Bangalore Water Supply and Sewerage Board

Last updated

The Bangalore Water Supply and Sewerage Board (BWSSB) is the premier governmental agency responsible for sewage disposal and water supply to the Indian city of Bangalore. It was formed in 1964. [1]

Contents

Bangalore Water Supply and Sewerage Board
BWSSB Water Treatment Plant.jpg
A water treatment plant of BWSSB
Statutory corporation overview
Formed10 September 1964(60 years ago) (1964-09-10)
Jurisdiction Government of Karnataka
Headquarters Bangalore, Karnataka, India
Website https://bwssb.karnataka.gov.in/english

Water supply

Typical BWSSB water supply tank for the locality. BWSSB Water Tank at Indiranagar, Hundred Feet Road.JPG
Typical BWSSB water supply tank for the locality.

BWSSB currently supplies approximately 900 million liters (238 million gallons) of water to the city per day, despite a municipal demand of 1.3 billion liters. Water for the city (with a population of 10 million) comes from a number of sources, with 80% of it coming from the Cauvery River. Water is also drawn from the Arkavathy River, but the supply does not meet the demand. [2]

The Per Capita water supply that BWSSB is able to provide averages 100 to 125 liters per capita per day. However, the actual availability of water to the poor areas of the city is limited by infrastructure, and so for these areas, the per capita supply can be as low as 40 to 45 liters per day. The per capita national standard for a city the size of Bangalore is 150 to 200 liters per day, [2] From the month of March 2012, water supply in Whitefield has been stopped, with even rich neighborhoods left to fend for themselves.

Kaveri River project

The majority of the water for Bangalore is imported by the BWSSB from the Cauvery River, over 100 kilometers (62 mi) south of the city. [3] Cauvery water was originally drawn from a reservoir near the village of Thorekadanahalli. To meet the increasing demand, the "Cauvery Water Supply Scheme" was undertaken by the BWSSB, with Stages I - III completed. [2] Stage IV is currently being built, with Phase I completed and bringing an additional 270 million liters to the city. [2] [4] Construction of Stage IV: Phase II is expected to bring an additional 510 million liters, and will be completed by 2010. [2]

The energy required to transport the water this distance consumes 75% of the agency's revenues. [5]

Arkavathy River

Up to 20% of the normal water supply for Bangalore comes from the Arkavathy River, from two reservoirs built on the river, the Hesaraghatta (or Hesseraggatta) which was built in 1894 and the Tippagondanahalli Reservoir (or T G Halli), which was built in 1933. [2]

In June 2007, T G Halli, from which BWSSB pumped 35 million liters per day into the western parts of the city, had effectively gone dry due to lack of rainfall over its watershed. BWSSB officials stated that they would address the issue initially by making water available for only one hour a day, and then by diverting water from other parts of the city, as well as bringing water in by truck. [6] The quality of the water in the reservoir has also become compromised by the discharge of effluent into the reservoir. [7]

Rainwater harvesting

To further address water supply issues, BWSSB has studied the rainwater harvesting (RWH) techniques used in Chennai, where such methods have greatly reduced water shortage issues. RWH methods are becoming mandatory in Bangalore. [5] In addition, in April 2007, BWSSB issued a moratorium on new building hookups to the water system. [8] The moratorium was lifted in July, but only on new buildings that have a RWH system installed. [9]

Water rationing

The BWSSB is also considering implementing a mandatory water rationing program in order to evenly distribute what water supplies exist. A small trial rationing program was instituted in March 2007. Electronic water meters would shut off after the allotted amount of water was used, but the program was considered a technical failure, due in part to software issues. [10]

Water table issues

Groundwater extraction has caused the water table to drop variously from 90 to 300 meters (300 to 1000 feet) below ground level (as compared to an average water table depth of about 30 meters (90 feet) two decades ago), according to the Indian Institute of Science. [5] [11]

The situation affecting T G Halli are not isolated. Rapid urbanization in and around Bangalore has destroyed many wetlands areas (of the 51 lakes in the city in 1973, only 17 remain in 2007 [11] ), which has also contributed to the decrease in the water table.[ citation needed ]

