Jakarta MRT | |||
---|---|---|---|
Overview | |||
Native name | Moda Raya Terpadu (MRT) Jakarta [a] | ||
Owner | Provincial Government of DKI Jakarta directly and through Perumda Pasar Jaya | ||
Area served | Greater Jakarta [b] | ||
Locale | Jakarta, Indonesia | ||
Transit type | Rapid transit | ||
Number of lines | 1 (operational) 2 (under construction) 3 (planned) | ||
Number of stations | 13 (operational) 28 (under construction) 40 (planned) 81 (total) | ||
Daily ridership | 163,162 (daily peak) [1] 91,000 (2023 average) [2] | ||
Annual ridership | 33.50 million (2023) [3] | ||
Chief executive | Tuhiyat, CEO | ||
Headquarters | Wisma Nusantara, 21st Floor, Jalan Mohammad Husni Thamrin 59, Jakarta, 10350, Indonesia | ||
Website | MRT Jakarta | ||
Operation | |||
Began operation | 24 March 2019 | ||
Operator(s) | PT Mass Rapid Transit Jakarta (Perseroda) | ||
Character | Elevated & underground | ||
Number of vehicles | 16 six-car MRTJ 1000 series trainsets | ||
Headway | 5 minutes (peak) 10 minutes (off-peak) [4] | ||
Technical | |||
System length | 15.7 km (9.8 mi) [5] (operational) 30.3 km (18.8 mi) (under construction) 76.8 km (47.7 mi) (planned) | ||
Track gauge | 1,067 mm (3 ft 6 in) | ||
Electrification | 1,500 V DC overhead catenary | ||
Top speed | 80 km/h (elevated section) 100 km/h (underground section) | ||
|
The Jakarta Mass Rapid Transit (Indonesian : Moda Raya TerpaduJakarta [a] ) or Jakarta MRT (MRT Jakarta, stylized as mrt jakarta) is a rapid transit system in Jakarta, the largest metropolis of Indonesia.
The system is operated by PT Mass Rapid Transit Jakarta (Perseroda), a municipally owned perseroan terbatas of the city of Jakarta. Phase 1 of the project (Lebak Bulus to Bundaran HI) was officially opened on 24 March 2019. [6] [7]
Jakarta is the main financial hub and largest city of Indonesia, harbouring 10 million inhabitants, one-third of the population of Greater Jakarta. It is estimated that over four million residents of the surrounding Greater Jakarta area commute to and from the city each working day. Transport issues are attracting increasing political attention with a government goal of increasing the number of trips using public transport to 60% by 2030. [8]
The idea of MRT construction in Jakarta has been sparked since 1985 by the then Head of the Agency for the Assessment and Application of Technology (currently the National Research and Innovation Agency), B.J. Habibie (a man who would later become president). The BPPT said that population growth in Jakarta declined between 1985 and 1990. However, the growth of Jakarta's satellite cities was high so that the mobility of residents from the capital to Bodetabek was very large. The roads in Jakarta will no longer be able to accommodate the mobility of the population. Therefore, a mode of transport is needed that accommodates the mobility of people from the Bodetabek area. [9] [10]
As of 2010, public transportation in Jakarta served only 56% of commuter trips. [11] This figure must be increased again considering the high growth of the vehicle population. The average growth of motorised vehicles in Jakarta was 9.5%, while the growth of road length only reached 0.1% between 2005 and 2010. [12] This must be addressed with a policy to reduce and prevent severe congestion. [13] Until then, public transportation in the city mainly consists of the TransJakarta bus rapid transit system, [14] the KRL Commuterline commuter rail, [15] and various types of independent buses; starting from the very small bemo and pickup-truck sized mikrolet, to slightly larger minibuses such as the widely used MetroMini and Kopaja minibuses and full sized city buses. There are also both two and four wheeled taxis.
