Beckjord Power Station

Last updated
Beckjord Generating Station
BeckjordPowerStation.JPG
Beckjord Power Station
Country
  • United States
Location Pierce Township, Clermont County, near New Richmond, Ohio
Coordinates 38°59′31.5″N84°17′50″W / 38.992083°N 84.29722°W / 38.992083; -84.29722 Coordinates: 38°59′31.5″N84°17′50″W / 38.992083°N 84.29722°W / 38.992083; -84.29722
StatusDecommissioned
Commission date Unit 1: 1952
Unit 2: 1953
Unit 3: 1954
Unit 4: 1958
Unit 5: 1962
Unit 6: 1969
Units GT1–GT4: 1972
Decommission dateUnit 1: 2012
Units 2–3: 2013
Units 4–6: 2014
Units GT1–GT4: 2014
Owner(s) Duke Energy
American Electric Power
Dayton Power & Light
Operator(s)Duke Energy
Thermal power station
Primary fuel Coal
Oil
Cooling source Ohio River
Power generation
Nameplate capacity 1,433 MW

The Walter C. Beckjord Generating Station was a 1.43-gigawatt (1,433 MW), dual-fuel power generating facility located near New Richmond, Ohio, 22 miles east of Cincinnati, Ohio. The plant began operation in 1952 and was decommissioned in 2014. It was jointly owned by Duke Energy, American Electric Power (AEP), and Dayton Power & Light (DP&L). [1]

Contents

Background

Of the two Beckjord power plants, one was coal-fired (Units 1–6) and the other was oil-fired (Units GT1–GT4). [2] [3] It was originally built by Cinergy (originally Cincinnati Gas and Electric Company (CG&E)), which was bought by Duke Energy in 2006. The plant is named after Walter C. Beckjord, the chairman of CG&E from 1957 to 1962. [4] CG&E installed new electrostatic precipitators at Beckjord in the 1970s to reduce pollution mandated by the State of Ohio. [5]

W. C. Beckjord Power Station [6]
UnitNameplate capacity, MWInitial year of operationRetired [7] [8]
Coal-Fired Unit 1115.019522012
Coal-Fired Unit 2112.519532013
Coal-Fired Unit 3125.019542013
Coal-Fired Unit 4163.219582014
Coal-Fired Unit 5244.819622014
Coal-Fired Unit 6460.819692014
Coal-Fired Total1,221.3
Oil-Fired Units GT1–GT452.9 (each)19722014
Oil-Fired Total211.6
Facility Total1,433

Closure and decommissioning

In July 2011, Duke Energy announced that Beckjord would shut down in January 2015 because of tightening environmental regulations from the Environmental Protection Agency (EPA) outweighed the benefits of retrofitting the plant. [9] The shut down was accelerated to November 2014 after an open valve caused an oil spill into the Ohio River the previous August. [4] [10] Duke Energy plead guilty in federal court in 2016 for spilling 9,000 gallons of diesel fuel into the Ohio River. The company was fined $1 million for the spill. [10]

In 2015, Duke Energy installed a battery-based energy storage system at the site for the purpose of regulating frequency in the electric grid. [11] As a part of the decommissioning process, Duke Energy terminated their lease with the New Richmond Soccer Association who played soccer matches adjacent to Beckjord. [12]

Duke Energy and its co-owners, AEP and DP&L, agreed to sell Beckjord and adjacent lands to Commercial Liability Partners for an undisclosed amount in February 2018. Commercial Liability Partners will repurpose the brownfields for redevelopment. [1]

In April 2023, local officials raised alarms after nearly 300 acres of the site, nearly one third, was purchased by a neighboring farmer. [13]

See also

Related Research Articles

<span class="mw-page-title-main">American Electric Power</span> United States utility company

American Electric Power Company, Inc. (AEP), is a major investor-owned electric utility in the United States, delivering electricity to more than five million customers in 11 states.

<span class="mw-page-title-main">Duke Energy</span> American electrical power and natural gas company

Duke Energy Corporation is an American electric power and natural gas holding company headquartered in Charlotte, North Carolina.

<span class="mw-page-title-main">William H. Zimmer Power Station</span>

The William H. Zimmer Power Station, located near Moscow, Ohio, was a 1.35-gigawatt coal power plant. Planned by Cincinnati Gas and Electric (CG&E), with Columbus & Southern Ohio Electric and Dayton Power & Light (DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation. The plant began operations in 1991. Today, the plant is owned and operated by Vistra Corp.

