1999 Wuppertal Schwebebahn accident

Last updated • 12 min readFrom Wikipedia, The Free Encyclopedia
1999 Wuppertal Schwebebahn accident
12. April 1999 - Ganz Wuppertal steht unter Schock.jpg
Scene of the incident, where a train fell onto a steam pipeline.
1999 Wuppertal Schwebebahn accident
Details
Date12 April 1999;24 years ago (1999-04-12)
Location Wuppertal, Germany
CauseTrain struck maintenance equipment left on tracks by rail workers.
Statistics
Trains1
Deaths5 (3 in wreck; 2 succumbed to injuries)
Injured47

The Wuppertal Schwebebahn accident (German: Schwebebahnunfall) took place on 12 April 1999 on a stretch of track near Robert-Daum-Platz station. The accident, involving car number 4 from the WSW GTW 72 series, killed five people and injured 47, some of them seriously. It remains the worst accident in the railway's history and the only one since the railway opened in 1901 to have had a deadly outcome.

Contents

Circumstances

The articulated train involved in the accident was travelling near kilometre 7 on the suspension railway's route at about 5:45 am local time at a speed of roughly 50 km/h (30 mph) when it struck a steel component (a "claw fastener") that had temporarily been attached to the running rail on the overhead track. The impact tore the lead bogie, the first of four, off the train's roof. The vehicle next leant over to the right, derailed, and then fell almost 10 m (30 ft) into the River Wupper. The train's front section came down on a bridge carrying steam heating pipes across the Wupper, breaking it in the middle. The bogie that had been torn off on impact at first remained up on the track, but quickly came off and fell down on the train, breaking through the vehicle's body. [1]

Rescue efforts

The accident site in 2005; the steam pipe bridge can be seen in the background. Schweb02012006-022.JPG
The accident site in 2005; the steam pipe bridge can be seen in the background.
A view of the accident scene from the riverbank in 2016 looking towards Pestalozzistrasse station, in the direction from which the train came. Wuppertal 2016 Wupperweg 060.jpg
A view of the accident scene from the riverbank in 2016 looking towards Pestalozzistraße station, in the direction from which the train came.

Employees from the firm ELBA, which stood alongside the river and the track, climbed over a scaffold in the river after hearing the loud bang and began the efforts to save the victims. The train's driver, who was himself injured, also helped to rescue the passengers. According to a resident who called the emergency services to report the accident, his report was at first met with laughter from the dispatcher on the telephone, as it was considered inconceivable for a Schwebebahn train to fall off the overhead track, and nobody had ever died in an accident on this railway, which was thus said to be the world's safest. [2]

In the end, more than 150 firefighting and ambulance personnel were on hand, along with twelve emergency physicians, to rescue and treat the injured at the site, which could only be reached with difficulty. Even clergymen were called into service to minister to those who were suffering from psychological shock.

The injured were taken to two nearby buildings and a tent set up by the firefighters in an underpass. Further gathering points for the injured were set up at a factory and in a quickly built tent city at a carpark. Conference rooms on the ground floor at a bank became a field hospital. A nearby hospital, the Ferdinand-Sauerbruch-Klinikum (now called the Helios Universitätsklinikum Wuppertal), was the first to admit patients from the accident scene. Meanwhile, the city square Robert-Daum-Platz, where Bundesstraße 7 and Landesstraße 427 cross, became an emergency landing pad for three rescue helicopters. At the Städtisches Klinikum Barmen (another hospital, now also part of the Helios Universitätsklinikum Wuppertal), all routine operations were postponed and all available doctors were pressed into emergency service. Within three hours of the accident, all 47 of the injured, suffering from broken bones, bruises and lacerations, found themselves at hospitals in Wuppertal, Remscheid and Solingen. Two men were recovered from the wreck dead, while a woman's body was only recovered hours later after the river had borne it downstream from the accident site. Two other passengers later succumbed to their injuries. [3] [4]