Sewerage system

Bangalore's original sewerage system was built in 1922, a time when the city was much smaller than it is today; the original system served only the heart of the city. In 1950, with the city greatly expanding, a project was initiated to greatly expand the sewerage system. After the BWSSB was formed in the 1960s, programs were again implemented to expand the system to not sewer areas. The current sewer system utilizes stoneware pipes up to 300 millimetres (11.8 in) in diameter, and RCC pipes for the mains and outfalls up to 2,100 millimetres (82.7 in) in diameter. [12]

There are three main sewage treatment plants, which are located in the Vrishabavathy, Koramangala-Chellaghatta and Hebbal valleys. Two additional mini-plants have been built near Madiwala and Kempambudi. [2]

See also

Related Research Articles

Water supply and sanitation in Singapore are intricately linked to the historical development of Singapore. It is characterised by a number of outstanding achievements in a challenging environment with geographical limitations. Access to water in Singapore is universal, affordable, efficient and of high quality.

<span class="mw-page-title-main">Thippagondanahalli Reservoir</span> Reservoir west of Bangalore, India

Thippagondanahalli Reservoir, also known as T G Halli Dam or Chamarajasagara, is located at the confluence of the Arkavathy and Kumudavathi rivers, 35 kilometres (22 mi) west of Bangalore, India. It is used by the Bangalore Water Supply and Sewerage Board as a major source of drinking water for western Bangalore. The lake is a man-made reservoir, created by the building of a dam which was inaugurated in 1933. M. Visvesvaraya supervised the construction work.

<span class="mw-page-title-main">Manila Water</span>

Manila Water Company, Inc. has the exclusive right to provide water and used water (wastewater) services to over six million people in the East Zone of Metro Manila. It is a subsidiary of Enrique Razon's Trident Water Holdings Company, Inc., who acquired stakes from the country's oldest conglomerate, Ayala Corporationstarting in 2020 and completely taking over by 2024.

Guyana, meaning "land of many waters", is rich in water resources. Most of the population is concentrated in the coastal plain, much of which is below sea level and is protected by a series of sea walls. A series of shallow reservoirs inland of the coastal plain, called "water conservancies", store surface water primarily for irrigation needs. Key issues in the water and sanitation sector in Guyana are poor service quality, a low level of cost recovery and low levels of access.

<span class="mw-page-title-main">Hesaraghatta Lake</span> Freshwater lake in Bengaluru, Karnataka

Hesaraghatta Lake is a humanmade reservoir located 18 km to the north-west of Bengaluru in Karnataka state, India. It is a fresh water lake created in the year 1894 across the Arkavathy River to meet the drinking water needs of the city. Sir K. Seshadri Iyer, the then Dewan of erstwhile Mysore state and the then Chief Engineer of Mysuru, M. C. Hutchins, planned to build the scheme called the "Chamarajendra Water Works" to store a three-years' water supply to the city.

The water resources of Palestine are de facto fully controlled by Israel, and the division of groundwater is subject to provisions in the Oslo II Accord.

<span class="mw-page-title-main">Water management in Greater Mexico City</span>

Greater Mexico City, a metropolitan area with more than 19 million inhabitants including Mexico's capital with about 9 million inhabitants, faces tremendous water challenges. These include groundwater overexploitation, land subsidence, the risk of major flooding, the impacts of increasing urbanization, poor water quality, inefficient water use, a low share of wastewater treatment, health concerns about the reuse of wastewater in agriculture, and limited cost recovery. Overcoming these challenges is complicated by fragmented responsibilities for water management in Greater Mexico City:

<span class="mw-page-title-main">Water management in greater Tegucigalpa</span> Place in Francisco Morazán, Honduras

Tegucigalpa, the capital city of Honduras, is located in a central mountainous region having a tropical climate within the Choluteca river basin. Major rivers supplying the capital city are the Choluteca and Guacerique rivers which then fill the Concepción and Laureles storage reservoirs. With an urban population of approximately 900,000 and another 400,000 living in the surrounding neighborhoods, Tegucigalpa is being confronted with an array of imposing integrated urban water management (IUWM) challenges. Potable water coverage is poor with around 40% of the city's residents without access to piped water supply thus relying on more costly water trucks and bottled water.

