Algoma Equinox

Last updated

Algoma Equinox in the Burlington Canal November 2019 (Ontario, Canada).jpg
Algoma Equinox in the Burlington Canal in 2019
History
NameAlgoma Equinox
Owner Algoma Central
Builder Nantong Mingde Heavy Industries, Tongzhou, China
Yard numberMD149
Laid down21 April 2012
Launched24 December 2012
Completed25 September 2013
In serviceDecember 2013
Identification IMO number:  9613927
StatusIn active service
General characteristics
Class and type Equinox-classfreighter
Tonnage
  • 23,895  GT
  • 39,400  DWT
Length225.6 m (740 ft 2 in) oa
Beam23.8 m (78 ft 1 in)

Algoma Equinox is a lake freighter and lead ship of her class built for Algoma Central, a Canadian shipping company. The vessel was built to a new design by Nantong Mingde Heavy Industries at their shipyard in Tongzhou, China in 2013. The ship entered service in December 2013, operating in the Great Lakes and Saint Lawrence Seaway.

Contents

Design and description

Algoma Equinox was constructed to a new design of lake freighters that operate on the Great Lakes by the design firm Delta Marine. [1] Algoma Central asserted that new design and new technology would make the new vessels 45 percent more energy efficient than their earlier vessels. Algoma Equinox is a "gearless bulker" meaning she has to use shore facilities to load and unload. [2] Two of the new gearless vessels will be owned by the Canadian Wheat Board, but operated by Algoma Central, on the Board's behalf. [3]

Algoma Equinox is 225.6 m (740 ft 2 in) long overall with a beam of 23.8 m (78 ft 1 in). The vessel has a gross tonnage (GT) of 23,895 and a deadweight tonnage (DWT) of 39,400. [4] Each crew member has an individual cabin, with an en-suite washroom, broadband internet, and satellite TV connections. [5] The vessel can operate with a minimum of 18 crew. [6]

Service history

The vessel was ordered as part of Algoma Central's plan to renew their Great Lakes shipping fleet. [3] The ship's keel was laid down on 21 April 2012 by Nantong Mingde Heavy Industries at their shipyard in Tongzhou, China. Algoma Equinox was launched on 24 December later that year and completed on 25 September 2013. [2] [4] The ship then crossed the Pacific Ocean and passed through the Panama Canal arriving at Port-Cartier, Quebec, in September 2013. [1] The vessel made its maiden voyage through the Great Lakes and Saint Lawrence Seaway in December 2013. [7] Algoma Equinox primarily transports iron ore and grain in the Great Lakes and Saint Lawrence Seaway. [1]

Captain Ross Armstrong of Algoma Equinox received the Top Hat as the first ship through the Welland Canal for 2014 at the Welland Canals Centre at Lock 3 in St. Catharines, Ontario, on 28 March 2014. Due to ice conditions on Lake Erie, she was unable to complete the journey into the lake that day. [8] Algoma Equinox was featured on Season 8 Episode 4 of the Discovery Channel's program Mighty Ships . [9]

Related Research Articles

Canada Steamship Lines (CSL) is a shipping company with headquarters in Montreal, Quebec, Canada. The business has been operating for well over a century and a half.

<span class="mw-page-title-main">Lake freighter</span> Ship type

Lake freighters, or lakers, are bulk carrier vessels that operate on the Great Lakes of North America. These vessels are traditionally called boats, although classified as ships.

<span class="mw-page-title-main">Algoma Central</span>

The Algoma Central Corporation is the result of a reorganization of the Algoma Central Railway in 1990. The company claims assets in excess of $400 million and revenue of $280 million. Corporate headquarters is located in St. Catharines, Ontario, Canada.

Port Weller Dry Docks was a shipbuilder on the Welland Canal at the Lake Ontario entrance. The shipbuilder was founded in 1946 and the site was initially owned by the Government of Canada for storage purchases. The shipyard expanded to include ship repair, and reconstruction work. In 1956, the drydock was sold to the Upper Lakes Shipping Company, which began the construction of vessels at the site. The shipyard twice went insolvent, most recently in 2015. Port Weller Dry Docks was used to build, refit and repair cargo vessels.

Quebecois was a lake freighter that served the Great Lakes, operating between ports in the United States and Canada. The vessel was launched in 1962 by Canadian Vickers Ltd of Montreal, Quebec, Canada. Used to carry grain and ore, Quebecois was built to the maximum dimensions allowed on the Saint Lawrence Seaway. The vessel entered service in 1963 and in 2012, the ship's named was altered to Algoma Quebecois. The ship was broken up for scrap at Port Colborne, Ontario, Canada in 2013.

