St. John's Terminal

Last updated

Addition under construction, 2021 St. John's Terminal from southwest HDR 2021 jeh.jpg
Addition under construction, 2021

St. John's Terminal, also known as 550 Washington Street, is a building on Washington Street in the Hudson Square neighborhood of Manhattan in New York City. Designed by Edward A. Doughtery, it was built in 1934 by the New York Central Railroad as a terminus of the High Line, an elevated freight line along Manhattan's West Side used for transporting manufacturing-related goods. The terminal could accommodate 227 train cars. The three floors, measuring 205,000 square feet (19,000 m2) each, were the largest in New York City at the time of their construction.

Contents

The building was used as a freight terminal until 1960, when the freight line was decommissioned. Afterward, the building was acquired by Eugene M. Grant and Lionel Bauman, who turned the structure into a warehouse and office building. The space was used by tenants such as banks Merrill Lynch & Co. and Manufacturers Hanover Corporation, the latter of which constructed a fourth story in 1966. The terminal was largely used by Merrill Lynch by the early 1990s. Afterward, St. John's Terminal was used for corporate real estate and offices.

Eugene Grant sold a majority ownership stake in the building to a joint venture of Atlas Capital Group, Fortress Investment Group, and Westbrook Partners in 2013. The developers initially planned a mixed-use development on the site, with residences, retail, and offices, using air rights purchased from the adjoining Pier 40. Though the plans were modified in response to community input, the plans stalled in 2017, and Oxford Properties and Canada Pension Plan bought the southern three-quarters of the site in early 2018. Oxford and CPP hired Cookfox to design an office redevelopment with nine additional stories above the original three floors. The building was purchased in 2021 by Google, which plans to occupy the building as part of a Hudson Square campus. The redevelopment was completed in February 2024.

Rail terminal

St. John's Terminal was built by the New York Central Railroad as the southern terminus to the High Line, an elevated segment of the West Side Line on the west side of Manhattan. [1] Prior to the development of the High Line, the West Side Line terminated at a ground-level structure at St. John's Park. [2] By the early 20th century, there were frequent collisions along the street-level route, [3] leading the New York Transit Commission to order in January 1929 that all grade crossings on the West Side Line be removed. [4] The street-level route was to be replaced with a viaduct as part of the West Side Improvement Project, which the Interstate Commerce Commission approved in December 1929. [5] [6]

By early 1930, the NYCR was acquiring land for the elevated Spring Street freight terminal, which would replace the old ground-level St. John's Park terminal. [7] Plans for the new terminal were announced that July. The building was to measure 1,250 feet (380 m) long between Clarkson Street to the north and Spring Street to the south, and it would have an average width of 250 feet (76 m) between West Street to the west and Washington Street to the east. The terminal would replace eighty-eight existing tenements, which were already being demolished. Though plans for the above-ground section of the terminal had not been finalized, it was expected to be either four or seven stories tall based on subsurface conditions. [8] [9] Preliminary designs for a 12-story structure, designed by Edward A. Doughtery, were filed with the New York City Department of Buildings in March 1931. [10] [11] According to a later New York Times article, there were plans for the building to be 17 stories tall. [12] By that November, the site had largely been cleared. [13]

The NYCR had hoped to rent out the space on the higher floors for commercial purposes. [12] The structure would have contained 3.6 million square feet (330,000 m2) had it been built to that size. The plans called for tracks on the second floor, capable of accommodating 190 railcars, as well as loading docks at ground level. The work entailed closing off King, Charlton, and Spring Streets and a bridge over Houston Street. [14] In February 1932, the NYCR requested a $7.5 million loan to fund the West Side Improvement, including the new freight depot. Initially, $10 million would be spent to build a portion of the terminal to meet "current needs". [15] That November, revised plans were filed for a three-story building with a projected cost of $2.5 million. According to a contemporary New York Times article, the reduction of size was due to cost, as the original structure would have $12.5 million. [16] However, a later Times article cited opposition from brokers as a reason for reducing the building's height. The building would serve only the NYCR's own direct purposes as a rail terminal; the structure had pilings capable of handling a larger building should the situation change. [12]

The Spring Street Terminal and the elevated rail viaduct were dedicated on June 29, 1934, with ceremonies at the terminal building. [1] [17] With the opening of the new terminal, the NYCR filed plans to abandon the nearby Franklin Street station, which was being used to make local deliveries. [18] The terminal quickly became known as St. John's Park Terminal because the old terminal had been so well known. [19] The building was noted for its unusually large floor areas compared to other Manhattan buildings, where properties are usually subdivided more narrowly. [20] The floors, measuring 205,000 square feet (19,000 m2) each, were the largest in New York City at the time of their construction. Each story could accommodate a load of 300 pounds per square foot (14 kPa). [21] The terminal itself was large enough to accommodate 227 train cars. [22] [23] The third floor was leased in 1937 to the Borden Company, which used that space as a warehouse for refrigeration equipment. [24] [25]

Warehouse and office building

550 Washington Street in 2018, with the original three floors and the fourth floor later addition Houston St Greenwich Washington td (2018-06-09) 01 - St. John's Terminal.jpg
550 Washington Street in 2018, with the original three floors and the fourth floor later addition