<span class="mw-page-title-main">Arkavathi River</span> River in India

The Arkavati is an important mountain river in Karnataka, India, originating at Nandi Hills of Chikkaballapura district. It is a tributary of the Kaveri, which it joins at 34 km south of Kanakapura, Ramanagara District called Sangama in Kannada, after flowing through Ramanagara and Kanakapura. The river drains into the Chikkarayappanahalli Lake near Kanivenarayanapura. Kumudavathi and Vrishabhavathi rivers are tributaries to this river. It forms Chunchi falls near Haroshivanahalli. It joins Cauvery river as a tributary near Mekedatu.

<span class="mw-page-title-main">Water supply and sanitation in Burkina Faso</span>

Water supply and sanitation in Burkina Faso are characterized by high access to water supply in urban areas, while access to an at least basic water sources in rural areas – where three quarters of the population live – remains relatively low. An estimated one third of water facilities in rural areas are out of service because of a lack of maintenance. Access to at least basic sanitation lags significantly behind access to water supply.

<span class="mw-page-title-main">Water supply and sanitation in Turkey</span>

Water supply and sanitation in Turkey is characterized by achievements and challenges. Over the past decades access to drinking water has become almost universal and access to adequate sanitation has also increased substantially. Autonomous utilities have been created in the 16 metropolitan cities of Turkey and cost recovery has been increased, thus providing the basis for the sustainability of service provision. Intermittent supply, which was common in many cities, has become less frequent. In 2004, 61% of the wastewater collected through sewers was being treated. In 2020 77% of water was used by agriculture, 10% by households and the rest by industry.Charging for water used by agriculture has been suggested.

Water supply and sanitation in Japan is characterized by numerous achievements and some challenges. The country has achieved universal access to water supply and sanitation, has one of the lowest levels of water distribution losses in the world, regularly exceeds its own strict standards for the quality of drinking water and treated waste water, uses an effective national system of performance benchmarking for water and sanitation utilities, makes extensive use of both advanced and appropriate technologies such as the jōkasō on-site sanitation system, and has pioneered the payment for ecosystem services before the term was even coined internationally. Some of the challenges are a decreasing population, declining investment, fiscal constraints, ageing facilities, an ageing workforce, a fragmentation of service provision among thousands of municipal utilities, and the vulnerability of parts of the country to droughts that are expected to become more frequent due to climate change.

Chennai Metropolitan Water Supply and Sewerage Board, known shortly as CMWSSB, is a statutory board of Government of Tamil Nadu which provides water supply and sewage treatment to the city of Chennai and its metropolitan region.

Water supply and sanitation in Lebanon is characterized by a number of achievements and challenges. The achievements include the reconstruction of infrastructure after the 1975–90 Civil War and the 2006 war with Israel, as well as the reform of the water and sanitation sector through a water law passed in 2000. The law created four Regional Water Establishments to consolidate numerous smaller utilities.

<span class="mw-page-title-main">Water supply and sanitation in Namibia</span>

Namibia is an arid country that is regularly afflicted by droughts. Large rivers flow only along its northern and southern borders, but they are far from the population centers. They are also far from the country's mines, which are large water users. In order to confront this challenge, the country has built dams to capture the flow from ephemeral rivers, constructed pipelines to transport water over large distances, pioneered potable water reuse in its capital Windhoek located in the central part of Namibia, and built Sub-Saharan Africa's first large seawater desalination plant to supply a uranium mine and the city of Swakopmund with water. A large scheme to bring water from the Okavango River in the North to Windhoek, the Eastern National Water Carrier, was only partially completed during the 1980s.

Water supply and sanitation in Nairobi is characterised by achievements and challenges. Among the achievements is the expansion of infrastructure to keep pace with population growth, in particular through the construction of the Thika Dam and associated water treatment plant and pipelines during the 1990s; the transformation of the municipal water department into an autonomous utility in 2003; and the more recent reduction of water losses – technically called non-revenue water – from 50 to 40%.

