Jakarta MRT

Last updated

Jakarta MRT
MRT Jakarta logo.svg
Jakarta MRT TS11 leaving Haji Nawi Station.jpg
Ratangga set 11 departing from Haji Nawi station
Overview
Native nameModa Raya Terpadu (MRT) Jakarta [lower-alpha 1]
Owner Provincial Government of DKI Jakarta
directly and through Perumda Pasar Jaya
Area served Jakarta
Banten and West Java [lower-alpha 2] [lower-alpha 3]
Locale Jakarta, Indonesia
Transit type Rapid transit
Number of lines1
Line number1 (operational)
1 (under construction)
2 (planned)
Number of stations13 (North–South line, first phase)
Daily ridership163,162 (daily peak) [1]
91,000 (2023 average) [2]
Chief executiveTuhiyat, CEO
Headquarters Wisma Nusantara, 21st Floor, Jalan Mohammad Husni Thamrin 59, Jakarta, 10350, Indonesia
Website MRT Jakarta
Operation
Began operation24 March 2019;5 years ago (2019-03-24)
Operator(s)PT Mass Rapid Transit Jakarta (Perseroda)
CharacterElevated & underground
Number of vehicles16 six-car MRTJ 1000 series trainsets
Headway 5 minutes (peak)
10 minutes (off-peak) [3]
Technical
System length15.7 km (9.8 mi) [4]
(current)
159.7 km (99.2 mi) (planned)
Track gauge 1,067 mm (3 ft 6 in)
Electrification 1,500 V DC overhead catenary
Top speed80 km/h (elevated section), 100 km/h (underground section)
System map

Jakarta MRT

The Jakarta Mass Rapid Transit (Indonesian : Moda Raya TerpaduJakarta [lower-alpha 1] ) or Jakarta MRT (MRT Jakarta, stylized as mrt jakarta) is a rapid transit system in Jakarta, the largest metropolis of Indonesia.

Contents

The system is operated by PT Mass Rapid Transit Jakarta (Perseroda), a municipally owned perseroan terbatas of the city of Jakarta. Phase 1 of the project (Lebak Bulus to Bundaran HI) was officially opened on 24 March 2019. [5] [6]

History

Jakarta is the main financial hub and largest city of Indonesia, harbouring 10 million inhabitants, one-third of the population of Greater Jakarta. It is estimated that over four million residents of the surrounding Greater Jakarta area commute to and from the city each working day. Transport issues are attracting increasing political attention with a government goal of increasing the number of trips using public transport to 60% by 2030. [7]

Impending gridlock and stall

The idea of MRT construction in Jakarta has been sparked since 1985 by the then Head of the Agency for the Assessment and Application of Technology, B.J. Habibie. The BPPT said that population growth in Jakarta declined between 1985 and 1990. However, the growth of Jakarta's satellite cities was high so that the mobility of residents from the capital to Bodetabek was very large. The roads in Jakarta will no longer be able to accommodate the mobility of the population. Therefore, a mode of transport is needed that accommodates the mobility of people from the Bodetabek area. [8] [9]

As of 2010, public transportation in Jakarta served only 56% of commuter trips. [10] This figure must be increased again considering the high growth of the vehicle population. The average growth of motorised vehicles in Jakarta was 9.5%, while the growth of road length only reached 0.1% between 2005 and 2010. [11] This must be addressed with a policy to reduce and prevent severe congestion. [12] Until then, public transportation in the city mainly consists of the TransJakarta bus rapid transit system, [13] the KRL Commuterline commuter rail, [14] and various types of independent buses; starting from the very small bemo and pickup-truck sized mikrolet, to slightly larger minibuses such as the widely used MetroMini and Kopaja minibuses and full sized city buses. There are also both two and four wheeled taxis.

In 1996, President Soeharto's administration set out to build the Jakarta MRT with a 14 km Blok MStasiun Jakarta Kota route, fully built underground. However, this endeavour failed due to the 1997‒1998 economic crisis. In 2000, the project was resumed after Indonesia's socio-political and economic conditions improved. At that time, the Study on Integrated Transportation Master Plan for Jabodetabek (SITRAMP) phase I was initiated. The main points of SITRAMP I were the reassessment of the MRT project of FatmawatiMonas route and the installation of the concept for SITRAMP II. At the request of the Government of Indonesia, JICA was entrusted by the Government of Japan to undertake the SITRAMP II study which lasted from November 2001 to March 2004. JICA offered the Fatmawati‒Monas route with several alternative construction designs to the government which were obtained after conducting a feasibility study. [8] However, efforts to build the MRT were only resumed in 2005. President Susilo Bambang Yudhoyono designated the Jakarta MRT as a national project. From this designation, the preparatory processes for the construction of the first line of the Jakarta MRT began. The Japanese government also agreed to provide a loan for this national project. [9] [15]

First development

Dukuh Atas MRT Station underground line tunnel during construction (2019) MRT Jakarta Dukuh Atas tunnel.jpg
Dukuh Atas MRT Station underground line tunnel during construction (2019)

The process of developing the first line of the Jakarta MRT began when President SBY designated the system as a national project. In November 2006, the first loan agreement was signed with JICA for the MRT project. The agreement includes study funding and construction work funding for the first MRT line. [16] [17] On 17 June 2008, the DKI Jakarta Government established PT MRT Jakarta as a regional-owned enterprise company to support the construction and operation of the Jakarta MRT. [9] [18]

The basic design work of this first line was carried out from 2010 to 2012. On 26 April 2012, the declaration of the preparation of the Jakarta MRT North-South Line project was carried out by then DKI Jakarta Governor, Fauzi Bowo. [19] A year later, on 11 June 2013, the first three project contracts were signed, namely the underground track construction. [20] Meanwhile, the contract for the elevated track was signed on 10 October 2013. [21] This event was held in conjunction with the laying of the first stone to mark the start of construction by the new Governor, Joko Widodo. [22]

Construction of the entire line was fully completed on 31 October 2017. [23] Starting 12 March 2019, the line was opened to the public in a limited public trial that lasted until just before the inauguration. [24] The first line of the Jakarta MRT was officially operated on 24 March 2019 after being inaugurated by President Joko Widodo. [25] [26] [22] [27]

Continued development

At the same time as the inauguration of the first phase of the North-South Line, President Joko Widodo also launched the construction of the second phase of the North-South Line. [25] [26] [27] The construction process of this second phase, especially phase II-A (Bunderan HIKota Tua), is considered to be late from the target. This is due to the Covid-19 pandemic which affects the budget and the contract auction process. As a result, there are several contract packages that are combined and carried out by direct procurement. The first segment construction target, which was originally completed in 2024, is believed to be delayed until 2025. [28] [29] To date, the construction process for this phase is still ongoing. Unlike the previous phase, this second phase has been designed to be built with the concept of a transit-oriented area, [30] making it easier for users to switch modes of transport. Meanwhile, phase II-B (Kota Tua‒Ancol) is still under feasibility study. [31]

According to the JABODETABEK Urban Transportation Policy Integration Phase (JUTPI) report, the Jabodetabek transportation master plan (RITJ) will eventually form 10 MRT routes, which by 2035 will consist of: [32]

Meanwhile, according to the DKI Jakarta Provincial Government on 12 November 2021 live at the Jakarta Investment Forum (JIF), [33] the Railway Masterplan 2039 (Concept of DKI Jakarta Transportation Masterplan) will be divided into two based on ownership status.

