BXC Solar Power Station | |
---|---|
Country | Ghana |
Location | Gomoa Onyandze, Gomoa West District, Central Region |
Coordinates | 05°22′22″N00°41′36″W / 5.37278°N 0.69333°W Coordinates: 05°22′22″N00°41′36″W / 5.37278°N 0.69333°W |
Status | Operational |
Commission date | April 2016 |
Construction cost | US$30 million |
Owner(s) | Beijing Xiaocheng Company |
Operator(s) | Beijing Xiaocheng Company |
Solar farm | |
Type | Flat-panel PV |
Site area | 100 acres (40 ha) |
Power generation | |
Nameplate capacity | 20 MW (27,000 hp) |
BXC Solar Power Station, also Onyandze Solar Power Station, is an operational 20 megawatt solar power plant in Ghana. The solar farm was developed, financed and is owned and operated by Beijing Xiaocheng Company, a Chinese independent power producer (IPP). The power station, commercially commissioned in April 2016, was the largest grid-ready IPP solar farm in Ghana, at that time. The energy generated at this power station is evacuated via a high voltage transmission line to a substation at Winneba Roundabout, where it enters the national grid. [1]
The power station is Located on 100 acres (40 ha), in the settlement of Gomoa Onyandze, in Gomoa West District, in the Central Region of Ghana, close to the town of Otaw, Ghana. [1] This is about 11 kilometres (7 mi), west of Winneba, the nearest large town. [2] Otaw is located approximately 71 kilometres (44 mi) west of Accra, the capital and largest city of Ghana. [3] The geographical coordinates of BXC Solar Power Station are 05°22'22.0"N, 0°41'36.0"W (Latitude: 5.372778; Longitude:-0.693333). [4] This solar farm is in close proximity to the 20 megawatt Gomoa Onyaadze Solar Power Station. [5]
The power station has an installed maximum generation capacity of 20 megawatts, although the owner/developers have plans of expanding generation capacity to 40 megawatts. [1] The energy generated here is conveyed via a high voltage transmission line from the power station to a substation belonging to Power Distribution Services Ghana (PDSG), formerly Electricity Company of Ghana (ECG), where the energy enters the national grid. A long-term power purchase agreement, between PDSG and the owner/operators of the power station governs the terms of sale and purchase of the energy. [6] [7]
The power station is owned by Beijing Xiaocheng Company (BXC), an electronics and technology company, based in Beijing, China. The parent company has a Ghanaian subsidiary, BXC Ghana Limited. The parent funded and constructed the solar farm. The local subsidiary operates and manages the power station. [7] [8]
The cost of construction is reported to be US$30 million, incurred by the developer/owners of the power plant. [1] [9]
Historically, the main applications of solar energy technologies in Canada have been non-electric active solar system applications for space heating, water heating and drying crops and lumber. In 2001, there were more than 12,000 residential solar water heating systems and 300 commercial/ industrial solar hot water systems in use. These systems presently comprise a small fraction of Canada's energy use, but some government studies suggest they could make up as much as five percentage of the country's energy needs by the year 2025.
A photovoltaic power station, also known as a solar park, solar farm, or solar power plant is a large-scale photovoltaic system designed for the supply of merchant power into the electricity grid. They are differentiated from most building-mounted and other decentralised solar power applications because they supply power at the utility level, rather than to a local user or users. The generic expression utility-scale solar is sometimes used to describe this type of project.
Tororo Solar Power Station, also Tororo Solar North Power Station, is a 10 megawatts (13,000 hp) solar power plant in Uganda, the third-largest economy in the East African Community.
Nzema Solar Power Station is a 155 megawatts (208,000 hp) solar power plant, under construction in Ghana. When completed as expected in 2017, the power station will be the largest solar power installation on the African continent.
Kanzimbe Solar Power Station, also Salima Solar Power Station, is a 60 megawatts (80,000 hp) solar power plant, under construction, in Malawi, in Southern Africa.