According to Dr. Soetjipto Wirosardjono, the deputy chairman of the Central Bureau of Statistics, the MRT system has never been a priority for the governors since they are mostly interested in the implementation of the project, and that means the system would take 15 to 20 years to complete. Many studies have been done either by the Germans, the French, the Japanese, or the World Bank, and no decision has been taken regarding the implementation of a public transportation system. An international consortium was formed in August 1995 to prepare a feasibility study of the first line of the MRT system. The consortium is named Indonesian Japanese European Group (IJEG), composed of Itochu Corporation of Japan, German companies Ferrostaal AG, AEG, and Siemens, ABB, Taylor Woodrow, and Indonesian companies such as Bakrie Brothers, Lippo, Bukaka Suthanthabie, Steady Safe, etc. [16]
In 1996, President Soeharto's administration set out to build the Jakarta MRT with a 14.5-km and 17-station Blok M‒Stasiun Jakarta Kota route, fully built underground. In April 1997, an MOU agreement was signed with Tycoon Bamabang Trihatmodjo (Bimantara Group) for the joining of the consortium planning a US$2 billion system. The planned completion was set for 2001, but disputes over financing have delayed the venture. [17] However, this endeavour failed due to the 1997‒1998 economic crisis. In 2000, the project was resumed after Indonesia's socio-political and economic conditions improved. At that time, the Study on Integrated Transportation Master Plan for Jabodetabek (SITRAMP) phase I was initiated. The main points of SITRAMP I were the reassessment of the MRT project of Fatmawati‒Monas route and the installation of the concept for SITRAMP II.
At the request of the Government of Indonesia, Japan International Cooperation Agency (JICA) was entrusted by the Government of Japan to undertake the SITRAMP II study which lasted from November 2001 to March 2004. JICA offered the Fatmawati‒Monas route with several alternative construction designs to the government which were obtained after conducting a feasibility study. [9] However, efforts to build the MRT were only resumed in 2005. President Susilo Bambang Yudhoyono designated the Jakarta MRT as a national project. From this designation, the preparatory processes for the construction of the first line of the Jakarta MRT began. The Japanese government also agreed to provide a loan for this national project. [10] [18]
The process of developing the first line of the Jakarta MRT began when President SBY designated the system as a national project. In November 2006, the first loan agreement was signed with JICA (then Japan Bank for International Cooperation or JBIC) for the MRT project. The agreement includes study funding and construction work funding for the first MRT line. [19] [20] On 17 June 2008, the DKI Jakarta Government established PT MRT Jakarta as a regional-owned enterprise company to support the construction and operation of the Jakarta MRT. [10] [21]
The basic design work of this first line was carried out from 2010 to 2012. On 26 April 2012, the declaration of the preparation of the Jakarta MRT North-South Line project was carried out by then DKI Jakarta Governor, Fauzi Bowo. [22] A year later, on 11 June 2013, the first three project contracts were signed, namely the underground track construction. [23] Meanwhile, the contract for the elevated track was signed on 10 October 2013. [24] This event was held in conjunction with the laying of the first stone to mark the start of construction by the new Governor, Joko Widodo. [25]
Construction of the entire line was fully completed on 31 October 2017. [26] Starting 12 March 2019, the line was opened to the public in a limited public trial that lasted until just before the inauguration. [27] The first line of the Jakarta MRT was officially operated on 24 March 2019 after being inaugurated by President Joko Widodo. [28] [29] [25] [30]
At the same time as the inauguration of the first phase of the North-South Line, President Joko Widodo also launched the construction of the second phase of the North-South Line. [28] [29] [30] The construction process of this second phase, especially phase II-A (Bunderan HI‒Kota Tua), is considered to be late from the target. This is due to the Covid-19 pandemic which affects the budget and the contract auction process. As a result, there are several contract packages that are combined and carried out by direct procurement. The first segment construction target, which was originally completed in 2024, is believed to be delayed until 2025. [31] [32] To date, the construction process for this phase is still ongoing. Unlike the previous phase, this second phase has been designed to be built with the concept of a transit-oriented area, [33] making it easier for users to switch modes of transport. Meanwhile, phase II-B (Kota Tua‒Ancol) is still under feasibility study. [34]
According to the JABODETABEK Urban Transportation Policy Integration Phase (JUTPI) report, the Jabodetabek transportation master plan (RITJ) will eventually form 10 MRT routes, which by 2035 will consist of: [35]
Meanwhile, according to the DKI Jakarta Provincial Government on 12 November 2021 live at the Jakarta Investment Forum (JIF), [36] the Railway Masterplan 2039 (Concept of DKI Jakarta Transportation Masterplan) will be divided into two based on ownership status.