The first is the DKI Jakarta Provincial Government Urban Railway with 14 lines consisting of two MRT lines, six LRT lines and six "Jakarta Urban Railway" lines or PPJ for short. This PPJ is the benchmark for the route that will later be used for rail transportation in the future, which can use any means of rail transportation such as trams, LRTs or MRTs. Meanwhile, the second is the Central Government Railway with the Jabodebek LRT, KRL Commuterline (with the development of Jatinegara-Manggarai-Tanah Abang-Duri-Angke-Kampung Bandan-Jatinegara into an Elevated Loopline), and the Jakarta-Bandung high-speed train

The routes belonging to the DKI Jakarta Provincial Government are:

Apart from that, South Korea's Hyundai Rotem offers an alternative Outer Ring Line route from Rawa Buaya to Ujung Menteng via Kembangan Station (Integration with the MRT East-West Line), Tanah Kusir Station (integration with the new station on the KRL Rangkasbitung Line), Fatmawati (Integration with the MRT North-South Line), then follow the Fatmawati-TMII route, then continuing back to Cikunir Station (integration with the LRT Jabodebek Bekasi Line), Cakung Station (Integration with the KRL Cikarang Line), and Ujung Menteng Station (Integration with the MRT East-West Line). [34]

Funding

Phase 1

Initial proposed line and stations of MRT Jakarta (2014) MRTjakarta plan.png
Initial proposed line and stations of MRT Jakarta (2014)

Phase 1 of the project was funded through a soft loan (Rp16 trillion) (US$1.2 billion) from the Japan International Cooperation Agency (JICA) with a 30 years tenure and 0.25% interest per annum. [35] The loan number IP is 536 (signed November 2006) for engineering services. The engineering services loan is a pre-construction loan to prepare the construction phase. It consists of:

Phase 2

Phase 2 was funded through a similar loan scheme with a 40 years tenure, allowing a 10 years grace period. The first stage of phase 2 funding (Rp9.4 trillion) incurred 0.1% interest per annum. [36] Phase 2A funding (Rp25 trillion) will cover a portion of phase 1 excess expenditure (Rp2.5 trillion).

On 24 August 2022, it was announced that the cost required for Phase 2A has been adjusted to Rp26 trillion (US$1.7 billion), up from Rp22.5 trillion. The challenging soil conditions were cited as the reason for the increase. [37]

Phase 3

Phase 3 will be funded by a Japanese investor, in January 2023 it was announced that cost required for Phase 3 is Rp160 trillion (US$10.6 billion). [38]

The Phase 3 will connected from Balaraja to Cikarang. [39]

Phase 4

Phase 4 will be funded by a South Korean consortium led by Korea Overseas Infrastructure and Urban Development Corporation with estimates cost Rp28 trillion (US$1.9 billion). [40] [41]

System network

MRT train depot in Lebak Bulus Station MRT Jakarta 2.jpg
MRT train depot in Lebak Bulus Station
Jakarta MRT Red line system map Jakarta MRT System Map.jpg
Jakarta MRT Red line system map

The Jakarta MRT is expected to stretch across over 108 kilometres (67 mi), including 26.7 kilometres (16.6 mi) for the Red line (from Lebak Bulus to Ancol) and 87 kilometres (54 mi) for the Yellow line (from Cikarang to Balaraja). [42] Trains run on the right to match Indonesian railways, which also have a right handed traffic, despite Indonesia has a left handed traffic for roads.

The following table lists the MRT lines that are currently operational, under construction or planned as of April 2023. Planned lines are preliminary and could still be altered before entering construction phase.

Colour and Line NamePhaseService CommencementTerminusStationsLengthDepot
Operational
Jakarta MRT M.svg North-South Line 124 March 2019Lebak Bulus
Bundaran HI
1315.7 km (9.8 mi)Lebak Bulus
Under construction
Jakarta MRT M.svg North-South Line 2A2027/2029Bundaran HI
Kota
75.8 km (3.6 mi)Lebak Bulus
Planned
Jakarta MRT M.svg North-South Line 2BTBAKota
Ancol
25.2 km (3.2 mi)Ancol Barat
Jakarta MRT East West Line.png East-West Line 3A S1TBATomang
Medan Satria
2124.5 km (15.2 mi)Rorotan (preliminary)
Jakarta MRT East West Line.png East-West Line 3A S2Tomang
Kembangan
TBA9.2 km (5.7 mi)
Jakarta MRT East West Line.png East-West Line 3BKembangan
Balaraja
29.9 km (18.6 mi)Balaraja (preliminary)
Jakarta MRT East West Line.png East-West Line 3BMedan Satria
Cikarang
20.5 km (12.7 mi)TBD
Jakarta MRT Outer Loop Line.png Outer–Ring Line 4Fatmawati
TMII
1012 km (7.5 mi)Kampung Rambutan (preliminary)

