield Line.

<span class="mw-page-title-main">Flatbush Avenue station (Connecticut)</span> Bus rapid transit station in West Hartford, Connecticut

Flatbush Avenue is a bus rapid transit station on the CTfastrak line, located near the intersection of Flatbush Avenue and New Park Avenue in West Hartford, Connecticut. It opened with the line on March 28, 2015. The station consists of one island platform to the side of the busway, with passing lanes to allow express buses to pass buses stopped at the station. A CTrail Hartford Line commuter rail platform is planned to open in 2022 under the name West Hartford.

<span class="mw-page-title-main">Union Station (Worcester, Massachusetts)</span> Railway station in Worcester, Massachusetts, US

Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.

<span class="mw-page-title-main">Newington Junction station</span>

Newington Junction is a bus rapid transit station on the CTfastrak line opened in 2015 located off Willard Avenue (CT-173) in the Newington Junction neighborhood of Newington, Connecticut.

<span class="mw-page-title-main">John W. Olver Transit Center</span> Intermodal transit hub in Franklin County, Massachusetts

The John W. Olver Transit Center, also called the JWO Transit Center, is an intermodal transit hub for Franklin County, Massachusetts. Located in Greenfield, it currently serves Franklin Regional Transit Authority (FRTA) local bus routes plus intercity bus service. Amtrak's Greenfield station is also located here, with one daily Vermonter round trip and two daily Valley Flyer round trips, which are extensions of Amtrak-run Hartford Line trains.

<span class="mw-page-title-main">Union Station (Northampton, Massachusetts)</span>

Union Station is a historic building in Northampton, Massachusetts, that served as a train station from 1897 until 1987. Built at the close of the nineteenth century, the structure incorporates many features of the Richardsonian Romanesque architectural style. The buff brick masses of the station are trimmed with red Longmeadow brownstone and hooded by red tile roofs. Steep dormers protrude from the roofline. The interior once featured Italian marble floors, oak woodwork, and a large fireplace.

<span class="mw-page-title-main">CT Rail</span> Commuter rail in Connecticut, USA

CT Rail, stylized as CTrail, is the brand for commuter rail services overseen by the Connecticut Department of Transportation (CTDOT), in the U.S. state of Connecticut, with some service extending into Massachusetts. CTDOT oversees two lines: Shore Line East, between New Haven and New London, Connecticut, and the Hartford Line, from New Haven, through Hartford, to Springfield, Massachusetts.

<i>Valley Flyer</i> (Amtrak train)

The Valley Flyer is a train service run by Amtrak between New Haven, Connecticut and Greenfield, Massachusetts along Amtrak's New Haven–Springfield Line and the Massachusetts Department of Transportation's Connecticut River Line.

<span class="mw-page-title-main">East-West Passenger Rail (Massachusetts)</span> Massachusetts east-to-west rail project

East-West Rail is a proposed intercity passenger rail project that would provide new service between Boston and western Massachusetts, with stops including Worcester, Palmer, Springfield, Pittsfield, and Amtrak's Albany–Rensselaer station in New York. The 171-mile (275 km) route between Boston and Albany would use the former mainline of the Boston and Albany Railroad, which is now owned by the Massachusetts Bay Transit Authority and CSX Transportation.