The first is the DKI Jakarta Provincial Government Urban Railway with 14 lines consisting of two MRT lines, six LRT lines and six "Jakarta Urban Railway" lines or PPJ for short. This PPJ is the benchmark for the route that will later be used for rail transportation in the future, which can use any means of rail transportation such as trams, LRTs or MRTs. Meanwhile, the second is the Central Government Railway with the Jabodebek LRT, KRL Commuterline (with the development of Jatinegara-Manggarai-Tanah Abang-Duri-Angke-Kampung Bandan-Jatinegara into an Elevated Loopline), and the Jakarta-Bandung high-speed train
The routes belonging to the DKI Jakarta Provincial Government are:
Apart from that, South Korea's Hyundai Rotem offers an alternative Outer Ring Line route from Rawa Buaya to Ujung Menteng via Kembangan Station (Integration with the MRT East-West Line), Tanah Kusir Station (integration with the new station on the KRL Rangkasbitung Line), Fatmawati (Integration with the MRT North-South Line), then follow the Fatmawati-TMII route, then continuing back to Cikunir Station (integration with the LRT Jabodebek Bekasi Line), Cakung Station (Integration with the KRL Cikarang Line), and Ujung Menteng Station (Integration with the MRT East-West Line). [37]
Phase 1 of the project was funded through a soft loan (Rp16 trillion) (US$1.2 billion) from the JICA with a 30 years tenure and 0.25% interest per annum. [38] The loan number IP is 536 (signed November 2006) for engineering services. The engineering services loan is a pre-construction loan to prepare the construction phase. It consists of:
Phase 2 was funded through a similar loan scheme with a 40 years tenure, allowing a 10 years grace period. The first stage of phase 2 funding (Rp9.4 trillion) incurred 0.1% interest per annum. [39] Phase 2A funding (Rp25 trillion) will cover a portion of phase 1 excess expenditure (Rp2.5 trillion).
On 24 August 2022, it was announced that the cost required for Phase 2A has been adjusted to Rp26 trillion (US$1.7 billion), up from Rp22.5 trillion. The challenging soil conditions were cited as the reason for the increase. [40]
Phase 3 is funded by JICA and the Asian Development Bank (ADB), in January 2023 it was announced that cost required for Phase 3 is Rp160 trillion (US$10.6 billion). [41] While ADB will finance the project with up to $600 million. [42]
The Phase 3 will connect Balaraja and Cikarang. [43]
Phase 4 will be funded by a South Korean consortium led by Korea Overseas Infrastructure and Urban Development Corporation with estimate cost of Rp21 trillion (US$1.9 billion). [44] [45] [46]
The Jakarta MRT is expected to stretch across over 122.8 kilometres (76.3 mi), including 26.7 kilometres (16.6 mi) for the Red line (from Lebak Bulus to Ancol), 84.1 kilometres (52.3 mi) for the Yellow line (from Cikarang to Balaraja), and 12.0 kilometres (7.5 mi) for the Green line (from Fatmawati to TMII). [47] Trains run on the right to match Indonesian railways, which also have a right handed traffic, despite Indonesia has a left handed traffic for roads.
The following table lists the MRT lines that are currently operational, under construction or planned as of April 2023. Planned lines are preliminary and could still be altered before entering construction phase.
