KL Monorail

Last updated

KL Monorail Line
KLRT Line 8 icon.svg
Set 27 Bukit Nanas, 2023 (01).jpg
A 4 car monorail train approaching Bukit Nanas Monorail station (at far left)
Overview
Native nameLaluan Monorel KL
StatusFully operational
Owner Prasarana Malaysia
Line number 8 (light green)
Locale Kuala Lumpur
Termini
Stations11
Website myrapid.com.my
Service
TypeStraddle-beam single-rail track
System Rapid KL Logo.svg Rapid KL
Services KL Sentral Monorail-Titiwangsa
Operator(s) Rapid Rail
Depot(s)Brickfields
Rolling stock Scomi SUTRA (4-car)
Daily ridership50,661 (2023)
71,623 (Q4 2014; Highest) [1]
Ridership18 million (mid 2023)
25.437 million (2013; Highest) [2] [1]
History
Opened31 August 2003;20 years ago (2003-08-31)
Technical
Line length8.6 km (5.3 mi)
CharacterElevated
Electrification 750 V DC   third rail
Operating speed60 km/h (37 mph)
Route map

Contents

BSicon utCONTg.svg
12 Arrow Blue Up 001.svg
BSicon uhLSTR+l.svg
BSicon HUBrg-R.svg
BSicon uhINTq.svg
BSicon HUB+r-L.svg
BSicon utKRZh.svg
BSicon uhCONTfq.svg
3 4 Arrow Blue Right 001.svg
BSicon HUBlf-R.svg
BSicon uhKINTa.svg
BSicon HUBrf-L.svg
BSicon utINT.svg
MR11
Titiwangsa
BSicon uhSTR.svg
BSicon utCONTf.svg
12 Arrow Blue Down 001.svg
BSicon uhBHF.svg
MR10
Chow Kit
BSicon uhBHF.svg
MR9
Medan Tuanku
BSicon utLSTR+l.svg
BSicon utBHFq.svg
BSicon KBL2.svg
BSicon BLc3.svg
BSicon uhKRZt.svg
BSicon utCONTfq.svg
KJ12
Dang Wangi
BSicon WALKl.svg 5 Arrow Blue Right 001.svg
BSicon BLc1.svg
BSicon uhBHF.svg
BSicon KBL4.svg
MR8
Bukit Nanas
BSicon uhBHF.svg
MR7
Raja Chulan
BSicon utLSTR+l.svg
BSicon utBHFq.svg
BSicon KBL2.svg
BSicon BLc3.svg
BSicon uhKRZt.svg
BSicon utCONTfq.svg
KG18A
Pavilion KL-Bukit Bintang
BSicon WALKl.svg 9 Arrow Blue Right 001.svg
BSicon BLc1.svg
BSicon uhBHF.svg
BSicon KBL4.svg
MR6
Bukit Bintang
BSicon uhBHF.svg
MR5
Imbi
BSicon HUB2.svg
BSicon uhINT.svg
BSicon HUBc3.svg
MR4
Hang Tuah
3 4 Arrow Blue Right 001.svg
BSicon uLSTRl.svg
BSicon HUBc1.svg
BSicon uhKRZ.svg
BSicon HUB4.svg
BSicon uINTq.svg
BSicon uCONTfq.svg
BSicon uhBHF.svg
MR3
Maharajalela
BSicon uhBHF.svg
MR2
Tun Sambanthan
BSicon utLSTR.svg
BSicon uhSTR2.svg
BSicon uhSTRc3.svg
BSicon lhSTRa@f.svg
BSicon uKDSTa.svg
Monorail Depot
BSicon utSTR.svg
BSicon CONTg.svg
BSicon uhSTRc1.svg
BSicon uhSTR2+4.svg
BSicon uhSTR+hc3.svg
BSicon WALKl.svg 1 2 Arrow Blue Up 001.svg
BSicon utBHF.svg
BSicon KBL2.svg
BSicon STR.svg
BSicon BLc3.svg
BSicon uhLSTR+4.svg
BSicon uhSTRc1.svg
BSicon uhABZg+4.svg
KG15
Muzium Negara
BSicon WALKl.svg 9
BSicon utSTR.svg
BSicon BLc1.svg
BSicon XPLTaq.svg
BSicon INT.svg
BSicon KBL4.svg
BSicon uhBHF.svg
BSicon XPLTq.svg
BSicon XPLTeq.svg
BSicon KINTa.svg
BSicon BLaq.svg
BSicon uhKBHFe.svg
BSicon BLeq.svg
MR1
KL Sentral BSicon LDER.svg
BSicon utCONTf.svg
BSicon CONTf.svg
BSicon uhCONTf.svg
BSicon CONTf.svg
BSicon WALKl.svg 1 2 10 5 6 7 Arrow Blue Down 001.svg

