Independent power producer

Last updated

An independent power producer (IPP) or non-utility generator (NUG) is an entity [1] that is not a public utility but owns facilities to generate electric power for sale to utilities and end users. [2] NUGs may be privately held facilities, corporations, cooperatives such as rural solar or wind energy producers, and non-energy industrial concerns capable of feeding excess energy into the system. [3]

Contents

An independent water and power producer (IWPP) is similar to an IPP, but with a unified process to also output usable treated water. [4]

Economic situation

For most IPPs, particularly in the renewable energy industry, a feed-in tariff or power purchase agreement provides a long-term price guarantee.

IPPs have been successful in driving the electricity sector's transition to renewables globally, owning the majority of the currently operating renewable energy generation capacity. [5]

Germany

Rare in Germany for decades, the IPP business model has grown more common since the EEG (for renewable energy). Success in the approach depends on finding a partner for distributing the produced energy to the customer.

Canada

In 2002, the government of British Columbia stipulated that new clean renewable energy generation in the province [6] would be developed by "independent power producers" (IPPs) not BC Hydro, save for large hydro-electric facilities. The role of the private sector in developing BC's "public" resources is one of the more controversial issues that British Columbians are currently grappling with.

Taiwan

Taiwan's electricity market was liberalized in January 1995. Nine IPP companies are currently operating in Taiwan. [7]

United States

NUGs were rare before the enactment of the US Public Utility Regulatory Policies Act (PURPA) of 1978. The few existing NUGs were seldom able to distribute power, as the cost of building the conveyance infrastructure was prohibitive. Public utilities generated power and owned the generating facilities, the transmission lines, and the local distribution-delivery systems. PURPA, however, established a class of non‐utility generators, called Qualifying Facilities (QFs), that were permitted to produce power for resale.

PURPA was intended to reduce domestic dependence on foreign energy, to encourage energy conservation, and to reduce the ability of electric utilities to abuse the purchase of power from QFs. A QF is defined as a generating facility that produces electricity and another form of useful thermal energy through the sequential use of energy, and meets certain ownership, operating, and efficiency criteria established by the Federal Energy Regulatory Commission (FERC).

Section 210 of PURPA now requires utilities to purchase energy from QFs at the utility's avoided cost. This allows QFs to receive a reasonable to excellent price for the energy they produce and ensures that energy generated by small producers won't be wasted. [3]

Pakistan

In 1994, the Government of Pakistan announced an investor-friendly policy to develop IPPs based on oil, coal and gas. Following the policy, 16 IPPs were established. The next year, a hydro power policy was announced, which resulted in the development of the country's first Hydro IPP.

In 2002, the new government adopted a new policy, under which another 12 IPPs began operations. For the development of Independent Power Producers (IPPs), Private Power and Infrastructure Board operates as one window facilitator on behalf of all the departments and Ministries of the Government of Pakistan to; process power projects in IPP mode, monitor their development, and facilitates in providing all required support on behalf of the Government of Pakistan.

In 2015, Pakistan adopted a new power policy by which another 13 IPPs were established, mostly by Chinese companies. A transmission policy for development of transmission line in the private sector was also announced.

More than 40 IPPs were operating in Pakistan as of 2018.

India

India also has many IPP's like ReNew Power, Adani, KPI Green Energy, Hero, Mytrah, Ostro, Greenko, Alfanar, Mahindra Susten, Jakson Ltd.Etc.

South Africa

The Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) is an initiative by the South African government aimed at increasing electricity generation through private sector investment in solar photovoltaic and concentrated solar, onshore wind power, small hydro (<40 MW), landfill gas, biomass, and biogas. As of 2021, there were 117 allocations, totalling 8891.86 MW, for private sector generation.

Related Research Articles

The British Columbia Hydro and Power Authority, operating as BC Hydro, is a Canadian electric utility in the province of British Columbia. It is the main electricity distributor, serving more than 4 million customers in most areas, with the exception of the City of New Westminster, where the city runs its own electrical department and portions of the West Kootenay, Okanagan, the Boundary Country and Similkameen regions, where FortisBC, a subsidiary of Fortis Inc. directly provides electric service to 213,000 customers and supplies municipally owned utilities in the same area. As a provincial Crown corporation, BC Hydro reports to the BC Ministry of Energy, Mines and Low Carbon Innovation, and is regulated by the British Columbia Utilities Commission (BCUC). Its mandate is to generate, purchase, distribute and sell electricity.