Colour and Line Name | Phase | Service Commencement | Terminus | Stations | Length | Depot |
---|---|---|---|---|---|---|
Operational | ||||||
North-South Line | 1 | 24 March 2019 | Lebak Bulus Bundaran HI | 13 | 15.7 km (9.8 mi) | Lebak Bulus |
Under construction | ||||||
North-South Line | 2A | 2027/2029 | Bundaran HI Kota | 7 | 5.8 km (3.6 mi) | Lebak Bulus |
East-West Line | 3A S1 | 2031 | Tomang Medan Satria | 21 | 24.5 km (15.2 mi) | Rorotan |
Planned | ||||||
North-South Line | 2B | 2032 | Kota Ancol | 2 | 5.2 km (3.2 mi) | Ancol Barat |
East-West Line | 3A S2 | TBA | Tomang Kembangan | 6 | 9.2 km (5.7 mi) | Rorotan |
East-West Line | 3B S1 | Kembangan Balaraja | 14 | 29.9 km (18.6 mi) | Balaraja (preliminary) | |
East-West Line | 3B S2 | Medan Satria Cikarang | 8 | 20.5 km (12.7 mi) | ||
Outer–Ring Line | 4 | Fatmawati TMII | 10 | 12 km (7.5 mi) | Kampung Rambutan (preliminary) |
North–South line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Phase 1 connects Lebak Bulus to Bundaran HI along 15.7 kilometres (9.8 mi) and consists of 13 stations (7 elevated stations and 6 underground stations). [48] The Indonesian Ministry of Transport approved this plan in September 2010 and invited tenders. Construction began in October 2013. [49]
Phase 1 was opened for free service on 24 March 2019. Commercial service began on 1 April 2019. [50] Phase 1 is expected to serve 212,000 passengers per day. This expected capacity may be maxed out to 960,000 per day. The 15.7 kilometres (9.8 mi) distance is covered in under 30 minutes. [51] Within its first month of operations, 82,000 passengers used the line daily. [52]
Phase 2 was initially planned to extend Bundaran HI to Kampung Bandan in North Jakarta. However, land acquisition issues hindered the process, prompting the administration to find an alternative location, which will also be designed to house the train depot.
On 1 January 2019, the president director of MRT Jakarta, William Sabandar said the city administration had decided to make Kota the final station for Phase 2. The extension was then renamed to Phase 2A.
Phase 2A will extend the Red line northwards, from Bundaran HI to Kota and consists of 7 stations over 5.8 kilometres (3.6 mi). The extension was initially planned to be fully operational by March 2026. However, due to problems securing bidders for the construction and the effects of the COVID-19 pandemic, the extension is now targeted to be fully operational by 2028. [53] [54]
On 20 February 2019, it was announced that the Red line will be extended further, towards Ancol. The extension was named Phase 2B. [55]
On 17 February 2020, during the signing of contract CP201 for the construction of the first two stations of the Phase 2A extension, the administration announced that Phase 2B will consist of two stations and one depot, and was under feasibility studies, with its construction expected to commence in mid-2022. [56] It has since been delayed. Phase 2B is estimated to cost Rp10 trillion. [57]
Phase 2A construction started on 22 March 2021. [58] During excavation works for the construction of Phase 2A, the remains of tracks used for Jakarta's tramway were found. [59]
East–West line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The East–West Line is the second MRT Jakarta line which connects Cikarang in the east with Balaraja in the west via the Central Jakarta area. This line is planned to have 48 stations and a length of approximately 84,102 to 87 km [60] [61] with funding requirements of IDR 160 trillion. [62] Just like the North-South line, the East-West line will also be built in phases, with similar system and gauge between the two lines. [63] The line is planned to interchange with the North-South line at Thamrin Station. [64] [65] [66] Architectural design studies have been underway and construction was initially expected to begin in 2020, however it has since been delayed. [67] Groundbreaking ceremony was held on 11 September 2024, with construction to be commenced in 2025. [68]
Phase I is the initial stage of construction of the East–West Line, divided into two stages. Initially, it was planned to stretch for 31.7 km connecting Ujung Menteng with Kembangan. Later, it was revised to connect Medan Satria with Tomang first for phase I stage 1, stretching 24.5 km, and then Kembangan with Tomang for phase I stage 2, stretching 9.2 km. [69] [70] Phase I will be funded by Japan International Cooperation Agency (JICA), after an agreement was signed on 13 May 2024. [71]