<span class="mw-page-title-main">Ohio Citizen Action</span>

Ohio Citizen Action is an advocacy group representing 32,000 members throughout Ohio. Over its history the organization has worked on issues as diverse as single-payer healthcare, expanding access to organic produce in grocery stores, and speeding Ohio's embrace of a just and equitable clean energy economy. The organization was founded in Cleveland in 1975 as the Ohio Public Interest Campaign (OPIC), a coalition of union, senior citizen, church, and community organizations. Responding to a wave of factory closings in Northeast Ohio, the coalition proposed state legislation to require advance notice to employees before a closing (1977). The Ohio legislature balked, so U.S. Senator Howard Metzenbaum (D-OH) sponsored it as a federal bill. It became federal law in 1988. In 1989, the Ohio Public Interest Campaign changed its name to Ohio Citizen Action to reflect its change from a coalition to a membership organization. Their headquarters is located fifteen minutes south of downtown Cleveland, on Brookpark Road.

<span class="mw-page-title-main">Rockport Generating Station</span> American coal-fired power station Indiana

Rockport Generating Station is a coal-fired power plant, located along the Ohio River in Ohio Township, Spencer County, Indiana, in the United States, near Rockport. The power plant is located along U.S. Route 231, approximately one mile north of the William H. Natcher Bridge, spanning the Ohio River. It is operated by Indiana Michigan Power, a subsidiary of American Electric Power.

<span class="mw-page-title-main">Kyger Creek Power Plant</span>

Kyger Creek Power Plant is a 1.08-gigawatt, 1,086 (MW) coal-fired power station located south of Cheshire, Ohio in Gallia County, Ohio. It is operated by the Ohio Valley Electric Corporation (OVEC).

<span class="mw-page-title-main">Clifty Creek Power Plant</span>

Clifty Creek Power Plant is a 1,300-MW coal-fired power station located in Madison, Indiana. Clifty Creek is operated by the Indiana Kentucky Electric Corporation. It is named after Clifty Creek, which enters the Ohio River nearby.

<span class="mw-page-title-main">Miami Fort Power Station</span>

The Miami Fort Generating Station is a dual-fuel power generating facility. It is a major coal-fired electrical power station, supplemented with a small oil-fired facility. Miami Fort is located in Miami Township, Hamilton County, immediately east of the tripoint of Indiana, Kentucky, and Ohio. Miami Fort Station is named for the nearby Miami Fort.

<span class="mw-page-title-main">DPL Inc.</span>

DP&L Inc. is a subsidiary of AES Corporation. Through its subsidiaries The Dayton Power and Light Company and DPL Energy Resources, DP&L sells to, and generates electricity for, a customer base of over 500,000 people within a 6,000-square-mile (16,000 km2) area of West Central Ohio, including the area around Dayton, Ohio, its namesake. Electricity for DP&L's 24 county service area within Ohio's Miami Valley is primarily generated at eight coal-fired power plants, but DP&L also provides service to its clients via the use of combustion turbines, diesel peaking units, and solar powered properties.

<span class="mw-page-title-main">Gavin Power Plant</span> Coal-fired power plant in Cheshire, Ohio

General James M. Gavin Power Plant is a 2,600-megawatt supercritical coal-fired power station in the village of Cheshire, Ohio, United States. It is owned by Lightstone Generation LLC, a 50–50 joint venture of The Blackstone Group L.P. and ArcLight Capital Partners. Gavin is the largest coal-fired power facility in Ohio, and one of the largest in the US, capable of powering two million homes. In February 2017, the plant represented slightly more than 11% of the total electric generation capacity in Ohio according to the Energy Information Administration (EIA). The plant was named in honor of James Maurice "Jumpin' Jim" Gavin, the third Commanding General (CG) of the 82nd Airborne Division during World War II.

<span class="mw-page-title-main">Tanner's Creek Generating Station</span> Electrical power plant in Indiana, US

Tanner's Creek Generating Station was a major, 1000-MWe coal-fired electrical power plant in Indiana. Located on the north bank of Ohio River along Tanners Creek, it was one of the two coal-fired power stations within 3 miles (5 km) of Lawrenceburg, Indiana, near the tripoint of Indiana, Ohio, and Kentucky. The former plant is situated directly across the Ohio river from Petersburg, Boone County, Kentucky. Tanner's Creek was one of the two Indiana coal power plants owned by Indiana Michigan Power, a subsidiary of American Electric Power.

The Ohio Valley Electric Corporation (OVEC) is a company jointly owned by several parent electrical utilities. It is headquartered in Piketon, Ohio. OVEC and its wholly-owned subsidiary, Indiana-Kentucky Electrical Corporation (IKEC), own and operate two coal-fired electrical generating plants. They are the Kyger Creek Power Plant, located near Gallipolis, Ohio, and the Clifty Creek Power Plant near Madison, Indiana.

