Advanced Launch System

Last updated

The Advanced Launch System (ALS) is a joint United States Air Force (USAF) and National Aeronautics and Space Administration (NASA) study which operated from 1987 to 1990. Its aim was to develop a flexible, modular, heavy-lift, high rate space launch vehicle that could deliver payloads to Earth orbit at a tenth the cost of existing boosters.

Contents

Background

An artist's rendering of the 2010s Space Launch System, which contains some design heritage from the ALS Space Launch System (16525420976).jpg
An artist's rendering of the 2010s Space Launch System, which contains some design heritage from the ALS

The ALS was a joint USAF and NASA study from 1987 to 1990. It was an endeavour of the years following the Space Shuttle Challenger disaster. Colonel John R. Wormington (retired Brigadier General USAF) was the Program Director of the Joint Department of Defense and NASA Advanced Launch System Program Office. Lieutenant Colonel Michael C. Mushala (retired Major General USAF) was assigned as Wormington's deputy. The program operated from the Los Angeles Air Force Base. In October 1989, Mushala was promoted to Colonel. In February 1990, Wormington was reassigned to command the 45th Space Wing at Patrick Air Force Base in Florida. Mushala became the program director and remained so until the project was disbanded in July 1990.

Although the project had a projected research and development cost of $15 billion, its early cancellation led to a final cost just under $3 billion.

The ALS program office differed from others in that it was the only one within the Air Force Space Command. The office was furnished with Apple Mac OS personal computers instead of the Command's usual Microsoft Windows systems[ citation needed ]. This was in part because NASA had already been using Apple computers. The program office pioneered what later became the Microsoft Project [ citation needed ].

Aims

The ALS program was charged with deploying the space based elements of the Strategic Defense Initiative (SDI) program. Secondly, the ALS program was to find a way to transport many thousands of tons of equipment for the SDI into low Earth orbit at a cost less than $1,000 per kilogram. The usual cost was about $10,000 per kg. [1]

The program had three main contractors, each with an $800 million multi-year contract. They were Boeing Aerospace, Martin-Marietta, and General Dynamics. The ALS program budget was just under $2.5 billion.

Progress

In 1989, the Bush administration, via the Defense Acquisition Board, was asked to ratify an existing plan to have the ALS program at an advanced state of development in 1990; ready for a first flight in 1998; and fully operational in 2000. [2] Then, from 2000 to 2005, the ALS program would develop a modular family of launch vehicles, with a payload capacity to low Earth orbit ranging from 5,000 kilograms to 200,000 kilograms. [3]

However, by late 1989, it was apparent that the ALS program was no longer required. [4] The initial phase of the SDI would employ existing Titan IV and Atlas II rockets. The launch requirements for subsequent phases of the SDI deployment were too vague to allow the immediate ongoing direction of the ALS program and its associated costs. [5] [6]

At the end of 1990, the ALS program, was changed to a propulsion development project with an annual budget of $150 million. [7]

See also

Related Research Articles

<span class="mw-page-title-main">Strategic Defense Initiative</span> U.S. military defense program (1984–1993)

The Strategic Defense Initiative (SDI), derisively nicknamed the "Star Wars program", was a proposed missile defense system intended to protect the United States from attack by ballistic strategic nuclear weapons. The concept was announced on March 23, 1983, by President Ronald Reagan, a vocal critic of the doctrine of mutually assured destruction (MAD), which he described as a "suicide pact". Reagan called upon American scientists and engineers to develop a system that would render nuclear weapons obsolete. Elements of the program reemerged in 2019 with the Space Development Agency (SDA).

<span class="mw-page-title-main">Expendable launch system</span> Launch system that uses a single use launch vehicle

An expendable launch system is a launch vehicle that can be launched only once, after which its components are either destroyed during reentry or discarded in space. ELVs typically consist of several rocket stages that are discarded sequentially as their fuel is exhausted and the vehicle gains altitude and speed. As of 2022, most satellites and human spacecraft are currently launched on ELVs. ELVs are simpler in design than reusable launch systems and therefore may have a lower production cost. Furthermore, an ELV can use its entire fuel supply to accelerate its payload, offering greater payloads. ELVs are proven technology in widespread use for many decades.

<span class="mw-page-title-main">John E. Blaha</span> American astronaut

John Elmer Blaha is a retired United States Air Force colonel and a former NASA astronaut. He is a veteran of five space missions aboard the Space Shuttle and Mir.