Interchange stations

BSicon INT.svg
BSicon HUBaq.svg
BSicon uINT.svg
BSicon HUBeq.svg
BSicon uINT.svg
integrated paid area
single fare trip
BSicon BHF.svg
BSicon BLaq.svg
BSicon uBHF.svg
BSicon BLq.svg
BSicon uBHF.svg
BSicon BLeq.svg
non-integrated paid area
multiple fare trips
BSicon INT.svg
BSicon XPLTaq.svg
BSicon uINT.svg
BSicon HUBaq.svg
BSicon XPLTq.svg
BSicon uKINTe.svg
BSicon HUBeq.svg
BSicon XPLTeq.svg
interchange within same building
or cross-platform interchange
BSicon kSTR2.svg
BSicon uSTRl.svg
BSicon uSTRq.svg
BSicon kSTRc1.svg
BSicon kSTRl+4.svg
BSicon STRq.svg

The KL Monorail Line is the only operational monorail system in Malaysia. Operated as part of the RapidKL system by Rapid Rail, a subsidiary of Prasarana Malaysia, it is one of the components of the Klang Valley Integrated Transit System . The line is numbered 8 and coloured light green on official transit maps.

Due to improper infrastructure planning and the inadequate size of the rolling stock (to transport a large number of passengers in or out of the downtown Kuala Lumpur area during rush hour), the KL Monorail is commonly cited as the most unsatisfactory rail line of the Klang Valley Integrated Transit System. [3] [4]

History

This urban monorail line was opened on 31 August 2003, with 11 stations running 8.6 km (5.3 mi) on two parallel elevated tracks. It connects the KL Sentral transport hub in the south and Titiwangsa in the north with the "Golden Triangle", a commercial, shopping, and entertainment area consisting of the Bukit Bintang area, and surrounded by Jalan Imbi , Jalan Bukit Bintang , Jalan Sultan Ismail, and Jalan Raja Chulan . [5]

The monorail scheme was announced by Kuala Lumpur City Hall in January 1990 after the Malaysian Government gave the go-ahead to the scheme at a cabinet meeting in June 1989. Its cost was then estimated at RM 143 million. The 14 km (8.7 mi), 22-station system is designed to carry more than 34,000 passengers a day on a 20-minute loop through Kuala Lumpur's bustling commercial core. The plan is to build it in two phases: in the first, 16 stations will be serviced over 7.7 km (4.8 mi); and in the later stage, another 6.5 km (4.0 mi) loop will be added. The first phase was expected to be completed within two years. [6]

According to plans dating back to the 1990s, the planned line was to have two branches (similar to the Ampang and Sri Petaling Lines), with one branch going via Maharajalela station and then on to the city centre, and the other branch going to Mid Valley, Abdullah Hukum, Jalan Klang Lama and ending at Kampung Pasir, which will probably include integration with KTM Komuter's Port Klang Line at Petaling or Pantai Dalam stations. KL Sentral and Tun Sambanthan were planned to be the common stations. [7] [8] Ultimately only the downtown branch was built, due to the 1997 Asian financial crisis.

Work was scheduled to begin in June 1990, but was postponed to May 1991, after the city's mayor complained that tenders submitted for preparatory work were too high. There has been no activity on the project since and few details are available on how the project is expected to proceed. The main contractor is a local company, BNK, which had little success in its search for backers to finance its share of the venture. Part of its problem in securing money stems from the project's escalating cost estimates, and part from its lack of a track record in handling such huge projects. [6]

Construction was re-initiated by Hitachi, Ltd., but the 1997 Asian financial crisis led to cessation of work in December 1997. When work was resumed in July 1998, MTrans Holdings took over, locally manufacturing its own rolling stock and completing the project to save cost; [9] the line was completed at a cost of MYR 1.18 billion.

