Taichung MRT | |
---|---|
Overview | |
Native name | 臺中捷運 |
Owner | Taichung City Government |
Locale | Taichung |
Transit type | Medium-capacity rapid transit |
Number of lines | 1 |
Number of stations | 18 |
Website | https://www.tmrt.com.tw/ |
Operation | |
Began operation | 25 April 2021 |
Operator(s) | Taichung Mass Rapid Transit Corporation |
Technical | |
System length | 16.71 km (10.38 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Taichung MRT | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 臺中捷運 | ||||||||||||||||
Simplified Chinese | 台中捷运 | ||||||||||||||||
| |||||||||||||||||
Taichung Mass Rapid Transit | |||||||||||||||||
Traditional Chinese | 臺中都會區大眾捷運系統 | ||||||||||||||||
Simplified Chinese | 台中都会区大众捷运系统 | ||||||||||||||||
Literal meaning | Taichung Metropolitan Area Mass Rapid Transit System | ||||||||||||||||
|
The Taichung MRT (TMRT;also called Taichung Mass Rapid Transit or Taichung Metro) is a medium-capacity rapid transit system in Taichung,Taiwan. Taichung MRT's first route,the Green Line,officially began operation on 25 April 2021,making it the 5th rapid transit system operating in Taiwan. [1]
Planning of the Taichung MRT started in 1990 with a study conducted by the Taiwanese Bureau of Housing and Urban Development. [2] The study was completed in 1998 and suggested the implementation of three routes (Red,Green,and Blue). The project was formally approved by the Executive Yuan of the ROC government on 23 November 2004. The city government signed a joint development contract with the Taipei City Government on 12 December 2007. [3]
Meanwhile,the Taichung City Government started their own planning of more lines and decided that the much cheaper BRT system would be the future of mass transit in Taichung. Since the corridor of the originally proposed Red Line was partially served by TRA commuter services,the Blue Line corridor was chosen as a first step to implement BRT in Taichung.
Construction of the first line,the Green Line,had been paid for and was expected to begin in October 2007,though it was pushed back and started construction on 8 October 2009. [4] The 16.7 km (10.4 mi) section of the Green Line was scheduled for completion by 2020 and includes 18 stations.
On 9 March 2011,Kawasaki Heavy Industries announced that it had won a joint order with Alstom Transport SA (France) and CTCI Corp. (Taiwan) to supply 36 units consisting of two-car,driverless trains totaling 29.5 billion yen. [5] While Kawasaki will oversee construction,Alstom will focus on signaling and CTCI will supply the electrical system. [5]
On 16 November 2020,the Green Line started trial runs. The first day of trial runs attracted more than 70,000 rides. [6] The trial runs were suspended on 21 November 2020 when a railway coupler snapped in half. [7] On 10 March 2021,Taichung Mayor Lu Shiow-yen announced that trial runs would resume on 25 March,and the opening ceremony would be a month after. [8] The Green Line officially began operation as scheduled on 25 April 2021.
Line | Mode | Terminals (District) | Length km | Stations | |||
---|---|---|---|---|---|---|---|
Green line | Wuri-Wenxin-Beitun line | Medium-capacity | HSR Taichung (Wuri) | Beitun Main (Beitun) | 16.7 | 18 |
The Green line between Beitun and Wuri is an elevated railway with driverless electric trains. The route is 16.5 km (10.3 mi) long and contains 18 stations. It stretches from Beitun Main Station on Songzhu Road in Beitun District along Beitun Road, Wenxin Road, and Wenxin South Road to the Taichung HSR station in Wuri District. [9] It was expected to cost NT$53.491 billion and was built by the Taipei City Department of Rapid Transit Systems. [10] In 2011, the planned total cost for the project was NT$51.39 billion (including land acquisition costs), split between the local and central governments. [2]
The Green line began trial operation on 16 November 2020 and was supposed to start formal operations on 19 December 2020. [1] [11] The trial run was suspended on 19 November 2020 when a railway coupler snapped in half. [1] [7] The trial resumed on 25 March 2021 and the line officially opened on 25 April 2021. [8]
As of 2020, fares for the Taichung MRT start at NT$20 and are capped at NT$50. [12] The fare increases by NT$5 for every 2 kilometres (1.2 mi) traveled. [13]
Line | Mode | Terminus | km | Total km | Status | ||
---|---|---|---|---|---|---|---|
Green line | Changhua Extension | Rapid transit | HSR Taichung - Changmei Road | 5.53 | 24.7 | Planned | |
Dakeng Extension | Jiushe - Yuanshan New Village | 2.49 | Planned | ||||
Blue line | Rapid transit | Port of Taichung - Taiping | 29.5 | 29.5 | Approved | ||
Orange line | Bus rapid transit | Zhongqing - Provincial Advisory Council | 25 | 25 | Cancelled [14] | ||
Rapid transit | Taichung Airport - Wufeng | 29.27 | 29.27 | Planned [14] | |||
Light rail | Taichung Airport - Wufeng | 25 | 25 | Cancelled [14] | |||
Red line | Rapid transit | Shepi - Shin Min High School | 11.3 | 11.3 | Planned | ||
Purple line | Rapid transit | Yuanshan New Village - Daqing | Planned |
In 2014, the Blue line began service as a BRT system running between Providence University and Taichung railway station. BRT service ended on 8 July 2015. A proposal for the Blue line MRT was approved by the Ministry of Transportation and Communications in late January 2024. Construction of the Blue line is expected to take ten years, and cost NT$161.51 billion, of which of which NT$67.56 billion was to be funded by the Executive Yuan. The planned Blue line is to start at the Port of Taichung, travel eastward through Shalu and Xitun, before terminating in central Taichung. [15]
A fourth line was planned in 2009 to connect the city with Taichung Airport. However, after multiple proposals to build a MRT and BRT line were rejected by the Ministry of Transportation and Communications, the city government turned to an LRT system. While the system was still being planned, they switched to a MRT system again. In 2019, MRT project substituted for LRT project. In 2021, LRT project switched back to the original MRT project again.
