Bedford Hydropower Project

Last updated
Bedford Hydropower Project
USA Virginia relief location map.svg
Red pog.svg
Location of Bedford Hydropower Project in Virginia
Location Bedford County, Virginia / Amherst County, Virginia, U.S.
Coordinates 37°34′24.85″N79°22′17.53″W / 37.5735694°N 79.3715361°W / 37.5735694; -79.3715361 Coordinates: 37°34′24.85″N79°22′17.53″W / 37.5735694°N 79.3715361°W / 37.5735694; -79.3715361
PurposeHydroelectric, Recreation, Fish and Wildlife Pond
StatusIn use
Owner(s)Town of Bedford, Virginia
Operator(s)Town of Bedford, Virginia
Dam and spillways
Type of dam Concrete gravity
Impounds James River
Height19.6 ft (6.0 m) [1]
Power Station
Operator(s)Town of Bedford, Virginia
Turbines 2
Installed capacity 4.5 MW
Annual generation 12,284.7 MWH (2018) [2]
FERC Number: 5596

The Bedford Hydropower Project (Snowden) is a hydroelectric generation facility on the James River near the community of Big Island, Virginia. The project includes a low head structure completely spanning the river; river flow is split into a concrete canal leading to the hydroelectric generation facility and the natural river course. [3]

Dam and hydroelectric plant are located approximately one mile downstream of the larger Cushaw Hydroelectric Project; the address of the project is 7443 Elon Road (Virginia Route 130), Big Island, Virginia. This dam is the middle of three dams in rapid succession; the Big Island Dam is located several miles downstream.

The project consists of a canal along the left bank of the river leading to the buttressed power plant structure and an adjacent run of the river bypass of natural riverbed past the low head dam. A public fishing area is located at the Project upstream of the canal headgates; a canoe portage is also provided. [4]

The project is operated by the Town and is manned at least two hours per day, seven days a week. Additionally, the plant is monitored remotely and an automated call system alerts Town personnel of abnormal conditions. [5]

Related Research Articles

James River River in Virginia, United States

The James River is a river in the U.S. state of Virginia that begins in the Appalachian Mountains and flows 348 miles (560 km) to Chesapeake Bay. The river length extends to 444 miles (715 km) if one includes the Jackson River, the longer of its two source tributaries. It is the longest river in Virginia. Jamestown and Williamsburg, Virginia’s first colonial capitals, and Richmond, Virginia's current capital, lie on the James River.

Jennings Randolph Lake

Jennings Randolph Lake is a reservoir of 952 acres (3.85 km2) located on the North Branch Potomac River in Garrett County, Maryland and Mineral County, West Virginia. It is approximately eight miles upstream of Bloomington, Maryland, and approximately five miles north of Elk Garden, West Virginia.

Nagarjuna Sagar Dam Dam in Guntur district, Andhra Pradesh and Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Guntur district in Andhra Pradesh. The dam provides irrigation water to the Nalgonda, Suryapet, Krishna, Khammam, West Godavari, Guntur, and Prakasam districts along with electricity generation.

Condit Hydroelectric Project Former dam in Washington, United States

Condit Hydroelectric Project was a development on the White Salmon River in the U.S. state of Washington. It was completed in 1913 to provide electrical power for local industry, and is listed in the National Register of Historic Places as an engineering and architecture landmark.

Srisailam Dam Dam in Sri Sailam, Kurnool district, Andhra Pradesh, India

The Srisailam Dam is constructed across the Krishna River in Kurnool district, Andhra Pradesh near Srisailam temple town and is the 2nd largest capacity working hydroelectric station in the country.

Ghazi-Barotha Hydropower Project Dam in Between Attock, Punjab, and Swabi and Haripur districts, Khyber Pakhtunkhwa

Ghazi-Barotha Hydropower Project is a 1,450 MW run-of-the-river hydropower connected to the Indus River about 10 km (6.2 mi) west of Attock in Punjab and east of Swabi and Haripur districts in Khyber Pakhtunkhwa, Pakistan. Construction of the project that began in 1995 consists of 5 generators each with a maximum power generation capacity of 290MW. Inauguration of the plant on 19 August 2003 by President General Pervez Musharraf also saw the commissioning of the first 2 of the 5 generators i.e. Unit 1 and Unit 2. The last generator was commissioned on 6 April 2004 and the project was completed by that December. It cost US$2.1 billion with funding from Pakistan's Water and Power Development Authority, the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank.

Run-of-the-river hydroelectricity

Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, thus the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.

The Tinker Dam is a hydroelectric dam built in Tinker on the Aroostook River in the Canadian province of New Brunswick, and operated jointly by WPS Energy and NB Power. Its power house has a capacity of 34 megawatts.

Asahi Dam (Gifu) Dam in Gifu Prefecture, Japan.

Asahi Dam (朝日ダム) is a dam built on the class 1 Hida River, located in the city of Takayama, Gifu Prefecture, Japan.

Mammoth Pool Dam Dam in Fresno / Madera counties, California

Mammoth Pool Dam is a hydroelectric dam located on the San Joaquin River in the southern Sierra Nevada mountain range of California, about 45 miles (72 km) northeast of Fresno. It forms Mammoth Pool Reservoir and lies within the Sierra National Forest. The dam and reservoir were named after a large natural pool in the river that was once located above the present dam site.