Phase II itself will initially have 22 stations, with 14 stations in the Balaraja-Karangtengah segment and 8 stations in Medan Satria-Cikarang segment. [72] Later, the construction of the western segment of the line was revised to Balaraja-Kembangan, while the eastern segment remains the same, with total length of 50.4 km of line to be constructed. [69]
In December 2020, the President Director of MRT Jakarta, William Sabandar, announced plans for the construction of Phase 4. This line will connect Fatmawati with Taman Mini Indonesia Indah for approximately 12 km. This route is considered the most strategic route because there is no rail transportation that passes through this area. Apart from that, this route is planned to be integrated with the Kampung Rambutan Bus Terminal, Tanjung Barat Station (KRL Bogor Line), and the Jabodebek LRT (Cibubur Line). Currently the process has begun for a feasibility study and then a design planning process is carried out. This phase of construction is planned to use the Government Cooperation with Business Entities (KPBU) scheme. It is planned that this line will be built starting in 2025. [73] [74] [75] [45] [76] [ excessive citations ]
The Jakarta MRT employs a cashless fare payment system. On 26 March 2019, the Jakarta MRT fares were set. The initial fare is Rp.3,000 as the minimum fare and increases by Rp.1,000 with each passing station. A trip spanning the entire existing line in 2019, travelling from Lebak Bulus Station to Bundaran HI Station, would cost a passenger Rp14,000. [77] [78] This fare was expected to come into effect on 1 April 2019. [79]
In order to fulfil the need for electronic tickets on MRT operations, A dedicated contactless smart card known as the 'Jelajah' can be purchased from the ticketing machines or ticket offices located at every station. [80] This payment card is released in two types of cards, namely cards for single-trip and prepaid cards for multi-trip. Single-trip cards can only be used for one trip and are required to be topped up within a maximum of 7 days after purchase. Meanwhile, multi-trip cards can be used multiple times as long as the balance in the card is still sufficient. [81] [82] The implementation of the multi-trip Cruise Card as a payment method was approved by Bank Indonesia on 14 November 2019. [83]
A refundable Rp15,000 deposit is required to purchase a single journey ticket, in addition to fares required for the journey.
The multi-trip card is no longer sold since January 2024 and it's usage will be discontinued on October 31st, 2024. [84]
To optimise intermodal transport, the DKI Jakarta Provincial Government implemented an integrated payment method using the Jak Lingko card and application. This programme is a continuation of the existing OK-Otrip system. This card can also be used for Jakarta LRT, Transjakarta, and KRL Commuter Line. [85] MRT Jakarta accepts all Jak Lingko payments provided by Bank DKI and Himbara member banks such as BRI, BNI and Mandiri. There is currently a trial of the new Jak Lingko card and application based on the KRL Commuterline Multi Trip Card and Fello e-wallet. [86] [87] Through the application, users can pay from all e-wallets that are connected to the Indonesian QR Code Standard (QRIS).
Jakarta MRT payments can also be made using electronic cards from various banks. The electronic cards include those issued by Himbara, namely Bank BNI, Bank BRI, and Bank Mandiri. In addition, cards provided by Bank DKI and Bank BCA are also accepted by MRT Jakarta. The list of electronic banking cards that can be used in fare payment is as follows. [88]
On 27 April 2020, payment and ticket purchases began to be used on the application made by PT MRT Jakarta, namely the MRT-J application. Users of electronic wallets must connect their wallet with an app provided by MRT Jakarta (MRT-J) and buy single trip tickets in the form of QR codes. [89] Payment through this application uses several digital wallet services, namely OVO, Dana, LinkAja, ShopeePay, MotionPay, GoPay, and AstraPay. After the user makes a payment, the user only needs to bring the mobile phone closer to the QR code reader at the passenger door so that the door opens automatically. [90] Passengers are required to tap their cards at the fare gates when entering and exiting the paid area of the stations.
