Kanpur Metro | |||
---|---|---|---|
Overview | |||
Owner | Uttar Pradesh Metro Rail Corporation | ||
Locale | Kanpur, Uttar Pradesh, India | ||
Transit type | Rapid transit | ||
Number of lines | Orange Line (Partially operational & under construction) Blue Line (Under construction) | ||
Line number | |||
Number of stations | Operational: Phase 1 Orange Line 9 stations - 8.98 km (5.58 mi) Motijheel - IIT Kanpur Under Construction - (Phase 1) Orange Line 12 Stations - 14.805 km (9.199 mi) (Under construction - Dec 2024 expected) Contents
Chunniganj - Naubasta 8 stations - 8.6 km (5.3 mi) (Under construction - Dec 2026 expected) CSA University - Barra 8 | ||
Headquarters | Kanpur Metro Depot, Gurudev Chauraha, Kanpur, Uttar Pradesh, 208024, India | ||
Website | http://www.lmrcl.com | ||
Operation | |||
Began operation | December 28, 2021 | ||
Operator(s) | Uttar Pradesh Metro Rail Corporation | ||
Character | Elevated & Underground | ||
Train length | 3 coaches | ||
Headway | 3 minutes | ||
Technical | |||
System length | Phase 1 - Orange Line 8.98 km (5.58 mi) (Operational) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 750 V DC third rail [1] | ||
Average speed | 40 km/h (25 mph) | ||
Top speed | 80 km/h (50 mph) | ||
|
The Kanpur Metro is a mass rapid transit (MRT) system in Kanpur, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC).This metro system is the fastest constructed metro system in the world, partially opening within 2 years of construction starting in 2019.
It had daily average ridership of 8,000 to 10,000 passengers a day. [2]
The feasibility study for the project was done by RITES in June 2015. The government approved two corridors as per Detailed Project Report (DPR). The tenders were floated for the priority section of corridor-1 between IIT Kanpur to Motijheel. The company Afcons Infrastructure was awarded the tender.
On 28 February 2019, the Central Government approved the metro project for Kanpur at an estimated cost of ₹ 11,076.48 crores and a five-year time limit. [3] [4] Construction work began on 15 November 2019, with the first section opening in December 2021. In phase 1, the Orange Line began with the 8.98 km (5.3 mi) stretch from IIT Kanpur to Motijheel. The metro will be extendable in the following phases to the Kanpur metropolitan area.
The first phase was inaugurated by Prime Minister Narendra Modi on 28 December 2021. [5]
Currently, Kanpur has the 5th largest metro network in Uttar Pradesh after Noida, Meerut, Ghaziabad, and Lucknow.
In Phase 1, 21 metro stations will be built on Orange Line from IIT Kanpur to Naubasta and 8 metro stations will be built on Blue Line from Agriculture University to Barra-8. [6]
Line Name | Terminals | Length | Stations | |
---|---|---|---|---|
Orange Line | IIT Kanpur | Naubasta | 23.8 km | 21 |
Blue Line | Agriculture University | Barra-8 | 8.6 km | 8 |
Total | 32.4 km | 29 |
Phase 1 | |||||||
---|---|---|---|---|---|---|---|
Line Name | Terminals | Length | Stations | Opening Date | |||
Orange Line | IIT Kanpur | Moti Jheel | 8.9 km | 9 | 28 December 2021 | ||
Moti Jheel | Naubasta | 14.9 km | 12 | Under construction | |||
Blue Line | Agticulture University | Barra-8 | 8.6 km | 8 | Planned | ||
Total | 32.4 km | 29 |
Kanpur Metro | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Line Name | First Operational | Last Extension | Station | Length | Terminal | Rolling Stock | Track Gauge | Electrification | |||
Orange Line | 28 December 2021 | N/A | 9 | 8.98 km | IIT Kanpur | Moti Jheel | Alstom (MOVIA [7] ) | 1,435 mm (4 ft 8+1⁄2 in) | 750 V DC third rail |
The trains operate at a frequency of five minutes between 06:00 am and 10:00 pm currently which will gradually reduce with ridership. The trains will operate with ATO over CBTC, with a design speed of 90 km/h and an operational speed of 80 km/h. Automated station announcements are recorded in Hindi and English. Many stations will have services such as ATMs, food outlets, cafés, convenience stores and mobile recharge. Eating, drinking, smoking and chewing gum are prohibited in the entire system.
Slab | No. of stations travelled | Metro Fare (₹) |
---|---|---|
1 | 1 | 10 |
2 | 2 | 15 |
3 | 3 - 6 | 20 |
4 | 7 - 9 | 30 |
5 | 10 - 13 | 40 |
6 | 14 - 17 | 50 |
7 | 18 and more | 60 |
State Bank of India and Uttar Pradesh Metro Rail Corporation (UPMRC) has introduced Kanpur Metro GoSmart Card to metro passengers. [8]
Through this Metro card service, passengers can travel without the hassle of being in the ticket queue. An EVM chip based card can be recharged in a range of Rs.100 to Rs.2000 and in multiples of 100. Metro passengers can get 10% off on their fares if transactions are made through cards.
