ADV Reliant

Last updated
History
Civil Ensign of Australia.svgAustralia
NameReliant
Owner Royal Australian Navy
Operator Teekay Shipping Australia
Builder Kleven Verft, Norway [1]
Launched2015 [1]
In service2022
Homeport Brisbane
Identification
History
Flag of Canada (Pantone).svgCanada
NameHorizon Star
OwnerHorizon Maritime
In service2017
Out of service2022
Homeport St. John's, Canada [2]
General characteristics
TypeMarin Teknikk MT 6015 [1]
Length103 metres (338 ft)
Beam20 metres (66 ft)
ComplementCore crew of 19
ArmamentNone
Aviation facilitiesHelicopter pad only

Australian Defence Vessel(ADV)Reliant is an auxiliary ship operated for the Royal Australian Navy (RAN) by Teekay Shipping Australia. The ship was purchased in February 2022 to serve as the RAN's Pacific support vessel.

Contents

Acquisition

The Australian Government announced in November 2018 that a large vessel was to be built for the RAN in Australia to undertake humanitarian tasks in the Pacific. This formed part of the government's "Pacific step-up" diplomatic initiative. [3] The Minister for Defence said the ship would be constructed in Western Australia. [4] [5] The 2020 Force Structure Plan stated that a Pacific support vessel would be built in Australia. [6]

During a Senate Estimates hearing in October 2021, Department of Defence officials stated that the government had decided instead to purchase the ship from overseas rather than build it in Australia. This decision had not been previously announced, and followed reports that the Australian shipbuilding industry lacked the capacity to construct the ship due to other priorities. The opposition Labor Party was critical of this decision, but the government stated that it would allow the ship to enter service earlier. [5]

In February 2022, the offshore supply vessel Horizon Star was purchased for US$67 million from Canadian company Horizon Maritime. This ship had been built in Norway, and originally entered service in 2017. [7] [8] [4] Following the purchase the ship underwent maintenance and checks in the Canary Islands, and sailed for Australia in May 2022. [9] She was renamed Australian Defence Vessel (ADV) Reliant while in the Canary Islands. [7]

Characteristics

Reliant has a displacement of approximately 5,600 tons, and is 103 metres (338 ft) long and 20 metres (66 ft) wide. She has a large cargo deck and a crane. The ship's bridge, helipad and crew accommodation is located in her large forward superstructure. [9] The ship "can produce thousands of litres of fresh water per day". [10]

In September 2022, the Chief of Navy, Vice Admiral Mark Hammond, stated that the tasks Reliant is capable of included "marine survey, delivering heavy equipment, search and rescue training, and disaster relief and recovery". [10]

The ship's capabilities upon delivery were criticised. She lacks the ability to operate landing craft. She also cannot embark a helicopter due to the absence of a hangar or aviation fuel storage facilities, and there is no direct connection between the cargo deck and helipad. The Australian Defence Magazine has written that these missing features are "widely seen as crucial for successful HADR [humanitarian assistance and disaster relief] operations, as they enable infrastructure independent transport". [9] An article by the retired RAN officer Bob Moyse published by the Australian Strategic Policy Institute stated that "the Reliant is likely to be of limited use for disaster relief" due to these issues. [11]

Under project SEA 3033 Phase 2, Reliant is to receive an upgrade. While the goals of the project have not been announced, the Australian Defence Magazine stated that they may include improvements to her helicopter and landing craft capabilities and possibly fitting the ship with small calibre weapons. [9] Moyse argued that these upgrades would not make Reliant fit for her intended purpose, as she can only enter deep ports and cargo would need to be loaded onto the landing craft with the ship's crane, which is an not an efficient approach. [11]

Operational service

During its voyage to Australia, Reliant supported RAN activities in Fiji and patrolled the exclusive economic zones of the Cook Islands and Samoa. [9]