Since October 2021, the KAI Commuter Multi Trip Card (KMT) can be used on the Jakarta MRT service. However, until now the use of KMT is still a trial application along with the Jakarta LRT and Transjakarta services. [91] [92]
To prevent track incursions, half-height and full-height platform screen doors (PSDs) are installed at platforms of elevated and underground stations respectively.
Trains and stations are equipped with CCTVs, which are monitored from the control room. Medical rooms are also available at every station to provide first-aid to passengers and workers, if necessary. [93] Security officers are regularly stationed at station entrances and platforms.
All stations are equipped with X-ray machines and walk through metal detectors for passengers entering the MRT system. [94]
Contract CP 108 for the procurement of rolling stock for the Jakarta MRT was awarded to a consortium led by Sumitomo Corporation on 3 March 2015. [95] A total of 16 six-cars trainsets were ordered at a cost of ¥10.8 billion (Rp145 billion). [96] The trains were built in Nippon Sharyo's plant in Toyokawa, Aichi. [97]
Each car measures 20 m (65 ft 7 in) in length, 2.9 m (9 ft 6 in) in width, and 3.9 m (12 ft 10 in) in height. [98] These trains utilize the CBTC signaling system and are equipped with Automatic Train Operation (ATO) GoA 2, with drivers operating the doors and driving in case of emergency. [99] Like the KRL Commuterline, the MRT trains are also powered via overhead catenary. [100]
MRT Jakarta officially call the trains Ratanggas (singular Ratangga), a nickname first bestowed on 10 January 2018 by then Governor of Jakarta, Anies Baswedan. The name, which is Old Javanese for chariots, [101] was derived from Mpu Tantular's Kakawin Sutasoma (also the source for Indonesia's national motto). [102] It offers a women-only carriage during morning peak hours from 7AM to 9AM and in the afternoon from 5PM to 7PM. [103]
PT Mass Rapid Transit Jakarta (Perseroda) is a municipally owned perseroan terbatas founded by the Government of Special Capital Region of Jakarta to operate the Jakarta MRT system. Its establishment was approved by the provincial parliament (DPRD) on 10 June 2008 and the company's incorporation was formally notarized on 17 June 2008. Due to a two-shareholder minimum in Indonesia's perseroan terbatas laws (rescinded for municipally owned corporations in 2020), only 99.98% of the shares are owned by the Government of Jakarta; the rest 0.02% is owned by Perumda Pasar Jaya (a municipal public corporation of Jakarta operating marketplaces). [104] Therefore, PT MRT Jakarta (Perseroda) is the first operating railway company in Indonesia that is not wholly or partly owned by state-owned company Kereta Api Indonesia, and one of the only such companies besides PT LRT Jakarta.
Banten is the westernmost province on the island of Java, Indonesia. Its capital city is Serang and its largest city is Tangerang. The province borders West Java and the Special Capital Region of Jakarta on the east, the Java Sea on the north, the Indian Ocean on the south, and the Sunda Strait on the west and shares a maritime border with Lampung to the west. The province covers an area of 9,352.77 km2 (3,611.12 sq mi). It had a population of over 11.9 million in the 2020 census, up from about 10.6 million in 2010. The estimated mid-2023 population was 12.308 million. Formerly part of the province of West Java, Banten was split off to become a province on 17 October 2000.
The Jakarta metropolitan area or Greater Jakarta, known locally as Jabodetabekpunjur is the most populous megapolitan area in Indonesia. It includes the national capital as well as five satellite cities and three complete regencies. The original term "Jabotabek" dated from the late 1970s and was revised to "Jabodetabek" in 1999 when "De" was inserted into the name following its formation. The term "Jabodetabekjur" or "Jabodetabekpunjur" was legalised on the Presidential Regulation Number 54 of 2008, and then the name "Jabodetabekpunjur" is officially used.