<span class="mw-page-title-main">Public Utility Regulatory Policies Act</span> Part of the US federal law known as the National Energy Act

The Public Utility Regulatory Policies Act is a United States Act passed as part of the National Energy Act. It was meant to promote energy conservation and promote greater use of domestic energy and renewable energy. The law was created in response to the 1973 energy crisis, and one year in advance of a second energy crisis.

<span class="mw-page-title-main">Hydro One</span> Electricity transmission and distribution utility serving in Ontario, Canada

Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario. In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

<span class="mw-page-title-main">The Electricity Act, 2003</span> Electricity act of government of India

The Electricity Act, 2003 is an Act of the Parliament of India enacted to transform the power sector in India.

<span class="mw-page-title-main">TANESCO</span>

The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO.

A feed-in tariff is a policy mechanism designed to accelerate investment in renewable energy technologies by offering long-term contracts to renewable energy producers. This means promising renewable energy producers an above-market price and providing price certainty and long-term contracts that help finance renewable energy investments. Typically, FITs award different prices to different sources of renewable energy in order to encourage the development of one technology over another. For example, technologies such as wind power and solar PV are awarded a higher price per kWh than tidal power. FITs often include a "digression": a gradual decrease of the price or tariff in order to follow and encourage technological cost reductions.

As of August 2020 Chile had diverse sources of electric power: for the National Electric System, providing over 99% of the county's electric power, hydropower represented around 26.7% of its installed capacity, biomass 1.8%, wind power 8.8%, solar 12.1%, geothermal 0.2%, natural gas 18.9%, coal 20.3%, and petroleum-based capacity 11.3%. Prior to that time, faced with natural gas shortages, Chile began in 2007 to build its first liquefied natural gas terminal and re-gasification plant at Quintero near the capital city of Santiago to secure supply for its existing and upcoming gas-fired thermal plants. In addition, it had engaged in the construction of several new hydropower and coal-fired thermal plants. But by July 2020 91% of the new capacity under construction was of renewable power, 46.8% of the total solar and 25.6% wind, with most of the remainder hydro.

As required by the Constitution, the electricity sector is federally owned, with the Federal Electricity Commission essentially controlling the whole sector; private participation and foreign companies are allowed to operate in the country only through specific service contracts. Attempts to reform the sector have traditionally faced strong political and social resistance in Mexico, where subsidies for residential consumers absorb substantial fiscal resources.

The largely government owned electricity sector in Haiti, referred to as Électricité d'Haïti (ED'H for "Haiti Electric Utility", faced a deep crisis characterized by dramatic shortages and the lowest coverage of electricity in the Western Hemisphere in 2006. with only about 38.5% of the population having regular access to electricity. In addition, Haiti's large share of thermal generation makes the country especially vulnerable to rising and unstable oil prices.

A power purchase agreement (PPA), or electricity power agreement, is a long-term contract between an electricity generator and a customer, usually a utility, government or company. PPAs may last anywhere between 5 and 20 years, during which time the power purchaser buys energy at a pre-negotiated price. Such agreements play a key role in the financing of independently owned electricity generators, especially producers of renewable energy like solar farms or wind farms.

<span class="mw-page-title-main">Electricity policy of Alberta</span>

The electricity policy of Alberta, enacted through several agencies, is to create an electricity sector with a competitive market that attracts investors, while providing consumers with reliable and affordable electricity, as well as reducing harmful pollution to protect the environment and the health of Albertans, according to their 2022 website.

Electricity in Pakistan is generated, transmitted and distributed by two vertically integrated public sector companies, first one being Water and Power Development Authority (WAPDA) responsible for the production of hydroelectricity and its supply to the consumers by electricity distribution companies (DISCOS) under the Pakistan Electric Power Company (PEPCO) being the other integrated company. Currently, there are 12 distribution companies and a National Transmission And Dispatch Company (NTDC) which are all in the public sector except Karachi Electric in the city of Karachi and its surrounding areas. There are around 42 independent power producers (IPPs) that contribute significantly in electricity generation in Pakistan.