Rail freight declined after World War II, affecting traffic on the West Side elevated freight line. [22] In 1960, the southernmost section of the line ceased operations and was demolished. St. John's Terminal was decommissioned for rail activity and changed into a warehouse instead. [26] The building was renovated with 750,000 square feet (70,000 m2) of offices. [27] Eugene M. Grant and Lionel Bauman purchased St. John's Terminal in 1960 [21] or 1962. [28]

Among the first tenants of the St. John's Terminal Building was the Oberly & Newell Lithographic Corporation, [29] Other office tenants included McKenzie Service Inc., a bookbinding firm; [30] [31] the Railway Express Agency; [32] [33] and N. Erlanger Blumgart & Co., one of the oldest textile companies in New York City. [34] City Specialty Stores, a specialty store, occupied a warehouse facility on the entire third floor, renovating that story with a cafeteria, clinic, restrooms, and air-conditioning. [35] Additionally, a tennis club took up some space on the roof. [12] The tennis club's lease was arranged after broker William J. Hirschman, who was using a helicopter to look for suitable space, spotted the roof of St. John's Terminal. [36] The Manufacturers Hanover Corporation, a bank that also occupied space in the building, added a fourth story in 1966 to consolidate its investment operations. The additional floor spanned 135,000 square feet (12,500 m2). [21] During 1968, investment bank Merrill Lynch & Co. leased 125,000 square feet (11,600 m2) across the terminal. [37]

Grant and Bauman started to advertise St. John's Terminal as a cheap office location in the 1980s. The cheap office space attracted tenants such as Bloomberg L.P. [22] By 1991, Merrill Lynch occupied 700,000 square feet (65,000 m2) in St. John's Terminal and was negotiating to occupy another 300,000 square feet (28,000 m2) of space. By then, the building was called St. John's Center, and its floors were being marketed at $12 per square foot ($130/m2). [38]

Redevelopment

Canceled mixed-use plans

In January 2013, Grant sold his 50.1 percent controlling stake for $250 million to a joint venture of Atlas Capital Group, Fortress Investment Group, and Westbrook Partners. [39] [40] [41] That November, Atlas and the Hudson River Park Trust signed a memorandum of understanding (MOU) in which Atlas would buy unused air rights above Pier 40, directly to the west. Atlas would use the air rights to redevelop the St. John's site over the following ten years, starting with the northern section of St. John's Terminal. The MOU was first publicized in May 2014. [42] [43] News of the MOU generated much public and political opposition, especially from Manhattan elected officials, who objected that the MOU had been made secretly. This led to the cancellation of the MOU the next month. [44] [45]

In September 2014, Atlas proposed purchasing 250,000 square feet (23,000 m2) of air rights from Pier 40. The air rights transfer would enable the addition of between 150 and 200 affordable housing units facing away from the river. [46] [47] The project would also include condominiums and retail. The redevelopment would proceed in two phases because Bloomberg LP still occupied part of the terminal site. [46] In August 2015, Westbrook Partners bought a $200 million ownership stake, giving it majority control of the building. [48] [49] The Hudson River Park Trust agreed that October to sell air rights above Pier 40. [50]

Cookfox announced plans for the St. John's Terminal site in November 2014. The northern end of the site would contain the largest residential building, a 430-foot-tall (130 m) tower with market-rate residences. There would also be 175 senior-housing units, 40,000 square feet (3,700 m2) of retail, and 105,000 square feet (9,800 m2) in the basement that could be used for big-box retail. The center of the site would contain a residential building with affordable and market-rate units, a residential building entirely composed of market-rate units, and a garden connecting the towers. At the south end of the site would be a 350-unit hotel and a mews. The former railroad loading platforms would be converted into a park similar to the High Line. [51] [52] In total, the development would contain 1,586 units. [50] Some 200,000 square feet (19,000 m2) of air rights from Pier 40, as well as 500,000 square feet (46,000 m2) of additional rights from an "upzoning", would be used to increase the floor area ratio from 5 to 8.7. Neighborhood groups, including the Greenwich Village Society for Historic Preservation, expressed concerns that the additional office space would make the development excessively large. [51]

West front of St. John's Terminal viewed from Pier 40 in 2018 Houston St West St td (2018-04-03) 12 - St. John's Terminal.jpg
West front of St. John's Terminal viewed from Pier 40 in 2018

A Uniform Land Use Review Procedure meeting was held in June 2016 to discuss the proposed air-rights transfer from Pier 40. At the meeting, residents of West Village and Hudson Square expressed concerns that the air-rights transfer could set a precedent for excessively large transfers for future projects. [53] These concerns were repeated at a meeting that August. Residents said the redevelopment could exacerbate traffic congestion and discussed whether St. John's Terminal needed a planned 772-space parking lot. [54] [55] The developers altered the plans in October 2016, eliminating the elevated park and big-box retail space. [56] [57] Following the revisions to the plans, Atlas and Westfield anticipated that the redevelopment could be delayed, leading to concerns that the Hudson River Park Trust might not receive money to repair Pier 40. [58] [59] The New York City Council approved the transfer of air rights from Pier 40 in December 2016, [60] [61] and Atlas and Westfield purchased the air rights for $100 million in May 2017. [62] In the meantime, the building was used as an event space, Skylight Clarkson Square and Skylight Clarkson North. [22] By late 2017, Brookfield Properties was discussing whether to join Atlas and Westfield in the project. [63] [64]

