USS Baton Rouge

Last updated

USS BR2.jpg
History
Flag of the United States.svgUnited States
NameUSS Baton Rouge
Namesake Baton Rouge, Louisiana
Awarded8 January 1971
Builder Newport News Shipbuilding
Laid down18 November 1972
Launched26 April 1975
Sponsored byMrs. F. Edward Hebert
Commissioned25 June 1977
Decommissioned13 January 1995
Stricken13 January 1995
FateSubmarine recycling
Badge USS Baton Rouge SSN-689.png
General characteristics
Class and type Los Angeles-class submarine
Displacement
  • 5,723 tons (surfaced)
  • 6,927 tons (submerged) [1]
Length110.3 m (361 ft 11 in)
Beam10 m (32 ft 10 in)
Draft9.4 m (30 ft 10 in)
Propulsion S6G nuclear reactor, 2 turbines, 35,000 hp (26 MW), 1 auxiliary motor 325 hp (242 kW), 1 shaft
Speed
  • 15 knots (28 km/h) surfaced
  • 33 knots (61 km/h) submerged 35 knots
Test depth290 m (950 ft)
Complement12 officers; 98 enlisted
Armament

USS Baton Rouge (SSN-689) was a Los Angeles-class nuclear-powered attack submarine which served with the United States Navy. With her keel laid down on 18 November 1972, Baton Rouge was launched on 26 April 1975. She became the second Los Angeles-class submarine to be commissioned, on 25 June 1977. In 1995, she was the first of her class to be decommissioned, after a collision with a Russian Sierra-class submarine.

Contents

Baton Rouge was the first and currently only ship of the United States Navy to be named for Baton Rouge, Louisiana.

Design

Mk 48 torpedo maintenance 1982.JPEG
Tomahawk Block IV cruise missile -crop.jpg
Harpoon launched by submarine.jpg
The three main weapons of Los Angeles-class submarines, and thus Baton Rouge, are the Mark 48 torpedo (top), the Tomahawk cruise missile (middle), and the Harpoon anti-ship missile (bottom).

Baton Rouge was a nuclear attack submarine and, as such, was optimized for anti-submarine warfare (ASW) and strike operations. [2] To this end, she carried a complement of 26 weapons, including the Mark 48 ADCAP torpedoes – the main weapon of U.S. Navy submarines, Harpoon anti-ship missiles and subsonic Tomahawk cruise missiles. The latter has a range of either 280 or 1,600 miles (450 or 2,500 km), depending on whether it is anti-ship or strike variant, and is nuclear-compatible, although this capability is normally not deployed on Los Angeles-class submarines. [2] Since the boat did not incorporate the vertical launching system found on later Los Angeles-class submarines, the Harpoons and Tomahawks were torpedo tube-launched. Baton Rouge can also lay Mobile Mark 67 and Mark 60 CAPTOR mines. [2]

The boat's propulsion system comprised a S6G pressurized-water reactor based on the D2G reactor of the Bainbridge and Truxtun classes of cruiser. [3] Heat produced from the S6G reactor converted water into steam, powering two turbines, and thus the propeller shaft (see Nuclear marine propulsion ). Although the U.S. Navy discloses the boat's submerged speed to be "25+ knots (28+ miles per hour; 46.3+ km/h)," [4] non-military sources have claimed that Los Angeles-class submarines' top speed to be in excess of 33 knots (38 mph; 61 km/h). [5] The nuclear reactor fuel load had a lifespan of ten years. [2]

A crucial component in Baton Rouge's ability to perform her mission were the comprehensive defensive, navigational and sonar systems. Among her several sonar sets were the TB-23/29 thin line passive towed array sonar, the Ametek BQS 15 close range high frequency active sonar and the Raytheon SADS-TG active detection sonar. These systems collaborated to give Baton Rouge good situational awareness. [2] The boat's electronic support measures included a direction finding system, interceptor and a radar warner. [2]