<span class="mw-page-title-main">Manned Orbiting Laboratory</span> Canceled U.S. Air Force human spaceflight program

The Manned Orbiting Laboratory (MOL) was part of the United States Air Force (USAF) human spaceflight program in the 1960s. The project was developed from early USAF concepts of crewed space stations as reconnaissance satellites, and was a successor to the canceled Boeing X-20 Dyna-Soar military reconnaissance space plane. Plans for the MOL evolved into a single-use laboratory, for which crews would be launched on 30-day missions, and return to Earth using a Gemini B spacecraft derived from NASA's Gemini spacecraft and launched with the laboratory.

<span class="mw-page-title-main">Richard A. Searfoss</span>

Richard Alan Searfoss was an American aviator who was United States Air Force colonel, NASA astronaut and test pilot.

<span class="mw-page-title-main">Titan IV</span> Expendable launch system used by the US Air Force

Titan IV was a family of heavy-lift space launch vehicles developed by Martin Marietta and operated by the United States Air Force from 1989 to 2005. Launches were conducted from Cape Canaveral Air Force Station, Florida and Vandenberg Air Force Base, California.

The Aerospace Corporation is an American nonprofit corporation that operates a federally funded research and development center (FFRDC) in El Segundo, California. The corporation provides technical guidance and advice on all aspects of space missions to military, civil, and commercial customers. As the FFRDC for national-security space, Aerospace works closely with organizations such as the United States Space Force and the National Reconnaissance Office (NRO) to provide "objective technical analyses and assessments for space programs that serve the national interest". Although the USSF and NRO are the primary customers, Aerospace also performs work for civil agencies such as NASA and NOAA as well as international organizations and governments in the national interest.

<span class="mw-page-title-main">Orbital Express</span> US project to autonomously service satellites in orbit ~2007

Orbital Express was a space mission managed by the United States Defense Advanced Research Projects Agency (DARPA) and a team led by engineers at NASA's Marshall Space Flight Center (MSFC). The Orbital Express program was aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consisted of two spacecraft: the ASTRO servicing satellite, and a prototype modular next-generation serviceable satellite; NEXTSat. The mission launched from Cape Canaveral Air Force Station on 8 March 2007, aboard an Atlas V expendable launch vehicle. The launch was part of the United States Air Force Space Test Program STP-1 mission.

Criticism of the Space Shuttle program stemmed from claims that NASA's Space Shuttle program failed to achieve its promised cost and utility goals, as well as design, cost, management, and safety issues. Fundamentally, it failed in the goal of reducing the cost of space access. Space Shuttle incremental per-pound launch costs ultimately turned out to be considerably higher than those of expendable launchers. By 2011, the incremental cost per flight of the Space Shuttle was estimated at $450 million, or $18,000 per kilogram to low Earth orbit (LEO). In contrast, the comparable Proton launch vehicle is said to cost as little as $110 million, or around $5,000 per kilogram to LEO, despite not being reusable.

<span class="mw-page-title-main">ASM-135 ASAT</span> Anti-satellite missile

The ASM-135 ASAT is an air-launched anti-satellite multistage missile that was developed by Ling-Temco-Vought's LTV Aerospace division. The ASM-135 was carried exclusively by United States Air Force (USAF) F-15 Eagle fighter aircraft.

The Space Test Program (STP) is the primary provider of spaceflight for the United States Department of Defense (DoD) space science and technology community. STP is managed by a group within the Advanced Systems and Development Directorate, a directorate of the Space and Missile Systems Center of the United States Space Force. STP provides spaceflight via the International Space Station (ISS), piggybacks, secondary payloads and dedicated launch services.

<span class="mw-page-title-main">Space Systems Command</span> U.S. Space Force space development, acquisition, launch, and logistics field command

Space Systems Command (SSC) is the United States Space Force's space development, acquisition, launch, and logistics field command. It is headquartered at Los Angeles Air Force Base, California and manages the United States' space launch ranges.

Jarvis was a proposed American medium-lift launch vehicle for space launch, designed by Hughes Aircraft and Boeing during the mid-1980s as part of the joint United States Air Force (USAF)/National Aeronautics and Space Administration (NASA) Advanced Launch System (ALS) study. Intended to utilize engines and tooling in storage from the Saturn V rocket program along with Space Shuttle components, and projected to be capable of carrying up to six satellites into multiple orbits using a single launch, the proposal failed to meet the ALS requirements, and the Jarvis rocket was never built.

<span class="mw-page-title-main">Space Launch Initiative</span> US NASA & DOD program 2000-2002

The Space Launch Initiative (SLI) was a NASA and U.S. Department of Defense joint research and technology project to determine the requirements to meet all the nation's hypersonics, space launch and space technology needs. It was also known as the second generation Reusable Launch Vehicle program, after the failure of the first. The program began with the award of RLV study contracts in 2000.

