Mumbai Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Reliance Infrastructure - Mumbai Metro One Private Limited (MMOPL) Mumbai Metropolitan Region Development Authority (MMRDA) Contents
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Area served | Mumbai Metropolitan Region | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Mumbai | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Transit type | Rapid Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of lines | Operational 4 | Under-construction 9 | Approved 4 | | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | OperationalUnder ConstructionApproved | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of stations | 53 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 747000 (daily average, July 2024) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Annual ridership | 27.3 crore (273 million)[ citation needed ] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Chief executive | S.V.R Srinivas, CMD & Metropolitan Commissioner | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Headquarters | NaMMTRI Building, Plot No. R-13, E-Block, Bandra-Kurla Complex, Bandra (E), Mumbai, Maharashtra 400051. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began operation | 8 June 2014 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Maha Mumbai Metro Operation Corporation Limited (MMMOCL) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train length |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Headway |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System length | 59.09 km (36.72 mi) (Operational) 146.083 km (90.772 mi) (Under Construction) 145.65 km (90.50 mi) (Approved and proposed) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC overhead catenary [1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average speed | 33 km/h (21 mph) [2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Top speed | 80 km/h (50 mph) [2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Mumbai Metro is a rapid transit system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.
While the Maharashtra Metro Rail Corporation Limited is responsible for all metro rail projects being developed in Maharashtra, except for those in the Mumbai Metropolitan Area, the Mumbai Metropolitan Region Development Authority is the authority responsible for maintaining the metro system in the Greater Mumbai area.
The rapid transit metro system is designed to reduce traffic congestion in the city and supplement the overcrowded Mumbai Suburban Railway network. It is being built in three phases, over 15 years, with overall completion expected in October 2026. The Mumbai Metro is the fourth longest operational metro network in India with an operational length of 59.5 km (37.0 mi) as of January 2023. When completed, the core system will comprise sixteen high-capacity metro railway lines, spanning a total of more than 523 kilometres (325 mi) (25% underground, the rest elevated, with a minuscule portion built at-grade) and serviced by 350 stations. [3]
Line 1 of the Mumbai Metro is operated by Mumbai Metro One Private Limited (MMOPL), a joint venture between Reliance Infrastructure (50%), Mumbai Metropolitan Region Development Authority, (50%) and formerly by RATP Dev Transdev Asia (5%) and Hong Kong MTR. [4] While lines 2, 4, 5, 6, 7 and their extensions will be built and operated by the Mumbai Metropolitan Region Development Authority (MMRDA), the completely underground Line 3 and Line 11 will be built by Mumbai Metro Railway Corporation Limited (MMRCL).
In June 2006, Prime Minister Manmohan Singh laid the foundation stone for the first phase of the Mumbai Metro project, although construction work began in February 2008. [5] [6] [7] A successful trial run was conducted in May 2013, [8] [9] [10] and the system's first line commenced operations on 8 June 2014. Many metro projects were delayed because of late environmental clearances, land acquisition troubles and protests.
After nearly eight years, two new metro corridors, 2A and 7, were inaugurated on 2 April 2022, and are now operational. On 5 October 2024, the 12 km underground BKC to Aarey Jogeshwari-Vikhroli Link Road section of Aqua Line was inaugurated. Additionally, there are 8 other metro lines currently under construction in the city.
Being the capital of Maharashtra, Mumbai is among the largest cities in the world, with a total metropolitan area population of over 2 crore (20 million) as of 2011, [11] and a population growth rate of around 2% per annum. [12] Mumbai has the advantage of a high modal share of the public (88%) in favour of a public mass transport system. [13] The existing Mumbai Suburban Railway carries over 70 lakh (7 million) passengers per day, [14] and is supplemented by the Brihanmumbai Electric Supply and Transport (BEST) bus system, which provides feeder services to station-going passengers to allow them to complete their journeys. Until 1980s, transport in Mumbai was not a big problem. The discontinuation of trams resulted in a direct increase of passenger pressure on the suburban railway network. By 2010, the population of Mumbai doubled. However, due to the city's geographical constraints and rapid population growth, road and rail infrastructure development has not been able to keep pace with growing demand over the last 4-5 decades. [15] Moreover, the Mumbai Suburban Railway, though extensive, is not built to rapid transit specifications. The main objective of the Mumbai Metro is to provide mass rapid transit services to people within an approach distance of between 1 and 2 kilometres (0.62 and 1.24 mi), and to serve the areas not connected by the existing Suburban Rail network. The master plan unveiled by the MMRDA in 2004 encompassed a total of 146.5 kilometres (91.0 mi) of track, of which 32 kilometres (20 mi) would be underground. [16] The Mumbai Metro was proposed to be built in three phases, at an estimated cost of ₹19,525 crore. [15] In September 2009, the proposed Hutatma Chowk – Ghatkopar was reduced to a line between Hutatma Chowk and Carnac Bunder.
