You can help expand this article with text translated from the corresponding article in Italian. (April 2024)Click [show] for important translation instructions.
|
This article needs additional citations for verification .(April 2024) |
Date | April 9 2024 |
---|---|
Location | Bargi, Camugnano, Italy |
Coordinates | 44°07′00″N11°02′35″E / 44.11674504°N 11.04307383°E |
Type | Explosion |
Deaths | 7 |
Non-fatal injuries | 5 |
Bargi hydroelectric power station (Italian : Centrale idroelettrica di Bargi) is a hydroelectric power station in the north-central part of Italy, in the Emilia-Romagna region. [1] The power station is located in Bargi, one of the villages around Lake Suviana lying upstream, in Camugnano near Bologna. It uses reservoirs created in the confluence of two right tributaries of the river Reno, which flows into the Adriatic Sea north of Ravenna). It is owned by Enel Green Power.
Back in 1911, the Brasimone reservoir with a volume of 6.4 million cubic metres was created with the help of a 40-meter high brick dam. It was located on the stream of the same name, which flows from the left into the Setta River (the right tributary of the Reno), and fed the Santa Maria power plant.
And in 1932, to the west of the Setta watershed, on the Limentra di Treppio river (another right tributary of Reno), the Suviana reservoir was built, [2] originally intended only to feed its own hydroelectric power plant with a capacity of 27 MW. The 96-meter-high and 225-meter-long gravity dam built here, which required 288,000 m3 of material, holds a reservoir with a volume of 46.7 million m3 (useful volume 43.9 million m3). It can be noted that, in addition to the direct flow, an additional resource comes to this reservoir from the western direction - from the Pavana reservoir on the Limentra di Sambuca (another right tributary of Reno) and from the Molino del Pallone water intake dam on Reno itself.
Due to increased energy demand, the Bargi hydroelectric power station was built in 1975 at a depth of 30 metres. The power plant uses water from both Lake Suviana and Lake Brasimone. [3] [4]
On April 9 2024, an explosion at the power plant left seven workers dead and five others critically injured. The explosion occurred around 15:00 CEST at the power plant. The power plant is located about 30 metres (98 ft) underground. [5] The prefect of Bologna, Attilio Visconti, said the explosion originated from a turbine located eight levels down and resulted in a fire, and the floor below it flooded. Enel Green Power said there was no damage to the dam's structure. [6]
Fifteen people were working at the plant at the time of the explosion. In the immediate aftermath, three workers were killed, including two from the southern cities of Taranto and Messina and a man from Romania who resided in Settimo Torinese. [7] Five people were critically injured with severe burns; they were transported by helicopter to nearby hospitals. Two people are in intensive care. [6] Four workers were declared missing. Three other workers escaped unharmed. [8]
On April 10, aquatic drones were deployed in the lake to search for the missing. [9] The next day, three of the missing were found dead, bringing the death toll to six. The men were from Padua, Milan and Pisa. [10] [11] On the morning of April 12, the last missing worker, a man from Naples, was found dead, bringing the death toll to seven. [12]
The fire brigade had great difficulty gaining access to the fire. [6] A rescue diver gained access to the seventh floor below the surface, but not lower where three people were trapped. [6]
Employees were evacuated following the explosion and electricity production was halted. [5]
The explosion contributed to concerns about work safety in Italy, with two of the country's largest unions renewing calls for planned nationwide four hour-strikes on April 10. [2] Following the explosion, more strikes and protests took place on April 11. [13] [14]
Authorities said the explosion appeared to have been caused by a defect in one of the turbines. [5] According to Marco Masinara, the mayor of Camugnano, the explosion occurred during maintenance work. [6] An investigation is due to launched after the missing people are found and the plant is deemed safe. [6]
On April 10, Masinara said the plant was never known to be at risk of such an incident. [15]
More than two years before the explosion, the Italian Labour Union issued warnings about safety risks in the hydroelectric power station. [14] However, Enel Energy denied such reports and said that it had received appreciation from labor unions in 2022 for the company's approach to training, safety, and risk assessment. [16]
Italian prime minister Giorgia Meloni said she was "anxiously" following the news and thanked the rescue workers. [6] Enel Green Power also expressed its condolences to the families of the victims [2] and has established an immediate fund of two million euros to enable the individuals involved and their families to address their immediate needs and emergencies. [17] The company also initiated an internal fundraising campaign to provide employees with the opportunity to express their condolences and solidarity with the families of the victims. [18]
On April 10, the explosion was commemorated by the Italian Chamber of Deputies. [19]
The Vajont Dam or Vaiont Dam is a disused hydro-electric dam in northern Italy. It is one of the tallest dams in the world, with a height of 262 m (860 ft). It is in the valley of the Vajont (river) under Monte Toc, in the municipality of Erto e Casso, 100 km (62 mi) north of Venice.