Water supply and sanitation in Vietnam is characterized by challenges and achievements. Among the achievements is a substantial increase in access to water supply and sanitation between 1990 and 2010, nearly universal metering, and increased investment in wastewater treatment since 2007. Among the challenges are continued widespread water pollution, poor service quality, low access to improved sanitation in rural areas, poor sustainability of rural water systems, insufficient cost recovery for urban sanitation, and the declining availability of foreign grant and soft loan funding as the Vietnamese economy grows and donors shift to loan financing. The government also promotes increased cost recovery through tariff revenues and has created autonomous water utilities at the provincial level, but the policy has had mixed success as tariff levels remain low and some utilities have engaged in activities outside their mandate.

The coastal city of Chennai has a metropolitan population of 10.6 million as per 2019 census. As the city lacks a perennial water source, catering the water requirements of the population has remained an arduous task. On 18 June 2019, the city's reservoirs ran dry, leaving the city in severe crisis.

<span class="mw-page-title-main">Water supply and sanitation in Algeria</span>

Drinking water supply and sanitation in Algeria is characterized by achievements and challenges. Among the achievements is a substantial increase in the amount of drinking water supplied from reservoirs, long-distance water transfers and desalination at a low price to consumers, thanks to the country's substantial oil and gas revenues. These measures increased per capita water supply despite a rapidly increasing population. Another achievement is the transition from intermittent to continuous water supply in the capital Algiers in 2011, along with considerable improvements in wastewater treatment resulting in better water quality at beaches. These achievements were made possible through a public-private partnership with a private French water company. The number of wastewater treatment plants throughout the country increased rapidly from only 18 in 2000 to 113 in 2011, with 96 more under construction. However, there are also many challenges. One of them is poor service quality in many cities outside Algiers with 78% of urban residents suffering from intermittent water supply. Another challenge is the pollution of water resources. There has also been insufficient progress concerning reuse of treated water, a government priority in this dry country.

Water supply and sanitation in Georgia is characterized by achievements and challenges. Among the achievements is the improvement of water services in the capital Tbilisi where the water supply is now continuous and of good quality, major improvements in the country's third-largest city Batumi on the Black Sea where the country's first modern wastewater treatment plant now is under operation, as well as a general increase in access to drinking water in the entire country. Water and sewer tariffs remain affordable, with the private water company Georgian Water and Power (GWP) serving the capital being financially viable and profitable, while the public water company serving most of the rest of the country remains financially weak. The improvements were achieved after the Rose Revolution of 2004 when the government decided to reform the sector and to invest in it after many years of neglect.

References

  1. "e-Governance in Bangalore Water Supply & Sewerage Board", India Governance Knowledge Center, accessed 11 August 2007 Archived 2007-10-19 at the Wayback Machine . Note that other sources indicate 1964 as the year of the Board's formation. Literally everybody living in Bangalore wastes so much water
  2. 1 2 3 4 5 6 7 BWSSB website FAQ Archived 2007-08-18 at the Wayback Machine
  3. "cauvery Water Supply Scheme - Stage IV: Phase I Design Review Report overview", TCE Consulting Engineers Limited, accessed 11 August 2007
  4. "Cauvery water for new areas soon", The Hindu, 20 June 2007, accessed 11 August 2007
  5. 1 2 3 "Bangalore team visits RWH structures in city", The Hindu, 3 August 2007, accessed 11 August 2007
  6. "It pours, but T G Halli reservoir remains dry", Deccan Herald, 27 June 2007, accessed 11 August 2007
  7. "Government of Karnataka Notification No. FEE 215 ENV 2000". Archived from the original on 27 September 2007. Retrieved 12 August 2007.
  8. "Rainwater harvesting is the way forward for Bangalore", The Hindu 3 June 2007, accessed 11 August 2007
  9. "Ban on New Water Connection Goes", Deccan Herald, 1 July 2007, accessed 11 August 2007
  10. "Water rationing looms large over Bangalore city", The Hindu, 27 June 2007
  11. 1 2 "Water access and citizens’ movements", The Hindu, 28 June 2007
  12. BWSSB Sewerage System overview