Aleksey Chirikov (icebreaker)

Last updated
History
Flag of Russia.svg Russia
NameAleksey Chirikov
Namesake Aleksei Chirikov
Operator Sovcomflot
Port of registry Saint Petersburg, Flag of Russia.svg  Russia [1]
Ordered16 December 2010
Builder Arctech Helsinki Shipyard, Helsinki, Finland
Cost$100 million
Yard number507
Laid down3 July 2012
Launched23 November 2012 [2]
Completed19 April 2013 [3]
Identification
StatusIn service
General characteristics [4]
Type Platform supply vessel
Tonnage
Length
Beam21.20 m (69.6 ft) (moulded)
Draught7.90 m (25.9 ft)
Depth11.00 m (36.09 ft)
Ice class RMRS Icebreaker6
Installed power
Propulsion
  • Two ABB Azipod VI1600 units (2 × 6.5 MW)
  • Two bow thrusters
Speed
  • 15 knots (28 km/h; 17 mph) (open water)
  • 3 knots (5.6 km/h; 3.5 mph) in 1.5 m (4.9 ft) level ice
Endurance30 days
Capacity
  • 700 m2 cargo deck
  • 195 evacuees
Crew50

Aleksey Chirikov is a Russian icebreaking platform supply and standby vessel owned by Sovcomflot. She and her sister ship, Vitus Bering, were ordered on 16 December 2010 from Arctech Helsinki Shipyard in Helsinki, Finland, shortly after the joint venture agreement between STX Finland Cruise Oy and United Shipbuilding Corporation had been signed. Aleksey Chirikov was delivered on 19 April 2013. She will be used in the Arkutun-Dagi offshore oil field in the Sea of Okhotsk.

Contents

Construction

Only six days after the agreement for the formation of the company was signed between STX Finland Cruise Oy and United Shipbuilding Corporation on 10 December 2010, the newly founded Arctech Helsinki Shipyard received an order for two multipurpose icebreaking supply vessels from the Russian state-owned shipping company Sovcomflot. The value of the shipbuilding contract was US$200 million and the construction of the vessels would provide work for 1,000 man-years. [6] Initially, both ships were set to be delivered to the customer in April 2013, [7] after which they will be used for standby, supply and ice management of an offshore platform operated by Exxon Neftegas Limited in the Arkutun-Dagi offshore oil field, located in the Sea of Okhotsk. [8]

Although the ship are constructed at Arctech Helsinki Shipyard, the majority of the steel blocks are manufactured by the Russian Vyborg Shipyard as the Hietalahti shipyard no longer has such production capacity. Only five of the 42 hull blocks for the two vessels will be manufactured locally in Helsinki while the remaining blocks will be produced and partially outfitted in Vyborg, and then brought to Helsinki on a barge for final outfitting, painting and hull assembly. [9] The production of the second vessel was started in Helsinki on 2 November 2012. [10]

The keel of the second vessel was laid down on 3 July 2012, only three days after the first vessel, Vitus Bering, had been floated out from the dry dock. [11] Although initially set for the same delivery date in April 2013, Vitus Bering will be delivered four months ahead of schedule in December 2012. She left for sea trials on 22 November 2012, and on the following day the second vessel, Aleksey Chirikov, was floated out from the dry dock. [12] [2] [13] She left for four-day sea trials on 19 March 2013. [14] Another sea trial was conducted in early April 2013 and Aleksey Chirikov was delivered to Sovcomflot on 19 April. [3]

The ship is named after the 18th-century Russian explorer Aleksei Ilyich Chirikov who was the first Russian to reach Alaska.

Technical details

Aleksey Chirikov is an upgraded version of SCF Sakhalin , a similar icebreaking platform supply vessel built at Helsinki in 2005. [15] Several modifications have been made to the original design, including adding a fourth main engine, but the hull form is nearly identical. The most noticeable external difference is the covered foredeck, which will protect the mooring equipment from icing.

Aleksey Chirikov is 99.83 metres (327.5 ft) long overall and 94.02 metres (308.5 ft) at the waterline. The hull has a moulded breadth of 21.20 metres (69.6 ft) and depth of 11.00 metres (36.09 ft) to upper deck. When loaded to a draught of 7.90 metres (25.9 ft), the deadweight tonnage of the ship is 4,191 tons. The four Wärtsilä [16] diesel generating sets — two twelve-cylinder 12V32 and two six-cylinder 6L32 engines — have a combined output of 18,000 kW (24,000 hp) and provide power for all shipboard consumers, including two 6.5 MW ABB Azipod VI1600 propulsion units. [17] [18] Being a double acting ship, Aleksey Chirikov is designed to be able to break ice both ahead and astern. She is capable of operating in ice up to 1.7 metres (5.6 ft) thick and maintain a speed of 3 knots (5.6 km/h; 3.5 mph) in level ice with a thickness of 1.5 metres (4.9 ft). [19]

Related Research Articles

MSV <i>Fennica</i> Finnish multipurpose icebreaker

MSV Fennica is a Finnish multipurpose icebreaker and offshore support vessel. Built in 1993 by Finnyards in Rauma, Finland and operated by Arctia Offshore, she was the first Finnish icebreaker designed to be used as an escort icebreaker in the Baltic Sea during the winter months and in offshore construction projects during the open water season. Fennica has an identical sister ship, Nordica, built in 1994.

