It is proposed that this article be deleted because of the following concern:
If you can address this concern by improving, copyediting, sourcing, renaming, or merging the page, please edit this page and do so. You may remove this message if you improve the article or otherwise object to deletion for any reason. Although not required, you are encouraged to explain why you object to the deletion, either in your edit summary or on the talk page. If this template is removed, do not replace it . The article may be deleted if this message remains in place for seven days, i.e., after 00:24, 14 January 2024 (UTC). Find sources: "A-E gas field" – news · newspapers · books · scholar · JSTOR |
A-E | |
---|---|
Country | Romania |
Region | Black Sea |
Block | Midia |
Offshore/onshore | offshore |
Operator | Sterling Resources |
Field history | |
Discovery | 2010 |
Start of development | 2014 |
Start of production | 2015 |
Production | |
Current production of gas | 310×10 3 m3/d 11×10 6 cu ft/d 0.113×10 9 m3/a (4.0×10 9 cu ft/a) |
Estimated gas in place | 1.2×10 9 m3 43×10 9 cu ft |
The A-E gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the A-E gas field are around 43 billion cubic feet (1.2 km³), and production is slated to be around 11 million cubic feet/day (0.31×106m³) in 2018. [1] [2]
The Copşa Mică gas field is a natural gas field located in Copșa Mică, Sibiu County. It was discovered in 1915 and developed by and Romgaz. It began production in 1920 and produces natural gas and condensates. The total proven reserves of the Copşa Mică gas field are around 2.77 trillion cubic feet (80 km³), and production is slated to be around 3.7 million cubic feet/day (0.1×105m³) in 2010.
The Ana gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2010 and will produce natural gas and condensates. The total proven reserves of the Ana gas field are around 247 billion cubic feet (7.1 km³), and production is slated to be around 110 million cubic feet/day (3.1×106m³) in 2010.
The Mușenița gas field is a natural gas field located in Mușenița, Suceava County. It was discovered in 2012 and developed by and Zeta Petroleum. It will begin production in 2014 and will produce natural gas and condensates. The total proven reserves of the Mușenița gas field are around 80 billion cubic feet (2.26 km³), and production is slated to be around 37 million cubic feet/day (1×105m³) in 2010.
The South Cobălcescu gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by PetroCeltic. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the South Cobălcescu gas field are around 404 billion cubic feet (11.6 km³), and production is slated to be around 200 million cubic feet/day (5.6×106m³) in 2018.
The Ioana gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It began production in 2015 and produces natural gas and condensates. The total proven reserves of the Ioana gas field are around 653 billion cubic feet (18.7 km³), and production is around 110 million cubic feet/day (3.1×106m³) in 2015.
The Clara gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2015 and will produce natural gas and condensates. The total proven reserves of the Clara gas field are around 97 billion cubic feet (2.8 km³), and production is slated to be around 11 million cubic feet/day (0.31×106m³) in 2015.
The Florina gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2015 and will produce natural gas and condensates. The total proven reserves of the Florina gas field are around 77 billion cubic feet (2.2 km³), and production is slated to be around 11 million cubic feet/day (0.31×106m³) in 2015.
The Gina gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2015 and will produce natural gas and condensates. The total proven reserves of the Gina gas field are around 88 billion cubic feet (2.5 km³), and production is slated to be around 22 million cubic feet/day (0.62×106m³) in 2015.
The Bianca gas field is a natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2015 and will produce natural gas and condensates. The total proven reserves of the Bianca gas field are around 144 billion cubic feet (4.1 km³), and production is slated to be around 22 million cubic feet/day (0.62×106m³) in 2015.
The Călineşti gas field is a natural gas field located in Călinești, Teleorman County. It was discovered in 2010 and developed by Carpathian Energy. It will begin production in 2014 and will produce natural gas and condensates. The total proven reserves of the Călineşti gas field are around 63 billion cubic feet (1.8 km³), and production will be centered on 10 million cubic feet/day (0.30×105m³).
The Plenița gas field is a shale gas field located in Plenița, Dolj County. It was discovered in 2012 and developed by and Sterling Resources. It will begin production in 2015 and will produce shale gas and condensates. The total proven reserves of the Plenița gas field are around 124 billion cubic feet (3.5 km³), and production is slated to be around 11 million cubic feet/day (0.3×105m³) in 2015.
The Dârvari gas field is a shale gas field located in Dârvari, Mehedinți County. It was discovered in 2012 and developed by and Sterling Resources. It will begin production in 2015 and will produce shale gas and condensates. The total proven reserves of the Dârvari gas field are around 148 billion cubic feet (4.2 km³), and production is slated to be around 11 million cubic feet/day (0.3×105m³) in 2015.
The East Cobălcescu gas field is a natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by PetroCeltic. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the East Cobălcescu gas field are around 491 billion cubic feet (14 km³), and production is slated to be around 200 million cubic feet/day (5.6×106m³) in 2018.
The Luceafărul gas field is a natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by Sterling Resources. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Luceafărul gas field are around 104 billion cubic feet (3 km³), and production is slated to be around 50 million cubic feet/day (1.4×106m³) in 2018.
The Nadia gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by Sterling Resources. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Nadia gas field are around 306 billion cubic feet (8.7 km³), and production is slated to be around 50 million cubic feet/day (1.4×106m³) in 2018.
The Paula gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by Sterling Resources. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Paula gas field are around 58 billion cubic feet (1.7 km³), and production is slated to be around 5 million cubic feet/day (0.14×106m³) in 2018.
The Maria gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Maria gas field are around 102 billion cubic feet (2.9 km³), and production is slated to be around 22 million cubic feet/day (0.62×106m³) in 2018.
The Anca gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Anca gas field are around 442 billion cubic feet (12.6 km³), and production is slated to be around 88 million cubic feet/day (2.4×106m³) in 2018.
The Miorița gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2015 and will produce natural gas and condensates. The total proven reserves of the Miorița gas field are around 125 billion cubic feet (3.6 km³), and production is slated to be around 22 million cubic feet/day (0.62×106m³) in 2015.
The Balaur gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2010 and developed by Sterling Resources. It will begin production in 2015 and will produce natural gas and condensates. The total proven reserves of the Balaur gas field are around 125 billion cubic feet (3.6 km³), and production is slated to be around 22 million cubic feet/day (0.62×106m³) in 2015.