Construction and commissioning

The contract to build Baton Rouge was awarded to Newport News Shipbuilding of Newport News, Virginia, on 8 January 1971, and her keel was laid down on 18 November 1972. [6] Launched on 26 April 1975 in the presence of sponsor Mrs. Felix Edward Hebert, wife of the United States representative from the first district and the former chairman of the House Armed Services Committee, Baton Rouge was commissioned on 25 June 1977. [1] [7]

Based at Norfolk and assigned to Submarine Squadron 8, Baton Rouge's immediate history following the commissioning was characterized by shakedown training in New London, Connecticut, among other tests. During 5–29 July, she performed drills off the New England coast, returning to Norfolk for a month-long post-shakedown upkeep. [1] From September 1977 to August 1978, she participated in numerous other tests, such as acoustic trials in Exuma Sound, The Bahamas, and weapons tests off Port Everglades, Florida. During this time, she returned periodically to Norfolk, and docked alongside USS L. Y. Spear, for upkeep, the longest of which spanned from February to August. [1]

Operational history

In preparations for her first overseas assignment, Baton Rouge was deployed to New London in September for training before returning to Norfolk for last-minute checks prior to the deployment. [1] She left port on 19 October 1978, and raised her first port of call in La Maddalena, Sardinia, on 1 November. Baton Rouge also visited La Spezia and took part in a variety of ASW exercises through the winter of 1978 and 1979. [1]

USS Baton Rouge underway near La Maddalena, Italy on 8 November 1984. USS BR3.jpg
USS Baton Rouge underway near La Maddalena, Italy on 8 November 1984.

The submarine returned to Norfolk from her first overseas assignment in March 1979. After post-deployment stand-down, Baton Rouge resumed normal operations later that year. These included participation in two major ASW exercises and visits to such widely separated places as Fort Lauderdale, Florida, and Halifax, Nova Scotia. [1] In July, she was assigned to Submarine Squadron 8 but continued to use Norfolk as her base of operations. During September–October, Baton Rouge participated in a major NATO exercise – Operation Ocean Safari – which took her across the Atlantic once more and included a call at Rotterdam, the Netherlands. She returned to Norfolk from that mission during the latter part of October and spent the remainder of 1979 in a restricted availability. [1]

In 1980, she was deployed to the Indian Ocean and circumnavigated the earth, passing through the International Date Line and the Panama Canal. For the deployment, she was awarded the Navy Unit Commendation when she arrived in Norfolk. [8] As was the case in the Indian Pacific in 1980, in 1981 Baton Rouge again came under the command of Commander in Chief, Atlantic Fleet (CINCLANTFLT), after which she received the Meritorious Unit Commendation. [8] For the third time, Baton Rouge came under the command of CINCPACFLT when she made her second deployment to the Mediterranean Sea. [8]

In the mid-1980s, the boat underwent an eighteen-month overhaul at the Norfolk Naval Shipyard. The overhaul, which ended in spring 1986, saw the addition to Baton Rouge the AN/BQQ-5C sonar system, the CCS Mk-1 digital fire-control system, and the ESGN navigation system. [8] She made her third deployment to the Mediterranean in November 1986, and her fourth in January 1990. [8] Between these two assignment, Baton Rouge conducted a deployment to the North Atlantic, and was awarded her second Meritorious Unit Commendation. [8]

Collision with the Kostroma

USS Baton Rouge prior to deactivation in 1995 USS BR1.jpg
USS Baton Rouge prior to deactivation in 1995

At 20:16 local time on 11 February 1992, while on patrol off Kildin Island near Severomorsk, Baton Rouge collided with the Russian Sierra-class attack submarine K-276 Kostroma. [9] The United States Navy stated that the collision occurred more than 12 miles (22 km) from the shore, in international waters. [9] Initially the U.S. Navy denied any damage suffered by Baton Rouge, but it was later disclosed that the boat suffered two cuts, as well as dents and scrapes. [10] Kostroma was fully repaired by 29 June 1992 and continues in service to this day, [11] while Baton Rouge was removed from service soon afterward. "Baton Rouge" was repaired to be 100% operational after the accident. The Navy was looking to make cuts in all classes of vessels at the time. Baton Rouge was just unlucky enough to be decommissioned for this reason. This is recorded in Russian navy lore as a victory and the Kostroma crew painted the number "1" bordered by a star on the sail, as did Soviet submarines during World War II to indicate the number of their victories.