In 2011, the MMRDA unveiled plans for an extended Colaba-Bandra-SEEPZ metro line. According to its earlier plans, a 20 km (12 mi) Colaba-to-Bandra metro line was to be constructed, running underground for 10 kilometres (6.2 mi) from Colaba to Mahalaxmi, and then on an elevated track from Mahalaxmi to Bandra. However, the MMRDA decided to increase ridership on the line by running it out past Bandra to Chhatrapati Shivaji Maharaj International Airport. The 33.5-kilometre (20.8 mi) Colaba-Bandra-SEEPZ line will be built at a cost of ₹21,000 crore (US$2.5 billion), [17] and will be the city's first underground metro line. It will have 27 stations. [18]
On 27 February 2012, the Union Government gave in-principle approval to the plan for Line 3. Money for the project is being borrowed from Japanese International Cooperation Agency (50%), the state government (16%), the central government (14%), and others. [19] In April 2012, the MMRDA announced plans to grant the Mumbai Metro Rail Company increased management autonomy, in an effort to enhance the project's operational efficiency. [20] In July 2012, the MMRDA announced plans to add more metro lines to its existing plan, including a line parallel to the Western Express Highway from Bandra to Dahisar. This line is expected to reduce the passenger load on the Western Line and vehicle traffic on the highway. Another proposed route, the 30-kilometre (19 mi), 28-station Wadala–Kasarvadavali line, received in-principle approval from the state government in 2013. [21] The MMRDA also intends to convert the proposed Lokhandwala–SEEPZ–Kanjurmarg monorail route into a metro line. [22] The Mumbai Metro master plan was revised by the MMRDA in 2012, increasing the total length of the proposed network to 160.90 km (99.98 mi). [23] In June 2015, two new lines were proposed. A line from Andheri West to Dahisar West, and a line from BKC to Mankhurd. [24] The following table shows the updated master plan unveiled by the MMRDA:
Phase | Line | Name of the corridor | Length (km) |
---|---|---|---|
Phase I (2006–2011) | 1 | Versova – Andheri – Ghatkopar | 11.07 |
2 | Bandra – Kurla – Mankhurd | 13.37 | |
3 | Colaba – Bandra – Charkop | 38.24 | |
Phase II (2011–2016) | 4 | Charkop – Dahisar | 7.5 |
5 | Ghatkopar – Mulund | 12.4 | |
Phase III (2016–2021) | 6 | BKC – Kanjurmarg via Airport | 19.5 |
7 | Andheri (E) – Dahisar (E) | 16.5 | |
8 | Hutatma Chowk – Ghatkopar | 21.8 | |
9 | Sewri – Prabhadevi | 3.5 |
On 18 February 2013, the MMRDA signed a memorandum of understanding with Transport for London, the transit authority in Greater London. The arrangement will facilitate the exchange of information, personnel and technology in the transportation sector. [26] [27] [28] [29]
The revised Mumbai Metro master plan had proposed a line along the Thane-Teen Haath Naka-Kaapurbavdi-Ghodbunder Road route. The feasibility report concluded that the line was not feasible as most residents of Thane and its neighbouring areas travelled to Mumbai for work daily. On 14 June 2014, Chavan announced that the MMRDA was instead examining a proposal for a metro line along the new proposed route of Wadala-Ghatkopar-Teen Haat Naka route. RITES will prepare the detailed project report and is expected to submit it by August 2014. The preliminary report proposed a 32 km (20 mi) line with 29 stations, to be built at an estimated cost of ₹22,000 crore. [30] This would be the fourth line of the metro, after the previously proposed Charkop-Dahisar route was merged with the Charkop-Bandra-Mankhurd route to form Line 2. [31]
In May 2015, the MMRDA said that it had begun planning for the Andheri-Dahisar line and Seepz-Kanjurmarg. Both lines are expected to be elevated, although the latter could be constructed underground if a proposal to extend Line 3 to Kanjurmarg is undertaken. DPRs for both lines had been prepared in 2004, along with the master plan, and the MMRDA would now update the DPRs. The agency also intends to construct Line 9 of the metro as an underground corridor from Sewri to Worli. However, planning for the project will only begun after the construction of the proposed Mumbai Trans Harbour Link commences. [32]
