STS-92

Last updated

STS-92
MS Wisoff and Z1 Truss Berthing.jpg
Wisoff oversees the Z1 truss (top) being mated with the zenith port of Unity (bottom) during EVA 2
Names Space Transportation System-100
Mission typeISS assembly
Operator NASA
COSPAR ID 2000-062A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 26563
Mission duration12 days, 21 hours, 43 minutes, 47 seconds
Spacecraft properties
Spacecraft Space Shuttle Discovery
Launch mass115,127 kilograms (253,812 lb)
Landing mass92,741 kilograms (204,459 lb)
Payload mass9,513 kilograms (20,973 lb)
Crew
Crew size7
Members
Start of mission
Launch date11 October 2000, 23:17:00 (2000-10-11UTC23:17Z) UTC
Launch site Kennedy LC-39A
End of mission
Landing date24 October 2000, 20:59:47 (2000-10-24UTC20:59:48Z) UTC
Landing site Edwards, Runway 22
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee altitude 386 kilometres (240 mi)
Apogee altitude 394 kilometres (245 mi)
Inclination 51.60 degrees
Period 92.3 min
Docking with ISS
Docking port PMA-2
(Unity forward)
Docking date13 October 2000, 17:45 UTC
Undocking date20 October 2000, 15:08 UTC
Time docked6 days, 21 hours, 23 minutes
Sts-92-patch.svg STS-92 crew.jpg
Left to right - Front: Melroy, Duffy; Back: Chiao, Lopez-Alegria, McArthur, Wisoff, Wakata
  STS-106 (99)
STS-97 (101) 
 

STS-92 was a Space Shuttle mission to the International Space Station [1] (ISS) flown by Space Shuttle Discovery. STS-92 marked the 100th mission of the Space Shuttle. It was launched from Kennedy Space Center, Florida, 11 October 2000. [2]

Contents

Crew

Position Astronaut
Commander Flag of the United States.svg Brian Duffy [3]
Fourth and last spaceflight
Pilot Flag of the United States.svg Pamela A. Melroy [4]
First spaceflight
Mission Specialist 1 Flag of Japan.svg Koichi Wakata [5] , JAXA
Second spaceflight
Mission Specialist 2 Flag of the United States.svg William S. McArthur [6]
Third spaceflight
Mission Specialist 3 Flag of the United States.svg Peter J.K. Wisoff [7]
Fourth and last spaceflight
Mission Specialist 4 Flag of Spain.svg / Flag of the United States.svg Michael E. López-Alegría [7]
Second spaceflight
Mission Specialist 5 Flag of the United States.svg Leroy Chiao [8]
Third spaceflight

Spacewalks

Mission highlights

Launch of STS-92 STS-92 launch.jpg
Launch of STS-92
Discovery lands at Edwards Air Force Base, 24 October 2000. STS-92 landing.jpg
Discovery lands at Edwards Air Force Base, 24 October 2000.
Illustration of the ISS after STS-92. Z1assembly.jpg
Illustration of the ISS after STS-92.

STS-92 was an ISS assembly flight that brought the Z1 truss, Control Moment Gyros, Pressurized Mating Adapter-3 (PMA-3) (mounted on a Spacelab pallet) and two DDCU (Heat pipes) to the space station. [1]

The Z1 truss was the first exterior framework installed on the ISS and allowed the first U.S. solar arrays to be temporarily installed on Unity for early power during flight 4A. The Ku-band communication system supported early science capabilities and U.S. television on flight 6A. The CMGs (Control Moment Gyros) weigh about 27 kilograms (60 lb) and provide non-propulsive (electrically powered) attitude control when activated on flight 5A, and PMA-3 provides shuttle docking port for solar array installation on flight 4A and Destiny Lab installation on flight 5A.

The mission included seven days of docked operations with the space station, four EVAs, and two ingress opportunities.