Elevated viaduct work has begun, more than 400 out of 538 pillars have been constructed and all the 439 double T-girders have been erected for making the base of the 9 stations of priority corridor. The pier caps and U-girders are being erected and construction work is going in full swing. The priority section of corridor-1 became operational in December 2021. [9]
In July 2020, Bombardier Transportation (acquired by Alstom) won the Agra Metro and Kanpur Metro rolling stock, and the signalling contract and manufacturing started on 26 Feb 2021. UPMRC's Managing Director Shri Kumar Keshav inaugurated the Rolling Stocks (Metro Trains) manufacturing in Bombardier's Savli Plant in Gujarat, located near Vadodara.
Kanpur to get total 39 trains of 3 Metro coaches (which would total up to 117 compartments) each for both the corridors of the Kanpur Metro Project, including Corridor-I i.e. From IIT to Naubasta and Corridor-II i.e. From Agriculture University to Barra-8. These trains have been designed with assistance from Bombardier Germany and design experts at Bombardier's Hyderabad office.
The trains are in line with utmost passenger safety and energy conservation, and each train is equipped with Communication Based Train Control System (CBTC) for Automatic Train Operations. These ultramodern trains have a state-of-the-art design for safe operation, energy efficiency and passenger comfort. These trains will also be equipped with CO2 sensor-based air-conditioning system to save energy during operations.
Valued at approximately ₹2051 crore (245 Mn EUR), Alstom's scope on the Agra-Kanpur metro project includes – the design, build and delivery of total 201 metro cars (67 MOVIA metro three-car trainsets) and an advanced signalling solution (CITYFLO 650).
The cost of construction is estimated at ₹11,076.48 crores for two lines in Phase I. [3]
Kanpur ( ), formerly anglicized as Cawnpore, is a large industrial city located in the central-western part of the state of Uttar Pradesh, India. Founded in year 1207, Kanpur became one of the most important commercial and military stations of British India. Kanpur is also the financial capital of Uttar Pradesh and part of upcoming Bundelkhand Industrial Development Authority i.e. BIDA Nestled on the banks of Ganges River, Kanpur has been the major financial and industrial centre of North India and also the ninth-largest urban economy in India. Today it is famous for its colonial architecture, gardens, sweets, dialect, IT parks and fine quality leather, plastic and textile products which are exported mainly to the West.
Uttar Pradesh is the most populous state in India with a population of nearly 240 million people. The economy of Uttar Pradesh is the fifth largest among states in India. At current prices, the gross state domestic product (GSDP) of Uttar Pradesh is estimated to be ₹24.39 lakh crore (US$310 billion) in 2023–24. Merchandise exports from Uttar Pradesh reached US$21.03 billion in FY22.
Ganga Expressway is an under-construction, 594 km (369 mi) long, 6-lane wide greenfield expressway in the state of Uttar Pradesh, India. It is being constructed in two phases. Phase-1 will connect Bijauli village on NH-334 in Meerut district with Judapur Dandu village on NH-19 in Prayagraj district, while Phase-2 will see the extension of both sides of the expressway: from Prayagraj to Ballia and from Meerut to Haridwar. It is being implemented by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) on the Design-Build-Finance-Operate-Transfer (DBFOT) Model.
The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes.
The Bhoj Metro is an under construction rapid transit system intended to serve the city of Bhopal, India, the capital of the Indian state of Madhya Pradesh. The total system consists of 6 corridors covering a distance of 104.87 kilometres (65.16 mi). The first phase of the Bhopal Metro project consists of 28 km (17.40 mi) of line 2 & 5 being under construction. This project will cost ₹80 billion (US$1.0 billion) approximately. There will be three types of run – on road, on bridges, and underground in some locations.
New Kanpur City is a satellite city of Kanpur, India. The new city spreads over 10,000 acres of prime land on the banks of the Ganges. Co-operative housing societies will get preference for allotment of plots in this new city. The remaining land will be allotted to the private developers with the clause that they will develop houses covering minimum 25 per cent of the plot area. New Kanpur city will be the most modern and well planned city in the whole country.
The Indore Metro is a rapid transit system which is under construction for the city of Indore, in the state of Madhya Pradesh, India. The total system consists of 11 corridors (lines) covering a distance of 124 kilometres (77 mi). This project will cost approximately ₹12,000 crore (US$1.5 billion). The cost per km will be 182 crores and total cost is 15,000 crores. The metro system will be elevated, underground and on ground. The Indore Metro project has been subject to serious contestation due to the inappropriate shifting of Seismic zone-II to Seismic zone-IV category which has led to increase in budgetary cost for the entire project.
The Noida Metro is a rapid transit system connecting the twin cities of Noida and Greater Noida in Gautam Buddh Nagar, Uttar Pradesh, India. The metro network consists of one line, with a total length of 29.7 kilometres (18.5 mi) serving 21 stations. The system has all elevated stations using standard-gauge tracks.