Decommissioning

Less than two years later, on 1 November 1993, Baton Rouge was placed in commission in reserve. On 13 January 1995, she became the first Los Angeles-class submarine to be decommissioned and stricken from the Naval Vessel Register, after less than 18 years in commission. As part of post-Cold War restructuring, the U.S. Navy decided to decommission 14 of the first 31 ships in the Los Angeles-class instead of refueling them, most at between 17 and 19 years of service. Some of Baton Rouge's sister ships served for 35 years or more after refueling. Ex-Baton Rouge entered the Nuclear Powered Ship-Submarine Recycling Program and ceased to exist on 30 September 1997.

Related Research Articles

<i>Seawolf</i>-class submarine Class of US nuclear attack submarines

The Seawolf class is a class of nuclear-powered, fast attack submarines (SSN) in service with the United States Navy. The class was the intended successor to the Los Angeles class, and design work began in 1983. A fleet of 29 submarines was to be built over a ten-year period, but that was reduced to 12 submarines. The end of the Cold War and budget constraints led to the cancellation of any further additions to the fleet in 1995, leaving the Seawolf class limited to just three boats. This, in turn, led to the design of the smaller Virginia class. The Seawolf class cost about $3 billion per unit, making it the most expensive United States Navy fast attack submarine and second most expensive submarine ever, after the French Triomphant-class nuclear-powered ballistic missile submarines.

The Ship-Submarine Recycling Program (SRP) is the process that the United States Navy uses to dispose of decommissioned nuclear vessels. SRP takes place only at the Puget Sound Naval Shipyard (PSNS) in Bremerton, Washington, but the preparations can begin elsewhere.

USS <i>Dallas</i> (SSN-700) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Dallas (SSN-700) is a Los Angeles-class nuclear-powered attack submarine of the United States Navy. She was the Navy's second vessel of that name, and the first to be named after the city of Dallas, Texas, although another two ships were scheduled but never completed. On 4 April 2018, after nearly 37 years of commissioned service, the boat was decommissioned at the Controlled Industrial Area of Puget Sound Naval Shipyard. The defueled vessel will eventually undergo recycling.

USS <i>Augusta</i> (SSN-710) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Augusta (SSN-710), a Los Angeles-class submarine, was the first ship of the United States Navy to be named for Augusta, Maine. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 31 October 1973 and her keel was laid down on 1 April 1983. She was launched on 21 January 1984 sponsored by Mrs. Diana D. Cohen, wife of U.S. Senator William Cohen and commissioned on 19 January 1985.

USS <i>Narwhal</i> (SSN-671) Submarine of the United States

USS Narwhal (SSN-671), a unique submarine, was the third vessel of the United States Navy to be named for the narwhal, a gray and white arctic whale with a unicorn-like, ivory tusk.

USS <i>Louisville</i> (SSN-724) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Louisville (SSN-724), a Los Angeles-class submarine, is the fourth ship of the United States Navy to be named for Louisville, Kentucky. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 11 February 1982 and her keel was laid on 24 September 1984. She was launched on 14 December 1985—sponsored by Mrs. Betty Ann McKee, wife of Admiral Kinnaird McKee, Director of Naval Nuclear Propulsion —and commissioned on 8 November 1986 with Captain Charles E. Ellis in command.

USS <i>Skipjack</i> (SSN-585) Submarine of the United States

USS Skipjack (SSN-585), the lead ship of her class of nuclear-powered attack submarine, was the third ship of the United States Navy to be named after the skipjack tuna.