Google campus

Oxford Properties entered the joint venture for the project in October 2017. [65] The following January, Oxford paid Westfield and Atlas $700 million for the portion of the St. John's Terminal site south of Houston Street. Canada Pension Plan was the junior partner in the project, with a 40 percent stake in the development. [66] [67] [68] Deutsche Bank provided $400 million of financing for the acquisition. [66] That October, Cookfox Architects announced their designs for the redevelopment of the St. John's Terminal site, which called for a wholly commercial development. According to Oxford's U.S. development executive Dean Shapiro, the firm had planned a taller building but instead decided to create a low structure with large floor plates of 100,000 square feet (9,300 m2). The first and second floors would have ceilings of up to 28 feet (8.5 m), while a new glass annex would rise nine stories above the existing third floor, with ceiling heights of 16 feet (4.9 m). [69] According to renderings, the existing fourth story of the terminal would be removed to make way for the addition. [23] [70] The overpass over Houston Street would be eliminated. [70] Three outdoor decks would be created on the redeveloped structure. [23]

Google began developing a new building at 345 and 315 Hudson Street to create a "Google Hudson Square" campus in 2018, along with the redevelopment of 550 Washington Street. [71] The redeveloped building would be 12 stories tall [20] [72] [73] and contain 120,000 square feet (11,000 m2) on each floor. [72] Work began in 2019 when the structure over Houston Street was demolished, as was the section of the terminal north of Houston Street. [74] By early 2020, the floor slabs of the expanded building were being constructed. Oxford received a $973 million loan from Wells Fargo in February 2020, [75] [76] and the new addition topped out that November. [77]

Google began leasing space in the completed parts of the campus in 2020–2021, although the company did not immediately move in due to the COVID-19 pandemic. In September 2021, Google announced it was purchasing the 550 Washington Street building outright for approximately US$2.1 billion, using it as an additional corporate office. [78] [79] This was comparable to the price of Google's $1.9 billion purchase of the Port Authority Building at 111 Eighth Avenue in Chelsea in 2010 and Google's $2.4 billion purchase of Chelsea Market in 2018. [80] [81] New York is Google's second largest city by number of employees in its offices, behind only its main Mountain View, California, offices in Silicon Valley. [78] At the time, many office employees were continuing to work from home due to the COVID-19 pandemic, but Google officials expressed optimism that the office space would be filled when the renovation was completed. [82] Google finalized its acquisition of the building in April 2022, [83] and Google formally opened its office on February 21, 2024. [84] [85]

Architecture and design

St. John's Terminal in 2022, with construction for Google still ongoing Google-Hudson-NYC-2022-1.png
St. John's Terminal in 2022, with construction for Google still ongoing

As part of the Google redevelopment, prefabricated, modular slabs of precast concrete were constructed using bridge-construction methods. Two mechanical cores of 14 stories, each with emergency staircases and 14 elevator shafts connecting the roof to the basement, were also built. The precast structure contains a steel framing to stabilize the original terminal building, allowing the newer stories to be built without bracing. The prefabricated slabs and the steel frame were built using the same two cranes. [74] Following the expansion, the building rises 232 feet (71 m) high, with 12 stories. On the northern elevation of the building (facing Houston Street), where the old terminal has been cut away, the track beds of the old terminal are visible, overhanging the main entrance. [86]

The interiors of the Google offices, designed by Gensler. [84] [86] The entry hall is three stories high with a kitchen, seating areas, and a coffee bar. [84] The workstations are clustered into 60 groups as part of a "neighborhood seating" layout, in which teams are assigned specific areas. [86] [87] There is also a double-level, 330-seat auditorium with Guastavino-like tile designs. [84] The spaces are decorated with New York City–related details; for example, the conference rooms depict wooden construction walls and assorted objects, while a Google sign in the lobby has depictions of items such as taxicabs and the Statue of Liberty. [84] Following the project's completion, the building has had nearly 1.5 acres (0.61 ha) of native plants on its roof garden, as well as a rainwater collection system with a capacity of 92,000 U.S. gallons (350,000 L; 77,000 imp gal). [87] There are also solar panels on the roof, in addition to wood salvaged from the Riegelmann Boardwalk on Coney Island. [86]

See also

Related Research Articles

<span class="mw-page-title-main">42nd Street (Manhattan)</span> West-east street in Manhattan, New York

42nd Street is a major crosstown street in the New York City borough of Manhattan, spanning the entire breadth of Midtown Manhattan, from Turtle Bay at the East River, to Hell's Kitchen at the Hudson River on the West Side. The street hosts some of New York's best known landmarks, including the headquarters of the United Nations, the Chrysler Building, Grand Central Terminal, the New York Public Library Main Branch, Times Square, and the Port Authority Bus Terminal.

<span class="mw-page-title-main">North River (Hudson River)</span> Section of the Hudson River between New York City and New Jersey

North River is an alternative name for the southernmost portion of the Hudson River in the vicinity of New York City and northeastern New Jersey in the United States.