In a report on 14 November 2014 about the cancellation of the PPP agreement for Line 2, Mint quoted a senior MMRDA official: "as decided earlier, all future lines of Mumbai Metro will be constructed by the Mumbai Metro Railway Corp. Ltd (MMRCL), a joint venture between the state government and the Union government." [33] On 20 May 2015, Chief Minister Devendra Fadnavis requested officials to consider constructing the Charkop-Bandra-Dahisar and the Wadala-Thane-Kasarvadavali lines as elevated corridors. Although both corridors had been planned as elevated lines in the Mumbai Metro master plan, the previous Congress-NCP had decided to construct all metro lines underground, after delays and difficulties caused by acquiring land for Line 1. However, Fadnavis believes that the two proposed lines can be constructed quicker and cheaper if they were elevated due to the proposed route of the alignment. [34] The Government plans to implement all future metro lines (except Line 3) as elevated corridors. [35] On 15 June 2015, the MMRDA announced that it would implement Line 2 of the metro in three parts. The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line. [35]
In June 2015, Fadnavis announced that he would request the Delhi Metro Rail Corporation (DMRC) to assist in the implementation of the Mumbai Metro. He said that he intends to expand the metro system by 109 km (68 mi) before the state assembly elections in October 2019. [36] [37] [38] In July 2015, UPS Madan announced that the State Government formally appointed the DMRC to revise and update the Mumbai Metro master plan. The DMRC will prepare DPRs for the Andheri East to Dahisar East, Jogeshwari to Kanjurmarg, Andheri West to Dahisar West and Bandra Kurla Complex to Mankhurd lines. [39] The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line. [35] All four lines are proposed to be elevated and constructed as cash contracts. The lines are estimated to cost a total of ₹21,000 crore (US$2.5 billion), or about ₹350 crore (US$42 million) per km. [24] In addition, the planned Line 3 and Wadala-Ghatkopar-Thane-Kasarvadavli line of the metro would also be constructed. [39]
Fadnavis announced on 8 April 2017 that the government was considering a circular metro loop line along the Kalyan-Dombivli-Taloja route. The proposed 15 km (9.3 mi) line would link Kalyan and Shil Phata with 13 stations, bring metro connectivity to Kalyan East, Dombivli, Ambernath and Diva. [40] [41]
The Mumbai Metro resumed services for general public on 19 October 2020, after being shut down since March 2020 due to the COVID-19 pandemic. [42] [43]
The project has faced significant and costly legal challenges. [44] In 2018, protestors rallied to protect trees that were to be chopped down as part of construction plans. The central government first proposed the construction of a metro station at the forest area of Aarey colony. [45] The protest resulted in several arrests. [46] Protests again flared in 2022. [47]
Line 1 connects Versova in the Western Suburbs to Ghatkopar in the Central Suburbs, covering a distance of 11.4 kilometres (7.1 mi). [48] It is fully elevated, and consists of 12 stations. [48] Work on the Versova-Andheri-Ghatkopar corridor, a part of Phase I, began on 8 February 2008. A crucial bridge on the project was completed at the end of 2012. [49] The line opened for service on 8 June 2014. [50]
This corridor is being executed in two phases.
Prime Minister Narendra Modi launched phase 2A in January 2023. [51] The 18.589 km (11.551 mi) [52] long 2A corridor was executed by DMRC on behalf of MMRDA. The corridor has 17 stations (Dahisar (West) to D N Nagar), and cost ₹6,410 crore (equivalent to ₹90 billionorUS$1.08 billion in 2023). The line had been partially operational since 2 April 2022 and became fully operational from 19 January 2023.