As of August 2022, Reliant formed part of the RAN's National Support Squadron. Like the other ships in the squadron, she is crewed by civilian mariners employed by Teekay Shipping Australia and a single RAN naval liaison officer. [12] In September 2022, the crew comprised 18 Teekay employees and a RAN officer. Other personnel will be embarked when needed for specific tasks. [10] Reliant is based in Brisbane and is scheduled to operate in the Pacific for 250 to 300 days annually. [9] The Australian Defence Force will control the ship, with taskings being determined in consultation with the Department of Foreign Affairs and Trade. [10]

In March 2023 Reliant was used to recover an Army MRH-90 helicopter that had ditched at Jervis Bay. [13]

Related Research Articles

<span class="mw-page-title-main">Royal Australian Navy</span> Naval warfare branch of the Australian Defence Force

The Royal Australian Navy (RAN) is the naval force of the Australian Defence Force (ADF). The professional head of the RAN is Chief of Navy (CN) Vice Admiral Mark Hammond AM, RAN. CN is also jointly responsible to the Minister of Defence (MINDEF) and the Chief of Defence Force (CDF). The Department of Defence as part of the Australian Public Service administers the ADF.

HMAS <i>Success</i> (OR 304) Durance-class multi-product replenishment oiler

HMAS Success was a Durance-class multi-product replenishment oiler that previously served in the Royal Australian Navy (RAN). Built by Cockatoo Docks & Engineering Company in Sydney, Australia, during the 1980s, she is the only ship of the class to be constructed outside France, and the only one to not originally serve in the Marine Nationale. The ship was part of the Australian contribution to the 1991 Gulf War, and was deployed to East Timor in response to incidents in 1999 and 2006. The ship was fitted with a double hull during the first half of 2011, to meet International Maritime Organization standards.

HMAS <i>Choules</i>

HMAS Choules (L100) is a Bay-class landing ship that served with the Royal Fleet Auxiliary (RFA) from 2006 to 2011, before being purchased by the Royal Australian Navy (RAN). The vessel was built as RFA Largs Bay by Swan Hunter in Wallsend, Tyne and Wear. She was named after Largs Bay in Ayrshire, Scotland, and entered service in November 2006. During her career with the RFA, Largs Bay served as the British ship assigned to patrol the Falkland Islands in 2008, and delivered relief supplies following the 2010 Haiti earthquake.

The Protecteur class of naval auxiliaries for the Royal Canadian Navy (RCN) began as the Joint Support Ship Project, a Government of Canada procurement project for the RCN that is part of the National Shipbuilding Procurement Strategy. It will see the RCN acquire two multi-role vessels to replace the earlier Protecteur-class auxiliary oiler replenishment vessels.

A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.

The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities.

<i>Kanimbla</i>-class landing platform amphibious

The Kanimbla class was a class of amphibious transport ships operated by the Royal Australian Navy (RAN). Two ships were purchased by Australia in 1994 and modified. Problems during the handover process and the need to repair previously unidentified defects meant the ships did not enter operational service until the end of the decade.

<i>Canberra</i>-class landing helicopter dock Australian naval amphibious ship class

The Canberra class is a ship class of two landing helicopter dock (LHD) ships built for the Royal Australian Navy (RAN). Planning to upgrade the navy's amphibious fleet began in 2000, based on Australian experiences leading the International Force for East Timor peacekeeping operation. With a new climate for growing Australian Navy spending, a desire existed for forward defence capability for landing and supporting troops on Asian territory, that had never existed in Australian history, even with the old Majestic-class light fleet carriers, HMAS Melbourne and HMAS Sydney in the 1970s. In 2004, French company Direction des Constructions Navales (DCN) and Spanish company Navantia were invited to tender proposals, with DCN offering the Mistral-class amphibious assault ship and Navantia proposing the "Buque de Proyección Estratégica" design. The Spanish design was selected in 2007, with Navantia responsible for construction of the ships from the keel to the flight deck, and BAE Systems Australia handling the fabrication of the combat and communications systems. Finally, Siemens (Germany) supplied and fitted the azimuth thrusters.