USS <i>Phoenix</i> (SSN-702) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Phoenix (SSN-702), a Los Angeles-class submarine, was the fifth ship of the United States Navy to be named "Phoenix" and the third to be named after the city, Phoenix, Arizona. The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 31 October 1973, and her keel was laid down on 30 July 1977. She was launched on 8 December 1979, sponsored by Mrs. Betty Harvey Rhodes, wife of Congressman John J. Rhodes, and commissioned on 19 December 1981.

USS <i>San Francisco</i> (SSN-711) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS San Francisco (SSN-711) is a Los Angeles-class nuclear submarine, the third ship or boat of the United States Navy to be named for San Francisco, California.

USS <i>Portsmouth</i> (SSN-707) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Portsmouth (SSN-707) is a decommissioned Los Angeles-class submarine. She was the fourth ship of the United States Navy to be named for Portsmouth, New Hampshire.

USS <i>Bergall</i> (SSN-667) Submarine of the United States

USS Bergall (SSN-667), a Sturgeon-class attack submarine, was the second ship of the United States Navy to be named for the bergall, a small fish found along the Atlantic coast of North America from the Chesapeake Bay to Labrador.

USS <i>Atlanta</i> (SSN-712) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Atlanta (SSN-712), a Los Angeles-class submarine, was the fifth ship of the United States Navy to be named for Atlanta, Georgia. The contract to build her was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia, on 1 August 1975 and her keel was laid down on 17 August 1978. She was launched on 16 August 1980 sponsored by Mrs. Sam Nunn, and commissioned on 6 March 1982, with Commander Robin J. White in command.

USS <i>Jacksonville</i> Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Jacksonville (SSN-699), a nuclear powered Los Angeles-class attack submarine, is the only vessel of the United States Navy to be named for Jacksonville, Florida.

USS <i>Norfolk</i> (SSN-714) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Norfolk (SSN-714), a Los Angeles-class attack submarine, was the third ship of the United States Navy to be named for Norfolk, Virginia.

USS <i>Buffalo</i> (SSN-715) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Buffalo (SSN-715) was a Los Angeles-class submarine, the second vessel that actively served the United States Navy to be named for Buffalo, New York. The contract to build her was awarded to Newport News Shipbuilding and Dry Dock Company in Newport News, Virginia on 23 February 1976, and her keel was laid down on 25 January 1980. She was launched on 8 May 1982 sponsored by Mrs. Joanne Kemp, wife of former Buffalo Bills quarterback and New York's 31st congressional district representative Jack Kemp, who was credited with winning approval to name the ship after the city in his district. Buffalo was commissioned on 5 November 1983, with Commander G. Michael Hewitt in command. Buffalo was decommissioned on 30 January 2019 after 35 years of service.

USS <i>Pasadena</i> (SSN-752) Los Angeles-class nuclear-powered attack submarine of the US Navy

USS Pasadena (SSN-752) is a Los Angeles-class submarine and the third ship of the United States Navy to be named for Pasadena, California.

USS <i>New Mexico</i> (SSN-779) US Navy Virginia-class submarine

USS New Mexico (SSN-779) is a Virginia-class nuclear powered fast-attack submarine of the United States Navy. She is the second U.S. warship named for the 47th state, after the early twentieth century super-dreadnought,USS New Mexico (BB-40).

<span class="mw-page-title-main">Submarine incident off Kildin Island</span> 1992 US–Russia nuclear submarine collision

The submarine incident off Kildin Island was a collision between the US Navy nuclear submarine USS Baton Rouge and the Russian Navy nuclear submarine B-276 Kostroma near the Russian naval base of Severomorsk on 11 February 1992. The incident occurred while the US unit was engaged in a covert mission, apparently aimed at intercepting Russian military communications. Although most sources claim that the American submarine was trailing her Russian counterpart, some authors believe that neither Kostroma nor Baton Rouge had been able to locate each other before the collision.