The 2B line will be 23.643 km (14.691 mi) long, and is estimated to cost ₹109.7 billion (equivalent to ₹150 billionorUS$1.84 billion in 2023), including land acquisition cost of ₹1,274 crore (equivalent to ₹18 billionorUS$214.12 million in 2023). This section will have 22 stations (D N Nagar to Mandale), work on which began in mid 2018. [53]
A fully underground section of the metro, Line 3 is planned to be 33.50 km (20.82 mi) long, and will have 27 stations once fully completed. [54] The metro line will connect the Cuffe Parade business district in the south of Mumbai with SEEPZ and Aarey in the north. [55] It will also pass through the Domestic and International airports of Mumbai, for which the airport operator (GVK) has promised an equity infusion of ₹777 crore (equivalent to ₹12 billionorUS$140.49 million in 2023).
The cost of this corridor was estimated at ₹23,136 crore (equivalent to ₹320 billionorUS$3.89 billion in 2023). [56] [57] The original deadline for the project was 2016, but it was extended due to several delays including COVID. [58] A section of the corridor from Aarey Colony to BKC was inaugurated on 5 October 2024 by Prime Minister Narendra Modi. This section cost ₹14,120 crore, and consists of 10 stations in a 12.44 km stretch. The remaining section from BKC to Cuffe Parade is expected to be completed by March 2025. [59] [60] [61]
The line will have interchanges with the planned Line 6 at Aarey JVLR, Line 1 at Marol Naka, Line 2B at BKC, Central Line at Chhatrapati Shivaji Terminus, Mumbai Monorail at Mahalaxmi (Jacob Circle), and Western Line at Mahalaxmi, Mumbai Central and Churchgate.
The line 4 of Mumbai Metro is planned to be a 32.32 km (20.08 mi) [62] long elevated corridor, covering 32 [62] stations from Kasarvadavali (beyond Thane) in the north to Wadala in the south. It is estimated to cost ₹14,549 crore (equivalent to ₹200 billionorUS$2.45 billion in 2023). This project will help connect the city of Thane with Mumbai with an alternate mode of public transport. The line was approved by the Maharashtra Government on 27 September 2016, [63] [64] and construction work on this line began in mid 2018. [53] The Asian Infrastructure Investment Bank has extended a multilateral loan of ₹3,916 crore (equivalent to ₹55 billionorUS$658.17 million in 2023) [65] for this project. [66] It is expected to get completed by 2025 at a cost of ₹15,498 crore and an anticipated daily ridership of 13.4 Lakh (1,340,000).
The 24.9 km (15.5 mi)-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost ₹8,416 crore. It will be an elevated corridor. It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs, with further extension to Taloja in Navi Mumbai that is line 12.
The line was approved by Chief Minister Devendra Fadnavis on 19 October 2016.The 12.811 km Thane – Bhiwandi section is under construction. Bhiwandi – Kalyan is on-hold (route modification in progress). [67] The corridor is being constructucted by Afcons in one package from Kalyan to Bhiwandi including 7 stations.
The 14.47 km (8.99 mi) long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor will have 13 stations and cost ₹6,672 crore. It will be an elevated corridor. It will connect Lokhandwala Complex in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, JVLR, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W), Vikhroli-Eastern Express Highway.
Metro 6 will provide interchange with Metro 2 at Infinity Mall in Andheri, with Metro 3 at SEEPZ, with Metro 4 and the Mumbai Suburban Railway at Jogeshwari and Kanjurmarg, and with Metro 7 at JVLR. [68]
The line was approved by Chief Minister Devendra Fadnavis on 19 October 2016. [69] [70] The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities will also be able to determine the location of trees along the alignment accuracy of up to 10 cm utilizing a differential GPS (DGPS), while a digital aerial triangulation system will help determine the types of trees, their heights and diameters. [71] Line-6's first section is expected to open in 2025.