Magadan is a Russian icebreaker and the second vessel in a series of three subarctic icebreakers built at Wärtsilä Helsinki shipyard in Finland in 1982–1983. The vessel's sister ships are Mudyug and Dikson.

SCF Sakhalin is a Russian icebreaking platform supply and standby vessel owned by SCF Sakhalin Vessels Limited, a subsidiary of Sovcomflot. The ship was built by Aker Finnyards Helsinki shipyard in Finland in 2005 as FESCO Sakhalin for Far East Shipping Company (FESCO), but was purchased by Sovcomflot and renamed in 2010. Since the beginning it has been in long-term charter for Exxon Neftegas Ltd. and used to supply oil platforms in the Sakhalin-I project.

Double acting ship Type of icebreaking ship designed to break heavy ice while going astern

A double acting ship is a type of icebreaking ship designed to run ahead in open water and thin ice, but turn around and proceed astern (backwards) in heavy ice conditions. In this way, the ship can operate independently in severe ice conditions without icebreaker assistance but retain better open water performance than traditional icebreaking vessels.

Arctech Helsinki Shipyard Shipbuilding company in Helsinki, Finland

Arctech Helsinki Shipyard is a Finnish shipbuilding company. The company focuses primarily on icebreakers and other icegoing vessels for arctic conditions.

<i>Vitus Bering</i> (icebreaker)

Vitus Bering is a Russian icebreaking platform supply and standby vessel owned by Sovcomflot. Built by Arctech Helsinki Shipyard in Helsinki, Finland, she and her sister ship, Aleksey Chirikov, were ordered on 16 December 2010, shortly after the joint venture agreement between STX Finland Cruise Oy and United Shipbuilding Corporation had been signed. Delivered to the owners on 21 December 2012, Vitus Bering will be used in the Arkutun-Dagi offshore oil field in the Sea of Okhotsk.

Arcticaborg (Арктикаборг) is an icebreaking platform supply vessel. She was previously operated by Wagenborg Kazakhstan in the Caspian Sea but was transferred to Canada in 2017 and acquired by Fathom Offshore in 2018. In 2019, she was contract to Russia for two years.

Georgiy Sedov is an icebreaking platform supply vessel operated by Rosmorport in the Sea of Azov. She was built by Kværner Masa-Yards in Helsinki, Finland, in 1998 as Antarcticaborg for Wagenborg Kazakhstan to be used in the Caspian Sea.

MSV <i>Nordica</i> Finnish multipurpose icebreaker

MSV Nordica is a Finnish multipurpose icebreaker and offshore support vessel. Built in 1994 by Finnyards in Rauma, Finland and operated by Arctia Offshore, she and her sister ship Fennica were the first Finnish icebreakers designed to be used as escort icebreakers in the Baltic Sea during the winter months and in offshore construction projects during the open water season.

Oblique icebreaker Icebreaker designed which can break ice obliquely to open a wide channel

An oblique icebreaker is a special type of icebreaker designed to operate not only ahead and astern, but also obliquely (sideways) with a large angle of attack. In this way, a relatively small icebreaker is capable of opening a wide channel in ice for large merchant ships.

<i>Baltika</i> (icebreaker) Russian icebreaker with asymmetric hull

Baltika is a Russian icebreaker built by Arctech Helsinki Shipyard in Helsinki, Finland. She is the first ship ever built with an asymmetric hull that allows her to operate not only ahead and astern, but also obliquely (sideways) with a large angle of attack. In this way, the relatively small oblique icebreaker is capable of opening a wide channel in ice for large merchant ships.

<i>Polaris</i> (icebreaker) Finnish icebreaker

Polaris is a Finnish icebreaker. Built in 2016 by Arctech Helsinki Shipyard, she is the most powerful icebreaker ever to fly the Finnish flag and the first icebreaker in the world to feature environmentally friendly dual-fuel engines capable of using both low-sulfur marine diesel oil (LSMDO) and liquefied natural gas (LNG). Polaris was initially ordered by the Finnish Transport Agency, but the ownership was transferred to the state-owned icebreaker operator Arctia after delivery.

Project 21900 icebreaker Russian icebreakers

Project 21900 icebreakers and their derivative designs are a series of Russian diesel-electric icebreakers built in the 2000s. They are also sometimes referred to using the type size series designation LK-16.

Vyborg Shipyard

Vyborg Shipyard PJSC is a shipbuilding company located in Vyborg, Russia. The company has a focus on icebreakers and other icegoing vessels for arctic conditions, but the company has also built deep sea semi-submersible floating drilling and production platforms for exploration of oil and gas offshore fields. Vyborg Shipyard employs more than 1,500 people.

<i>Murmansk</i> (2015 icebreaker) Russian icebreaker

Murmansk is a Russian Project 21900M diesel-electric icebreaker. While her construction was contracted to Vyborg Shipyard in Russia, she was built at Arctech Helsinki Shipyard in Finland and delivered to Rosmorport in 2016.

