| | |||||||||||
| General information | |||||||||||
| Location | Beitun, Taichung Taiwan | ||||||||||
| Coordinates | 24°11′7″N120°42′34″E / 24.18528°N 120.70944°E | ||||||||||
| Operated by | |||||||||||
| Line | |||||||||||
| Platforms | 2 side platforms | ||||||||||
| Construction | |||||||||||
| Structure type | At grade | ||||||||||
| Other information | |||||||||||
| Station code | 103a | ||||||||||
| History | |||||||||||
| Opened | 25 April 2021 [1] | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
| Beitun Main Station | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Chinese | 北屯總站 | ||||||||||
| |||||||||||
Beitun Main Station is a metro station operated by Taichung MRT located in Beitun District,Taichung,Taiwan. It is the eastern terminus of the Green line,and is located near the depot of the entire line. [2]
Beitun Main station is located within a new development zone. With the construction of the new station,the surrounding area saw rapid development,including a planned Costco store. [3]
| 2F | Crossover Level | Platforms-connecting Overpass |
| G | ||
| Track 1 | ||
| Track 2 | ||
Side platform, doors will open on the right | ||
| Concourse | Exit/Entrance, Lobby, information desk, automatic ticket dispensing machines, one-way faregates | |