North–South line

North–South line
BSicon uextCONTg.svg
 
 
BSicon uexKDSTa.svg
Ancol Barat Depot
BSicon uextSTRa.svg
BSicon uextBHF.svg
Ancol
BSicon uextSKRZ-A.svg
Jakarta Inner Ring Road
BSicon STR+l.svg
BSicon uxmtKRZ.svg
BSicon CONTfq.svg
Jakarta KRL TP.svg
BSicon CONTgq.svg
BSicon BHF.svg
BSicon KRZ.svg
BSicon uxmtKRZ.svg
BSicon CONTfq.svg
BSicon STR.svg
BSicon uextBHF.svg
Mangga Dua
BSicon ABZg+l.svg
BSicon uxmtKRZ.svg
BSicon CONTfq.svg
Jakarta KRL B.svg ↑ Phase 2
BSicon KBHFe.svg
BSicon KBL2.svg
BSicon uextSTR.svg
BSicon uextBHF.svg
BSicon KBL4.svg
Kota
TransJakarta roundel 1.svg TransJakarta roundel 12.svg
BSicon uextBHF.svg
Glodok
TransJakarta roundel 1.svg
BSicon uextBHF.svg
Mangga Besar
TransJakarta roundel 1.svg
BSicon uextBHF.svg
Sawah Besar
TransJakarta roundel 1.svg
BSicon uextBHF.svg
Harmoni
TransJakarta roundel 1.svg TransJakarta roundel 2.svg TransJakarta roundel 3.svg
BSicon uextSTR.svg
↑ Phase 2A II: opening 2029
BSicon uextBHF.svg
Monas
BSicon uextCONTgq.svg
BSicon uextTINTxt.svg
BSicon uextCONTfq.svg
Thamrin
  M2   TransJakarta roundel 1.svg
BSicon uextSTR.svg
↑ Phase 2A I: opening 2027
BSicon utKBHFxa.svg
BHI
Bundaran HI
TransJakarta roundel 1.svg
BSicon BL+l.svg
BSicon utBHF.svg
BSicon BLq.svg
BSicon BL+r.svg
DKA
Dukuh Atas BNI
TransJakarta roundel 1.svg TransJakarta roundel 4.svg TransJakarta roundel 6.svg
BSicon CONTgq.svg
BSicon BHFq.svg
BSicon HUBaq.svg
BSicon BLe.svg
BSicon HUBq.svg
BSicon umtKRZ.svg
BSicon BHFq.svg
BSicon HUBlg.svg
BSicon BLe.svg
BSicon CONTfq.svg
Jakarta KRL C.svg Jakarta KRL A.svg BNI City Jakarta KRL C.svg Sudirman
BSicon WASSERq.svg
BSicon utKRZW.svg
BSicon HUB.svg
BSicon WASSERq.svg
West Flood Canal
BSicon utSTR.svg
BSicon HUBe.svg
BSicon uhKBHFaq.svg
BSicon uhCONTfq.svg
Jakarta LRT CB.svg Jakarta LRT BK.svg Dukuh Atas
BSicon utBHF.svg
STB
Setiabudi Astra
TransJakarta roundel 1.svg
BSicon utBHF.svg
BNH
Bendungan Hilir
TransJakarta roundel 1.svg TransJakarta roundel 9.svg
BSicon RACONTgq.svg
BSicon utSKRZ-A.svg
BSicon RACONTfq.svg
Jakarta Inner Ring Road
BSicon utBHF.svg
IST
Istora Mandiri
TransJakarta roundel 1.svg
BSicon utBHF.svg
SNY
Senayan Mastercard
TransJakarta roundel 1.svg
BSicon hPORTALg.svg
BSicon uhBHF.svg
SSM
ASEAN
TransJakarta roundel 1.svg TransJakarta roundel 13.svg
BSicon uhBHF.svg
BLM
Blok M BCA
TransJakarta roundel 1.svg
BSicon uhBHF.svg
BLA
Blok A
BSicon uhBHF.svg
HJN
Haji Nawi
BSicon uhBHF.svg
CPR
Cipete Raya
BSicon RA+l.svg
BSicon uhSKRZ-A.svg
BSicon RACONTfq.svg
Jakarta Outer Ring Road
BSicon RACONTf.svg
BSicon uhBHF.svg
FTM
Fatmawati Indomaret
BSicon uhBHF.svg
LBB
Lebak Bulus Grab
TransJakarta roundel 8.svg
BSicon uhENDEaq.svg
BSicon uhABZr+r.svg
BSicon lhSTRe@g.svg
BSicon uKDSTe.svg
Lebak Bulus Depot
Dukuh Atas Station Platform Dukuh Atas 3.jpg
Dukuh Atas Station Platform
Jakarta MRT passengers waiting for the train on the platform Jakarta MRT passengers waiting for the train.jpg
Jakarta MRT passengers waiting for the train on the platform

Phase 1

Phase 1 connects Lebak Bulus to Bundaran HI along 15.7 kilometres (9.8 mi) and consists of 13 stations (7 elevated stations and 6 underground stations). [43] The Indonesian Ministry of Transport approved this plan in September 2010 and invited tenders. Construction began in October 2013. [44]

Jakarta MRT arriving at the Dukuh Atas BNI station.

Phase 1 was opened for free service on 24 March 2019. Commercial service began on 1 April 2019. [45] Phase 1 is expected to serve 212,000 passengers per day. This expected capacity may be maxed out to 960,000 per day. The 15.7 kilometres (9.8 mi) distance is covered in under 30 minutes. [46] Within its first month of operations, 82,000 passengers used the line daily. [47]

Phase 2

Phase 2 was initially planned to extend Bundaran HI to Kampung Bandan in North Jakarta. However, land acquisition issues hindered the process, prompting the administration to find an alternative location, which will also be designed to house the train depot.

On 1 January 2019, the president director of MRT Jakarta, William Sabandar said the city administration had decided to make Kota the final station for Phase 2. The extension was then renamed to Phase 2A.

Phase 2A will extend the Red line northwards, from Bundaran HI to Kota and consists of 7 stations over 5.8 kilometres (3.6 mi). The extension was initially planned to be fully operational by March 2026. However, due to problems securing bidders for the construction and the effects of the COVID-19 pandemic, the extension is now targeted to be fully operational by 2028. [48] [49]

On 20 February 2019, it was announced that the Red line will be extended further, towards Ancol. The extension was named Phase 2B. [50]

On 17 February 2020, during the signing of contract CP201 for the construction of the first two stations of the Phase 2A extension, the administration announced that Phase 2B will consist of two stations and one depot, and was under feasibility studies, with its construction expected to commence in mid-2022. [51] It has since been delayed. Phase 2B is estimated to cost Rp10 trillion. [52]

Phase 2A construction started on 22 March 2021. [53] During excavation works for the construction of Phase 2A, the remains of tracks used for Jakarta's tramway were found. [54]

East–West line (planned)

The East–West Line is the second MRT Jakarta line which connects Cikarang in the east with Balaraja in the west via the Central Jakarta area. This line is planned to have 48 stations and a length of approximately 84,102 to 87 km [55] [56] with funding requirements of IDR 160 trillion. [57] Just like the North-South line, the East-West line will also be built in phases, 3A and 3B. The line is planned to interchange with the North-South line at Thamrin Station. [58] [59] [60] It is currently under architectural design studies and construction was initially expected to begin in 2020, however it has since been delayed and is now targeted to begin in 2024. [61]

Phase 3A

Phase 3A is the first stage of construction of the East–West Line. Phase 3A will stretch for 31.7 km connecting Ujung Menteng with Kembangan. Phase 3A will have 26 stations and groundbreaking will take place in 2024. [57]

Phase 3B

Phase 3B itself will have 22 stations, with 14 stations in the Balaraja-Karangtengah segment and 8 stations in Medan Satria-Cikarang segment. [62]

Outer–Ring Line (planned)

