Ahmedabad Suburban Railway | |
---|---|
Overview | |
Owner | Gujarat Infrastructure Development Board Indian Railways |
Locale | Ahmedabad |
Transit type | Suburban rail |
Number of lines | 2 (planned) |
Number of stations | 41 (planned) [ citation needed ] |
Daily ridership | 4,55,000 (Estimated) |
Headquarters | Ahmedabad |
Website | www |
Operation | |
Operator(s) | Western Railways |
Train length | 3 coaches |
Headway | 10 minutes |
Technical | |
System length | 52.96 km |
Track gauge | Broad gauge |
Ahmedabad Suburban Railway is a planned regional rail system in the city of Ahmedabad, Gujarat, India.
The suburban railway was proposed to let people live in satellite towns and commute easily making less pressure on urban infrastructure. The project was conceptualised by the Delhi Metro Board around 2003. The Detailed Project Review was submitted to the Gujarat Infrastructure Development Board (GIDB) by Delhi Metro Rail Corporation in October 2005. GIDB sent it to RITES for verification. The project had received approval in 2009 but was not implemented. [1] During Vibrant Gujarat Global Investors Summit 2015, MOU was signed with Rail Vikas Nigam Ltd for a suburban railway system in Ahmedabad. Later it was announced in 2016 Union Rail Budget. [1]
The project will use the existing Right of Way of Indian Railways, passing through Ahmedabad by upgrading and integrating existing facilities. Two corridors are planned for Ahmedabad Suburban Railway. [1]
Gandhinagar is the capital of the state of Gujarat in India. Gandhinagar is located approximately 23 km north of Ahmedabad, on the west central point of the industrial corridor between the megacities of Delhi and Mumbai.
The Western Railway is one of the 19 zones of Indian Railways and is among the busiest railway networks in India, headquartered at Mumbai, Maharashtra. The major railway routes of Indian Railways which come under Western Railways are: Mumbai Central–Ratlam, Mumbai Central–Ahmedabad and Palanpur–Ahmedabad. The railway system is divided into six operating divisions: Ahmedabad, Vadodara, Rajkot, Bhavnagar, Ratlam, and Mumbai WR. Vadodara railway station, being the junction point for the Ahmedabad–Mumbai route and the Mumbai–Ratlam route towards New Delhi, is the busiest junction station in Western Railways and one of the busiest junctions of Indian Railways too, while Ahmedabad Division earns highest revenue followed by Mumbai Division and Vadodara Division. Surat railway station is one of the busiest railway station in Western Railway in non-junction category where more than 180 trains pass per day.
Ahmedabad Junction railway station, commonly known as Kalupur railway station, is the main railway station of Ahmedabad, Gujarat, India. It is also the biggest railway station within Gujarat and one of the major railway stations in India. It is the highest income-generating division in Western Railways. It connects to Mumbai, Chennai, Delhi, Howrah and other major cities of India, in addition to being a center of the Gujarati rail network connecting Saurashtra, Kutch, Vadodara, Surat, Himmatnagar, Palanpur, Porbandar, and Bhavnagar Terminus.
The Bengaluru Suburban Railway is an under-construction suburban rail network for the city of Bengaluru in Karnataka. Since the first proposal in 1983, several others were made but to no avail until a revised proposal of length 161 km (100 mi) was approved in the 2019 Railway Budget. The network is set to have four lines in total with two of them planned to open by December 2026.
Indian Railways operates India's railway system and comes under the purview of the Ministry of Railways of Government of India. As of 2023, it maintains over 108,706 km (67,547 mi) of tracks and operates over 13,000 trains daily. According to the Ministry of Railways, a route capable of supporting trains operating at more than 160 km/h (100 mph) is considered as a higher speed or semi-high speed rail line.
The Western Railway Elevated Corridor, also known as the Oval Maidan-Virar elevated corridor, was a proposed rapid transit corridor that would have run along the same alignment as the Western Line of the Mumbai Suburban Railway, and link Oval Maidan with Virar.
Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad and Gandhinagar in Gujarat state of India. Currently the network is 58.66 km (36.450 mi) long and has 39 stations.
Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of Regional Rapid Transit System, suburban rail, monorail, and tram systems.
Sabarmati Junction railway station is a junction station of the Indian Western Railway in Ahmedabad, Gujarat. The station is six kilometres (3.7 mi) from the main Ahmedabad Junction railway station on the Ahmedabad–Delhi main line, at Dharamnagar near the Sabarmati Ashram. Sabarmati Junction has 2 tracks, the Mehsana line, and the Botad line, in addition to the main broad-gauge line for trains departing from Ahmedabad. The station has a dedicated rail yard for passenger trains, and was proposed in 2010 for development as an additional terminal for Delhi-bound trains.
Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction high-speed rail line, which will connect Mumbai, the financial hub of India, with Ahmedabad, the largest city in the state of Gujarat. When completed, it will be India's first high-speed rail line, with a top speed of 320 km/h (200 mph).
The Ahmedabad–Udaipur Line is a railway route of both the Western and North Western Railway zones of the Indian Railways. It plays an important role in short-connectivity transport, reaching to North India and Eastern India from Gujarat and the coastal areas of Maharashtra, Goa, Karnataka and Kerala.
The Delhi–Meerut Regional Rapid Transit System is a partially operational 82.15 km (51.05 mi)-long semi-high-speed rail and regional transit system that will connect the National Capital Region (NCR) cities of Delhi, Ghaziabad and Meerut. It is the first of the four rapid rail corridors planned under the first phase of the Namo Bharat project managed by the National Capital Region Transport Corporation (NCRTC). Designed to allow a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of ₹30,274 crore (US$3.5 billion). It will start from Jangpura as the starting station, run through Sarai Kale Khan, the terminal for the three planned corridors, both in Delhi, and end in Modipuram in Meerut. It will have 16 stations and two depots at Duhai and Modipuram.
The National High Speed Rail Corporation Limited (NHSRCL) was incorporated in 2016 to manage high-speed rail corridors in India. It is a wholly owned subsidiary of Indian Railways, the Ministry of Railways and the Government of India.
Haryana Orbital Rail Corridor (HORC), with target completion by 31 March 2025, is an under construction twin-track 121.7-kilometre (75.6 mi)-km long, 160 km per hour high-speed, railway project in Haryana state of India, which will run around along the Western Peripheral Expressway (WPE) on the western side of Delhi.
Delhi–Ahmedabad High Speed Rail Corridor is a proposed high-speed rail line connecting India's capital Delhi with the city of Ahmedabad. When completed, it will be India's second high-speed rail line. It is also said to be an extension of Mumbai–Ahmedabad HSR corridor.
The Chennai-Mysuru high speed rail corridor is India's third high-speed rail project after the Mumbai Ahmedabad High Speed Rail Corridor and Delhi Varanasi High Speed Rail Corridor. The 435 km HSR corridor will connect Chennai to Mysuru through 9 stations.
Bilimora high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. It is located at Kesali village near Bilimora, Gujarat, India. It is the sixth station of the Mumbai-Ahmedabad high-speed rail corridor, after Vapi station and before Surat station. It is scheduled to be completed by December 2024, and is slated to become operational by 2026 along with the opening of the Gujarat section of the high-speed rail corridor.
Vadodara high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Vadodara Junction railway station in Pratapgunj, Vadodara, Gujarat, India. It is the ninth station of the Mumbai–Ahmedabad high-speed rail corridor, after Bharuch station and before Anand-Nadiad station.
Ahmedabad high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Ahmedabad Junction railway station in Kalupur, Ahmedabad, Gujarat, India. It is the eleventh station of the Mumbai–Ahmedabad high-speed rail corridor, after Anand-Nadiad station and before Sabarmati station.
Sabarmati high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located near Sabarmati Junction railway station in Ram Nagar, Sabarmati, Ahmedabad, Gujarat, India. It is the twelfth and the last station, as well as the northern terminus of the Mumbai–Ahmedabad high-speed rail corridor.