The Uttar Pradesh Metro Rail Corporation(UPMRC) is a joint venture company that operates the Lucknow Metro, Agra Metro and Kanpur Metro.The Varanasi Metro, Prayagraj Metro, Gorakhpur Metro, and Bareilly Metro are proposed by UPMRC. The company's headquarters is at Vipin Khand, Gomti Nagar Lucknow
Purvanchal Expressway is a 340.8 km long, 6-lane wide access-controlled expressway in the state of Uttar Pradesh, India. The expressway connects Chand Saray village near Gosainganj in Lucknow district with Haydaria village on NH-31 in Ghazipur district. It is developed by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). The Purvanchal Expressway has a 3.2 km long airstrip at Akhalkiri Karwat village near Kurebhar in Sultanpur district for emergency landing of aircraft. The construction work was started by the UPEIDA on 10 October 2018 and was inaugurated and opened to the public on 16 November 2021.
Agra Metro is a rapid transit network in Agra, the fourth largest city in the Indian state of Uttar Pradesh. The Detailed Project Report (DPR) was submitted in 2014 and cleared by the Uttar Pradesh cabinet in 2015. However, due to the formation of a new government and a new Metro Rail Policy, a revised feasibility report was created with the government finally approving it on the 6 March 2024. The Agra Metro is set to consist of two metro lines, with a total length of 29.65 kilometres (18.42 mi).
The Meerut Metro is an under-construction rapid transit system, which will serve the city of Meerut, Uttar Pradesh, India. It is being built in two phases, out of which the first phase with the first line will cover 23.6 km (14.7 mi) with 13 stations, from Modipuram to Meerut South. It will have nine elevated, three underground stations, one at-grade station as the depot station at Modipuram, and four stations integrated with the Delhi–Meerut RRTS on a single corridor, making the metro the first such rapid transit system in India to be merged directly with a regional railway system. The second phase will include a second line covering 15 km (9.3 mi) from Shradhapuri Phase-II to Jagrati Vihar, with 12 stations, out of which seven will elevated and five will be underground, thereby taking the overall length to 38.6 km (24.0 mi). The metro will also be the fastest metro of India, at an operational speed of 120 km/h (75 mph).
The Varanasi Metro is a light rail transit system proposed for the city of Varanasi, Uttar Pradesh, India. The proposed system consists of 2 corridors that span from BHEL to Banaras Hindu University (19.35 km) and Benia Bagh to Sarnath (9.885 km). The feasibility study of the project was done by RITES and was completed in June 2015.
The Delhi–Meerut Regional Rapid Transit System, also known as Delhi–Meerut RRTS, Delhi–Ghaziabad–Meerut RRTS and coloquially Rapid Rail, is an under-construction and partially operational 82.15 km (51.05 mi)-long semi high-speed rail and regional transit corridor that will connect the National Capital Region (NCR) cities of Delhi, Ghaziabad and Meerut. It is the first of the four rapid rail corridors planned under the first phase of the RapidX project managed by the National Capital Region Transport Corporation (NCRTC). Designed to allow a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of ₹30,274 crore (US$3.8 billion). It will start from Jangpura as the starting station, run through Sarai Kale Khan, the terminal for the three planned corridors, both in Delhi, and end in Modipuram in Meerut. It will have 16 stations and two depots at Duhai and Modipuram.
The Department of Housing and Urban Planning, often abbreviated as DoHUP, is a department of Government of Uttar Pradesh responsible for coordinated and planned development with a comprehensive Master Plan along with the work of various other agencies involved in the creation and extension of urban infrastructure.
The Aqua Line is a line of Noida Metro, a rapid transit system in Noida and Greater Noida in Uttar Pradesh, India. It consists of 21 metro stations from Sector 51 in Noida to Depot in Greater Noida.
COVID-19 Pandemic spread to Uttar Pradesh in March 2020. While the World Health Organization praised the UP government for its contact tracing efforts, there were several other issues in its management of the pandemic, including under reportage of cases by the government, vaccine shortages and dismal conditions of COVID-19 hospitals.
Metrolite is a light rail (LRT) urban transit system being planned in India for cities with lower ridership projection and as a feeder system for the existing metro systems. It will cater to lower passenger capacity at a reduced cost than a metro line. It will have dedicated tracks, separated from the road.
The Orange Line is a metro rail line of the Kanpur Metro, a rapid transit system in Kanpur, Uttar Pradesh, India. The priority section of the line was inaugurated on December 28, 2021, by the prime minister of India, Narendra Modi. This line is the first line of the Kanpur Metro to be operationalized. In the first phase, a 9 km (5.6 mi) section of the route was opened, which is fully elevated. 9 stations were also opened on this priority section of the line as well. The total length of the route will be 23.8 km (14.8 mi) of which 15.2 km (9.4 mi) will be elevated, and 8.6 km (5.3 mi) will be underground. The line will have a total of 21 stations when the entire line is commissioned.