In December 2020, the President Director of MRT Jakarta, William Sabandar, announced plans for the construction of Phase 4. This line will connect Fatmawati with Taman Mini Indonesia Indah for approximately 12 km. This route is considered the most strategic route because there is no rail transportation that passes through this area. Apart from that, this route is planned to be integrated with the Kampung Rambutan Bus Terminal, Tanjung Barat Station (KRL Bogor Line), and the Jabodebek LRT (Cibubur Line). Currently the process has begun for a feasibility study and then a design planning process is carried out. This phase of construction is planned to use the Government Cooperation with Business Entities (KPBU) scheme. It is planned that this line will be built starting in 2025. [63] [64] [65] [66] [67]

Fares and ticketing

Tariff

The Jakarta MRT employs a cashless fare payment system. On 26 March 2019, the Jakarta MRT fares were set. The initial fare is Rp.3,000 as the minimum fare and increases by Rp.1,000 with each passing station. A trip spanning the entire existing line in 2019, travelling from Lebak Bulus Station to Bundaran HI Station, would cost a passenger Rp14,000. [68] [69] This fare was expected to come into effect on 1 April 2019. [70]

Payment method

Kartu Jelajah (single trip) by MRT Jakarta Jakarta MRT Kartu Jelajah Single Trip.jpg
Kartu Jelajah (single trip) by MRT Jakarta
Automatic ticketing machine Jakarta MRT ticket vending machine.jpg
Automatic ticketing machine

Kartu Jelajah (single trip)

In order to fulfil the need for electronic tickets on MRT operations, A dedicated contactless smart card known as the 'Jelajah' can be purchased from the ticketing machines or ticket offices located at every station. [71] This payment card is released in two types of cards, namely cards for single-trip and prepaid cards for multi-trip. Single-trip cards can only be used for one trip and are required to be topped up within a maximum of 7 days after purchase. Meanwhile, multi-trip cards can be used multiple times as long as the balance in the card is still sufficient. [72] [73] The implementation of the multi-trip Cruise Card as a payment method was approved by Bank Indonesia on 14 November 2019. [74]

A refundable Rp15,000 deposit is required to purchase a single journey ticket, in addition to fares required for the journey.

Jak Lingko

To optimise intermodal transport, the DKI Jakarta Provincial Government implemented an integrated payment method using the Jak Lingko card and application. This programme is a continuation of the existing OK-Otrip system. This card can also be used for Jakarta LRT, Transjakarta, and KRL Commuter Line. [75] MRT Jakarta accepts all Jak Lingko payments provided by Bank DKI and Himbara member banks such as BRI, BNI and Mandiri. There is currently a trial of the new Jak Lingko card and application based on the KRL Commuterline Multi Trip Card and Fello e-wallet. [76] [77] Through the application, users can pay from all e-wallets that are connected to the Indonesian QR Code Standard (QRIS).

Electronic banking cards

Jakarta MRT payments can also be made using electronic cards from various banks. The electronic cards include those issued by Himbara, namely Bank BNI, Bank BRI, and Bank Mandiri. In addition, cards provided by Bank DKI and Bank BCA are also accepted by MRT Jakarta. The list of electronic banking cards that can be used in fare payment is as follows. [78]

  • BRIZZI (Bank BRI)
  • TapCash (Bank BNI)
  • e-Money (Bank Mandiri)
  • Flazz (Bank BCA)
  • Jakcard  [ id ] (Bank DKI)

Jakarta MRT App

On 27 April 2020, payment and ticket purchases began to be used on the application made by PT MRT Jakarta, namely the MRT-J application. Users of electronic wallets must connect their wallet with an app provided by MRT Jakarta (MRT-J) and buy single trip tickets in the form of QR codes. [79] Payment through this application uses several digital wallet services, namely OVO, Dana, LinkAja, ShopeePay, MotionPay, GoPay, and AstraPay. After the user makes a payment, the user only needs to bring the mobile phone closer to the QR code reader at the passenger door so that the door opens automatically. [80] Passengers are required to tap their cards at the fare gates when entering and exiting the paid area of the stations.

KAI Commuter Multi Trip Card

Since October 2021, the KAI Commuter Multi Trip Card (KMT) can be used on the Jakarta MRT service. However, until now the use of KMT is still a trial application along with the Jakarta LRT and Transjakarta services. [81] [82]

Safety and security

Platform screen doors at ASEAN MRT station ASEAN MRT Station 3.jpg
Platform screen doors at ASEAN MRT station

To prevent track incursions, half-height and full-height platform screen doors (PSDs) are installed at platforms of elevated and underground stations respectively.

Trains and stations are equipped with CCTVs, which are monitored from the control room. Medical rooms are also available at every station to provide first-aid to passengers and workers, if necessary. [83] Security officers are regularly stationed at station entrances and platforms.

All stations are equipped with X-ray machines and walk through metal detectors for passengers entering the MRT system. [84]

Rolling stock

Jakarta MRT set 01 departing from Fatmawati Station Jakarta MRT TS1 at Fatmawati Station.jpg
Jakarta MRT set 01 departing from Fatmawati Station
Inside the train Indonesia MRT.jpg
Inside the train

Contract CP 108 for the procurement of rolling stock for the Jakarta MRT was awarded to a consortium led by Sumitomo Corporation on 3 March 2015. [85] A total of 16 six-cars trainsets were ordered at a cost of ¥10.8 billion (Rp145 billion). [86] The trains were built in Nippon Sharyo's plant in Toyokawa, Aichi. [87]

Each car measures 20 m (65 ft 7 in) in length, 2.9 m (9 ft 6 in) in width, and 3.9 m (12 ft 10 in) in height. [88] These trains utilize the CBTC signaling system and are equipped with Automatic Train Operation (ATO) GoA 2, with drivers operating the doors and driving in case of emergency. [89] Like the KRL Commuterline, the MRT trains are also powered via overhead catenary. [90]

MRT Jakarta officially call the trains Ratanggas (singular Ratangga), a nickname first bestowed on 10 January 2018 by then Governor of Jakarta, Anies Baswedan. The name, which is Old Javanese for chariots, [91] was derived from Mpu Tantular's Kakawin Sutasoma (also the source for Indonesia's national motto). [92] It offers a women-only carriage during morning peak hours from 7AM to 9AM and in the afternoon from 5PM to 7PM. [93]

PT Mass Rapid Transit Jakarta

PT Mass Rapid Transit Jakarta (Perseroda) is a municipally owned perseroan terbatas founded by the Government of Special Capital Region of Jakarta to operate the Jakarta MRT system. Its establishment was approved by the provincial parliament (DPRD) on 10 June 2008 and the company's incorporation was formally notarized on 17 June 2008. Due to a two-shareholder minimum in Indonesia's perseroan terbatas laws (rescinded for municipally owned corporations in 2020), only 99.98% of the shares are owned by the Government of Jakarta; the rest 0.02% is owned by Perumda Pasar Jaya (a municipal public corporation of Jakarta operating marketplaces). [94] Therefore, PT MRT Jakarta (Perseroda) is the first operating railway company in Indonesia that is not wholly or partly owned by state-owned company Kereta Api Indonesia, and one of the only such companies besides PT LRT Jakarta.