<i>Huon</i>-class minehunter

The Huon-class minehunter coastal (MHC) ships are a group of minehunters built for the Royal Australian Navy (RAN). Following problems with the Bay-class minehunters, a request for tender was issued in 1993 for a class of six coastal minehunters under the project designation SEA 1555. The tender was awarded in 1994 to the partnership of Australian Defence Industries (ADI) and Intermarine SpA, which was offering a variant of the Italian Gaeta-class minehunter.

HMAS <i>Sirius</i> (O 266) Fleet replenishment vessel

HMAS Sirius was a commercial tanker purchased by the Royal Australian Navy and converted into a fleet replenishment vessel to replace HMAS Westralia. She was named in honour of HMS Sirius of the First Fleet. Launched in South Korea on 2004, and converted in Western Australia, Sirius was commissioned in 2006; three years before a purpose-built vessel would have been built, and at half the cost. The tanker was decommissioned in 2021.

HMAS <i>Tobruk</i> (L 50) Modified Round Table-class Landing Ship Heavy of the Royal Australian Navy

HMAS Tobruk was a Landing Ship Heavy (LSH) of the Royal Australian Navy (RAN), based on the design of the Round Table-class of the British Royal Fleet Auxiliary. Planning for the ship began in the 1970s to provide the Australian Army with a permanent sealift capability. She was laid down by Carrington Slipways in 1979, launched in 1980, and commissioned in 1981. She was a multi-purpose, roll-on/roll-off heavy lift ship capable of transporting soldiers, APCs, and tanks, and delivering them to shore via landing craft or directly by beaching.

The Australian Patrol Boat Group is a Force Element Group (FEG) of the Royal Australian Navy. It manages the Navy's patrol boats.

<span class="mw-page-title-main">Amphibious warfare ships of Australia</span>

The Royal Australian Navy and Australian Army have operated 24 amphibious warfare ships. These ships have been used to transport Army units and supplies during exercises and operational deployments.

<i>Arafura</i>-class offshore patrol vessel Class of patrol vessel

The Arafura class is a class of offshore patrol vessels being built for the Royal Australian Navy (RAN). Initially proposed in the 2009 Defence White Paper and marked as procurement project SEA 1180, it was originally planned that 20 Offshore Combatant Vessels (OCV) would replace 26 vessels across four separate ship classes: the Armidale-class patrol boats, the Huon-class minehunters, the Leeuwin-class survey vessels, and the Paluma-class survey motor launches. Although having a common design, the ships would use a modular mission payload system to fulfill specific roles; primarily border patrol, mine warfare, and hydrographic survey. The 2013 Defence White Paper committed to the OCV project as a long-term goal, but opted in the short term for an accelerated procurement of an existing design to replace the Armidales, and life-extension refits for the other types. This resulted in the Offshore Patrol Vessel (OPV) project and the amount of vessels reduced to 12. However, this was further increased to 14 when 2 further Mine Counter Measures variants were proposed under SEA 1905.

LCVP (Australia) Australian landing craft class

Since 1993, the Royal Australian Navy has operated four Australian-designed and built Landing Craft, Vehicle and Personnel from the landing ship, heavy HMAS Tobruk, replenishment oiler HMAS Success, LSD HMAS Choules and Pacific support vessel ADV Reliant. These aluminum craft were built by Geraldton Boat Builders and can carry up to 36 personnel or a Land Rover with a half-ton trailer. They are maintained for the RAN by the firm DMS Maritime. As of 2022, T4 and T5 are carried by ADV Reliant.

ADV <i>Ocean Protector</i> Auxiliary naval vessel of the Royal Australian Navy

Australian Defence Vessel (ADV) Ocean Protector is an auxiliary naval vessel of the Royal Australian Navy manned and managed by Teekay.