KRL Commuterline, commonly known as Greater Jakarta Commuter rail, Jakarta Commuter rail, and KRL Commuter Line Jabodetabek is a commuter rail system for Greater Jakarta in Indonesia. It was previously known as KRL Jabodetabek. It is operated by KAI Commuter (KCI), a subsidiary of the Indonesian national railway company PT Kereta Api Indonesia (KAI). The rail system uses rolling stock of rapid transit standard and operates high frequency services with minimum headway. In 2019, the average number of Commuterline users per day reached 1.04 million, with the record of the highest number of users served in a day being 1,154,080.
Balaraja is a town and an administrative district (kecamatan) within Tangerang Regency in the province of Banten, on Java, Indonesia.
Klender Station (KLD) is a railway station located in Jatinegara Kaum, Pulo Gadung, East Jakarta, Indonesia. The station, which is located at an altitude of +10 m, is included in the Jakarta Operational Area I and only serves KRL Commuterline trips.
Jakarta International Stadium is a retractable roof football stadium in Tanjung Priok, Jakarta, Indonesia. It is the home ground of Persija Jakarta after moving from their previous stadium, Gelora Bung Karno Stadium, and the occasional home of the Indonesia national football team, after an agreement between PSSI and PT JAKPRO to use the facility. The stadium has a seating capacity of 82,000 spectators, making it the largest stadium in Indonesia and largest football-specific stadium in Asia.
Jalan M.H. Thamrin or Jalan Thamrin is a major thoroughfare in Jakarta, Indonesia. The road is located at the center of Jakarta, running from the north end of Jalan Jenderal Sudirman at West Flood Canal at the south end to the roundabout near Arjuna Wijaya Statue Jakarta at the north end. Developed in the 1950s, the road was a landmark of post-colonial Indonesia and continues to have a prominent importance in Jakarta.
Sudirman Station is a train station of KRL Commuterline, which is located in Menteng, Central Jakarta, Indonesia. The station is named from Jalan Jenderal Sudirman, one of the main avenue in Jakarta, which crosses above the station. This station is located on the north bank of West Flood Canal. Though this station serves only Commuterline trains, but it is a transit point for other types of public transportation as part of the Dukuh Atas TOD.
The Jabodebek LRT, formerly known as Greater Jakarta LRT is a light rapid transit system in Greater Jakarta, the capital city of Indonesia, as well as the adjacent areas of West Java, within the Jakarta Metropolitan area. It was implemented by the central government, and operated by Kereta Api Indonesia (KAI), the system connects the Jakarta city center with suburbs in Greater Jakarta such as Bogor, Depok and Bekasi, hence its acronym Jabodebek.
Bintaro Jaya is a planned township located in Greater Jakarta, Indonesia. It is developed by PT Jaya Real Property Tbk. The development of the township began within South Jakarta in 1979 and is expanded further to South Tangerang in Banten province. The township is built as a satellite city for Jakarta, with a total land area of about 1000 hectares. The name Bintaro is derived from the Bintaro Village, which also takes the name of Bintaro plant, whereas Jaya came from the name of the developer. Bintaro Jaya along with Bumi Serpong Damai (BSD) is one of the largest township in Indonesia.
The Jakarta Light Rapid Transit or Jakarta LRT is one of the light rapid transit systems in Jakarta, the capital city of Indonesia. It is conceived and built by the Jakarta provincial government. The first phase of the LRT, from Velodrome to Pegangsaan Dua, began commercial operations on 1 December 2019.
Lebak Bulus MRT Station is a rapid transit station on the North-South Line of the Jakarta MRT in Jakarta, Indonesia. The station is located in Lebak Bulus, Cilandak, South Jakarta and has only two railway lines, both of which are straight lines. The station is located not far from Lebak Bulus Terminal. MRT Jakarta users can also continue their journey with the TransJakarta Corridor 8 bus rapid transit service via the Lebak Bulus bus stop.Located in the South Jakarta, it is the terminus of the North-South Line, however the track does continue east, towards Lebak Bulus Depot as a maintenance facility for the Jakarta MRT train, which is located on the former Lebak Bulus Stadium land.