Network Map

Jakarta MRT

See also

Notes

  1. 1 2 lit. "Jakarta Integrated Mass Mode"
  2. "Serves on Phase 3"
  3. "Banten only serves with Tangerang (also Regency) where West Java only serves with Bekasi (also Regency)"

Related Research Articles

<span class="mw-page-title-main">Banten</span> Province of Indonesia in western Java

Banten is the westernmost province on the island of Java, Indonesia. Its capital city is Serang and its largest city is Tangerang. The province borders West Java and the Special Capital Region of Jakarta on the east, the Java Sea on the north, the Indian Ocean on the south, and the Sunda Strait on the west and shares a maritime border with Bengkulu and Lampung to the east and Bangka Belitung Islands to the north. The province covers an area of 9,352.77 km2 (3,611.12 sq mi). It had a population of over 11.9 million in the 2020 census, up from about 10.6 million in 2010. The estimated mid-2023 population was 12.308 million. Formerly part of the province of West Java, Banten was split off to become a province on 17 October 2000.

<span class="mw-page-title-main">Jakarta metropolitan area</span> Metropolitan area of Jakarta and surrounded city, Indonesia

The Jakarta metropolitan area or Greater Jakarta, known locally as Jabodetabekpunjur is the most populous megapolitan area in Indonesia. It includes the national capital as well as five satellite cities and three complete regencies. The original term "Jabotabek" dated from the late 1970s and was revised to "Jabodetabek" in 1999 when "De" was inserted into the name following its formation. The term "Jabodetabekjur" or "Jabodetabekpunjur" was legalised on the Presidential Regulation Number 54 of 2008, and then the name "Jabodetabekpunjur" is officially used.

<span class="mw-page-title-main">Ciracas</span> District in DKI Jakarta, Indonesia

Ciracas is a district (kecamatan) of East Jakarta, one of the five administrative cities of Jakarta, Indonesia. Ciracas is the southernmost district in Jakarta. The area of Cibubur Scout's camping ground complex is located partly within the Ciracas District, although the main camping ground area is located in Cipayung District. The boundaries of Ciracas District are: Cipinang River to the west, Cipinang River - Jambore Road to the south, Jagorawi Tollroad to the east, and Kelapa Dua Wetan Road to the north.

<span class="mw-page-title-main">Klender railway station</span> Railway station in Indonesia

Klender Station (KLD) is a railway station located in Jatinegara Kaum, Pulo Gadung, East Jakarta, Indonesia. The station, which is located at an altitude of +10 m, is included in the Jakarta Operational Area I and only serves KRL Commuterline trips.

<span class="mw-page-title-main">Jakarta International Stadium</span> Indonesian international stadium

Jakarta International Stadium is a retractable roof football stadium in Tanjung Priok, Jakarta, Indonesia. It is the home ground of Persija Jakarta after moving from their previous stadium, Gelora Bung Karno Stadium, and the occasional home of the Indonesia national football team, after an agreement between PSSI and PT JAKPRO to use the facility. The stadium has a seating capacity of 82,000 spectators, making it the largest stadium in Indonesia and largest football-specific stadium in Asia.

<span class="mw-page-title-main">Jalan M.H. Thamrin</span> Major thoroughfare in Jakarta, Indonesia

Jalan M.H. Thamrin or Jalan Thamrin is a major thoroughfare in Jakarta, Indonesia. The road is located at the center of Jakarta, running from the north end of Jalan Jenderal Sudirman at West Flood Canal at the south end to the roundabout near Arjuna Wijaya Statue Jakarta at the north end. Developed in the 1950s, the road was a landmark of post-colonial Indonesia and continues to have a prominent importance in Jakarta.

<span class="mw-page-title-main">Sudirman railway station</span> Railway station in Indonesia

Sudirman Station is a train station of KRL Commuterline, which is located in Menteng, Central Jakarta, Indonesia. The station is named from Jalan Jenderal Sudirman, one of the main avenue in Jakarta, which crosses above the station. This station is located on the north bank of West Flood Canal. Though this station serves only Commuterline trains, but it is a transit point for other types of public transportation as part of the Dukuh Atas TOD.

Most railway lines in Indonesia were constructed during the Dutch colonial rule. After independence in 1945, many lines were abandoned. The current national rail operator, PT Kereta Api Indonesia (Persero), was founded on 28 September 1945.

<span class="mw-page-title-main">Jabodebek LRT</span> Light rapid transit system in Greater Jakarta

The Jabodebek LRT or Greater Jakarta LRT is a light rapid transit system in Greater Jakarta, the capital city of Indonesia, as well as the adjacent areas of West Java, within the Jakarta Metropolitan area. It was implemented by the central government, and operated by Kereta Api Indonesia (KAI), the system connects the Jakarta city center with suburbs in Greater Jakarta such as Bogor, Depok and Bekasi, hence its acronym Jabodebek.

<span class="mw-page-title-main">Bintaro Jaya</span>

Bintaro Jaya is a planned township located in Greater Jakarta, Indonesia. It is developed by PT Jaya Real Property Tbk. The development of the township began within South Jakarta in 1979 and is expanded further to South Tangerang in Banten province. The township is built as a satellite city for Jakarta, with a total land area of about 1000 hectares. The name Bintaro is derived from the Bintaro Village, which also takes the name of Bintaro plant, whereas Jaya came from the name of the developer.

<span class="mw-page-title-main">Jakarta LRT</span> Light rapid transit system in Jakarta

The Jakarta Light Rapid Transit or Jakarta LRT is one of the light rapid transit systems in Jakarta, the capital city of Indonesia. It is conceived and built by the Jakarta provincial government. The first phase of the LRT, from Velodrome to Pegangsaan Dua, began commercial operations on 1 December 2019.

<span class="mw-page-title-main">Cikarang railway station</span> Railway station in Indonesia

Cikarang Station (CKR) is a railway station located at Karangasih, North Cikarang, West Java in Indonesia. Previously the station was only served by regional train services between West Java and Jakarta. It is included in the service area of Jakarta metro commuter rail since October 2017.

<span class="mw-page-title-main">Lebak Bulus Grab MRT station</span> MRT station in Jakarta, Indonesia

Lebak Bulus MRT Station is a rapid transit station on the North-South Line of the Jakarta MRT in Jakarta, Indonesia. Located in the South Jakarta, it is the terminus of the North-South Line, however the track does continue east, towards Lebak Bulus Depot.

<span class="mw-page-title-main">Fatmawati Indomaret MRT station</span> MRT station in Jakarta, Indonesia

Fatmawati MRT Station, or Fatmawati Indomaret MRT Station for sponsorship reason, is a rapid transit station on the M1 North-South Line of the Jakarta MRT in Jakarta, Indonesia. Located in South Jakarta, it is the penultimate station on the M1 North-South Line, located between Lebak Bulus Grab Station (Terminus) to the west and Cipete Raya station to the northeast.