Over the course of four scheduled spacewalks, two teams of space walkers and an experienced robot arm operator collaborated to install the Z1 (Z for zenith port) truss structure on top of the U.S. Unity connecting node on the growing station and to deliver the third Pressurized Mating Adapter (PMA 3) to the ISS for the future berthing of new station components and to accommodate shuttle dockings.

The Z1 truss was the first permanent lattice-work structure for the ISS, very much like a girder, setting the stage for the future addition of the station's major trusses or backbones. The Z1 fixture also served as the platform on which the huge U.S. solar arrays were mounted on the next shuttle assembly flight, STS-97. The Z1 truss included many elements of the Communications and Tracking subsystem. The hardware included a Transmitter/Receiver/Controller (SGTRC) built by L3 Communications Systems-East in Camden, NJ. John Schina was the Chief Engineer of the ISS Program at L3.

The Z1 contains four large gyroscopic devices, called Control Moment Gyroscope (CMGs), which are used to maneuver the space station into the proper orientation on orbit once they were activated following the installation of the U.S. laboratory.

During the fourth spacewalk, astronauts Wisoff and López-Alegría tested the SAFER jet backpack, flying up to 50 feet while remaining tethered to the spacecraft. [12]

Media

See also

Related Research Articles

<span class="mw-page-title-main">Yuri Malenchenko</span> Russian cosmonaut (born 1961)

Yuri Ivanovich Malenchenko is a retired Russian cosmonaut. Malenchenko became the first person to marry in space, on 10 August 2003, when he married Ekaterina Dmitrieva, who was in Texas, while he was 240 miles (390 km) over New Zealand, on the International Space Station. As of June 2016, Malenchenko ranks second for career time in space due to his time on both Mir and the International Space Station (ISS). He is a former commander of the International Space Station.

<span class="mw-page-title-main">Michael López-Alegría</span> American astronaut

Michael López-Alegría is an astronaut, test pilot and commercial astronaut with dual nationality, American and Spanish; a veteran of three Space Shuttle missions and one International Space Station mission. He is known for having performed ten spacewalks so far in his career, presently holding the second longest all-time EVA duration record and having the fifth-longest spaceflight of any American at the length of 215 days; this time was spent on board the ISS from September 18, 2006 to April 21, 2007. López-Alegría commanded Axiom-1, the first ever all-private team of commercial astronaut mission to the International Space Station, which launched on April 8, 2022 and spent around 17 days in earth's orbit.

<span class="mw-page-title-main">STS-112</span> 2002 American crewed spaceflight to the ISS

STS-112 was an 11-day Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleAtlantis. Space Shuttle Atlantis was launched on 7 October 2002 at 19:45 UTC from the Kennedy Space Center's launch pad 39B to deliver the 28,000 pound Starboard 1 (S1) truss segment to the Space Station. Ending a 4.5-million-mile journey, Atlantis landed at 15:44 UTC on 18 October 2002 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility.

<span class="mw-page-title-main">STS-97</span> 2000 American crewed spaceflight to the ISS

STS-97 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. The crew installed the first set of solar arrays to the ISS, prepared a docking port for arrival of the Destiny Laboratory Module, and delivered supplies for the station's crew. It was the last human spaceflight of the 20th century.

<span class="mw-page-title-main">Expedition 7</span> Long-duration mission to the International Space Station

Expedition 7 was the seventh expedition to the International Space Station.

<span class="mw-page-title-main">STS-116</span> 2006 American crewed spaceflight to the ISS

STS-116 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Discovery. Discovery lifted off on December 9, 2006, at 20:47:35 EST. A previous launch attempt on December 7 had been canceled due to cloud cover. It was the first night launch of a Space Shuttle since STS-113 in November 2002.