<span class="mw-page-title-main">Riverside South, Manhattan</span> Building complex in New York City

Riverside South is an urban development project in the Lincoln Square neighborhood of the Upper West Side of Manhattan, New York City. It was originated by six civic associations – The Municipal Art Society, Natural Resources Defense Council, New Yorkers for Parks, Regional Plan Association, Riverside Park Fund, and Westpride – in partnership with real estate developer Donald Trump. The largely residential complex, located on the site of a former New York Central Railroad yard, includes Freedom Place and Riverside Center. The $3 billion project is on 57 acres (23 ha) of land along the Hudson River between 59th Street and 72nd Street.

<span class="mw-page-title-main">James A. Farley Building</span> Historic post office in Manhattan, New York

The James A. Farley Building is a mixed-use structure in Midtown Manhattan, New York City, which formerly served as the city's main United States Postal Service (USPS) branch. Designed by McKim, Mead & White in the Beaux-Arts style, the structure was built between 1911 and 1914, with an annex constructed between 1932 and 1935. The Farley Building, at 421 Eighth Avenue between 31st Street and 33rd Street in Midtown Manhattan, faces Pennsylvania Station and Madison Square Garden to the east.

<span class="mw-page-title-main">Pier 57</span> Pier in Manhattan, New York

Pier 57 is a long pier located in the Hudson River on the West Side of Manhattan in New York City. Opened in December 1954, it sits at the end of West 15th Street on Eleventh Avenue, just south of the Chelsea Piers sports complex and just north of Little Island. It underwent renovations starting in the early 2010s, and is currently operated by Google. In addition to serving as a campus for employees, the pier opened to the public in April 2023.

<span class="mw-page-title-main">Javits Center</span> Convention center in Manhattan, New York

The Jacob K. Javits Convention Center, commonly known as the Javits Center, is a large convention center on Eleventh Avenue between 34th Street and 38th Street in Hell's Kitchen, Manhattan, New York City. It was designed by architect James Ingo Freed of Pei Cobb Freed & Partners. The space frame structure was constructed from 1979 to 1986 and was named to honor Jacob Javits, the United States Senator for New York. When the Javits Center opened, it replaced the New York Coliseum at Columbus Circle as the city's major convention facility; the Coliseum was subsequently demolished and replaced by Time Warner Center.

<span class="mw-page-title-main">Bush Tower</span> Office skyscraper in Manhattan, New York

The Bush Tower is a skyscraper in the Midtown Manhattan neighborhood of New York City, just east of Times Square. Designed by Frank J. Helmle and Harvey Wiley Corbett of the firm Helmle & Corbett, the building occupies a plot at 130–132 West 42nd Street between Broadway and Sixth Avenue.

<span class="mw-page-title-main">Hudson River Park</span> Public park in Manhattan, New York

Hudson River Park is a waterfront park on the North River that extends from 59th Street south to Battery Park in the New York City borough of Manhattan. The park, a component of the Manhattan Waterfront Greenway, stretches 4.5 miles (7.2 km) and comprises 550 acres (220 ha), making it the second-largest park in Manhattan after the 843-acre (341 ha) Central Park.

<span class="mw-page-title-main">Hudson Terminal</span> Former building complex in Manhattan, New York

The Hudson Terminal was a rapid transit station and office-tower complex in the Radio Row neighborhood of Lower Manhattan in New York City. Opened during 1908 and 1909, it was composed of a terminal station for the Hudson & Manhattan Railroad (H&M), as well as two 22-story office skyscrapers and three basement stories. The complex occupied much of a two-block site bounded by Greenwich, Cortlandt, Church, and Fulton Streets, which later became the World Trade Center site.

<span class="mw-page-title-main">330 West 42nd Street</span> Office skyscraper in Manhattan, New York

330 West 42nd Street, also known as the McGraw-Hill Building and formerly the GHI Building, is a skyscraper in the Hell's Kitchen neighborhood of Manhattan in New York City. Designed by Raymond Hood and J. André Fouilhoux in a mixture of the International Style, Art Deco, and Art Moderne styles, the building was constructed from 1930 to 1931 and originally served as the headquarters of McGraw-Hill Companies. The 485-foot-tall (148 m) building contains 33 stories.

<span class="mw-page-title-main">3 World Trade Center</span> Office skyscraper in Manhattan, New York

3 World Trade Center is a skyscraper constructed as part of the new World Trade Center in Lower Manhattan, New York City. The tower is located on Greenwich Street along the eastern side of the World Trade Center site. The building was designed by Rogers Stirk Harbour + Partners, and is managed by Silverstein Properties through a ground lease with the Port Authority of New York and New Jersey (PANYNJ), the landowner. It is 1,079 ft (329 m) high, with 80 stories. As of 2023, it is the ninth-tallest building in the city.

<span class="mw-page-title-main">Industry City</span> Historic intermodal shipping, warehousing, and manufacturing complex in Brooklyn, New York

Industry City is a historic intermodal shipping, warehousing, and manufacturing complex on the Upper New York Bay waterfront in the Sunset Park neighborhood of Brooklyn, New York City. The northern portion, commonly called "Industry City" on its own, hosts commercial light manufacturing tenants across 6,000,000 square feet (560,000 m2) of space between 32nd and 41st Streets, and is operated by a private consortium. The southern portion, known as "Bush Terminal", is located between 40th and 51st Streets and is operated by the New York City Economic Development Corporation (NYCEDC) as a garment manufacturing complex.