<span class="mw-page-title-main">Bundaran HI MRT station</span> MRT station in Jakarta, Indonesia

Bundaran HI Station is a rapid transit station on the North-South Line of the Jakarta MRT in Central Jakarta, Jakarta, Indonesia. Located nearby the Hotel Indonesia (HI) Roundabout, it is currently the terminus of the North-South Line, as the phase 2 construction of the line is underway.

<span class="mw-page-title-main">North–South Line (Jakarta MRT)</span> Rapid transit line of Jakarta MRT

The North–South line is a rapid transit line of the Jakarta MRT. Coloured dark red on the map, the line is currently 15.7 km (9.8 mi) long and serves 13 stations. It is the first line of the Jakarta MRT.

<span class="mw-page-title-main">Transjakarta Corridor 8</span> Bus rapid transit route in Indonesia

TransJakarta Corridor 8 is a bus rapid transit corridor in Jakarta, Indonesia, operated by TransJakarta. It serves the route from Lebak Bulus, South Jakarta to the Pasar Baru BRT station in Central Jakarta. The corridor traverses along Pasar Jumat, Ciputat Raya, TB Simatupang, Metro Pondok Indah, Arteri Pondok Indah, Teuku Nyak Arif, Letjen Supeno, Panjang, Daan Mogot, Letjen S. Parman, Tomang Raya, Balikpapan, Suryopranoto, Ir. Hj. Djuanda, and Pos streets, and terminates at Pasar Baru. Then continues via Gedung Kesenian, Lapangan Banteng Utama, and Katedral streets towards Lebak Bulus. This corridor is integrated with KRL Commuterline at Kebayoran railway station which serves the Rangkasbitung Line via Kebayoran BRT station, Tangerang Line at Pesing railway station via Damai BRT station, and Bogor Line at Juanda railway station via Juanda BRT station. This corridor is also integrated with the Jakarta MRT at Lebak Bulus Grab station via Lebak Bulus BRT station.

<span class="mw-page-title-main">Dukuh Atas LRT Station</span> LRT station in Indonesia

Dukuh Atas LRT Station is a light rail station located within the Dukuh Atas TOD in Jalan Setia Budi Tengah, Kuningan Timur, Setiabudi, South Jakarta, Jakarta, Indonesia. The station, which is located at an altitude of +27.9 meters, serves the Cibubur and Bekasi lines of the Jabodebek LRT system.