<span class="mw-page-title-main">STS-117</span> 2007 American crewed spaceflight to the ISS

STS-117 was a Space Shuttle mission flown by Space Shuttle Atlantis, launched from pad 39A of the Kennedy Space Center on June 8, 2007. Atlantis lifted off from the launch pad at 19:38 EDT. Damage from a hail storm on February 26, 2007, had previously caused the launch to be postponed from an originally-planned launch date of March 15, 2007. The launch of STS-117 marked the 250th orbital human spaceflight.

<span class="mw-page-title-main">STS-118</span> 2007 American crewed spaceflight to the ISS

STS-118 was a Space Shuttle mission to the International Space Station (ISS) flown by the orbiter Endeavour. STS-118 lifted off on August 8, 2007, from launch pad 39A at Kennedy Space Center (KSC), Florida and landed at the Shuttle Landing Facility at KSC on August 21, 2007.

<span class="mw-page-title-main">STS-119</span> 2009 American crewed spaceflight to the ISS

STS-119 was a Space Shuttle mission to the International Space Station (ISS) which was flown by space shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station. The launch took place on March 15, 2009, at 19:43 EDT. Discovery successfully landed on March 28, 2009, at 15:13 pm EDT.

<span class="mw-page-title-main">STS-120</span> 2007 American crewed spaceflight to the ISS

STS-120 was a Space Shuttle mission to the International Space Station (ISS) that launched on October 23, 2007, from the Kennedy Space Center, Florida. The mission is also referred to as ISS-10A by the ISS program. STS-120 delivered the Harmony module and reconfigured a portion of the station in preparation for future assembly missions. STS-120 was flown by Space ShuttleDiscovery, and was the twenty-third Space Shuttle mission to the ISS.

<span class="mw-page-title-main">STS-129</span> 2009 American crewed spaceflight to the ISS

STS-129 was a NASA Space Shuttle mission to the International Space Station (ISS). Atlantis was launched on November 16, 2009, at 14:28 EST, and landed at 09:44 EST on November 27, 2009, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. It was also the last Shuttle mission of the 2000s.

<span class="mw-page-title-main">STS-131</span> 2010 American crewed spaceflight to the ISS

STS-131 was a NASA Space Shuttle mission to the International Space Station (ISS). Space ShuttleDiscovery launched on April 5, 2010, at 6:21 am from LC-39A, and landed at 9:08 am on April 20, 2010, on runway 33 at the Kennedy Space Center's Shuttle Landing Facility. The mission marked the longest flight for Space Shuttle Discovery.

<span class="mw-page-title-main">STS-132</span> 2010 American crewed spaceflight to the ISS

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on May 16, 2010. STS-132 was launched from the Kennedy Space Center on May 14, 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on May 26, 2010.

<span class="mw-page-title-main">Expedition 15</span>

Expedition 15 was the 15th expedition to the International Space Station (ISS). Four crew members participated in the expedition, although for most of the expedition's duration only three were on the station at any one time. During Expedition 15, the ISS Integrated Truss Structure was expanded twice: STS-117 brought the S3/S4 truss, and STS-118 brought the S5 truss.

<span class="mw-page-title-main">Integrated Truss Structure</span> Part of the International Space Station; sequence of connected trusses

The Integrated Truss Structure (ITS) of the International Space Station (ISS) consists of a linear arranged sequence of connected trusses on which various unpressurized components are mounted such as logistics carriers, radiators, solar arrays, and other equipment. It supplies the ISS with a bus architecture. It is approximately 110 meters long and is made from aluminum and stainless steel.

<span class="mw-page-title-main">Pressurized Mating Adapter</span> Spacecraft docking adapter

The Pressurized Mating Adapter (PMA) is a class of spacecraft adapters that convert the Common Berthing Mechanism (CBM) used on the US Orbital Segment to APAS-95 docking ports. There are three PMAs located on the International Space Station (ISS); the first two were launched with the Unity connecting module in 1998 aboard STS-88, and the third was launched in 2000 aboard STS-92. All three of the PMAs are now used to permanently connect parts of the ISS, so they are no longer available as docking ports for visiting spacecraft.