<span class="mw-page-title-main">City Pier A</span> Pier in Manhattan, New York

Pier A, also known as City Pier A, is a pier in the Hudson River at Battery Park in Lower Manhattan, New York City. It was built from 1884 to 1886 as the headquarters of the New York City Board of Dock Commissioners and the New York City Police Department (NYPD)'s Harbor Department. Pier A, the only remaining masonry pier in New York City, contains a two- and three-story structure with a clock tower facing the Hudson River. The pier is a New York City designated landmark and is listed on the National Register of Historic Places (NRHP).

<span class="mw-page-title-main">Battery Maritime Building</span> Ferry terminal in Manhattan, New York

The Battery Maritime Building is a building at South Ferry on the southern tip of Manhattan Island in New York City. Located at 10 South Street, near the intersection with Whitehall Street, it contains an operational ferry terminal at ground level, as well as a hotel and event space on the upper stories. The ground story contains three ferry slips that are used for excursion trips and ferries to Governors Island, as well as commuter trips to Port Liberté, Jersey City. The upper stories contain the Cipriani South Street event space, operated by Cipriani S.A., and a 47-room hotel called Casa Cipriani.

<span class="mw-page-title-main">111 Eighth Avenue</span> Mixed-use building in Manhattan, New York

111 Eighth Avenue, also known as the Google Building and formerly known as Union Inland Terminal #1 and the Port Authority Building, is an Art Deco multi-use building in the Chelsea neighborhood of Manhattan, New York City. Fifteen stories tall and occupying an entire city block, it has 2.9 million square feet (270,000 m2) of floor space, more than the Empire State Building.

<span class="mw-page-title-main">Starrett–Lehigh Building</span> Commercial building in Manhattan, New York

The Starrett–Lehigh Building is a 19-story building at 601 West 26th Street, occupying the full block between Eleventh Avenue, 26th Street, Twelfth Avenue, and 27th Street, in the Chelsea neighborhood of Manhattan in New York City. It was built between 1930 and 1931 by the Starrett Corporation and the Lehigh Valley Railroad (LV), who formed a joint venture to develop a freight terminal and warehouse to replace the railroad's previous freight terminal. The structure was designed by the firm of Cory & Cory, with Yasuo Matsui as the associate architect and the firm of Purdy & Henderson as the consulting structural engineers. The Starrett–Lehigh Building has largely been used as an office building since the late 1990s.

<span class="mw-page-title-main">Domino Sugar Refinery</span> Development and former refinery in New York City

The Domino Sugar Refinery is a mixed-use development and former sugar refinery in the neighborhood of Williamsburg in Brooklyn, New York City, along the East River. When active as a refinery, it was operated by the Havemeyer family's American Sugar Refining Company, which produced Domino brand sugar and was one of several sugar factories on the East River in northern Brooklyn.

<span class="mw-page-title-main">American Stock Exchange Building</span> Building in Manhattan, New York

The American Stock Exchange Building, formerly known as the New York Curb Exchange Building and also known as 86 Trinity Place or 123 Greenwich Street, is the former headquarters of the American Stock Exchange. Designed in two sections by Starrett & van Vleck, it is located between Greenwich Street and Trinity Place in the Financial District of Lower Manhattan in New York City, with its main entrance at Trinity Place. The building represents a link to the historical practices of stock trading outside the strictures of the New York Stock Exchange (NYSE), which took place outdoors "on the curb" prior to the construction of the structure.

<span class="mw-page-title-main">Hudson Yards (development)</span> Development project in Manhattan, New York

Hudson Yards is a 28-acre (11 ha) real estate development in the Hudson Yards neighborhood in Manhattan, New York City, between the Chelsea and Hell's Kitchen neighborhoods. It is located on the waterfront of the Hudson River. Upon completion, 13 of the 16 planned structures on the West Side of Midtown South would sit on a platform built over the West Side Yard, a storage yard for Long Island Rail Road trains. The first of its two phases, opened in 2019, comprises a public green space and eight structures that contain residences, a hotel, office buildings, a mall, and a cultural facility. The second phase, on which construction had not started as of 2023, will include residential space, an office building, and a school.

5 Columbus Circle is an office building on the southeast corner of Broadway and 58th Street, just south of Columbus Circle, in the Midtown Manhattan neighborhood of New York City, New York, United States. Designed by Carrère and Hastings in the Beaux-Arts style, it is 286 feet (87 m) tall with 20 stories.