Kenan Aiqin Bridge (科湳愛琴橋), which crosses over National Freeway 1 and Provincial Highway 74, has a space on the center median allocated for the line. [16] [17]
The Red Line is being planned.
The Purple Line is being planned.
Taiwan Taoyuan International Airport MRT, commonly known as the Airport MRT, is a rapid transit line of the Taoyuan Metro that connects the municipalities of the capital Taipei, Taoyuan and New Taipei with Taoyuan International Airport. The 51.33 km (31.89 mi) line, from Taipei Main Station to Laojie River, has 22 stations and began commercial service on 2 March 2017.
Taichung is located in central Taiwan and is the second largest city in the island country.
The Wenhu or Brown line is a metro line in Taipei operated by Taipei Metro, named after the districts it connects: Wenshan and Neihu. It is an automated medium-capacity rubber-tyred metro line and is 25.1 kilometres (15.6 mi) long, serving a total of 24 stations located in 7 districts in Taipei, of which 22 are elevated and 2 underground. As of April 2022, the line transports an average of approximately 140,000 passengers daily.
The Ministry of Transportation and Communications governs transportation in Taiwan.
Taichung HSR is a railway and metro station in Wuri District, Taichung, Taiwan. It is served by Taiwan High Speed Rail and the Green line of the Taichung MRT. The station is adjacent to Xinwuri station of Taiwan Railway.
Jiushe is a metro station operated by Taichung Metro located in Beitun District, Taichung, Taiwan. It is on the Green Line and is the western terminus of the planned Dakeng Extension.
Beitun Main Station is a metro station operated by Taichung Metro located in Beitun District, Taichung, Taiwan. It is the eastern terminus of the Green Line, and is located near the depot of the entire line.
The Taichung BRT was a bus rapid transit (BRT) system located in Taichung which stretched from Taichung TRA station to Providence University via Taiwan Boulevard, a major thoroughfare. The line was 17.1-kilometer (10.6 mi) in length with 21 stations. It was the first BRT line in Taiwan. The line was converted to a dedicated bus lane for conventional buses on July 8, 2015, and the BRT is no longer in operation.
Provincial Highway 12, named as Taiwan Boulevard (台灣大道) for its entire length, is a 23.2 km east–west highway that connects Port of Taichung in Wuqi with downtown Taichung City.
The Green line is a medium-capacity rapid transit line in Taichung as part of Taichung Metro. The line was briefly opened to the public on 16 November 2020, but closed on 22 November due to faulty couplers on the trains. The line officially re-entered service on 25 April 2021, becoming Taiwan's fifth rapid transit system in operation. Two extensions, one heading east to Dakeng and the other reaching south into Changhua, are also planned.
Sihwei Elementary School is a metro station on the Green Line operated by Taichung Metro in Beitun District, Taichung, Taiwan.
Wenxin Chongde is a metro station on the Green Line operated by Taichung Metro in Beitun District, Taichung, Taiwan.
Wenxin Zhongqing is a metro station on the Green Line operated by Taichung Metro in North District, Taichung, Taiwan.
Wenxin Yinghua is a metro station on the Green Line operated by Taichung Metro in Xitun District, Taichung, Taiwan.
Taichung City Hall is a metro station operated by Taichung Metro located in Xitun District, Taichung, Taiwan. It is on the Green Line. The planned Blue Line will intersect with the Green Line at this station.
Shui-an Temple is a metro station on the Green Line operated by Taichung Metro in Nantun District, Taichung, Taiwan.
Wenxin Forest Park is a metro station on the Green Line operated by Taichung Metro in Nantun District, Taichung, Taiwan.
Jiuzhangli is a metro station on the Green Line operated by Taichung Metro in Wuri District, Taichung, Taiwan.
The Blue line is a proposed rapid transit line in Taichung and will be operated by Taichung Metro.
On 21 May 2024, a Taiwanese man carried out a stabbing spree directed at passengers on a Taichung Metro train near Taichung City Hall station. Three people, including the attacker, were injured. The attack occurred exactly ten years after the 2014 Taipei Metro attack.