This corridor is 16.475 km (10.237 mi) [72] long, and runs from Dahisar (East) in the north to Andheri (East) in the south, with a further extension till Bhayander [73] in the north, and Mumbai International Airport Terminal 2 [74] in the south. The line is partially elevated (under construction, with completion slated for 2019), and partially underground (approved, with construction planned to begin in 2018).
The elevated section is expected to cost ₹6,208 crore (equivalent to ₹89 billionorUS$1.07 billion in 2023), while the outlay for the recently approved underground section is ₹600 crore (equivalent to ₹842 croreorUS$100.84 million in 2023). Civil works, including viaduct and station works, is being executed by NCC, Simplex Infrastructure, and J. Kumar Infraprojects. The corridor is partially operational since 2 April 2022 and fully operational since 19 January 2023.
A section of Line 7 from Dahisar East to Aarey (along with the section of Line 2 from Dahanukarwadi to Dahisar East ) was opened on 2 April 2022, by the then CM Uddhav Thackeray. The final section of the line (along with the final section of Line 2A from Dhanukarwadi to Andheri West) was inaugurated on 19 January 2023 by Prime Minister Narendra Modi.
This is a proposed metro line between the Chhatrapati Shivaji Maharaj International Airport and the under construction Navi Mumbai International Airport. [75] It will connect Mumbai airport to upcoming Navi Mumbai airport and its length would be approx 32 km.
It's expected to cost ₹15,000 crore and finish construction by October 2026. The line has an anticipated daily ridership of 3 lakh. [76]
Extension of Line 7 (Red Line)
Metro line 9 will ply between Dahisar-Mira Bhayander route. It will have 10 stations all elevated. This Under Construction Metro of Dahisar to Mira-Bhayandar will cut down approximately 30 km of travel distance between the Mira-Bhayandar and Mumbai suburbs. It is an extension of Line 7. Phase 1 of the line is now expected to be completed by June 2025. [59]
Extension of Line 4 (Green Line)
In February 2017, the MMRDA announced that the DMRC was preparing a detailed project report (DPR) on Metro 10, a proposed 9 km (5.6 mi) elevated extension of Metro 4 from Gaimukh to Shivaji Chowk. [77] The project is estimated to cost ₹3,908 crore (US$470 million) with an estimated ridership of 2.5 lakh (250,000). [78] [79] [80] [81] It will be completed by 2025.
Extension of Line 4 (Green Line)
In November 2018, the MMRDA cleared the Metro 11, which connects Wadala with CSMT. This would be considered to be an extension to Metro 4. The length of the line is 11.4 km (7.1 mi), and it proposed to cost ₹8,739 crore (US$1.207 billion). The line will be partially underground, with 8 underground and 2 elevated stations. It will be completed by October 2026.
Extension of Line 5 (Orange Line)
MMRDA has planned the Metro 12, which will connect Kalyan with Taloja. It is an extension of line 5. In another boost to connectivity, the Mumbai Metropolitan Region Development Authority (MMRDA) has decided to connect Mumbai, Thane and Navi Mumbai with a Metro line. The construction started in April 2024 and is estimated to be completed in about 3 years [82] .Kalyan Station and Kalyan APMC station have been added to the new route [83]
It is a proposed metro project to connect Mira Road with Virar. The project length is 23 km (14 mi) and the estimated cost of the project is ₹6,900 crore.[ citation needed ]
It is an approved metro project to connect Vikhroli with Kanjurmarg and further to Ambernath-Badlapur. It will have an intersection at Kanjurmarg with Line 6, the Pink Line. This project is now at the DPR stage. The project length is 45 km (28 mi) and the estimated cost of the project is ₹13,500 crore. It will be completed by October 2026.
Lines on the Mumbai Metro are currently identified by numbers. In March 2016, MMRDA Metropolitan Commissioner, U.P.S. Madan, announced that all lines on the system would be color-coded after more lines are opened.