As the line was opened in 2003, it was agreed that the parent company and owner of the KL Monorail Line, KL Monorail System Sdn Bhd (KLMS) under its parent company KL Infrastructure Group (KL Infra), would hold a 40-year concession to operate the monorail. [10] The line and number of stations remains unchanged since 2003. Based on 1999 transit map, Originally KL monorail line have 19 stations, start from Titiwangsa, Chow Kit, Wawasan, P. Ramlee, Raja Chulan, Bukit Bintang, Imbi, Hang Tuah, Merdeka, Sultan Sulaiman (cancelled), Tun Sambanthan, subsequently unbuild line from Syed Putra, Taman Seputeh, Abdullah Hukum, Lembah Pantai, Pantai Dalam, Taman Desa, OUG and Kampung Pasir. [11]

Since the start of operations, the KL Infrastructure Group suffered losses due largely to depreciation and interest repayment costs. [12] For the financial year to 30 April 2004, KL Infra posted a net loss of MYR 46.24 million on a MYR 15.08 million revenue. [13] KL Infra had also taken up a MYR 300 million Malaysian government loan and a MYR 260 million infrastructure loan from the Bank Pembangunan Malaysia Berhad (BPMB) (The development bank of Malaysia) (Malay : Bank Pembangunan Malaysia, BPM). [ citation needed ] In addition, KL Infra had proposed to buy MTrans' three subsidiary companies to improve its business, but failed after Scomi bought up some of the targeted companies. [12]

Government takeover

In April 2007, talks were under way between KL Infra and the government and the Bank Pembangunan Malaysia Berhad to sell the KL Monorail Line to the Prasarana Malaysia, which then had already owned both the Kelana Jaya Line and the Ampang Line, as well as 10% of KL Infra shares. KL Infra was cited as intending to exit Malaysia's monorail business. The takeover is part of the government's master plan to improve the urban public transport sector. [12] [14]

SPN gave its agreement in principle to the takeover on 22 December 2006 and a follow-up meeting was held on 6 February 2007 with the government on the takeover of its operational assets and assumption of loan liabilities. [ citation needed ]A due diligence audit was conducted from 5 March 2007 to 27 April 2007 by consultants appointed by the government. Following agreement to the takeover, BPM granted KL Monorail an extension until 29 April 2007 for an interest repayment amounting to MYR 4,244,801.91, which was originally due on 29 December 2006. [15]

However, the takeover seemed to have suffered a setback at least from the perspective of KL Infra when on 26 March 2007, it was notified by BPM that it was not going to entertain any further extensions for interest repayment. Subsequently on 27 April 2007, the bank notified that it would not be granting any moratorium on interest repayments. On 29 April 2007, KL Monorail was not able to make the repayment of the interest instalment which had become due. [15]

On 3 May 2007, KL Monorail was issued a default notice by BPM which sought repayment of the entire principal sum of MYR 609,616,423.73 and capitalised interest of MYR 296,428,910.88 totalling MYR 906,045,334.61. The company was granted seven days from that day to repay the entire sum, which it failed to do. [ citation needed ]On 14 May 2007, Mohd Anwar Bin Yahya and Cho Choo Meng were appointed receivers and managers by Amanah Raya, the Security Trustee for BPM. Nevertheless, the takeover process is still deemed ongoing, KL Infra stating that it will continue to engage the government and BPM to address the proposed takeover of KL Monorail by Prasarana based on earlier discussions and an approval in principle. [16]

One of the effects of the appointment of receivers and managers is the possibility that KL Infra will not be receiving any compensation for KL Monorail should the takeover by SPN go through. [17]

The trading of KL Infra was suspended from 15 May 2007. [18] On the same day, KL Infra's board announced to Bursa Malaysia that it had formed the opinion that it was not solvent and would not be able to pay all its debts in full within a period not exceeding twelve months. [19] On 28 November 2007, Prasarana Malaysia signed a sale-and-purchase agreement with KL Monorail Systems, effectively making Prasarana the operator of KL Monorail, and resulting in Prasarana taking over the MYR 882 million BPM loan.[ citation needed ]

List of stations

KL Monorail dynamic route map display KL Monorail route display 2021.jpg
KL Monorail dynamic route map display

The line consists of a single dual-way line that links areas of inner Kuala Lumpur not served by rail transport, namely Brickfields, Bukit Bintang, and Chow Kit, with existing LRT, MRT and KTM Komuter stations at KL Sentral, Muzium Negara, Hang Tuah, Bukit Bintang, Bukit Nanas, and Titiwangsa. The two termini are on a single track with a Spanish solution layout.

The stations are designed as elevated structures with ticketing facilities on either the ground level (as seen in the KL Sentral station) or the first-floor level. The platforms are on the top floor, separated from the monorail lines by fencing. They were originally covered by large canvas roofs, which were replaced in 2014 by aluminium zinc roofs. [20] Certain stations are situated above roadways, or are slightly longer than others. Each station used to be designated with a sponsor, with route maps associating each station with a particular product brand.

The depot is between KL Sentral and Tun Sambanthan.

Station CodeStation NameImagePlatform typeInterchange/Notes
 MR1  KL Sentral KL Sentral Monorail Station.jpg Terminus (Spanish solution)Southern terminus.