<i>Algoma Montrealais</i> Lake Cargo vessel

Montrealais was a lake freighter launched in 1961. Constructed in two parts, the vessel was completed in 1962 and registered in Canada. Utilized as a bulk carrier, the vessel served on the Great Lakes until 2015. Montrealais was sold three times between 1962 and 2012, when the freighter was acquired by Algoma Central Corp. and renamed Algoma Montrealais. The bulk carrier continued in service until 2015, when the vessel was renamed Mont and sold for scrap. Mont was taken to Aliağa, Turkey and broken up beginning on 10 July 2015.

MV <i>Algoma Mariner</i>

Algoma Mariner is a Canadian lake freighter delivered to Algoma Central on 31 May 2011. The bulk carrier was the first new Canadian-flagged vessel on the Great Lakes in 25 years. Algoma Mariner is a Seawaymax vessel, designed to carry dry bulk through the Saint Lawrence Seaway and Great Lakes. The vessel was constructed at the Chengxi Shipyard in China and is currently in service.

<i>Sauniere</i> (ship)

Sauniere was a self-unloading bulk carrier operated by Algoma Central. Laid down as Bulknes, before launching the vessel's name was changed to Brooknes. The ship was constructed and completed in 1970 and was initially owned by the Swedish company Kristian Jebsens Rederi A/S. In 1974, Algoma Central purchased the vessel, registered the ship in West Germany and renamed it Algosea. The ship was sent to Swan Hunter in England to be lengthened. Emerging in 1976, Algosea sailed for Canada for conversion to a self-unloading bulk carrier at Herb Fraser and Associates in Port Colborne, Ontario. Algosea, which transported road salt between ports in the Gulf of St. Lawrence, Saint Lawrence Seaway and Great Lakes suffered three collisions and two groundings during its career. The vessel was renamed Sauniere in 1982 and continued in service until 2009 when the bulk carrier was sold for scrap and broken up in Turkey in 2010.

MS Windoc was a lake freighter or laker, initially constructed as an ocean-going bulk carrier in West Germany in 1959. Entering service that year as Rhine Ore, the ship was renamed Steelcliffe Hall in 1977 and reconstructed as a laker. In 1988 the laker was renamed Windoc and in 2001, was involved in a collision with a bridge on the Welland Canal which caused the ship to catch fire. The ship was declared a constructive total loss. While undergoing repairs in Ontario, the ship broke free of its moorings and grounded. Later pulled free, the vessel was eventually converted into a barge.

<i>John B. Aird</i> (ship)

John B. Aird was a self-discharging lake freighter/bulk carrier that was launched in 1983 and served on the Great Lakes and Saint Lawrence Seaway until 2017. The vessel was owned and operated by Algoma Central during that time, which had named the vessel for a former chairman of the Algoma Central Railway. Prior to the construction of Algoma Equinox in 2013, John B. Aird was the last vessel built for the company.

<i>English River</i> (ship) Canadian lake freighter and bulk carrier, launched in 1961

English River was a lake freighter and bulk carrier, launched in 1961 by Collingwood Shipyards of Collingwood, Ontario. In her initial years she carried bulk cargoes and deck cargoes to smaller ports on the Great Lakes and Saint Lawrence River watershed and estuary. In 1973, the vessel was converted into a cement carrier and carried mainly raw cement for the construction industry. The ship continued to operate until English River was removed from service and sold for scrap.

<i>Algolake</i> Self-unloading bulk carrier

Algolake was a self-unloading bulk carrier owned and operated by Algoma Central. The ship entered service in 1977 on the Saint Lawrence Seaway. In 1994, the ship ran aground in the St. Lawrence River off Quebec. The ship was laid up for scrapping in 2018, renamed Gola and was later scrapped in Aliağa, Turkey.

<i>Algoma Progress</i>

Algoma Progress was a self-unloading lake freighter and bulk carrier operating on the North American Great Lakes, owned by Algoma Central. Launched in 1968, the ship was originally named Canadian Progress and operated by the Upper Lakes Shipping. At launch, the ship was the largest self-unloading vessel on the Great Lakes. Canadian Progress was used to transport coal, iron ore, barley and road salt on the Great Lakes and Saint Lawrence Seaway. Canadian Progress ran aground twice, the first in 1985 and then again in 1988. In 2011, Upper Lakes Shipping sold its entire fleet to Algoma Central, which renamed the vessel Algoma Progress. In 2014, Algoma Progress was sold for scrap and broken up at Port Colborne, Ontario.

<i>Whitefish Bay</i> (2012 ship)

Whitefish Bay is a self-unloading lake freighter that entered service with Canada Steamship Lines (CSL) in 2013. Built in China, the vessel is the third of CSL's Trillium-class ships. Her sister ships are Baie Comeau, Baie St. Paul and Thunder Bay. Whitefish Bay is used primarily to transport goods on the North American Great Lakes and the St. Lawrence Seaway.