The R. Gallagher Generating Station was a four-unit coal-burning power plant located along the Ohio River some two miles (3 km) downstream from New Albany, Indiana in southernmost Floyd County, Indiana. The total aggregate capacity (year-around) of the plant's four identical units was 560MW. Unit 2 began operating in 1958; unit 1 in 1959; unit 3 in 1960 and unit 4 in 1961. In early 2012, both Units 1 and 3 were retired. Units 2 and 4 continued to operate because Duke Energy installed baghouses, greatly reducing the pollution and meeting the current standards set by the EPA. The plant's 2012 output was 280 megawatts. The plant is connected to the grid by 138 and 230 kilovolt transmission lines.

<span class="mw-page-title-main">J.M. Stuart Station</span>

J.M. Stuart Station was a 2.3-gigawatt coal power plant located east of Aberdeen, Ohio in Adams County, Ohio. The power plant had four units and was operated by AES Ohio Generation, a subsidiary of the AES Corporation. It began operations in 1970 and ceased on May 24, 2018.

<span class="mw-page-title-main">Cardinal Power Plant</span>

Cardinal Power Plant is a 1.8-gigawatt coal power plant located south of Brilliant, Ohio in Jefferson County, Ohio. The power plant has three units. Cardinal is co-owned with Unit 1 owned by American Electric Power's (AEP) subsidiary, AEP Generation Resources. Units 2–3 are owned by Buckeye Power, a utility cooperative. It began operations in 1967.

Picway Power Plant was a 220 megawatt (MW) coal power plant located west of Lockbourne in Pickaway County, Ohio. The plant generated electricity from 1926 until its closure in 2015. It was operated by American Electric Power (AEP).

<span class="mw-page-title-main">Conesville Power Plant</span> Coal power plant in Coshocton County, Ohio

Conesville Power Plant was a 2-gigwatt, coal power plant located east of Conesville, Ohio in Coshocton County, Ohio. Its units were co-owned at the time of its closing by American Electric Power (AEP) and AES Ohio Generation. All plant operations were handled by AEP. Conesville began operations in 1957 and ceased generation in April 2020.

<span class="mw-page-title-main">Darby Generating Station</span>

Darby Generating Station is a 480 megawatt (MW), natural gas peaker plant located in Darby Township, Pickaway County near Mount Sterling, Ohio. The plant is currently owned by Lightstone Generation LLC, a 50-50 joint venture of The Blackstone Group and ArcLight Capital Partners. The plant has six units and began operations in 2001.

References

  1. 1 2 "Duke Energy, joint owners sell retired coal-fired plant in New Richmond". Cincinnati.com. Associated Press. February 27, 2018. Retrieved February 27, 2018.
  2. "Beckjord Station (Coal)". Duke Energy. Archived from the original on 19 July 2008. Retrieved 2008-07-14.
  3. "Beckjord Station (Oil)". Duke Energy. Archived from the original on 20 July 2008. Retrieved 2008-07-14.
  4. 1 2 "Beckjord plant shutting down". Cincinnati.com. The Cincinnati Enquirer. November 22, 2014. Retrieved October 25, 2017.
  5. Bode, Patricia (September 1972). "Pollution: Take heart–we're actually gaining on the stuff". Cincinnati Magazine . p. 65.
  6. "Existing Electric Generating Units in the United States, 2006" (Excel). Energy Information Administration, U.S. Department of Energy. 2006. Archived from the original on 16 June 2008. Retrieved 2008-07-14.
  7. "W.C. Beckjord Station Retirement Plans".
  8. "PJM Generator Deactivation Summary Sheets". Archived from the original on 2015-11-21. Retrieved 2015-11-21.
  9. Warren, Jay (July 18, 2011). "Duke Energy to close Beckjord Power Plant in Clermont County". WCPO-TV . Retrieved October 25, 2017.
  10. 1 2 Smith, Carrie Blackmore; Brennan, Patrick (November 22, 2016). "Duke Energy apologizes for 2014 Ohio River diesel spill". Cincinnati.com. The Cincinnati Enquirer. Retrieved October 25, 2017.
  11. "Duke Energy, LG Chem, Greensmith commission fast-response energy storage system in Ohio".
  12. Shanklin, Garth (June 8, 2016). "New Richmond youth soccer searching for new home". The Clermont Sun. Retrieved October 25, 2017.
  13. "Clermont officials cast wary eye on new owner at former Beckjord site, weighing new jobs and site cleanup". WCPO 9 Cincinnati. 24 April 2023. Retrieved 24 April 2023.