References

  1. "163.162 Orang Tercatat Gunakan Ratangga pada 15 November 2023". jakartamrt.co.id (in Indonesian). Retrieved 18 November 2023.
  2. Harahap, Lumongga (6 January 2024). "MRT Cetak Rekor Jumlah Penumpang Terbanyak Dalam Sehari di 2023!". detikfinance (in Indonesian). Retrieved 1 February 2024.
  3. "Kebajikan Operational MRT Jakarta mulai 7 Oktober 2021". MRT Jakarta. Retrieved 7 October 2021.
  4. "Next Station, Kota: Jakarta MRT Transports 20 Million Passengers in First Eight Months". Jakarta Globe. Retrieved 3 December 2019.
  5. Farras, Bernhart; Asmara, Chandra Gian (24 March 2019). "Resmikan MRT Jakarta, Jokowi: Sebuah Peradaban Baru Dimulai". CNBC Indonesia.
  6. "Jakarta metro inaugurated". Metro Report. Retrieved 2 April 2019.
  7. Van Mead, Nick. "The world's worst traffic: can Jakarta find an alternative to the car?". The Guardian. The Guardian. Retrieved 3 February 2024.
  8. 1 2 Santosa, Wimpy; Basuki, Tri (2003). "Jakarta Mass Rapid Transit Project: An Economic Review". Universitas Katolik Parahyangan . S2CID   131201157.
  9. 1 2 3 Gumelar, Galih (12 March 2019). "MRT, 'Mimpi' Jakarta Sejak 1985 yang Akhirnya Terwujud". CNN Indonesia . Retrieved 21 February 2021.
  10. "Urban Public Transport System in Jakarta (2010)" (PDF). sustainabledevelopment.un.org.
  11. "United Nations Forum on Climate Change Mitigation, Fuel Economy And Sustainable Development of Urban Transport" (PDF). Urban Public Transport System in Jakarta. Retrieved 20 September 2015.
  12. Rini, Daryanti Asrining. "Urban Public Transport System in Jakarta" (PDF). Sustainable Development Goals, United Nations.
  13. "Koridor – PT Transportasi Jakarta". transjakarta.co.id. Retrieved 6 April 2019.
  14. "Tentang Kami".
  15. Susanto, Agus (2020). Menuju Ratangga: Kereta Kota Kita. Jakarta: PT MRT Jakarta.
  16. "Jepang Danai Mega Proyek MRT". detikcom . 28 November 2006. Retrieved 21 February 2021.
  17. "Jepang Beri Pinjaman Untuk Pembangunan MRT". ANTARA News . 29 November 2006. Retrieved 21 February 2021.
  18. "Sejarah". MRT Jakarta. Retrieved 21 February 2021.
  19. Hamdani, Trio (27 December 2019). "Indonesia Akhirnya Punya MRT". detikcom . Retrieved 5 December 2020.
  20. Tambun, Lenny Tristia (11 June 2013). "Kontrak Proyek MRT Ditandatangani, Pembangunan Segera Dimulai". BERITA SATU. Retrieved 20 February 2021.
  21. Aziza, Kurnia Sari (8 October 2013). Syatiri, Ana Shofiana (ed.). "MRT "Underground" Dimulai, Konstruksi Layang Ditandatangani". Kompas.com . Retrieved 20 February 2021.
  22. 1 2 Tambun, Lenny Tristia (10 October 2013). "Jokowi Resmikan Groundbreaking Fisik MRT Jakarta". BERITASATU. Retrieved 5 December 2020.
  23. "MRT Jakarta focuses on constructing station, depot". The Jakarta Post. 1 November 2017. Retrieved 5 December 2020.
  24. Velarosdela, Rindi Nuris (12 March 2019). Patnistik, Egidius (ed.). "Uji Coba Operasi MRT Jakarta untuk Publik Dimulai Hari Ini". Kompas.com . Retrieved 5 December 2020.
  25. 1 2 "Jokowi Resmikan MRT di Bundaran HI". CNN Indonesia . 24 March 2019. Retrieved 12 January 2021.
  26. 1 2 "MRT Pertama di Indonesia Resmi Beroperasi". VOA Indonesia. 25 March 2019. Retrieved 20 February 2021.
  27. 1 2 Asmara, Bernhart Farras & Chandra Gian; Asmara, Chandra Gian (24 March 2019). "Resmikan MRT Jakarta, Jokowi: Sebuah Peradaban Baru Dimulai". CNBC Indonesia . Retrieved 24 March 2019.
  28. Hikam, Herdi Alif Al (5 January 2021). "Akhirnya Proyek MRT Jakarta Fase II Dapat Kontraktor". detikcom . Retrieved 9 January 2021.
  29. Fadli, Ardiansyah (5 January 2021). Alexander, Hilda B (ed.). "Akibat Pandemi, Pembangunan MRT Fase II Molor hingga Agustus 2027". Kompas.com . Retrieved 9 January 2021.
  30. Wijaya, Lani Diana (11 July 2019). "Gandeng ITDP, MRT Kembangkan TOD di Pembangunan Fase 2". Tempo.co (in Indonesian). Retrieved 3 July 2021.[ permanent dead link ]
  31. "Fase 2 | MRT Jakarta". jakartamrt.co.id. Retrieved 16 December 2023.
  32. JABODETABEK Urban Transportation Policy Integration Project Phase 2 in the Republic of Indonesia (PDF) (Report). Tokyo: Japan International Cooperation Agency.
  33. "Railway Masterplan 2039 (Concept of DKI Jakarta Transportation Masterplan)". Jakarta: Dinas Informasi, Komunikasi dan Statistik Provinsi DKI Jakarta via YouTube.
  34. Putri Berlian, Almadinah. "Pembangunan MRT Fatmawati-Kampung Rambutan Ditargetkan 2024". Detik.com. Detik.
  35. "Indonesia, JICA sign deal on loan for MRT Phase II project". The Jakarta Post. 25 October 2018.
  36. Simorangkir, Eduardo. "Mengintip Skema Pembayaran Utang Pembangunan MRT Jakarta". detikfinance. Retrieved 11 March 2019.
  37. Indraini, Anisa (24 August 2022). "Proyek MRT Jakarta Bundaran HI-Kota Bengkak Jadi Rp 26 T, Ini Biang Keroknya". Detik Finance.
  38. Kamalina, Annasa Rizki (23 January 2023). "Jepang Alirkan Rp160 Triliun untuk Proyek MRT Cikarang-Balaraja, Konstruksi 2024". Bisnis com.
  39. Al Hikam, Herdi Alif (18 February 2023). "Cek! Rincian 48 Wilayah Bakal Dilewati MRT Fase 3 Cikarang-Balaraja". finance.detik.com.
  40. Maharani, Aisyah Sekar Ayu (2 September 2022). Alexander, Hilda (ed.). "Proyek MRT Jakarta Fase 4 Resmi Didukung Korea Selatan". Kompas.com (in Indonesian).
  41. Brilian, Almadinah Putri (23 January 2023). "MRT Fase 4 Fatmawati-Kampung Rambutan Dibangun 2025". Detik Finance.
  42. Anwar, Muhammad Choirul (3 December 2019). "Pondok Cabe-Serpong Bakal Ada MRT, Mulai Dibangun 2022". CNBC Indonesia. Retrieved 6 December 2019.
  43. "Stasiun dan Fasilitas" (in Indonesian). Retrieved 3 February 2018.
  44. "MTR Academy Signs Memorandum of Understanding with MRT Jakarta to Support Development of Indonesia's First Mass Transit System" (PDF). MTR. 28 April 2017.
  45. Radityo, Muhammad (22 March 2019). "Tarif Belum Diketok, Warga Masih Bisa Nikmati MRT Cuma-cuma Sampai Akhir Maret". Merdeka.com. Retrieved 22 December 2017.
  46. Arditya, Andreas (7 October 2011). "MRT construction likely to disrupt public utility networks". The Jakarta Post.
  47. Ikhsanudin, Arief (30 April 2019). "Sebulan Operasi, MRT Angkut 82.615 Penumpang Per Hari". detiknews (in Indonesian). Retrieved 4 May 2019.
  48. Atika, Sausan (20 October 2020). "MRT Jakarta phase 2 faces delays amid lack of interest, COVID-19 pandemic". The Jakarta Post.
  49. "Pembangunan MRT Fase 2A Dimulai, Ditargetkan Selesai 2028" (in Indonesian). 12 September 2022.
  50. Simorangkir, Eduardo (18 January 2019). "Lokasi Depo Belum Pasti, Pembangunan MRT Fase II Dibagi 2 Tahap". Detik Finance.
  51. "MRT, Adhi Karya, dan Shimizu teken Kontrak MRT Fase 2A". CNN Indonesia. 17 February 2020.