Operational Lines | ||||||
---|---|---|---|---|---|---|
No. | Line Name | Terminals | Stations | Distance (km) | Opening Date | |
1 | Line 1 | Versova | Ghatkopar | 12 | 11.40 km (7.08 mi) | 8 June 2014 |
2 | Line 2A | Dahisar East | Dahanukarwadi | 9 | 9.8 km (6.1 mi) | 2 April 2022 |
Dahanukarwadi | Andheri West | 8 | 8.8 km (5.5 mi) | 19 January 2023 | ||
3 | Line 3 | Aarey Colony | Income Tax Office (BKC) | 10 | 12.69 km (7.89 mi) | 5 October 2024 |
4 | Line 7 | Dahisar East | Aarey | 10 | 10.7 km (6.6 mi) | 2 April 2022 |
Aarey | Gundavali | 4 | 5.8 km (3.6 mi) | 19 January 2023 | ||
53 | 59.09 km (36.72 mi) | |||||
Under Construction Lines | ||||||
No. | Line Name | Terminals | Stations | Distance (km) | Opening Date | |
1 | Line 2B | Andheri West | Diamond Garden | 15 | 23.6 km (14.7 mi) | December 2027 |
Diamond Garden | Mandale | 5 | March 2026 | |||
2 | Line 3 | Income Tax Office (BKC) | Cuffe Parade | 17 | 20.81 km (12.93 mi) | May 2025 |
3 | Line 4 | Gaimukh | Kasarvadavali | 2 | 2.88 km (1.79 mi) | 2026 |
Kasarvadavali | Bhakti Park (Wadala) | 32 | 32.32 km (20.08 mi) | 2026 | ||
4 | Line 5 | Kapurbawdi | Kalyan APMC | 17 | 24.9 km (15.5 mi) | 2027 |
5 | Line 6 | Swami Samarth Nagar | Vikhroli EEH | 13 | 14.47 km (8.99 mi) | April 2026 |
6 | Line 7A | Gundavali | CSMIA T2 | 2 | 3.17 km (1.97 mi) | 2026 |
7 | Line 9 | Mira-Bhayandar | Dahisar (East) | 10 | 11.38 km (7.07 mi) | June 2026 |
8 | Line 12 | Kalyan APMC | Taloja | 17 | 20.75 km (12.89 mi) | December 2027 |
130 | 154.28 km (95.87 mi) | |||||
Proposed Lines | ||||||
No. | Line Name | Terminals | Stations | Distance (km) | Opening Date | |
1 | Line 8 | CSMIA T2 | NMIA | 12 | 35 km (22 mi) | Approved |
2 | Line 10 | Gaimukh | Shivaji Chowk | 5 | 9.2 km (5.7 mi) | Approved |
3 | Line 11 | Anik Nagar Bus Depot | SPM Circle | 11 | 16 km (9.9 mi) | Approved |
4 | Line 13 | Shivaji Chowk | Virar | 20 | 23 km (14 mi) | Approved |
5 | Line 14 | Vikhroli EEH | Badlapur | 40 | 45 km (28 mi) | Approved |
88 | 128.2 km (79.7 mi) |
Reliance Infrastructure consulted a number of major international rolling stock builders to provide the train fleet for the Mumbai Metro. Bidders for the contract included established metro-vehicle manufacturers such as Kawasaki, Alstom, Siemens and Bombardier, but CRRC Nanjing Puzhen of China was ultimately chosen to supply rolling stock for ₹600 crore. [84] [85] In May 2008, CSR Nanjing completed the first 16 trains, each comprising four cars. [84] The first ten trains were reported to be ready for operation in January 2013. [86]
The coaches are fire retardant, [87] air-conditioned and designed to reduce noise and vibration, and will feature both high seating capacity and ample space for standing passengers. They will be outfitted with a number of features for safety and convenience, including LCD screens, 3D route maps, first-aid kits, wheelchair facilities, fire-fighting equipment and intercom systems permitting communication with the train driver. Each coach will furthermore feature a black box to assist in accident investigations. [88] The trains will be capable of carrying over 1,100 passengers in a four-car unit, with each carriage being approximately 2.9 metres (9 ft 6 in) wide. [89]
In 2018, the Mumbai Metro Rail Corporation chose Alstom to supply 31 eight car trains for Aqua line (line 3). These trains are capable of driverless operations and were built at Alstom's factory in Sri City, Andhra Pradesh. [90]
In 2018, Mumbai Metropolitan Region Development Authority which will operate all metro lines except Line 3, awarded a tender to Bharat Earth Movers Ltd. (BEML) to supply 63 trainsets (378 coaches) for Yellow Line (Line 2) and Red Line (Line 7) at a cost of ₹3,015 crores ($427.33 million). Capable of driverless operations, the trains are manufactured at BEML's factory in Bengaluru and first trainset for the Yellow Line arrived in Mumbai on 27 January 2021, and will continue to receive the rest of the sets until 2022. [91] [92] On 17 January 2021, Bombardier won the tender to supply 234 driverless coaches for the Green Line (Line 4) of six-car configuration for Mumbai metro. However, the contract was cancelled in March 2022 due to delays and uncertainties of the project. [93] [94]