References

  1. "Amtrak Fact Sheet, Fiscal Year 2022: Commonwealth of Massachusetts" (PDF). Amtrak. June 2023. Retrieved August 30, 2023.
  2. "Amtrak Fact Sheet, FY2017, State of Massachusetts" (PDF). Amtrak. November 2017. Retrieved April 25, 2018.
  3. 1 2 3 Kinney, Jim (May 8, 2017). "Peter Pan Agrees on Union Station Move". The Republican. Springfield, Mass. Retrieved May 26, 2017.
  4. Brennan, Tim (February 7, 2015). "Springfield's Union Station renovation key to Pioneer Valley's future". The Republican. Retrieved December 7, 2015.
  5. 1 2 Neal, Richard (May 14, 2017). "Mission Accomplished". The Republican. Springfield, Mass. p. S2.
  6. Phaneuf, Wayne; Joseph Carvalho III (May 14, 2017). "From Golden Age to Forgotten Resource". The Republican. Springfield, Mass. p. S10.
  7. Pioneer Valley Transit Authority; Springfield Redevelopment Authority (Mass.) (October 7, 2008). Redevelopment Plan for the Union Station Intermodal Transportation Facility (PDF). HDR, Inc. Retrieved December 7, 2015.
  8. Tuthill, Paul (December 12, 2014). "Officials Announce Full Build Out for Union Station". WAMC Northeast Public Radio . Albany, N.Y.
  9. Kinney, Jim (November 26, 2014). "Springfield Union Station baggage building demolition to begin Monday, Dec. 1". MassLive. Retrieved November 30, 2014.
  10. "Springfield Redevelopment Authority Page on Union Station".
  11. "Finishing Touches". The Republican. Springfield, Mass. May 14, 2017. p. S16.
  12. "Peter Pan move to Union Station could happen in September".
  13. "Peter Pan Bus Company to End Partnership with Greyhound". Associated Press. August 28, 2017.
  14. "Amtrak returns to Springfield's Union Station concourse, new platform expected to open in four weeks". Masslive. June 10, 2019. Retrieved June 10, 2019.
  15. "AMTRAK TRAINS RETURN TO HISTORIC SPRINGFIELD UNION STATION" (Press release). Amtrak. June 2019.
  16. "Springfield's Union Station Platform Work".
  17. "Baker-Polito Administration, Federal & Local Officials Celebrate Improvements at Springfield's Union Station" (Press release). Massachusetts Department of Transportation. January 24, 2020.
  18. http://www.timetables.org/full.php?group=19910407ne&item=0022 Amtrak. January 24, 1991.
  19. Kent, Bill (April 9, 1995). "Atlantic City; Last (Amtrak) Train Out of Town". The New York Times.
  20. Porter, Mikaela; Owens, David (June 17, 2018). "Thousands Take A Free Ride On Hartford Line's Inaugural Run" . Retrieved June 17, 2018.
  21. McGuinness, Dylan (July 24, 2017). "Commuter Rail Service Between Hartford And New Haven Will Begin In May 2018".
  22. "CTrail Hartford Line Schedules: Effective November 12, 2018" (PDF). Hartford Line. November 12, 2018. Retrieved November 10, 2018.
  23. "AMTRAK AND MASSDOT ANNOUNCE START OF NEW VALLEY FLYER TRAIN SERVICE IN WESTERN AND NORTHERN MASSACHUSETTS" (Press release). Amtrak. August 27, 2019.
  24. "About This Project". Northern New England Intercity Rail Initiative. Massachusetts Department of Transportation. Archived from the original on January 20, 2015. Retrieved January 15, 2015.
  25. Holland, Kevin (2004). Passenger Trains of Northern new England in the Streamline Era. Lynchburg, VA: TLC Publishing. p. 117. ISBN   1-883089-69-7.
  26. Boston and Maine April 1946 timetable, Table 1 http://streamlinermemories.info/Eastern/B&M46TT.pdf
  27. Jim Kinney | (2022-12-02). "East-west rail seeks $108 million from federal government". masslive. Retrieved 2022-12-02.
  28. "Chapter 4 - Alternatives Development and Analysis". East-West Passenger Rail Study Final Report. Massachusetts Department of Transportation. January 2021.
  29. Kinney, Jim (May 9, 2017). "With Peter Pan bus deal in place, 1st floor of Springfield's Union Station nears 100% occupancy ahead of grand opening". MassLive. Retrieved August 19, 2017.
  30. Kinney, Jim (July 28, 2017). "Springfield's Union Station: What businesses are moving in soon?". MassLive. Retrieved August 19, 2017.
  31. "Rail News Roundup #12". Trains in the Valley. April 14, 2018. Retrieved April 25, 2018.
  32. "Food Options". Springfield Union Station.
  33. Kinney, Jim (June 6, 2017). "Dietz & Company Architects moving to Springfield Union Station". Mass Live.
  34. Kinney, Jim (November 20, 2017). "Peter Pan signs lease for Union Station offices". Mass Live.

Further reading