<span class="mw-page-title-main">NASA Astronaut Group 13</span>

NASA Astronaut Group 13 was a group of 23 astronauts announced by NASA on 17 January 1990. The group name came from its selection of a black cat as a mascot, to play against the traditional unlucky connotations of the number 13.

<span class="mw-page-title-main">STS-134</span> 2011 American crewed spaceflight to the ISS and final flight of Space Shuttle Endeavour

STS-134 was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space ShuttleEndeavour. This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station. Mark Kelly served as the mission commander. STS-134 was expected to be the final Space Shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation. STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch on Need mission that would have been necessary if the STS-134 crew became stranded in orbit.

<span class="mw-page-title-main">NASA Astronaut Group 16</span> 1996 human spaceflight selection of 44 candidates; "The Sardines"

NASA Astronaut Group 16 was a group of 44 astronauts announced by NASA on May 1, 1996. The class was nicknamed "The Sardines" for being such a large class, humorously implying that their training sessions would be as tightly packed as sardines in a can. These 44 candidates compose the largest astronaut class to date. NASA selected so many candidates in preparation for the anticipated need for ISS crew members, along with regular shuttle needs. Nine of the 44 astronauts selected were from other countries including 5 from Europe and 2 from Canada and Japan.

References

  1. 1 2 Ryba, Jeanne (15 February 2010). "STS-92". Mission Archives. NASA. Archived from the original on 14 March 2022. Retrieved 17 April 2022.
  2. Petty, John Ira (11 October 2000). "STS-92 Mission Control Center Status Report #1". Johnson News. Johnson Space Center. Archived from the original on 8 April 2013. Retrieved 17 April 2022.
  3. Dunn, Marcia (12 October 2000). "100th shuttle mission in orbit". Wisconsin State Journal. Associated Press. p. 3. Archived from the original on 17 April 2022. Retrieved 17 April 2022 via Newspapers.com.
  4. Siceloff, Steven (3 October 2000). "Female shuttle pilot puzzled by attention". Florida Today. p. 11. Archived from the original on 17 April 2022. Retrieved 17 April 2022 via Newspapers.com.
  5. Dunn, Marcia (17 October 2000). "Astronauts attach new docking port". The Courier-News. Associated Press. p. 10. Archived from the original on 17 April 2022. Retrieved 17 April 2022 via Newspapers.com.
  6. Carreau, Mark (18 October 2000). "Setting up for solar energy". South Florida Sun Sentinel. Houston Chronicle. p. 3. Archived from the original on 17 April 2022. Retrieved 17 April 2022 via Newspapers.com.
  7. 1 2 Dunn, Marcia (19 October 2000). "Spacewalkers cruise around". Evansville Courier and Press. Associated Press. p. 4. Archived from the original on 17 April 2022. Retrieved 17 April 2022 via Newspapers.com.
  8. Young, Kelly (18 October 2000). "Astronauts attach power converters". Florida Today. p. 29. Archived from the original on 17 April 2022. Retrieved 17 April 2022 via Newspapers.com.
  9. Petty, John Ira (15 October 2000). "STS-92 Mission Control Center Status Report #9". Johnson News. Johnson Space Center. Archived from the original on 8 April 2013. Retrieved 17 April 2022.
  10. Petty, John Ira (16 October 2000). "STS-92 Mission Control Center Status Report #11". Johnson News. Johnson Space Center. Archived from the original on 8 April 2013. Retrieved 17 April 2022.
  11. Petty, John Ira (17 October 2000). "STS-92 Mission Control Center Status Report #13". Johnson News. Johnson Space Center. Archived from the original on 8 April 2013. Retrieved 17 April 2022.
  12. 1 2 Petty, John Ira (18 October 2000). "STS-92 Mission Control Center Status Report #15". Johnson News. Johnson Space Center. Archived from the original on 8 April 2013. Retrieved 17 April 2022.