Enel S.p.A. is an Italian multinational manufacturer and distributor of electricity and gas. Enel was first established as a public body at the end of 1962, and then transformed into a limited company in 1992. In 1999, following the liberalisation of the electricity market in Italy, Enel was privatised. The Italian state, through the Ministry of Economy and Finance, is the main shareholder, with 23.6% of the share capital as of 1 April 2016.
Ravanusa is a comune (municipality) in the Province of Agrigento in the Italian region Sicily, located about 110 kilometres (68 mi) southeast of Palermo and about 35 kilometres (22 mi) east of Agrigento.
In Italy, the phrase Years of Lead refers to a period of political violence and social upheaval that lasted from the late 1960s until the late 1980s, marked by a wave of both far-left and far-right incidents of political terrorism and violent clashes.
The Reno is a river of Emilia-Romagna and Tuscany, northern Italy. At 211 km (131 mi), it is the tenth longest river in Italy and the most important of the region apart from the Po.
Ponale Hydroelectric Power Plant is a pumped storage plant, located in city of Riva del Garda in the Italian province of Trentino, on River Ponale between Lake Ledro and Lake Garda. Its output capability is 76MW.
Enel Green Power S.p.A. is an Italian multinational renewable energy corporation, headquartered in Rome. The company was formed as a subsidiary of the power generation firm Enel in December 2008. It has operations in five continents generating energy from solar, geothermal, wind and hydropower sources. As of 2024, it manages a capacity of 63,8 GW, with an annual production of 75.95 TWh and has over 1300 plants worldwide.
Italy's total electricity consumption was 302.75 terawatt-hour (TWh) in 2020, of which 270.55 TWh (89.3%) was produced domestically and the remaining 10.7% was imported.
The Presenzano Hydroelectric Plant, officially known as the Domenico Cimarosa Hydroelectric Plant, is located along the Volturno River in Presenzano, Province of Caserta, Italy. Using the pumped-storage hydroelectric method, it has an installed capacity of 1,000 megawatts (1,300,000 hp). Construction began in 1979, it was finished in 1990 and the generators commissioned in 1991. In 2004, the plant was renamed after Domenico Cimarosa. Power is generated by releasing water from the upper Cesima reservoir down to the power plant which contains four reversible 250 MW Francis pump-turbine-generators. After power production, the water is sent to the lower reservoir. During periods of low energy demand, the same pump-generators pump water from the lower reservoir back to the upper where it becomes stored energy. Power generation occurs when energy demand is high. The upper reservoir, formed by an embankment dam, is located at an elevation of 643 metres (2,110 ft) in the municipality of Sesto Campano in the Province of Isernia. Both the upper and lower reservoirs have an active storage capacity of 6,000,000 cubic metres (4,900 acre⋅ft). The difference in elevation between both the upper and lower affords a hydraulic head of 495 metres (1,624 ft).
The Bao-Tavera Dam Complex refers to two earth-filled embankment dams located about 15 km (9.3 mi) south of Santiago in Santiago Province of the Dominican Republic. The Bao Dam on the Bao River is 113 m (371 ft) and withholds a reservoir with a maximum storage capacity of 280,000,000 m3 (230,000 acre⋅ft). It is the second tallest dam in the country behind the Monción Dam. The Tavera Dam, about 8 km (5.0 mi) east of Bao Dam, on the river Yaque del Norte is 82 m (269 ft) high and has a reservoir with a capacity of 170,000,000 m3 (140,000 acre⋅ft). A 1.5 km (0.93 mi) canal connects each reservoir, making them a complex. The purpose of the complex is to provide municipal water, water for irrigation and to generate hydroelectric power. Water from the Tavera Reservoir is piped downstream to the Tavera Hydroelectric Plant which is situated on the right bank of the Bao River before it meets the Yaque del Norte River. The power station contains two 48 MW Francis turbine-generators for an installed capacity of 96 MW. Construction on the Tavera Dam began in September 1969 and it was completed on 27 September 1973. The Bao Dam was completed in 1981. The power station was upgraded from 80 MW to 96 MW in 1992.