Big Creek Hydroelectric Project

The Big Creek Hydroelectric Project is an extensive hydroelectric power scheme on the upper San Joaquin River system, in the Sierra Nevada of central California. The project is owned and operated by Southern California Edison (SCE). The use and reuse of the waters of the San Joaquin River, its South Fork, and the namesake of the project, Big Creek – over a vertical drop of 6,200 ft (1,900 m) – have over the years inspired a nickname, "The Hardest Working Water in the World".

Yuba–Bear Hydroelectric Project

The Yuba–Bear Hydroelectric Project is a complex hydroelectric scheme in the northern Sierra Nevada in California, tapping the upper Yuba River and Bear River drainage basins. The project area encompasses approximately 400 square miles (1,000 km2) in Nevada, Placer, and Sierra Counties. Owned by the Nevada Irrigation District, it consists of 16 storage dams plus numerous diversion and regulating dams, and four generating stations producing 425 million kilowatt hours of electricity each year. The Yuba–Bear Hydroelectric Project consists of the Bowman development, Dutch Flat No. 2 development, Chicago Park development, and Rollins development.

Upper North Fork Feather River Project

The Upper North Fork Feather River Project is a hydroelectric scheme in the Sierra Nevada of California, within Lassen and Plumas Counties. The project consists of three dams, five power plants, and multiple conduits and tunnels in the headwaters of the North Fork Feather River, a major tributary of the Feather—Sacramento River systems. The total installed capacity is 362.3 megawatts (MW), producing an annual average of 1,171.9 gigawatt hours (GWh). The project is also contracted for the delivery of irrigation water between March 31 and October 31 of each year. The project is owned and operated by Pacific Gas and Electric Company.

Cushaw Hydroelectric Project Dam in Bedford County, Virginia / Amherst County, Virginia, U.S.

The Cushaw Hydroelectric Project is a 7.5 megawatt (MW) dam and power house facility owned and operated by Virginia Electric Power Company, operating as Dominion Virginia Power.

Holcomb Rock Dam Dam in Bedford County, Virginia / Amherst County, Virginia, U.S.

The Holcomb Rock Dam is a concrete dam across the James River near Lynchburg, Virginia. The project consists of a concrete dam across the river, an earthen embankment canal on the right bank, and a power house where water is discharged to generate electricity. Per the 2008 annual generation report, the project generated 6,089,209 KW-hours.

Reusens Dam Dam in Amherst County, Virginia, U.S.

The Reusens Dam is a 12.5 MW hydroelectric generation facility on the James River near the city of Lynchburg, Virginia. The project includes a concrete gravity dam spanning the left side of river which incorporates eight 16 3/4-foot-high flood gates, a 125 feet long by 25 feet tall concrete arch dam segment with 7 1/4-foot-high flashboards, and two separate power houses towards the right bank which contain hydroelectric generation equipment. The A and B power houses have installed capacities of 7.5 MW with three turbines and 5.0 MW with two turbines, respectively. The plant is used in a peaking capacity. The dam is located downstream of the smaller Holcomb Rock Dam and upstream of the Scotts Mill Dam. The typically submerged Bosher Dam near Richmond lies further downstream.

Coleman Falls Dam Dam in Bedford County, Virginia / Amherst County, Virginia, U.S.

The Coleman Falls Dam is a hydroelectric generation facility on the James River near the community of Coleman Falls, Virginia. The project includes a gravity dam spanning the left side of river and a power house on the right bank which contain hydroelectric generation equipment.

Big Island Dam Dam in Bedford County, Virginia / Amherst County, Virginia, U.S.

The Big Island Dam is a hydroelectric generation facility on the James River near the community of Big Island, Virginia. The project includes a gravity dam spanning the left side of river and a power house on the right bank which contain hydroelectric generation equipment. The dam is located adjacent to and integrated with the large Georgia Pacific paper mill at this location.

St. Anthony Falls in Minneapolis, Minnesota, is the only natural falls on the Mississippi River. Since almost the beginning of settlement in the area by European descendants, the St. Anthony Falls have been used for waterpower. The first allowed settlers were at Ft. Snelling, where construction began in 1820. A sawmill was operating 1821 and a flour mill in 1823. As soon as the land at the sides of the falls became available it was purchased with the intent of using the waterpower of the falls. First lumber mills covered the falls, cutting lumber floated down the Mississippi. After 1870 flour mills started to dominate the area. From 1880 to 1930 the area was the number one flour producer in the US. In later years, some of the power came from steam, but in 1923 half of the waterpower used was for flour milling. Other industries have also used the waterpower.

References

  1. US Army Corps of Engineers National Inventory of Dams; NIDID VA00914
  2. Town of Bedford, “Head Water Benefits Production for 2018 and value of production for use in head water benefits assessments under P-5596”, June 3, 2019; James River Basin, Docket No. HB68-19A-98
  3. Town of Bedford, “Bedford Project – FERC 5596; Request for Modification of Minimum Flow in Bypass Reach”; May 20, 2015; FERC Accession Number 20150522-5281
  4. Town of Bedford, “City of Bedford submits public safety plan under P-5596.”, November 05, 2008; FERC Accession Number 20090129-0053.
  5. Town of Bedford, “Town of Bedford, VA notifies FERC that the dam is in good condition and has no recordable accidents for the Town of Bedford Hydro Project under P-5596”, December 30, 2013; FERC Accession Number 20140123-0286