Recovery efforts

First, the affected stretch of the overhead track and the trainwreck in the river were seized by order of the public prosecutor's office (Staatsanwaltschaft). The recovery of the fallen suspension railway train was readied on 13 April 1999 and proceeded only with great difficulty. It turned out that an emergency laneway next to an office-residential building could not be used for the needed 300-metric-ton crane because an underground garage presented stability problems. Across the Wupper lay the grounds of the firm ELBA, which offered an alternative, although the direct path to the accident scene was blocked by a production building. Nevertheless, during that day, the crane was positioned there and an excavator was lowered into the Wupper. To prepare for the actual recovery, the steel truss carrying the steam pipes, onto which the suspension railway train had fallen, had to be taken apart. Meanwhile, several halogen floodlights were mounted on the overhead track and a police light mast vehicle was brought to the scene. As evening set in, the recovery scene was brightly lit. The work went on through the night into 14 April 1999. From the 22-metric-ton articulated train, the first bits to be lifted out of the river were three bogies each weighing roughly 3½ metric tons. These were lifted with the crane during the day over the ELBA work buildings and onto an articulated truck waiting on Ernststraße (street), which had been closed for the occasion. The fourth bogie, the one that had been torn off the train's roof in the accident and had fallen into the passenger compartment, had to be recovered later. The tail end of the articulated train could now be freed and lifted out of the riverbed. In work that took until evening, the whole train was lifted out of the Wupper after having been taken apart into three pieces. These were then transported to one of the halls at the Generaloberst-Hoepner-Kaserne (barracks) on Lichtscheid, Wuppertal's highest hill. The section of rail from the overhead track onto which the fateful claw fastener was attached was removed to a place for safekeeping on Friday 16 April 1999. [5]

Investigations

Beginning in November 1997, in the course of renovation work in the leadup to the Schwebebahn's centenary in 2001, each weekend was spent completely replacing the railway's weightbearing structure. The steel claw fastener that was attached to the guide rail served to stabilize the overhead track during this work. On the night before the accident, work had ended during which parts of the overhead track, a few piers from the accident site, had been replaced. The night's work lagged so far behind schedule that the work site was left only ten minutes before the morning's first train from the Vohwinkel direction came along. The workers were apparently in such a hurry that they forgot to remove the claw fastener.

The Technischer Überwachungsverein (TÜV) Rheinland/Berlin-Brandenburg was authorized to investigate and examine the whole process of the renovations on the stretch of the line from Pestalozzistraße station to Ohligsmühle station (each one stop from Robert-Daum-Platz station, the nearest to where the accident happened) from 9 to 12 April 1999 from the time when they began until the line was ready for use, and the documentation relating thereto, [6] as well as the established organization for verifying safe suspension railway operation after completion of periodic building in which replacement work is done on sections of the overhead track. [5]

In the subsequent proceedings, it became clear that the train's fall from the track did not arise from a technical defect or a systemic error. Instead the accident had been caused by careless disassembly work towards the end of that night's shift, and deficient oversight of this work. A test run that could have prevented the accident was neither planned nor prescribed by law.

Judicial consequences

At the Wuppertal State Court (Landgericht), the prosecutor, Rolf Mayer, put it to the defendants, three Wuppertal City Works Corporation (WSW Wuppertaler Stadtwerke, or WSW for short) employees along with four fitters and their foreman from Lavis GmbH, the Aschaffenburg company contracted to do the renovation work on Suspension Railway, [7] that carelessness had led to the accident. He further said that the four fitters had let every care slip when they had not removed the claw fastener from the overhead track, and that the other defendants had failed to make sure that the line was in good condition for use, despite having had the responsibility to do just that. The fitters' foreman told the court that he could not rule out the possibility of "unwittingly having made a mistake". He could not, he said, oversee all the work being done. The fitters had clearly been assigned the job of removing the claw. "I can limit myself during supervisory duties to spot checks only," he further said. He had to rely on the fitters, among whom were "experienced men", for this was, according to him, necessary. The two accused WSW inspectors who in the end had given the green light for the suspension railway to begin running on the morning in question, for their part, told the court that they had not been able to see the claw on the track because it had been too dark at the time and they had had no portable light. The works manager who had developed the safety scheme for the renovation work told the court, "I complied to the full extent with my duties," to which Mayer responded with a suggestion that the manager's safety scheme had been inadequate. The four fitters had nothing to say in response. Many of the surviving victims were on hand for the proceedings, including at least one who had been left with permanent mobility issues arising from injuries in the accident. [8]

The accused who was responsible for the safety scheme, the works manager, and the workers who were responsible for dismantling certain equipment in the area of the accident, including the claw fitting, were each acquitted by the State Court, partly for legal reasons, partly on factual grounds. The accused who were responsible for technical or building work oversight, but who nevertheless did not carry out their supervisory functions in accordance with standards, were each found guilty by the State Court of negligent homicide in five legally concurrent cases in coincidence with negligent bodily harm in 37 legally concurrent cases, and sentenced to probation.