Accessed via NU Sentral shopping mall if coming from KL Sentral (main terminal building).

Connecting station (requires exiting the station's paid area) to:

 MR2  Tun Sambanthan Tun Sambanthan Monorail Station outview (220116) 03.jpg Side Exit to Methodist College Kuala Lumpur (MCKL) and Brickfields.
 MR3  Maharajalela
Maharajalela Station - Mapillary (fYARhUpI04TajodUDxfStu).jpg
Exit to Merdeka 118.
 MR4  BBCC–Hang Tuah Hang Tuah Station outview (221203) 04.jpg Interchange station to  AG9  SP9  LRT Ampang and Sri Petaling Lines.

Exit to LaLaport and Bukit Bintang City Centre (BBCC) via the transit hub.

 MR5  Imbi Imbi Station - Mapillary (KVrlRn4Aer8vaguCNIT6kT).jpg Exit to Berjaya Times Square via an elevated walkway.
 MR6  Bukit Bintang Bukit Bintang Monorail Station outview (211030).jpg Connecting station to  KG18A  MRT Kajang Line.

Pedestrian access to  KJ10  KLCC on the LRT Kelana Jaya Line via an elevated walkway from Pavilion Kuala Lumpur.

Exit to Lot 10 and Sungei Wang Plaza via elevated walkways.

 MR7  Raja Chulan Raja Chulan Station - Mapillary (nxVNQF3R1IJVgsyIugkGae).jpg Pedestrian access to  KJ10  KLCC on the LRT Kelana Jaya Line via an elevated walkway from Pavilion Kuala Lumpur.
 MR8  Bukit Nanas Bukit Nanas Station - Mapillary (z7O9EaHtLZ63COug7NVwOy).jpg

Connecting station to  KJ12  Dang Wangi on the LRT Kelana Jaya Line.

 MR9  Medan Tuanku Medan Tuanku Monorail Station from elevated pedestrian walkway (230404) (cropped).jpg Pedestrian access to  AG5  SP5  Sultan Ismail on the LRT Ampang and Sri Petaling Lines via 580 meter elevated walkway.

Exit to Quill City Mall via an elevated walkway.

 MR10  Chow Kit Chow Kit Station - Mapillary (hMNhS0ZNmLhC9UpHczlwHn).jpg Exit to Chow Kit district and Hospital Kuala Lumpur.
 MR11  Titiwangsa TItiwangsa Monorail Station outview (211030).jpg Terminus (Spanish solution)Northern terminus.

Interchange station to  AG3  SP3  LRT Ampang and Sri Petaling Lines and  PY17  MRT Putrajaya Line.

Proposed interchange with  CC08  MRT Circle Line .

KL Monorail
Location of KL Monorail

Expansion

To some extent, the line has been designed to accommodate future expansion. [ citation needed ] While some stations are significantly longer than the current two-car sets, providing room for longer train sets, extension works for other stations have been necessary. An expansion project known as the KL Monorail Fleet Expansion project is being carried out by Prasarana to ensure a more efficient and user-friendly monorail services in the future. The installation of the Platform Automatic Gate System (PAGS) is one such work under the project. [ citation needed ] This gate system is necessary to improve passenger safety as before this, there are no barriers between the passenger platforms and the tracks and this may pose dangers to the users. The project also includes the installation of a new signalling system, construction of a new depot to accommodate larger train sets, and other station upgrades and universal access facilities.

An example of station upgrades is at Bukit Bintang station. Touted as one of the busiest stations of the line due to its proximity to Bukit Bintang, [ citation needed ] the hub of shopping and entertainment in Kuala Lumpur, it used to have only one exit, but the upgrading project now provided the station with added an alternative entrance and exit walkway and a direct entry to the Lot 10 and Sungei Wang Plaza shopping complexes. The monorail station is also equipped with new ticket vending machines and ticketing gates. [ citation needed ] Other than that, escalators and lifts as well as a new Customer Service Office are also provided. Another example is at the second busiest monorail station, Kuala Lumpur Sentral station, where the Nu Sentral Mall overhead bridge becomes the new entrance to the station. [ citation needed ] Previously, monorail users needed to exit KL Sentral and cross the busy main thoroughfare in Brickfields to reach the station. The completion of the overhead bridge now enables customers to travel between KL Sentral and the monorail station safely and conveniently. [21] [22] [23]