<span class="mw-page-title-main">1st Space Operations Squadron</span> U.S. Space Force unit

The 1st Space Operations Squadron is a United States Space Force unit responsible for space-based space domain awareness. Located at Schriever Space Force Base, Colorado, the squadron operates the Space Based Space Surveillance system, the Advanced Technology Risk Reduction system, the Operationally Responsive Space-5 satellite, and the Geosynchronous Space Situational Awareness Program.

SpaceWorks Enterprises, Inc. (SEI) is an aerospace engineering company based in Atlanta, Georgia, United States that specializes in the design, assessment, hardware prototyping and flight demonstration of advanced space concepts for both government and commercial customers.  

The DARPA XS-1 was an experimental spaceplane/booster with the planned capability to deliver small satellites into orbit for the U.S. Military. It was reported to be designed to be reusable as frequently as once a day, with a stated goal of doing so for 10 days straight. The XS-1 was intended to directly replace the first stage of a multistage rocket by taking off vertically and flying to hypersonic speed and high suborbital altitude, enabling one or more expendable upper stages to separate and deploy a payload into low Earth orbit. The XS-1 would then return to Earth, where it could ostensibly be serviced fast enough to repeat the process at least once every 24 hours.

Northrop Grumman Innovation Systems (NGIS) was a sector of Northrop Grumman from 2018 through 2019. It was formed from Orbital ATK Inc. a company which resulted from the merger of Orbital Sciences Corporation and parts of Alliant Techsystems in 2015. Orbital ATK was purchased by Northrop Grumman in 2018. Northrop Grumman Innovation Systems designed, built, and delivered space, defense, and aviation-related systems to customers around the world both as a prime contractor and as a merchant supplier. It had a workforce of approximately 12,000 employees dedicated to aerospace and defense including about 4,000 engineers and scientists; 7,000 manufacturing and operations specialists; and 1,000 management and administration personnel. With Northrop Grumman's reorganization of its divisions effective January 1, 2020, NGIS was split, with most of the sector merging with other Northrop Grumman businesses into a new Space Systems sector.

<span class="mw-page-title-main">Shuttle-Centaur</span> Proposed Space Shuttle upper stage

Shuttle-Centaur was a version of the Centaur upper stage rocket designed to be carried aloft inside the Space Shuttle and used to launch satellites into high Earth orbits or probes into deep space. Two variants were developed: Centaur G-Prime, which was planned to launch the Galileo and Ulysses robotic probes to Jupiter, and Centaur G, a shortened version planned for use with United States Department of Defense Milstar satellites and the Magellan Venus probe. The powerful Centaur upper stage allowed for heavier deep space probes, and for them to reach Jupiter sooner, prolonging the operational life of the spacecraft. However, neither variant ever flew on a Shuttle. Support for the project came from the United States Air Force (USAF) and the National Reconnaissance Office, which asserted that its classified satellites required the power of Centaur. The USAF agreed to pay half the design and development costs of Centaur G, and the National Aeronautics and Space Administration (NASA) paid the other half.

<span class="mw-page-title-main">History of the United States Space Force</span> History of American military development

While the United States Space Force gained its independence on 20 December 2019, the history of the United States Space Force can be traced back to the beginnings of the military space program following the conclusion of the Second World War in 1945. Early military space development was begun within the United States Army Air Forces by General Henry H. Arnold, who identified space as a crucial military arena decades before the first spaceflight. Gaining its independence from the Army on 18 September 1947, the United States Air Force began development of military space and ballistic missile programs, while also competing with the United States Army and United States Navy for the space mission.

References

  1. "ALS Contractors Concentrate on Expendable, Reusable Designs", Aerospace Daily, 20 June 1989 page 463
  2. Wolfe, M.G. et al, "The Advanced Launch System." 40th International Astronautical Federation Congress, Malaga Spain, 8–14 October 1989, IAF Paper 89-229.
  3. Branscome, D.R., "The United States Space Transportation Survey," Proceedings of the 2nd European Aerospace Conference on Progress in Space Transportation, (European Space Agency, ESA SP-293, August 1989), pages 39-44.
  4. "Air Force Embraces Expendable Launchers," Military Space, 17 July 1989, page 3-4.
  5. "Adams, Peter, "Congress May Consider ALS Too Costly, Sources Say," Defense News, 27 March 1989, page 25.
  6. Finnegan, Philip, "Report: ALS Program Lacks Mission, Should be Pared to Propulsion Study," Defense News, 25 September 1989, page 4.
  7. Finnegan, Philip, "U.S. Air Force, NASA Restructure Advanced Launch System Program," Defense News, 15 January 1990, page 1, 25.