Fatmawati MRT Station, or Fatmawati Indomaret MRT Station for sponsorship reason, is a rapid transit station on the M1 North-South Line of the Jakarta MRT in Jakarta, Indonesia. Located in South Jakarta, it is the penultimate station on the M1 North-South Line, located between Lebak Bulus Grab Station (Terminus) to the west and Cipete Raya station to the northeast.
Bundaran HI Station is a rapid transit station on the North-South Line of the Jakarta MRT in Central Jakarta, Jakarta, Indonesia. Located nearby the Hotel Indonesia (HI) Roundabout, it is currently the terminus of the North-South Line, as the phase 2 construction of the line is underway. The station is located in the Gondangdia area of Menteng, Central Jakarta and is built underneath Jalan M.H. Thamrin. Jakarta MRT users can continue their journey with Transjakarta's Corridor 1 service from this station via the Bundaran HI bus stop located above. This connection with Transjakarta is in the form of stairs so it is not disabled friendly. The station only has two railroad tracks equipped with a Buffer stop and a Railroad switch on the south side. The switch is used to move MRT trains that were originally on the left track to the right, or vice versa.
The Jabodebek LRT Cibubur Line is one of the two light rapid lines of the Jabodebek LRT which connect Dukuh Atas to Harjamukti station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations.
The North–South line is a rapid transit line of the Jakarta MRT. Coloured dark red on the map, the line is currently 15.7 km (9.8 mi) long and serves 13 stations. It is the first and only operational line of the Jakarta MRT. The line is the second rail transit system to be operated in the country, after Palembang LRT.
Transjakarta Corridor 8 is a bus rapid transit corridor in Jakarta, Indonesia, operated by Transjakarta. It serves the route from Lebak Bulus, South Jakarta to the Pasar Baru BRT station in Central Jakarta. The corridor traverses along Pasar Jumat, Ciputat Raya, TB Simatupang, Metro Pondok Indah, Arteri Pondok Indah, Teuku Nyak Arif, Letjen Supeno, Panjang, Daan Mogot, Letjen S. Parman, Tomang Raya, Balikpapan, Suryopranoto, Ir. Hj. Djuanda, and Pos streets, and terminates at Pasar Baru. Then continues via Gedung Kesenian, Lapangan Banteng Utama, and Katedral streets towards Lebak Bulus. This corridor is integrated with KRL Commuterline at Kebayoran railway station which serves the Rangkasbitung Line via Kebayoran BRT station, Tangerang Line at Pesing railway station via Damai BRT station, and Bogor Line at Juanda railway station via Juanda BRT station. This corridor is also integrated with the Jakarta MRT at Lebak Bulus Grab station via Lebak Bulus BRT station.
Dukuh Atas LRT Station is a light rail station located within the Dukuh Atas TOD in Jalan Setia Budi Tengah, Kuningan Timur, Setiabudi, South Jakarta, Jakarta, Indonesia. The station, which is located at an altitude of +27.9 meters, serves the Cibubur and Bekasi lines of the Jabodebek LRT system.
The Transjakarta Corridor 2 is a bus rapid transit corridor in Jakarta, Indonesia, operated by Transjakarta. It connects the Pulo Gadung Bus Terminal in East Jakarta to the Monumen Nasional BRT station in Central Jakarta. The streets that are passed by Corridor 2 are Perintis Kemerdekaan, Letjen Suprapto, Imam Sapi'i.e., Kwini II, Abdul Rahman Saleh, Pejambon, Medan Merdeka Timur, Perwira, Katedral, Ir. H. Djuanda, Veteran III, and Medan Merdeka Utara streets, and terminates at Monas. In the opposite direction, the route passes Medan Merdeka Barat, Medan Merdeka Selatan, and Kwitang Raya streets, then continues at Letjen Suprapto Street towards Pulo Gadung. This corridor is integrated with the Pasar Senen railway station, which serves the KRL Commuterline and the intercity train services via Pasar Senen BRT station and the Juanda railway station, which serves KRL Commuterline service only via Juanda BRT station.