<i>Pineglen</i>

Pineglen was a bulk carrier owned and operated by Canada Steamship Lines. She was built at the Collingwood Shipyards, in Collingwood, Ontario in 1985, to a single superstructure lake freighter design. Initially named Paterson, the vessel was sold to Canada Steamship Lines in 2002 and renamed. Unlike more modern lake freighters she was built to a "straight-deck" design – i.e. she was not equipped with a self-unloading boom. The vessel was sold for scrap in 2017.

Trillium-class freighter

The Trillium class is a series of freighters owned by Canada Steamship Lines (CSL). The class is divided into three subclasses; the self-discharging lake freighters, the lake bulk carriers, and the Panamax self-discharging bulk carriers. Initially a nine-ship building program, six are operated by Canada Steamship Lines for use on the Great Lakes, while three are operated by CSL Americas for international trade. Two more ships were acquired later for use by CSL Americas.

<i>Radcliffe R. Latimer</i>

Radcliffe R. Latimer is a lake freighter launched in 1978. The vessel is owned by Algoma Central but operated under charter to Canada Steamship Lines from 1994 to 1997. As Algobay, the bulk carrier was involved in a collision with another lake freighter in 1980. In 2009 the vessel was rebuilt in China for service in the Caribbean Sea. The vessel is currently in service.

The Equinox class is a series of related bulk carriers operated by Canadian shipping company Algoma Central for service on the Great Lakes. Two variants of the class have been ordered, totaling twelve ships.

<i>Algoma Provider</i>

Algoma Provider was a Canadian lake freighter, which operated from 1963 to 2013 under the flag of several shipping lines. She was built to seawaymax dimensions at the Collingwood Shipyards in Collingwood, Ontario for Canada Steamship Lines. She was powered by a steam turbine, and was the company's last steam-powered vessel. Initially named Murray Bay, the ship was sold in 1994 to Upper Lakes Shipping, which renamed the vessel Canadian Provider. In 2011, Upper Lakes Shipping sold its entire fleet to Algoma Central, which renamed the lake freighter Algoma Provider. The vessel continued in service until 2013, when she was sold to be broken up for scrap. The ship was renamed Ovi for her journey to the scrapyard in Turkey. During her career, the ship carried bulk cargoes to destinations along the Saint Lawrence Seaway and Great Lakes.

Algoma Sault, which entered service in 2018, is the third freighter Algoma Central named after Sault Ste. Marie, Ontario. She is a self-unloading bulk carrier, built for carrying cargoes like ore, grain, or coal, on the North American Great Lakes and St. Lawrence Seaway. She is the seventh vessel of the Equinox class, and like her sister ships she was built in China.

References

  1. 1 2 3 Ilika, Dan (20 January 2014). "Canada's greenest bulk freighter ready to cruise the Great Lakes". canadianmanufacturing.com. Retrieved 7 January 2018.{{cite web}}: CS1 maint: url-status (link)
  2. 1 2 Nguyen, Betty (25 December 2012). "Algoma: First Equinox Class Vessel Launched (Canada)". World Maritime News . Archived from the original on 20 October 2014. Retrieved 19 August 2016. This Equinox Class series will include eight vessels consisting of four gearless bulk carriers (requiring shore-side equipment for cargo discharge) and four self-unloading bulk carriers. Algoma will own six of the series, consisting of two gearless bulkers and four self-unloading vessels.
  3. 1 2 "Algoma Invests in Great Lakes Shipping". Marine Link . 23 March 2011. Archived from the original on 11 October 2015. Retrieved 22 June 2013. Equinox Class ships are the next generation of bulk carriers on the Great Lakes. They will be able to carry significantly more cargo and move faster than conventional vessels. Newer engine technology will result in reduced fuel consumption, which means lower fuel costs and lower emissions.
  4. 1 2 "Algoma Equinox (9613927)" . Miramar Ship Index . Retrieved 7 January 2018.
  5. "Tour the Equinox Class". Algoma Central. Archived from the original on 6 January 2014. Individual cabins include modular washroom facilities for ease of use and cleaning plus each cabin is fitted with broadband internet and satellite TV.
  6. Worsham, Taylor (22 September 2020). "The Algoma Equinox". The Sault News. Retrieved 30 April 2021.{{cite web}}: CS1 maint: url-status (link)
  7. Fraser, Don (6 December 2013). "Algoma's $400M Equinox investment starts sailing". St. Catharines Standard. Archived from the original on 19 December 2017. Retrieved 7 January 2017.
  8. Glynn, Matt (28 March 2014). "Lingering lake ice hinders Welland Canal traffic". Buffalo News . Archived from the original on 7 March 2016. Retrieved 30 March 2014.
  9. "Anchors Aweigh! Discovery's Canadian-Produced Mega Hit MIGHTY SHIPS Sets Sail for Season 8, July 19" (Press release). Bell Media. 29 June 2015. Retrieved 7 January 2018.