References

  1. 1 2 "Death Avenue' Exodus Starts At Dedication: St. John's Park Freight Terminal, Elevated Railroad to 35th St. Are Opened". New York Herald Tribune. June 29, 1934. p. 3. ProQuest   1329014923.
  2. "Lower West Side Landmark Passing". The New York Times. July 26, 1936. p. RE1. ISSN   0362-4331. ProQuest   101743217.
  3. "'Death Ave.' Ends as Last Rusty Rail Goes; Huge West Side Improvement Completed" (PDF). The New York Times. June 26, 1941. Retrieved February 12, 2018.
  4. "West Side Crossings Ordered Eliminated; Transit Commission Conditions Work on Agreement With New York Central on City Plan". The New York Times. February 21, 1929. ISSN   0362-4331 . Retrieved October 13, 2021.
  5. "West Side Plan Wins Approval of I.C.C." The New York Times. December 12, 1929. ISSN   0362-4331 . Retrieved October 13, 2021.
  6. "I. C. C. Approves N. Y. Central's West Side Plan: Decision Permits Immediate Relocation of Tracks, Elimination of Crossings". New York Herald Tribune. December 12, 1929. p. 48. ProQuest   1112014255.
  7. "New York Central Adds to Its Site for New Freight Station: Procures Several Parcels at West, Charlton Sis.; Part of West Side Improvement". New York Herald Tribune. May 25, 1930. p. K8. ProQuest   1113646659.
  8. "Central to Build Huge West Side Freight Depot". New York Herald Tribune. July 11, 1930. p. 3. ProQuest   1113647501.
  9. "N.y. Central Plans $15,000,000 Terminal on Lower West Side; Prepares to Start Foundation Work on 4-block Freight Depot This Fall". The New York Times. July 11, 1930. ISSN   0362-4331 . Retrieved October 13, 2021.
  10. "Central Files Plan of $15,000,000 Depot; 12-story West Side Freight Terminal Expected to Be Completed in Year". The New York Times. March 10, 1931. ISSN   0362-4331 . Retrieved January 11, 2020.
  11. "Plans Submitted; For $15,000,000 Freight Center: N. Y. Central to Start Work in Spring on Four-Block Terminal and Warehouse". New York Herald Tribune. March 10, 1931. p. 38. ProQuest   1114073489.
  12. 1 2 3 4 Friedman, Charles (December 27, 1964). "Huge Roof on Lower West Side To Be Used for Tennis Court". The New York Times. Retrieved September 21, 2021.
  13. "West Side Improvement Projects Advancing Rapidly". The New York Times. November 29, 1931. p. RE1. ISSN   0362-4331. ProQuest   99106685.
  14. "Huge Freight Depot to Be Started Soon; Central's New Freight Terminal to Cover Four West Side Blocks". The New York Times. November 27, 1931. ISSN   0362-4331 . Retrieved October 13, 2021.
  15. "N.Y. Central to Ask Loan for West Side; $7,000,000 to Be Sought From Reconstruction Finance Corporation Today". The New York Times. February 25, 1932. ISSN   0362-4331 . Retrieved October 13, 2021.
  16. "New Freight Depot to Be 3 Stories Only; Central Files Revised Plans for West Side Building, Cutting Cost to $2,500,000". The New York Times. November 17, 1932. ISSN   0362-4331 . Retrieved October 13, 2021.
  17. "Mayor Dedicates West Side Project; 'Death to Death Av.' Is Toast to Terminal and Vast System of Tracks on West Side" (PDF). The New York Times. June 29, 1934. Retrieved February 12, 2018.
  18. "Freight Depot Plan Up.; Decision Reserved on Plea to Abandon Franklin St. Station". The New York Times. June 1, 1934. ISSN   0362-4331 . Retrieved October 13, 2021.
  19. "NEW YORK'S LIFE-LINE". Railway History Home Page. Retrieved October 13, 2021.
  20. 1 2 Morris, Sebastian (November 19, 2020). "Construction Tops Out on Google's St. John's Terminal Building in Hudson Square". New York YIMBY. Retrieved October 13, 2021.
  21. 1 2 3 "Bank Centralizes Inside Operations; Remote Units Are Merged by Manufacturers Hanover". The New York Times. March 27, 1966. ISSN   0362-4331 . Retrieved October 13, 2021.
  22. 1 2 3 4 Rosenberg, Zoe (January 19, 2017). "In the old High Line terminus, an emblem of new New York". Curbed NY. Retrieved October 13, 2021.
  23. 1 2 3 Baird-Remba, Rebecca (October 2, 2018). "Oxford Properties Reveals Office Redevelopment of St John's Terminal". Commercial Observer. Retrieved October 13, 2021.
  24. "Borden Leases Space in West Side Station; Will Centralize Distributing in 50,000 Square Feet". The New York Times. March 6, 1941. ISSN   0362-4331 . Retrieved October 13, 2021.
  25. "Borden Leases Space in N. Y. Central Station: Dairy Concern Will Occupy. 50,000 Sq.Ft in St. John's Park Freight Terminal". New York Herald Tribune. March 9, 1941. p. D8. ProQuest   1249017227.
  26. "Freight Yard to Shut; Central Railroad Gets Permit on St. John's Station". The New York Times. January 30, 1960. ISSN   0362-4331 . Retrieved January 11, 2020.
  27. "Manhattan Lofts Gaining Business; Rentals in Small Buildings Rise With Renovations". The New York Times. March 25, 1962. ISSN   0362-4331 . Retrieved October 13, 2021.