In the ruling handed down by the Federal Court of Justice (Bundesgerichtshof) on 31 January 2002 (4 StR 289/01), the Federal Court upheld the State Court's guilty verdicts against those who were responsible for technical or building work oversight, and the foreman's acquittal. However, after an appeal from the prosecutor's office and a third party, the Federal Court overturned the fitters' acquittals, saying that the State Court had made a legal error by dividing what was an instance of collective responsibility into separate ones by applying the "principle of reliance" (Vertrauensgrundsatz). [9]

The case as it related to the acquitted defendants was sent back to another chamber at the Wuppertal State Court. In these proceedings, one of the workers was sentenced to four months' probation, while the administrative fine of €500 to which the other three had been sentenced was suspended. [10]

The WSW, as the suspension railway's operator, paid some DM  1.3 million in damages, for pain and suffering, for medical treatment and for burial costs, as well as for specialists to help the bereaved and others affected by the accident overcome their psychological trauma. The total cost to the Corporation from the Wuppertal Suspension Railway accident ran to well over DM 8 million. [5] In a press release dated 30 September 2000, the WSW acknowledged that the Wuppertal Suspension Railway accident had badly affected some people's health and psychological wellbeing, not only victims in the accident itself, but also their kin. The WSW also declared in the release that in future it would lend those affected any conceivable help in the form of counselling, support and financial compensation, even after the legal proceedings were over. This included two telephone numbers at which callers could speak to advisers. An ombudsman was appointed to help those affected in their dealings with all questions relating to the accident's consequences. The release also dealt with questions about safety raised at the legal proceedings. While admitting that the improvements to the safety plan that had been introduced in June 1999, only two months after the accident, could not yet properly be evaluated – the responsibility for that lay with the Technical Oversight Authority (Technische Aufsichtsbehörde) in the local Regierungsbezirk  – the WSW also pointed out that questions raised in court repeatedly about the train's and the track's safety had to be seen alongside the lack of any such deficiencies that could be found by an expert consultant hired by the public prosecutor's office (Staatsanwaltschaft). The release ended with the WSW stating that it would not comment on the court’s guilty verdicts against the accused. [11]

Technical consequences

Repair work was undertaken by WSW suspension railway workshop employees once extensive structural evaluations of overhead track support installation and of the effects wrought by the accident itself on the overhead track had been done by outside engineering consultants and other experts. Many safety tests were undertaken, among them a special inspection of the whole overhead track, including supports and test runs with the five articulated trains that since the accident had been the main and secondary foci of attention among the rolling stock. Extensive shunting work was necessary at the line's two termini, Vohwinkel and Oberbarmen to bring the trains into working order. [5]

Preparatory work for the repairs to the damaged parts of the overhead track at the accident site was begun on 31 May 1999, after the crane needed for replacing overhead track parts had been set up on ELBA's property a few days earlier. The actual repair work, involving the replacement of roughly 5 m (16 ft) of rail support, running rail and current rail, began at midday on 2 June 1999. It is now established practice to do test runs after such work, even if this is still not required by law. The Schwebebahn was opened back up to the public on 8 June 1999, some eight weeks after the accident. [5] After being examined, the piece of rolling stock damaged in the accident, car number 4, was scrapped and not replaced. [12]

Public memorials

Memorial plaque at Robert-Daum-Platz station Schwebebahnstation Robert-Daum-Platz 13 ies.jpg
Memorial plaque at Robert-Daum-Platz station
Memorial plaque at the accident site Wuppertal 2016 Wupperweg 056.jpg
Memorial plaque at the accident site

On 12 April 2000, the first anniversary of the fateful day, Wuppertal's chief mayor (Oberbürgermeister) Hans Kremendahl and WSW's chairman of the board Rolf Krumsiek unveiled a memorial plaque to the victims of the accident. It can be found at Robert-Daum-Platz station. [5] Later, on 18 April 2009, days after the accident's tenth anniversary, another memorial plaque was unveiled at a spot much nearer the accident site, on the north bank of the Wupper, a few metres (yards) from the steam pipe bridge onto which the train fell (and which has since been repaired). [13]

Related Research Articles

<span class="mw-page-title-main">Wuppertal</span> City in North Rhine-Westphalia, Germany

Wuppertal is a city in North Rhine-Westphalia, the most populous state of Germany. With a population of approximately 355,000, Wuppertal is the seventh-largest city in North Rhine-Westphalia as well as the 17th-largest city in Germany. It was founded in 1929 by the merger of the cities and towns of Elberfeld, Barmen, Ronsdorf, Cronenberg and Vohwinkel, and was initially "Barmen-Elberfeld" before adopting its present name in 1930. It is regarded as the capital and largest city of the Bergisches Land.