  52. Dorimulu, Primus (25 May 2022). "Proyek MRT Cikarang-Balaraja dan Fatmawati-TMII Butuh Rp 188 Triliun". Berita Satu.
  53. Fadli, Ardiansyah (21 March 2021). Alexander, Hilda (ed.). "MRT Fase 2A Dilanjutkan, Rekayasa Lalin Mulai Berlaku 22 Maret-30 Juni 2021". KOMPAS.com (in Indonesian). Retrieved 22 March 2021.
  54. Wijaya, Lani Diana (31 August 2021). Afifa, Laila (ed.). "MRT Jakarta Discovers Old Tramway in Kota Tua". Tempo. Translated by Dewi Elvia Muthiariny. Retrieved 27 September 2021.
  55. Ayu Maharani, Aisya Sekar (18 February 2023). "MRT Fase 3, "Booster" buat Properti Koridor Timur Naik Kelas". Kompas.com . Retrieved 3 April 2023.
  56. Yulianson (20 February 2023). "Warganet Ramai Bahas Proyek MRT Jakarta Fase 3, Ada yang Bangga hingga Nyinyir". Liputan6 . Retrieved 3 April 2023.
  57. 1 2 Heppy, Amy (26 January 2023). "Pembangunan MRT Jakarta Fase 3 dan 4 Ditargetkan Mulai 2024". tempo.co (in Indonesian). Retrieved 2 April 2020.
  58. Indraini, Anisa (3 August 2020). "Mengintip Desain 'Wah' 2 Stasiun Baru MRT Jakarta". detikcom . Retrieved 12 January 2021.
  59. Anggraini, Rizka Gusti (24 March 2019). "MRT Fase III Cikarang – Balaraja akan Mulai Dibangun Kuartal II 2020". Kata Data.
  60. "MRT akan Membentang dari Kalideres Hingga Ujung Menteng". IDN Times. 24 March 2019.
  61. Susanti, Sanya; Liman, Uyu (21 January 2023). Kurmala, Azis (ed.). "East-West MRT construction to be expedited: Minister Hartarto". Antara.
  62. Al Hikam, Herdi Alif (18 February 2023). "Cek! Rincian 48 Wilayah bakal dilewati MRT Fase 3 Cikarang-Balaraja". detikFinance . Retrieved 3 April 2023.
  63. Afriyadi, Achmad Dwi (30 June 2022). "MRT Fatmawati-TMII Dibangun Tahun Depan, Ini Rutenya". Detik Finance (in Indonesian).
  64. Kristianti, Livia (10 December 2020). Sujatmiko, Edy (ed.). "MRT Jakarta bocorkan alasan rencana rute Fatmawati-TMII jadi fase 4". Jakarta. LKBN Antara . Retrieved 23 February 2021.
  65. Afriyadi, Achmad Dwi (17 January 2021). "MRT Jakarta Mau Nyambung Sampai TMII, Sudah Sampai Mana Prosesnya?". Detik . Jakarta: Trans Media . Retrieved 23 February 2021.
  66. Maharani, Aisyah Sekar Ayu (2 September 2022). Alexander, Hilda (ed.). "Proyek MRT Jakarta Fase 4 Resmi Didukung Korea Selatan". Kompas.com (in Indonesian).
  67. Brilian, Almadinah Putri (23 January 2023). "MRT Fase 4 Fatmawati-Kampung Rambutan Dibangun 2025". Detik Finance.
  68. Tambun, Lenny Tristia (26 March 2019). "Jakarta Sets MRT Ticket Price". Jakarta Globe. Retrieved 31 March 2019.
  69. Wirayani, Prima (26 March 2019). "Semua Sepakat! Ini Dia Tarif Resmi MRT Jakarta Antar-Stasiun". CNBC Indonesia . Retrieved 23 February 2021.
  70. Nailufar, Nibras Nada (27 March 2019). Rastika, Icha (ed.). "Tarif MRT Rp 3.000-Rp 14.000 Berlaku 1 April 2019". Kompas.com . Retrieved 23 February 2021.
  71. Romadoni, Ahmad (4 February 2019). "MRT Kenalkan Tiket Perjalanan Bernama 'Kartu Jelajah'". kumparan (in Indonesian). Retrieved 22 March 2019.
  72. Malik, Dusep (5 February 2019). "Mengintip 'Kartu Jelajah', Uang Elektronik untuk Naik MRT Jakarta". VIVA.co.id . Retrieved 22 March 2019.
  73. Nailufar, Nibras Nada (31 March 2019). Ika, Aprillia (ed.). "Mulai Senin, Naik MRT Pakai Uang Elektronik atau Kartu Harian". Kompas.com . Retrieved 1 April 2019.
  74. Sutianto, Feby Dwi (16 November 2019). "Dapat Restu BI, MRT Jakarta Akan Luncurkan Kartu Multi Trip". kumparanBisnis. Retrieved 23 February 2021.
  75. Natalyn, Ezra; Rachmani, Adinda Purnama (24 March 2019). "Anies Sebut MRT Bagian Jak Lingko, Integrasi Transportasi Jakarta". VIVA.co.id . Retrieved 27 March 2019.
  76. "Ujicoba Penerapan Aplikasi Integrasi Jak Lingko". Republika Online (in Indonesian). 31 August 2021. Retrieved 29 December 2021.
  77. "Beginilah Uji Coba Terbatas Kartu Transportasi JakLingko pada Moda Transportasi Jakarta". Railway Enthusiast Digest (in Indonesian). 1 September 2021. Retrieved 29 December 2021.
  78. Prastiwi, Devira. Yulika, Nila Chrisna (ed.). "4 Cara Pembayaran Naik MRT Jakarta dari Uang Elektronik hingga QR Code". Liputan6.com (in Indonesian). Retrieved 23 November 2019.
  79. Siregar, Efrem. "Naik MRT Bisa Lewat OVO, Dana, LinkAja, & GoPay Mulai 2020". CNBC Indonesia (in Indonesian). Retrieved 13 October 2021.
  80. Junita, Nancy (27 April 2020). Rahardyan, Aziz (ed.). "MRT Jakarta Sediakan Aplikasi Tiket via QR-Code, Bisa Dicoba Mulai Hari Ini". Bisnis.com . Retrieved 23 February 2021.
  81. Atika, Sausan (1 April 2019). "MRT Jakarta opens at half-price fares for April". The Jakarta Post.
  82. Yati, Rahmi (12 October 2021). Kusumawardhani, Amanda (ed.). "KAI Commuter Uji Coba Kartu Multi Trip di MRT, LRT, dan TransJakarta Koridor 1 | Ekonomi". Bisnis.com (in Indonesian). Retrieved 13 October 2021.
  83. Atika, Sausan (26 February 2019). "MRT Jakarta gears up for passenger safety". The Jakarta Post.
  84. Maharani, Aisyah Sekar Ayu (4 July 2022). Alexander, Hilda (ed.). "Jamin Keamanan Penumpang, MRT Jakarta Sediakan X-Ray di Pintu Masuk". KOMPAS.com (in Indonesian). Retrieved 14 February 2023.
  85. "Kontrak Rolling Stock Proyek MRT Jakarta Ditandatangani" (PDF) (Press release) (in Indonesian). PT MRT Jakarta. 3 March 2015. Archived from the original (PDF) on 16 March 2015.
  86. Sukarno, Puput Ady (3 March 2015). Cakti, Gita Arwana (ed.). "PROYEK MRT JAKARTA: Sumitomo Corporation Menangkan Tender Kereta Listrik". Bisnis.com. Retrieved 23 July 2020.
  87. Riana, Friski (11 December 2017). Sugiharto, Jobpie (ed.). "Melihat Kereta MRT Jakarta Diproduksi: Tak Lagi Mirip Jangkrik". Tempo (in Indonesian). Retrieved 4 April 2019.
  88. "Kereta MRT Jakarta: Untuk Kenyamanan Mobilitas Penumpang". MRT Jakarta (in Indonesian). 16 January 2018. Retrieved 4 April 2019.
  89. "CBTC: Untuk Keamanan, Kenyamanan, dan Keandalan MRT Jakarta". MRT Jakarta (in Indonesian). 3 December 2017. Archived from the original on 11 January 2020. Retrieved 4 April 2019.
  90. Agustine, Irene (2 July 2018). "MRT Jakarta to be fully operational in 2024". Investor Daily. PricewaterhouseCoopers.
  91. Farozy, Ikko Haidar (10 December 2018). "Nama Kereta MRT Jakarta Diresmikan Gubernur DKI". Railway Enthusiast Digest. Retrieved 10 December 2018.
  92. "MRT Diberi Nama Ratangga, Diambil dari Kitab Mpu Tantular". CNN Indonesia (in Indonesian). 10 December 2018. Retrieved 10 January 2021.
  93. Putri, Anggie Lianda (13 March 2019). Arifin, Choirul (ed.). "MRT Sediakan Satu Kabin Kereta Khusus Penumpang Wanita di Jam-jam Sibuk". Tribunnews.com (in Indonesian). Retrieved 4 April 2019.
  94. "History of Jakarta MRT". jakartamrt.co.id. Retrieved 4 November 2021.