AMP Energy Bhadla Solar Power Plant | |
---|---|
Country | India |
Location | Bhadla, Rajasthan |
Coordinates | 27°29′06″N71°59′52″E / 27.485071°N 71.997756°E |
Construction began | 2021 |
Commission date | 2023 |
| |
Solar farm | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 100 MW |
AMP Energy Bhadla Solar Power Plant (also known as AMP Energy Green Four Solar Power Plant) is a photovoltaic power station in Bhadla, Jodhpur district, India.
The 100 MW solar plant has been built at the phase 2 of the Bhadla Solar Park by AMP Energy India. [1] It is supported by the Bhadla-II PS 220 kV section line. [2] In 2022, the operator of the plant signed a power purchase agreement with Amazon India to supply power through the Inter State Transmission System (ISTS). [3] [4]
India is the third largest producer of electricity in the world. During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.
NV Energy is a public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno–Sparks metropolitan area of northern Nevada. Based in Las Vegas, Nevada, it serves about 1.3 million customers and over 40 million tourists annually.
Iberdrola, S.A. is a Spanish multinational electric utility company based in Bilbao, Spain. It has around 40,000 employees and serves around 30 million customers.
The Calcutta Electric Supply Corporation (CESC) is the Kolkata-based flagship company of the RP-Sanjiv Goenka Group, born from the erstwhile RPG Group, under the chairmanship of businessman Sanjiv Goenka. It is an Indian electricity generation and the sole distribution company serving 567 square kilometres (219 sq mi) of area administered by the Kolkata municipal corporation, in the city of Kolkata, as well as parts of Howrah, Hooghly, 24 Parganas (North) and 24 Parganas (South) districts in the state of West Bengal. It also serves power distribution in Kota, Bikaner and Bharatpur in Rajasthan under the name CESC RAJASTHAN. It serves 3.0 million consumers approximately, which includes domestic, industrial and commercial users.
Solar power in India is an essential source of renewable energy and electricity generation in India. Since the early 2000s, India has increased its solar power significantly with the help of various government initiatives and rapid awareness about the importance of renewable energy and sustainability in the society. In order to decrease carbon dioxide emissions, reduce reliance on fossil fuels, with coal being the primary source of electricity for the nation at present, bolster employment, economy and make India energy independent by making self-reliant on renewable energy, the Ministry of New and Renewable Energy was formed in 1982 to look after the country's activities to promote these goals. These collaborative efforts, along with global cooperation with the help of International Solar Alliance (ISA) since 2015 for promoting solar energy worldwide while also taking care of India, have made India one of the world's fastest adopters of solar power, making it the third-largest producer of solar power globally as of 2024, after China and the United States.
NextEra Energy Resources, LLC (NEER) is a wholesale electricity supplier based in Juno Beach, Florida. NEER is a subsidiary of NextEra Energy, a Fortune 200 company. Prior to 2009, NextEra Energy Resources was known as FPL Energy.
Energy in Afghanistan is provided by hydropower followed by fossil fuel and solar power. Currently, less than 50% of Afghanistan's population has access to electricity. This covers the major cities in the country. Many rural areas do not have access to adequate electricity but this should change after the major CASA-1000 project is completed.
Welspun Energy Private Limited is an independent power company based in New Delhi, India. It is a subsidiary of Welspun Group.
Adani Power is an Indian multinational power and energy company, subsidiary of Adani Group and based in Khodiyar in Ahmedabad, India. It is a private thermal power producer, with a capacity of 15,250 MW and operates a mega solar plant of 40 MW at Naliya, Bitta, Kutch, Gujarat. Adani Godda Power is implementing a 1,600 MW plant at Jharkhand. The company has signed long term power purchase agreements of about 9,153 MW with the government of Gujarat, Maharashtra, Haryana, Rajasthan, Karnataka, and Punjab.
Power sector of Andhra Pradesh is divided into 4 categories namely Regulation, Generation, Transmission and Distribution. Andhra Pradesh Electricity Regulatory Commission (APERC) is the regulatory body. APGENCO deals with the electricity production and also maintenance, proposes new projects and upgrades existing ones as well. The APGENCO also set up a Special Purpose Vehicle (SPV), named as Andhra Pradesh Power Development Company Limited (APPDCL), a joint venture company of APGENCO and IL&FS to set up Krishnapatanam thermal power project.
Ultra Mega Solar Power Projects, also known as Ultra Mega Solar Parks, are a series of solar power projects planned by the Ministry of New and Renewable Energy of the Union Government of India. Each power project has a minimum capacity of 500 MW.
The Bhadla Solar Park is a solar power plant located in the Thar Desert of Rajasthan, India. It covers an area of 56 square kilometers and has a total installed capacity of 2,245 megawatts (MW), making it India's largest and the 11th-largest solar park in the world as of 2024. The park was developed in four phases since 2015, with $775 million in funding from the Climate Investment Fund and $1.4 billion in funding from other sources. The park contributes to India's renewable energy goals and helps reduce greenhouse gas emissions by an estimated 4 million tons per year.
Shakti Sthala, also called Pavagada Solar Park is a solar park covering an area of 53 square kilometres in Pavagada taluk, Tumkur district, Karnataka. Completed in 2019, the park has a capacity of 2,050 MW. As of April 2021, it is the world's third largest photovoltaic solar park after the 2,245 MW Bhadla Solar Park in Rajasthan and 2,200 MW Huanghe Hydropower Hainan Solar Park in China. It is the second largest in India.The total project cost was ₹14,800 crore.
Alten Solar Power Station, also Kesses 1 Solar Power Station, is a 44 megawatts (59,000 hp) solar power plant in Kenya, the largest economy in the East African Community.
Omkareshwar Floating Solar Power Park is a floating photovoltaic power station at Omkareshwar Dam, Khandwa, India.
NTPC Dadri Solar Power Plant is a photovoltaic power station of NTPC Limited in Dadri, India.
KPI Green Energy Limited is a solar power company based in Surat, Gujarat. Established in 2008, it is part of the KP Group. The company generates and supplies electricity from solar power projects under the brand name Solarism.
KP Energy Limited is an Indian wind energy company headquartered in Gujarat, India.