<span class="mw-page-title-main">Elberfeld</span> Municipality in Germany

Elberfeld is a municipal subdivision of the German city of Wuppertal; it was an independent town until 1929.

<span class="mw-page-title-main">Tuffi</span> Elephant famous for falling from monorail

Tuffi was a female Asian elephant that became famous in West Germany during 1950 when she accidentally fell from the Wuppertal Schwebebahn into the River Wupper underneath.

<span class="mw-page-title-main">Dresden Suspension Railway</span> Funicular suspension railway in Dresden, Germany

The Dresden Suspension Railway is a suspended funicular located in Dresden, Germany, and connects the districts of Loschwitz and Oberloschwitz. It is one of the oldest suspension railways, having entered service on 6 May 1901, the same year the Wuppertal Schwebebahn entered service. Like the Wuppertal railway, this system was designed by Eugen Langen. The line is 274 metres (899 ft) long and is supported on 33 pillars.

<span class="mw-page-title-main">Wuppertal Schwebebahn</span> Suspension railway in Wuppertal, Germany (opened 1901)

The Wuppertaler Schwebebahn is a suspension railway in Wuppertal, Germany. Its original name was Einschienige Hängebahn System Eugen Langen. It is the oldest electric elevated railway with hanging cars in the world and is a unique system in Germany.

<span class="mw-page-title-main">Elevated railway</span> Rapid transit railway with the tracks above street level

An elevated railway or elevated train is a railway with the tracks above street level on a viaduct or other elevated structure. The railway may be broad-gauge, standard-gauge or narrow-gauge railway, light rail, monorail, or a suspension railway. Elevated railways are normally found in urban areas where there would otherwise be multiple level crossings. Usually, the tracks of elevated railways that run on steel viaducts can be seen from street level.

<span class="mw-page-title-main">Wupper</span> River in Germany

The Wupper is a right tributary of the Rhine in the state of North Rhine-Westphalia, Germany. Rising near Marienheide in western Sauerland it runs through the mountainous region of the Bergisches Land in Berg County and enters the Rhine at Leverkusen, south of Düsseldorf. Its upper course is called the Wipper. Both names are related to "weave", and refer to the twisting course.

The term monorail or industrial monorail is used to describe any number of transport systems in which a chair or carrier is suspended from, or rides on, an overhead rail structure. Unlike the well-known duo-rail system, there are many rail-guided transport options which have been described as monorails, so that tracing the history presents a demarcation problem regarding what should be included and what should be omitted.

<span class="mw-page-title-main">Wuppertal Hauptbahnhof</span>

Wuppertal Hauptbahnhof is a railway station in the city of Wuppertal, just south of the Ruhr Area, in the German state of North Rhine-Westphalia. It is on the line between Düsseldorf/Cologne and Dortmund. The 1848 reception building is one of the oldest of its kind. The station was originally Elberfeld station and has been renamed several times since. Since 1992, it has been called Wuppertal Hauptbahnhof. Wuppertal Hauptbahnhof is also the site of lost luggage operations for Deutsche Bahn.

<span class="mw-page-title-main">Elberfeld–Dortmund railway</span> Railway line

The Elberfeld–Dortmund railway is a major railway in the German state of North Rhine-Westphalia. It is part of a major axis for long distance and regional rail services between Wuppertal and Cologne, and is served by Intercity Express, InterCity, Regional Express, Regionalbahn and S-Bahn trains.

<span class="mw-page-title-main">Wuppertal-Vohwinkel station</span>

Vohwinkel station is the most western station in the city of Wuppertal. It is located in the district of Vohwinkel. It is a triangular station, built at a railway junction.

<span class="mw-page-title-main">Suspension railway</span> Overhead monorail

A suspension railway is a form of elevated monorail in which the vehicle is suspended from a fixed track, which is built above streets, waterways, or existing railway track.

The Düsseldorf-Derendorf–Dortmund Süd railway is a partially closed line in the German state of North Rhine-Westphalia from Düsseldorf-Derendorf station to Dortmund South station. Parts of it are still busy, including two sections used for the Rhine-Ruhr S-Bahn.