ABFC <i>Ocean Shield</i> Offshore patrol vessel operated by the Australian Border Force

Australian Border Force Cutter (ABFC) Ocean Shield is an offshore patrol vessel operated by the Australian Border Force. The ship was originally ordered in 2010 by DOF Subsea as an offshore support vessel, and was laid down by STX OSV as MSV Skandi Bergen in 2011. In 2012, the Australian Department of Defence was seeking a short-term replacement for the decommissioned Kanimbla-class amphibious landing ships, and negotiated to purchase the under-construction Skandi Bergen from DOF Subsea. The ship was completed, and entered Royal Australian Navy (RAN) service in mid-2012 as the civilian-crewed Australian Defence Vessel (ADV) Ocean Shield.

MV <i>Sycamore</i>

MV Sycamore is a training ship built to support the Royal Australian Navy (RAN) by Netherlands shipbuilders Damen Group. The vessel was built in Damen's shipyard in Haiphong, Vietnam and launched in 2016. The ship is operated for the RAN by Teekay Australia and entered service in 2017.

MV <i>Avatar</i> Refitted cargo vessel

MV Avatar was a general cargo vessel in service with the Republic of Singapore Navy as a training vessel. She is owned by Valour Offshore Marine Services and was leased to the Defence Science and Technology Agency from 2001-2023, a statutory board under the Ministry of Defence. Avatar was not a commissioned navy warship and flew the state marine ensign instead of the naval ensign.

References

  1. 1 2 3 Foxwell, David (10 August 2017). "Kleven offloads subsea vessel launched in 2015". Riviera. Riviera Maritime Media. Retrieved 23 September 2022.
  2. Cooke, Jodi (29 May 2019). State-of-the-art supply vessel waiting for next deployment offshore (Television production). Newfoundland Broadcasting Corporation. Retrieved 23 September 2022.
  3. Prime Minister; Minister for Foreign Affairs; Minister for Defence (8 November 2018). "Strengthening Australia's commitment to the Pacific". Minister for Foreign Affairs website (Press release). Retrieved 23 September 2022.
  4. 1 2 Kerr, Julian (21 April 2022). "Defence quietly acquires Pacific Support Vessel". Australian Defence Magazine. Retrieved 23 September 2022.
  5. 1 2 Greene, Andrew (27 October 2021). "Government concedes naval ship it promised to build will now be bought from overseas". ABC News. Retrieved 4 September 2022.
  6. Department of Defence (2020). 2020 Force Structure Plan (PDF). Commonwealth of Australia. pp. 12, 41. ISBN   9780994168061 . Retrieved 23 September 2022.
  7. 1 2 Greene, Andrew (18 April 2022). "Industry anger after Defence spends $90 million on second-hand vessel in Canary Islands". ABC News. Retrieved 4 September 2022.
  8. "RELIANT, Offshore Support Vessel - Details and current position - IMO 9752254 - VesselFinder". Vessel Finder. Retrieved 4 September 2022.
  9. 1 2 3 4 5 6 Felton, Benjamin (4 August 2022). "Australia's Pacific Support Vessel: What to make of ADV Reliant". Australian Defence Magazine. Retrieved 4 September 2022.
  10. 1 2 3 4 Trembath, LT Brendan (5 September 2022). "A vessel Pacific partners can rely on" (Press release). Department of Defence. Retrieved 5 September 2022.
  11. 1 2 Moyse, Bob (17 May 2022). "Pacific support vessel another platform that doesn't fit Australia's policies". The Strategist. Australian Strategic Policy Institute. Retrieved 4 September 2022.
  12. Massie, CMDR Mark (26 August 2022). "Pacific support vessel shoots to thrill" (Press release). Department of Defence. Retrieved 4 September 2022.
  13. Fernandez, Tim (24 March 2023). "Stranded Army helicopter recovered by Defence". ABC News. Retrieved 24 March 2023.