  28. "Eugene M. Grant | St. John's Terminal". The Real Deal New York. April 4, 2018. Retrieved October 13, 2021.
  29. "Space Is Leased at 340 West St.; Lithographic Concern Is 2d to Sign in Building – Other Rentals Are Reported". The New York Times. November 7, 1960. ISSN   0362-4331 . Retrieved October 13, 2021.
  30. "Big Space Taken by Book Finishers; 125,000 Square Feet Leased at St. John's Terminal – Other Rental Deals". The New York Times. December 24, 1960. ISSN   0362-4331 . Retrieved October 13, 2021.
  31. "Several Firms In Lease Deals". New York Herald Tribune. December 24, 1960. p. 15. ProQuest   1337944404.
  32. "Railway Express Gets New Space; International Division to Be at St. John's Terminal". The New York Times. November 3, 1961. ISSN   0362-4331 . Retrieved October 13, 2021.
  33. "Railway Express Leases Space". New York Herald Tribune. November 4, 1961. p. 14. ProQuest   1327012007.
  34. "Textile Co. Takes Space In Terminal: Blumgart Leases 50,000 Square Feet". New York Herald Tribune. March 7, 1962. p. 28. ProQuest   1325842746.
  35. "Central Office Set for Apparel Chains". The New York Times. December 4, 1960. ISSN   0362-4331 . Retrieved October 13, 2021.
  36. "Helicopter Used in Hunt for Space; Undaunted Broker Honored for Ingenious Transaction". The New York Times. January 22, 1965. ISSN   0362-4331 . Retrieved October 13, 2021.
  37. Whitehouse, Franklin (November 20, 1968). "News of Realty: Ex-rail Space Let; Merrill Lynch Plans Offices in St. John's Building". The New York Times. ISSN   0362-4331 . Retrieved October 13, 2021.
  38. Dunlap, David W. (January 20, 1991). "Commercial Property: The West Side Viaduct; Conrail Looking to a Revival of Its Freight Traffic". The New York Times. ISSN   0362-4331 . Retrieved October 13, 2021.
  39. Barbarino, Al (January 4, 2013). "Real Estate Tycoon Eugene Grant Sells Controlling Stake in the Behemoth St. John's Terminal Building". Commercial Observer. Retrieved October 13, 2021.
  40. Katz, Rayna (January 3, 2013). "Grant Relinquishes 550 Washington Control". GlobeSt. Retrieved October 13, 2021.
  41. "In the News: Big West Street Development". Tribeca Citizen. January 6, 2013. Retrieved October 13, 2021.
  42. Bagli, Charles V. (May 16, 2014). "Possible Deal May Bring Money to Repair Pier 40 in Manhattan". The New York Times. ISSN   0362-4331 . Retrieved October 13, 2021.
  43. Rosenberg, Zoe (November 12, 2014). "Pier 40 Air Rights Deal Could Mean Affordable Housing Nearby". Curbed. Retrieved October 13, 2021.
  44. Budin, Jeremiah (June 9, 2014). "Pier 40's Secret $100 Million Air Rights Memorandum Is Dead". Curbed. Retrieved March 20, 2015.
  45. "'Expedited ULURP' now eyed for Pier 40 air-rights transfer". amNewYork. June 12, 2014. Retrieved October 13, 2021.
  46. 1 2 Tcholakian, Danielle (November 12, 2014). "Notes Reveal What a Developer Wants to Do With Pier 40's Air Rights". DNAinfo New York. Retrieved October 13, 2021.
  47. Rosenberg, Zoe (November 12, 2014). "Pier 40 Air Rights Deal Could Mean Affordable Housing Nearby". Curbed NY. Retrieved October 13, 2021.
  48. Rosenberg, Zoe (August 24, 2015). "Sprawling St. John's Terminal May Be Closer to Redevelopment". Curbed NY. Retrieved October 13, 2021.
  49. Geiger, Daniel (August 24, 2015). "Firm pays $200 million for majority stake in St. John's Terminal, eyes big redevelopment". Crain's New York Business. Retrieved October 13, 2021.
  50. 1 2 Tcholakian, Danielle (October 21, 2015). "City, Hudson River Park Trust Strike $100M Air Rights Deal for Pier 40 – Hudson Square – New York". DNAinfo. Retrieved October 13, 2021.
  51. 1 2 Anderson, Lincoln (November 19, 2015). "Architect and developer try to build the case for St. John's project". amNewYork. Retrieved October 13, 2021.
  52. Warerkar, Tanay (November 20, 2015). "St. John's Terminal Redevelopment Gets First Renderings". Curbed NY. Retrieved October 13, 2021.
  53. Warerkar, Tanay (June 7, 2016). "West Village Residents Still Hesitant Over Pier 40 Development Deal". Curbed NY. Retrieved October 13, 2021.
  54. Warerkar, Tanay (August 24, 2016). "St. John's Terminal redevelopment continues to elicit concerns". Curbed NY. Retrieved October 13, 2021.
  55. Tcholakian, Danielle (August 22, 2016). "Massive Development Across From Pier 40 Set for City Planning Hearing – Hudson Square – New York". DNAinfo. Retrieved October 13, 2021.
  56. Tcholakian, Danielle (October 8, 2016). "St. John's Terminal Developers Outline Changes to Proposal". DNAinfo New York. Retrieved October 13, 2021.
  57. Nonko, Emily (October 10, 2016). "St. John's Terminal plans change to reflect community's concerns". Curbed NY. Retrieved October 13, 2021.