The electricity sector in Guyana is dominated by Guyana Power and Light (GPL), the state-owned vertically integrated utility. Although the country has a large potential for hydroelectric and bagasse-fueled power generation, most of its 226 MW of installed capacity correspond to thermoelectric diesel-engine driven generators.

The United States has the second largest electricity sector in the world, with 4,178 Terawatt-hours of generation in 2023. In 2023 the industry earned $491b in revenue at an average price of $0.127/kWh.

<span class="mw-page-title-main">Electricity sector in Sri Lanka</span>

The electricity sector in Sri Lanka has a national grid which is primarily powered by hydroelectric power and thermal power, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid.

<span class="mw-page-title-main">Electricity sector in the Philippines</span> Overview of the electricity sector in the Philippines

The electricity sector in the Philippines provides electricity through power generation, transmission, and distribution to many parts of the country. The Philippines is divided into three electrical grids, one each for Luzon, the Visayas and Mindanao. As of June 2016, the total installed capacity in the Philippines was 20,055 megawatts (MW), of which 14,348 MW was on the Luzon grid. As of June, 2016, the all-time peak demand on Luzon was 9,726 MW at 2:00 P.M. on May 2, 2016; on Visayas was 1,878 MW at 2:00 P.M. on May 11, 2016; and on Mindanao was 1,593 MW at 1:35 P.M. on June 8, 2016. However, about 12% of Filipinos have no access to electricity. The Philippines is also one of the countries in the world that has a fully functioning electricity market since 2006 called the Philippine Wholesale Electricity Spot Market(WESM) and is operated by an independent market operator.

Independent power producer (IPP) projects have had a significant presence in British Columbia since the 1980s. Their relationship with BC Hydro grew from the province's need to supply growing energy demands and implementation of the 2002 Energy Strategy, which mandated that BC Hydro would purchase its energy supply from IPPs rather than generating the supply itself. There are a variety of power projects in BC, with the most popular being hydroelectricity and biomass projects. In recent years, more attention has been placed on the environmental effects of IPP projects and the social implications it has to residents living around the project development sites. Despite the decline in demand for new IPP projects, in 2016 they supplied 20,000 GWh, one-third of BC Hydro's total.

<span class="mw-page-title-main">Renewable energy in South Africa</span>

Renewable energy in South Africa is energy generated in South Africa from renewable resources, those that naturally replenish themselves—such as sunlight, wind, tides, waves, rain, biomass, and geothermal heat. Renewable energy focuses on four core areas: electricity generation, air and water heating/cooling, transportation, and rural energy services. The energy sector in South Africa is an important component of global energy regimes due to the country's innovation and advances in renewable energy. South Africa's greenhouse gas (GHG) emissions is ranked as moderate and its per capita emission rate is higher than the global average. Energy demand within the country is expected to rise steadily and double by 2025.

Net metering in New Mexico is a set of state public policies that govern the relationship between solar customers and electric utility companies.

References

  1. Gas engines for IPPs, www.clarke-energy.com, accessed 11 November 2013
  2. "Independent Power Producer (IPP) - Americas Generators". Gopower.com. Archived from the original on 10 February 2012. Retrieved 8 February 2012.
  3. 1 2 "independent power producer (IPP), non-utility generator (NUG)". Energyvortex.com. Archived from the original on 17 January 2013. Retrieved 8 February 2012.
  4. "Water and Power: Will Your Next Power Plant Make Both?". 9 January 2012. Retrieved 6 June 2019.
  5. Alova, G. (2020). "A global analysis of the progress and failure of electric utilities to adapt their portfolios of power-generation assets to the energy transition". Nature Energy. 5 (11): 920–927. Bibcode:2020NatEn...5..920A. doi:10.1038/s41560-020-00686-5. ISSN   2058-7546. S2CID   225179903.
  6. "Archived copy" (PDF). Archived from the original (PDF) on 20 October 2022. Retrieved 27 May 2009.{{cite web}}: CS1 maint: archived copy as title (link)
  7. "Renewable Energy". Archived from the original on 29 October 2013. Retrieved 11 November 2013.