<span class="mw-page-title-main">Wuppertal-Oberbarmen station</span> Railway station in Wuppertal, Germany

Wuppertal-Oberbarmen station is located in the city of Wuppertal in the German state of North Rhine-Westphalia. Historically, it served as a significant railway junction, connecting to four railway lines. Presently, the station is served by two remaining lines: the Dortmund–Wuppertal main line and the branch line to Solingen.

<span class="mw-page-title-main">Trolleybuses in Solingen</span>

The Solingen trolleybus, also known locally as Stangentaxi, serves the city of Solingen, in the federal state of North Rhine-Westphalia, Germany.

The Baumwollspinnerei Hammerstein was a cotton mill which had accompanying weaving sheds, located in the area now known as Wuppertal, Germany. It was the largest of its type in Bergisches Land and was owned by the Jung family between 1835 and 1869, when it also included a textile school.

<span class="mw-page-title-main">Oberbarmen station</span> Monorail terminal in Wuppertal, Germany

Oberbarmen is the eastern terminal of the Wuppertal Schwebebahn; it is located in the Barmen area of Wuppertal. The terminal consists of two buildings, the station proper and the depot with the loop for the train to turn around. The depot holds trains during the night. The buildings are suspended above the Wupper and separated by a bridge, the Wupperbrücke Berliner Platz. The main works for maintenance and repair are at the Vohwinkel Schwebebahn terminal.

<span class="mw-page-title-main">GTW 72</span> Suspension railway train type formerly operated in Wuppertal, Germany

The GTW 72 is a suspended monorail train type operated by Wuppertaler Stadtwerke on the Wuppertal Schwebebahn from 1972 until 2018.

<span class="mw-page-title-main">GTW Generation 15</span> Suspension railway train type operated in Wuppertal, Germany

The GTW Generation 15 is a suspended monorail train type operated by Wuppertaler Stadtwerke on the Wuppertal Schwebebahn since 2016.

<span class="mw-page-title-main">Trams in Wuppertal</span>

The Wuppertal tramway network served Wuppertal, Germany for 114 years until its closure in 1987.

References

  1. "Unfälle der Schwebebahn". Die Wuppertaler Schwebebahn (in German).
  2. Oertel, Marie Luise (2001), Jahrhundertbauwerk Schwebebahn (in German) (1 ed.), Odenthal, p. 13, ISBN   3-00-008291-3 {{citation}}: CS1 maint: location missing publisher (link)
  3. "Schwebebahn-Unglück: Ein schwarzer Tag für Wuppertal". RP Online (in German). 12 April 2004.
  4. Iven, Jens Peter (12 April 1999). "Gespenstische Stille nach dem Unglück". Der Tagesspiegel (in German).
  5. 1 2 3 4 5 6 "Nach dem Schwebebahnunfall in Elberfeld vom 12.04.1999". www.home.wtal.de (in German). 15 April 2000. Archived from the original on 4 March 2016. Retrieved 24 November 2017.
  6. "WSW-Presse-Info Nr. 2/99". www.home.wtal.de (in German). 15 April 1999. Archived from the original on 16 August 2021. Retrieved 24 November 2017.
  7. Friedrichsen, Gisela (18 September 2000). "Man kann doch nicht alles selbst machen". Der Spiegel (in German). Archived from the original on 27 February 2011.
  8. Meinke, Ulf (24 August 2000). "Schwebebahn-Unglück: Jeder hat eine Entschuldigung". Welt (in German).
  9. "Unfall der Wuppertaler Schwebebahn – Freisprüche von vier Monteuren aufgehoben". Bundesgerichtshof, Pressestelle des Bundesgerichtshofes (in German). 31 January 2002.
  10. Bretschneider, Frank; Busch, Wibke (5 June 2003). "Verfahren gegen Monteure im Schwebebahnprozeß eingestellt" (in German).
  11. Wuppertaler Stadtwerke (30 September 2000). "Wuppertaler Stadtwerke AG zum Urteil im Schwebebahnprozess" (Press release) (in German).
  12. "Als das unfassbare geschah - das Schwebebahnunglück vom 12. April 1999". Bahnen im Bergischen (in German). 12 April 1999.
  13. "10. Jahrestag des Schwebebahn-Unglück". RGA (in German). 31 December 2014.

Further reading

Court rulings


51°15′06″N7°07′58″E / 51.2518°N 7.1327°E / 51.2518; 7.1327