  58. Tcholakian, Danielle (October 1, 2016). "St. John's Developers Considering Major Change to Plan, to Council Chagrin". DNAinfo New York. Retrieved October 13, 2021.
  59. Walker, Ameena (November 2, 2016). "St. John's Terminal redevelopment may be postponed, developers say". Curbed NY. Retrieved October 13, 2021.
  60. Bagli, Charles V. (December 15, 2016). "$100 Million Deal to Save Pier 40 in Manhattan Is Approved". The New York Times. ISSN   0362-4331 . Retrieved October 13, 2021.
  61. Rosenberg, Zoe (December 15, 2016). "City Council approves $100M transfer of Pier 40 air rights". Curbed NY. Retrieved October 13, 2021.
  62. "Pier 40 air rights close at $100M". Real Estate Weekly. May 4, 2017. Retrieved October 13, 2021.
  63. Rosenberg, Zoe (August 25, 2017). "St. John's Terminal project might have nabbed another major player". Curbed NY. Retrieved October 13, 2021.
  64. Maurer, Mark (August 25, 2017). "Brookfield in talks to join St. John's Terminal project: sources". The Real Deal New York. Retrieved October 13, 2021.
  65. "Oxford Properties enters joint venture for St. John's Terminal project". Real Estate Weekly. September 7, 2017. Retrieved October 13, 2021.
  66. 1 2 Maurer, Mark (January 31, 2018). "Canada Pension Plan joins Oxford on St. John's Terminal megaproject". The Real Deal New York. Retrieved October 13, 2021.
  67. Kim, Betsy (January 1, 2018). "Oxford and CPPIB Acquire South Portion of St. John's Terminal for $700 Million". GlobeSt. Retrieved October 13, 2021.
  68. "Canadian funds pay $700M for St. John's Terminal". Real Estate Weekly. January 31, 2018. Retrieved October 13, 2021.
  69. Bockmann, Rich (October 2, 2018). "Oxford Properties reveals design for St. John's Terminal redevelopment". The Real Deal New York. Retrieved October 13, 2021.
  70. 1 2 Warerkar, Tanay (October 2, 2018). "First look at St. John's Terminal's transformation into 'green' office complex". Curbed NY. Retrieved October 13, 2021.
  71. Morris, Sebastian (December 18, 2018). "Google's Billion-Dollar New York Campus Expansion Lands in Hudson Square, Manhattan". New York YIMBY. Retrieved October 13, 2021.
  72. 1 2 Warerkar, Tanay (October 2, 2018). "First look at St. John's Terminal's transformation into 'green' office complex". Curbed NY. Retrieved October 13, 2021.
  73. "550 Washington Street Redevelopment, New York City Copy". view.ceros.com. Retrieved October 13, 2021.
  74. 1 2 Stabile, Tom (September 14, 2020). "$1B NYC Google Hub Project Takes Cues From Bridge Building". Engineering News-Record. Retrieved October 13, 2021.
  75. Varnham O'Regan, Sylvia (February 27, 2020). "Google Office at St. John's Terminal Gets Construction Loan". The Real Deal New York. Retrieved October 13, 2021.
  76. Cunningham, Cathy (February 26, 2020). "Wells Fargo Leading $973M Financing for St. John's Terminal". Commercial Observer. Retrieved October 13, 2021.
  77. "Oxford tops out Google's new digs at St John's Terminal". Real Estate Weekly. November 17, 2020. Retrieved October 13, 2021.
  78. 1 2 Haag, Matthew; Hong, Nicole (September 21, 2021). "Google to Spend $2.1 Billion on Manhattan Office Building". The New York Times. Retrieved September 21, 2021.
  79. Putzier, Konrad (September 21, 2021). "WSJ News Exclusive | Google to Buy New York City Office Building for $2.1 Billion". Wall Street Journal. ISSN   0099-9660 . Retrieved October 13, 2021.
  80. Bagli, Charles V. (December 2, 2010). "Google Signs Deal To Buy Manhattan Office Building". The New York Times . Retrieved December 3, 2010.
  81. Rubin, Ben Fox (March 20, 2018). "Google buys Chelsea Market in New York for $2.4 billion". CNET. Retrieved April 6, 2024.
  82. Lach, Eric (March 5, 2022). "Google's New Manhattan Groundscraper Bets on the Future of the Office". The New Yorker. Retrieved March 29, 2023.
  83. Morris, Sebastian (April 24, 2022). "Oxford Properties Completes $2.1B Sale of St. John's Terminal to Google in Hudson Square, Manhattan". New York YIMBY. Retrieved March 29, 2023.
  84. 1 2 3 4 5 Baird-Remba, Rebecca (February 22, 2024). "Inside Google's New St John's Terminal Office in Hudson Square". Commercial Observer. Retrieved February 23, 2024.
  85. Hughes, C. J. (February 20, 2024). "Google opens massive Hudson Square site as it closes other offices, sheds workers". Crain's New York Business. Retrieved February 23, 2024.
  86. 1 2 3 4 Eberhardt, Ellen (February 21, 2024). "Google opens New York HQ built on renovated 1930s train terminal". Dezeen. Retrieved February 23, 2024.
  87. 1 2 Gannon, Devin (February 21, 2024). "Google opens new NYC office at historic St. John's Terminal". 6sqft. Retrieved February 23, 2024.

40°43′45″N74°00′36″W / 40.7291°N 74.0100°W / 40.7291; -74.0100