Kanpur Monorail

Last updated

Kanpur Monorail
Overview
Owner Government of Uttar Pradesh
Locale Kanpur, Uttar Pradesh
Transit type Monorail
Number of lines3 (planned)
Daily ridership35,000 (Estd.)
Headquarters Monorail
Operation
Train length4 coaches
Technical
Electrification 750 V DC
Average speed31 km/h (19 mph)
Top speed80 km/h (50 mph)

The Kanpur Monorail was a proposed monorail system for the city of Kanpur. [1] [2]

Contents

Lines

There are three lines proposed in phase I are as follows: [3]

Total length of Phase I would be 63.0 km.

Other lines

Other lines which are being proposed in addition to Phase I are: [4]

Status

Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016. [3] As of 2021 no work has commenced.

In 2016 the State Government approved the rail based Kanpur Metro, which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans.

References

  1. "Monorail News Briefs". Monorails.org. Archived from the original on 13 June 2010. Retrieved 16 September 2010.
  2. http://www.niua.org/projects/tpt/introduction.pdf Archived 14 May 2012 at the Wayback Machine [ bare URL PDF ]
  3. 1 2 Sujay Mehdudia (21 January 2010). "The Hindu : Cities / Kanpur : Kanpur likely to get monorail". Chennai, India: Beta.thehindu.com. Retrieved 11 August 2010.[ permanent dead link ]
  4. Megha Suri (21 February 2008). "Monorail to hit Kanpur streets by 2010". The Times of India. Retrieved 11 August 2010.