Unlike 97% of metro corridors worldwide which run on direct current (DC), the Mumbai Metro runs on alternating current (AC) which is more labour and cost-intensive. MMRDA joint project director Dilip Kawathkar stated that AC power was chosen "after a proper study by a team of experts" which found that the AC model was "a better option". Bidders for Line 3 were reportedly in favour of the DC model. Experts believe that the decision to use AC will escalate the project cost of underground lines by 15%, since more digging is required for the rail to work on AC. [95]
The Mumbai Metro will feature an advanced signalling system, including an automatic train protection system (ATPS) and automated signalling to control train movements on the 11-kilometre (6.8 mi) Line 1. A four-minute service interval is anticipated on the route. [2]
Siemens will supply the signalling systems required for the project, while Thales Group will supply the Metro's communication systems. The network's signalling and train control systems will be based on LZB 700M technology. [96]
On 21 October 2019, exactly 1,960 days (approx. 5 years) after Mumbai Metro Line 1's inception, the system crossed 60 crore passengers, with an average daily ridership of around 4,50,000 (4.5 lakh) passengers. [97]
Thane is a metropolitan city located on the northwestern side of the state of Maharashtra in India and on the northeastern side of Mumbai. It is an immediate neighbour of Mumbai city proper, and a part of the Mumbai Metropolitan Region. It is situated in the north-eastern portion of the Salsette Island.
Transport in Mumbai is achieved by both public and private transport. As of 2016, 52% of commuters use public transport. Mumbai has the largest organized bus transport network among major Indian cities.
Maharashtra State Highway 42, commonly referred to as Ghodbunder Road or G.B. Road, runs entirely through the district of Thane. It is one of the major roads leading out of Thane city and connects to the Eastern Express Highway coming from south at Kapurbawdi, which joins National Highway 3 at this junction from North-East. It also connects to the Western Express Highway coming from south at Ghodbunder village, which later joins National Highway 8 at this junction traveling Northwards towards Gujarat.
Andheri ([ən̪d̪ʱeɾiː]) is a suburb situated in Western Mumbai, Maharashtra, India.
The Western Railway Elevated Corridor, also known as the Oval Maidan-Virar elevated corridor, was a proposed rapid transit corridor that would have run along the same alignment as the Western Line of the Mumbai Suburban Railway, and link Oval Maidan with Virar.
The Mumbai Trans Harbour Link, officially named as Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu and colloquially known as Atal Setu, is a 21.8 km (13.5 mi) 6-lane grade separated expressway bridge, which connects Mumbai with Navi Mumbai, its satellite city. It is the longest sea bridge in India, and the world's 12th longest sea bridge. The bridge begins in Sewri, South Mumbai, crosses Thane Creek north of Elephanta Island, and terminates at Chirle near Nhava Sheva in Uran taluka, Navi Mumbai. The road is linked to the Mumbai–Pune Expressway in the east and to the Coastal Road in the west. The 6-lane highway is 27 meters in width, in addition to two emergency exit lanes, two edge strips, parallel crash barriers and noise barriers on both sides. The project costs a total of ₹17,843 crore (US$2.1 billion). The bridge has a capacity to handle 70,000 vehicles per day. Construction on the bridge began in April 2018, and was inaugurated by Prime Minister Narendra Modi on 12 January 2024.