<i>Novorossiysk</i> (icebreaker) Russian icebreaker

Novorossiysk is a Russian Project 21900M diesel-electric icebreaker. She was built by Vyborg Shipyard in Russia and delivered to Rosmorport in 2016.

Miscaroo was an icebreaking anchor handling tug supply vessel built by Vancouver Shipyards for BeauDril, the drilling subsidiary of Gulf Canada Resources, in 1983. She was part of a fleet of Canadian icebreakers used to support offshore oil exploration in the Beaufort Sea. In the 1990s, the vessel was acquired by Canadian Marine Drilling (Canmar) and renamed Canmar Miscaroo. In 1998, she was purchased by Smit International and served in the Sakhalin oil fields as Smit Sakhalin until 2017 when the 34-year-old icebreaker was sold for scrapping in China.

Ikaluk is an icebreaking anchor handling tug supply vessel built by Nippon Kōkan K. K. Tsurumi Shipyard in Japan for BeauDril, the drilling subsidiary of Gulf Canada Resources, in 1983. She was part of a fleet of Canadian icebreakers used to support offshore oil exploration in the Beaufort Sea. In the 1990s, the vessel was acquired by Canadian Marine Drilling (Canmar) and renamed Canmar Ikaluk. In 1998, she was purchased by Smit International and served in the Sakhalin oil fields as Smit Sibu. Since 2009, she was owned by FEMCO Management and in 2012 was given back her original name. Ikaluk was sold to China in February 2018 and later renamed Beijing Ocean Leader.

MT <i>Yuriy Kuchiev</i>

Yuriy Kuchiev is an icebreaking gas condensate tanker operated by the Greek shipowner Dynacom. The vessel, built at Arctech Helsinki Shipyard in Finland, utilizes the double acting ship principle to allow independent operation without icebreaker escort in ice-covered seas. The vessel was delivered to the owner in August 2019.

<i>Vladivostok</i> (2014 icebreaker) Russian icebreaker

Vladivostok is a Russian diesel-electric icebreaker and the lead ship of Project 21900M icebreakers. She was built by Vyborg Shipyard in Russia and delivered to Rosmorport in 2015.

References

  1. Aleksey Chirikov. SCF Group. Retrieved2012-01-27.
  2. 1 2 Arctech Launched Sister of Arctic Offshore Vessel. Arctech Helsinki Shipyard, 23 November 2012. Retrieved2012-11-25.
  3. 1 2 Arctic offshore vessel was delivered to Sovcomflot. Arctech Helsinki Shipyard, 19 April 2013. Retrieved2013-04-19.
  4. 1 2 "Aleksey Chirikov (111107)". Register of ships. Russian Maritime Register of Shipping . Retrieved 2013-06-12.
  5. "Aleksey Chirikov (9613551)" . Equasis. French Ministry for Transport . Retrieved 2013-06-12.
  6. Esko Mustamäki appointed as the Managing Director of Arctech Helsinki Shipyard Inc. Arctech Helsinki Shipyard, 4 April 2011. Retrieved2012-01-28.
  7. Arctech receives an order for two new icebreaking Supply Vessels from Sovcomflot. Arctech Helsinki Shipyard, 16 December 2010.
  8. "Russia: Sovcomflot Successiful in Exxon Neftegas Supply Vessel Tender". Offshore Energy Today. 2010-12-20. Retrieved 2012-01-27.
  9. Arctech Started the Hull Assembly of Multifunctional Icebreaking Supply Vessel. Arctech Helsinki Shipyard, 19 January 2012. Retrieved2012-01-27.
  10. Arctech Helsinki Shipyard Started the Production of Second Icebreaking Supply Vessel. Arctech Helsinki Shipyard, 2 November 2011. Retrieved2012-01-28.
  11. Arctech Helsinki Shipyard Started the Hull Assembly of Arctic Offshore Vessel. Arctech Helsinki Shipyard, 3 July 2012.
  12. Arctic Offshore Vessel Will Be Delivered from Arctech 4 months in Advance. Arctech Helsinki Shipyard, 15 August 2012. Retrieved2012-08-15.
  13. Arctic offshore vessel Vitus Bering on sea trial. Arctech Helsinki Shipyard, 22 November 2012. Retrieved2012-11-25.
  14. Arctic offshore vessel Aleksey Chirikov on sea trial. Arctech Helsinki Shipyard, 19 March 2013. Retrieved2013-03-25.
  15. SCF Sakhalin. Arctech Helsinki Shipyard. Retrieved2012-01-28.
  16. Helsinki yard turns to special vessels for Arctic conditions. Helsingin Sanomat, 14 August 2012.
  17. References - Propulsion Products. ABB. Retrieved2015-05-28.
  18. Multifunctional icebreaking supply vessel (MIBSV) Archived 2013-12-30 at the Wayback Machine . Arctech Helsinki Shipyard. Retrieved2012-01-27.
  19. Russian multi-purpose icebreaking PSV begins build in Finland Archived 2013-01-29 at archive.today . The Motor Ship, 20 January 2012. Retrieved2012-01-27.