<span class="mw-page-title-main">Submarine incident off Kola Peninsula</span> 1993 maritime accident

The submarine Incident off Kola Peninsula was a collision between the US Navy nuclear attack submarine USS Grayling and the Russian Navy nuclear ballistic missile submarine K-407 Novomoskovsk some 150 km (90 mi) north of the Russian naval base of Severomorsk, on 20 March 1993. The incident took place when the American submarine, who was trailing her Russian counterpart, lost track of Novomoskovsk. At the time that Grayling reacquired the other submarine, the short distance of only half-mile made the collision unavoidable. The incident happened just a week before the first summit between American president Bill Clinton and the president of the Russian Federation, Boris Yeltsin.

<span class="mw-page-title-main">Moored training ship</span>

A moored training ship (MTS) is a United States Navy nuclear powered submarine that has been converted to a training ship for the Naval Nuclear Power Training Command's Nuclear Power Training Unit (NPTU) at Naval Support Activity Charleston in South Carolina. The NPTU is part of the Navy's Nuclear Power School at Goose Creek, S.C. The Navy uses decommissioned nuclear submarines and converts them to MTSs to train personnel in the operation and maintenance of submarines and their nuclear reactors. The first moored training ship was USS Sam Rayburn (SSBN-635) a James Madison-class fleet ballistic missile submarine, redesignated as (MTS-635) in 1989, followed a year later by USS Daniel Webster (SSBN-626), a Lafayette-class ballistic missile submarine, redesignated as (MTS-626). Conversion of these two boats took place at the Charleston Naval Shipyard and modifications included special mooring arrangements with a mechanism to absorb power generated by the main propulsion shaft.

References

This article includes information collected from the public domain sources Dictionary of American Naval Fighting Ships and Naval Vessel Register .

  1. 1 2 3 4 5 6 7 8 Mann, Raymond A.; Cressman, Robert J. (28 February 2006). "Baton Rouge". US Navy. Archived from the original on 7 November 2012. Retrieved 4 January 2012.
  2. 1 2 3 4 5 6 "USS Helena (SSN-725)". Naval Technology. Retrieved 5 January 2012.
  3. "Los Angeles class". Military-today.com. Retrieved 5 January 2012.
  4. "U.S. Navy Fact Sheet: Attack Submarines – SSN". US Navy. Retrieved 5 January 2012.
  5. Mount, Mike (22 January 2005). "Officials: U.S. submarine hit undersea mountain". CNN. Retrieved 5 January 2012. The U.S. Navy submarine accident that killed one sailor and injured 24 others occurred when the vessel – traveling at high speed – hit an undersea mountain head-on... The commander of the USS San Francisco, Kevin Mooney, has not been relieved of duty... The submarine was traveling in excess of 33 knots – about 35 mph – when its nose hit the undersea formation head-on, officials said.
  6. "Baton Rouge (SSN-689)". Naval Vessel Register . 1 March 1999. Retrieved 4 January 2012.
  7. "Commissioning of the Nuclear-Powered Attack Submarine USS Baton Rouge" (PDF). US Navy. Retrieved 6 January 2012.
  8. 1 2 3 4 5 6 "USS Baton Rouge (SSN 689)". Navysite.de. Retrieved 5 January 2012.
  9. 1 2 Miasnikov, Eugene (April 1993). "Submarine Collision off Murmansk: A Look from Afar". Center for Arms Control, Energy and Environmental Studies. The Submarine Review: 6–14.
  10. "Pentagon Describes Damage To Sub After Arctic Collision". The New York Times. 28 February 1992. Retrieved 6 January 2011. Navy divers had discovered two cuts, as well as dents and scrapes, in the hull of [the] submarine that collided with a Commonwealth of Independent States submarine on 11 Feb.... The Pentagon previously said the Baton Rouge...had not been damaged in the collision...
  11. Yanko, Eugene (2009). "945 Sierra Class". Warfare.ru.