Line 1 (Blue Line) is a rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India. The 11.40 km (7.08 mi) line is fully elevated and consists of 12 stations from Versova to Ghatkopar. The line connects the eastern and western suburbs of Mumbai. It was built at an estimated cost of ₹4,321 crore (US$520 million) and is operated by the Metro One Operation Pvt Ltd (MOOPL) on a 5-year contract. This special purpose vehicle, namely, Mumbai Metro One Private Limited (Mumbai Metro 1) was incorporated for the implementation of the project. Reliance Infrastructure holds 69% of the equity share capital of MMOPL, 26% is with Mumbai Metropolitan Region Development Authority (MMRDA), and the remaining 5% stake with Veolia Transport.
The Jogeshwari–Vikhroli Link Road (JVLR), is a 10.6-kilometre-long (6.6 mi) 6-lane road with a central median in Mumbai which connects the Western Express Highway and Eastern Express Highway providing speedier access from Jogeshwari in the Western Suburbs to Vikhroli in the Eastern Suburbs. It was opened to traffic in 1994, and widened from two to six lanes in 2012 at a cost of ₹221.45 crore. The under-construction Line 6 of the Mumbai Metro is being constructed on this link road.
Line 3 (Aqua Line) is a rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India. The 33.5 km (20.8 mi) route is Mumbai Metro's first underground line with 27 underground stations and one at-grade station. The line will run from Navy Nagar in the far-south of Mumbai to Aarey Depot in the north-centre, and will include connections to other metro lines, monorail, suburban rail, inter-city rail, and Mumbai's International Airport. Line 3 is expected to reduce road congestion as well as the load on the Western Line between Bandra and Churchgate.
Line 2 (Yellow Line) is a rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India. The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi.
Line 7 (Red Line) is a rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India. When completed, the 30.08 km (18.69 mi) line will connect Bhayander with the Chhatrapati Shivaji Maharaj International Airport with 24 stations. The line is mostly elevated except for the 2.49 km (1.55 mi) underground twin tunnels at its southern terminus.
Line 4 (Green Line) is an under construction rapid transit metro line of the Mumbai Metro in the city of Mumbai, Maharashtra, India.
The Vikhroli-Kopar Khairane Link Road (VKLR), also known as the JVLR-Kopar Khairane-Ghansoli Bridge, is a proposed 7.5 km to 10 km, freeway grade road bridge connecting the Indian city of Mumbai with Navi Mumbai, its satellite city. The new link road would start at Eastern Express Highway (EEH) where Jogeshwari–Vikhroli Link Road (JVLR) ends in Vikhroli, then cross Thane Creek and Harbour railway line and will terminate at Kopar Khairane in Navi Mumbai before ending on Thane-Belapur Road. The link would be a six-lane road of about 10 km in length including a 2-kilometre-long (1.2 mi) bridge over the Thane Creek. At present motorists have to take either the Vashi Bridge or Mulund–Airoli Link Road to go to Navi Mumbai and Pune. The new road will help motorists save time and fuel. The project is estimated to cost around ₹ 550 to 1200 crore. Mumbai Metropolitan Region Development Authority (MMRDA) appointed N P Bridging, as designing consultants for the project, which was supposed to submit the final report on the link road by mid-September 2016.
Red Line 9 (extension) of the Mumbai Metro is part of the metro system for the city of Mumbai, India. Metro Line 9 is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road. This line will be unique from the other metro lines because it will run on a double-decker bridge. There will be a flyover on the first deck and the metro will run on the second deck. The flyover will start near the proposed Shivaji Chowk metro station and will end in Bhayander (West) via Mira Bhayander Road. It shall provide interconnectivity among the Western Express Highway, the Western Line, and the Mumbai Metro.
Green Line 10 (extension) of the Mumbai Metro, also referred to as the Gaimukh-Shivaji Chowk corridor, is part of the metro system for the city of Mumbai, India. This line is fully elevated.
Line 5 (Orange Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. When completed, the 24.9 km (15.5 mi) line will connect Thane with Kalyan via Bhiwandi, with 17 stations. The line will be fully elevated except for a 3 km underground section in Bhiwandi.
Line 6 (Pink Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The 14.477 km (8.996 mi) elevated line will connect Lokhandwala Complex with Vikhroli and will have 13 stations.
Kandarpada is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This metro station is located on CS Link Road in Dahisar, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.
Borivali West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Borivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.