Diéma Solar Power Station, is a planned 100 MW (130,000 hp) solar power plant in Mali. The privately owned power plant is expected to sell the energy produced to the national electric utility, Energie du Mali (EDM-SA), under a 25-year power purchase agreement.
The Lubango Solar Power Station is a planned 35 MW (47,000 hp) solar power plant in Angola. The power station is in the development stage, by the company Total Eren, a subsidiary of TotalEnergies, the French oil conglomerate, in collaboration with Greentech-Angola Environment Technology.
The Dondo Solar Power Station is a planned 40 MW (54,000 hp) solar power plant in Mozambique. The power station is part of a 160 megawatts energy package of four renewable energy power stations under development in the country. They comprise three solar power stations in the districts of Dondo, Lichinga and Chiuta, together with a wind farm in Inhambane Province. Each power station will have maximum generation capacity of 40 MW.
The Khoumagueli Solar Power Station is a 40 MW (54,000 hp) solar power plant under development in Guinea. When completed, it is expected to be the largest grid-connected, privately funded solar power plant in the country.
The Golomoti Solar Power Station is a 20 MW (27,000 hp) solar power plant, under construction in Malawi. The power station is being developed by a consortium comprising InfraCo Africa of the United Kingdom and JCM Power, a Canadian independent power producer. The solar farm is expected to come online during the fourth quarter of 2021.
The Kwekwe Solar Power Station is a proposed 50 MW (67,000 hp) solar power plant in Zimbabwe. The power station is under development by a consortium comprising Tatanga Energy, an independent power producer (IPP) and Sable Chemical Industries, a fertilizer-manufacturing company. The energy generated by this station is intended for use, primarily in the fertilizer factory, with the excess sold to Zimbabwe Electricity Supply Authority (ZESA), for integration into the national electricity grid.
The Blitta Solar Power Station is an operational 50 MW (67,000 hp) solar power plant in Togo. The power station was developed by Amea Power, an independent power producer (IPP), based in the United Arab Emirates. The solar farm, which is the largest grid-ready in Togo, is also referred to as Mohamed Bin Zayed Power Station, named after His Highness Sheikh Mohamed bin Zayed Al Nahyan, the Crown Prince of Abu Dhabi. The power station began commercial operations in June 2021.
The Serenje Solar Power Station is a proposed 200 MW (270,000 hp) solar power plant in Zambia. The project is rated as the largest solar project in the country. The power station is under development by Ultra Green Corporation Zambia Limited, a subsidiary of Ultra Green Corporation Inc., an American independent power producer (IPP).
The Kishapu Solar Power Station is a proposed 50 MW (67,000 hp) solar power plant in Tanzania. The power station is under development by Tanzania Electric Supply Company Limited (TANESCO), the national electricity monopoly utility company. The energy will be integrated into the national grid, also operated by TANESCO. The solar farm will be developed in phases to capacity of 150 megawatts. When completed and commissioned, it will be the largest, grid-ready solar power station in the country.
The Gomoa Onyaadze Solar Power Station is an operational grid-connected 20 megawatts (27,000 hp) solar power plant, in Ghana. The privately owned power station sells its power to the Power Distribution Services Ghana (PDSG), formerly Electricity Company of Ghana (ECG), under a long-term power purchase agreement.
The Oyster Bay Wind Power Station is an operational 140 MW (190,000 hp) wind power plant in South Africa. The power station was developed and is owned by Enel Green Power, a subsidiary of the Italian energy conglomerate, Enel, headquartered in Rome. The energy generated at this wind farm is sold to the South African national electricity utility company Eskom, under a 20-year power purchase agreement (PPA).
The Wesley–Ciskei Wind Power Station is a 34.5 megawatts wind power energy project, under construction in South Africa. The power station is under development and is owned by EDF Renewables, a subsidiary of the French energy conglomerate Électricité de France (EDF). EDF won the concession for this project in June 2015, during the 4th round of the South African government's Renewable Energy Independent Power Producer Procurement of South Africa (REIPPP).