Acea Spa is a multiutility operative in the management and development of networks and services in the water, energy and environmental sectors. Originally the city of Rome's provider, the Acea group is the main national operator in the water sector with a catchment area of about 10 million people, and manages integrated water services—aqueduct, sewerage and purification—that span the territories of Rome and Frosinone, as well as their respective provinces. Acea's activity is concentrated in Lazio, Tuscany, Umbria, Molise and Campania, as well as in some Latin American countries including Honduras, Peru and the Dominican Republic.
The Toulnustouc generating station, is a hydroelectric power generating station managed by Hydro-Québec on the Toulnustouc River in the territory of Côte-Nord, Quebec, Canada. It has an installed capacity of 526 MW. The power station is fed by water from a dam and dyke that contain the Lake-Sainte-Anne reservoir.
The Limentra di Sambuca is a mountain river in Italy, a right tributary of the Reno. It passes through Sambuca Pistoiese, on the north side of the Apennine Mountains. Its valley runs from southwest to northeast, parallel to the upper valley of the Reno to its west and the Limentrella to its east. It has a length of 19.4 kilometres (12.1 mi) and flows into the Reno near Ponte della Venturina, near the border between Tuscany and Emilia-Romagna.
The Limentra orientale (also: Limentra di Treppio) is a mountain river in Italy, a right tributary of the Reno. Its valley runs roughly from southwest to northeast, on the north side of the Apennine Mountains. Its upper valley is part of the Natura 2000 protected area Tre Limentre – Reno. Near Suviana is a 97 m (318 ft) high dam, creating one of the largest reservoirs of the Apennines, Lake Suviana, with a capacity of about 46,000,000 cubic metres (1.6×109 cu ft). It was built between 1928 and 1932 and is used for hydropower. The Bargi hydroelectric power station, site of a deadly explosion in April 2024, is situated at Lake Suviana. The Limentra orientale enters the Metropolitan City of Bologna near Lentula and Treppio. It flows into the Reno after 41 kilometres (25 mi), near Riola di Vergato.
On 3 July 2022, a serac collapsed on the mountain of Marmolada, in the Dolomites at the regional border between Trentino and Veneto, Italy. Eleven people were killed and eight were wounded. The large-scale collapse of the serac led to one of the most serious accidents in the Alps in decades. The seismic energy released was comparable to an earthquake of 0.6 M.
The Campo Moro dams are a pair of hydroelectric-gravity dams situated in Lanzada, in the province of Sondrio, Lombardy. The two dams are called Alpe Gera dam and Campo Moro dam. Alpe Gera, the largest of the pair, was constructed with approximately 1,800,000 m3 of concrete to create the Alpe Gera reservoir. The lower dam, Campo Moro, was created to form the Campo Moro reservoir.
Lake Suviana is an artificial lake located in metropolitan city of Bologna, Italy in the Bolognese Apennines, formed following the construction of a 91.5 m high dam, begun in 1928 and completed in 1932.
Lake Brasimone is an artificial lake located on the Bolognese Apennines along the Brasimone stream, in the municipal territory of Camugnano and is included within the Suviana and Brasimone.
The Mont-Cenis Lake is a lake located in the Mont-Cenis massif at an altitude of 1,974 meters in the municipality of Val-Cenis in France. It is situated at the top of the Cenise valley, on the Italian side of the Mont-Cenis pass, the most frequented passage on the Lyon-Turin-Milan axis during the Middle Ages between Western Europe and the Italian peninsula. This was while the Montgenèvre pass required an initial crossing, followed by the Lautaret pass, and the Petit-Saint-Bernard pass was 107 meters higher.