The main goal of the fleet expansion project is, however, the introduction of new, state-of-the-art four-car trains. Two four-car trains have been introduced to the public while the rest will be delivered in stages until the fourth quarter of 2015. The new four-car trains can accommodate up to 430 passengers per trip and could significantly reduce the waiting time for passengers. [24] They are also more comfortable and spacious than the current two-car trains. After all sets of four-car trains have been delivered and commissioned, the two-car sets, which have been in operation since 2003, would be retired. Besides having a larger capacity, the new trains are also fitted with better safety features including open-door windows, on-board closed-circuit television cameras and "run-flat" features, which allow the trains to continue moving in the event of a puncture. [25] [26]

Rolling stock

Former 2-car ALWEG rolling stock Kuala Lumpur Monorail 01 (cropped).jpg
Former 2-car ALWEG rolling stock
4-car Scomi SUTRA rolling stock SCOMI Sutra for Rapid Rail.jpg
4-car Scomi SUTRA rolling stock
The interior of KL Monorail Scomi SUTRA car Interior of KL Monorail Scomi SUTRA.jpg
The interior of KL Monorail Scomi SUTRA car

The first trains used on the KL Monorail line were 10 sets permanently coupled two-car trains of a similar design to the Seattle Center Monorail's ALWEG trains. [9] Each monorail train can accommodate 158 passengers during regular operations. The monorail carriages themselves were constructed by Scomi Rail, a Malaysian monorail manufacturer, [9] at the Scomi Rail plant in Rawang, which also featured its own tracks for monorail train tests. [27] In June 2017, the monorail was operated solely using 6 sets two-car trains. The remaining two-car trains had been fully decommissioned by end of 2022.

KL Monorail subsequently began upgrading its rolling stock to brand-new, four-car trains. [28] These were also manufactured by Scomi, this time to the company's in-house-developed SUTRA design, which was also ordered by the Mumbai Monorail line in India. Each of these trains can accommodate 430 passengers per trip, compared with 213 passengers for the two-car trains. [28] The new trains are equipped with four closed-circuit television cameras and space for wheelchairs and strollers. [28]

The first two sets four-car trains entered service in December 2014, with the remaining units scheduled to be arriving in stages. While they were initially all scheduled to be in operation by the end of 2015, [28] only five have been delivered so far. They were taken out of service in May 2017 due to safety reasons. [29] Three of the four-car trains have been reinstated in August 2019, with two more expected to re-enter service in November of the same year. In 2019 KL monorail service is operated using five sets 4-car trains and four sets 2-car trains. [30] Once delivery of the remaining 7 sets of four-car trains is complete, the original ALWEG two-car trains will be decommissioned. [28]

Fleet details & formation

Below is the list of the 4-car Scomi SUTRA:

Set designation1234
FormationCabinMiddle CarMiddle CarCabin

The 4-car Scomi SUTRA has 2 livery colour

Set No.1234StatusCar ConfigurationLivery Colour
Set 212101210221032104In operation4-carRed
Set 222205220622072208In operation4-carBlue
Set 232309231023112312In operation4-carRed
Set 242413241424152416Temporarily grounded (Caught fire)4-carBlue
Set 252517251825192520In operation4-carRed
Set 262621262226232624In operation4-carBlue
Set 272725272627272728In operation4-carRed
Set 282829283028312832In operation4-carBlue
Set 292933293429352936In operation4-carRed
Set 303037303830393040In operation4-carBlue
Set 313141314231433144Delivered4-carRed
Set 323245324632473248Delivered4-carBlue

Ridership

The monthly ridership increased from 341,850 passengers in September 2003 to 1.18 million passengers in August 2004. In January 2007, the monorail attained its 50 millionth passenger since its opening. On 29 July 2009, the monorail reportedly reached the 100 million passenger mark.

KL Monorail Ridership [31] [32]
YearMonth/QuarterRidershipAnnual RidershipNote
2023Q14,099,6878,370,974
Q24,271,287
Q3
Q4
2022Q12,431,76011,496,524
Q22,434,132
Q33,125,274
Q43,505,358
2021Q11,167,4914,226,329
Q2968,990
Q3591,448
Q41,498,400
2020Q12,928,8237,143,534
Q2774,603
Q32,021,544
Q41,418,564
2019Q12,854,68812,573,738
Q22,853,647
Q33,077,452
Q43,749,951
2018Q13,456,79712,594,377
Q23,110,144
Q33,047,678
Q42,979,758
201716,841,630
201624,200,299
201525,067,866
201424,303,465
201325,437,621
201224,435,931
201124,200,299
201022,108,308
200921,021,390
200821,765,233
200720,142,772
200617,370,337
200514,482,575
200410,956,675
20032,917,065September—December 2003

Accident and incidents

David Chelliah accident

Prior to the opening, on 16 August 2002 an accident occurred during a test run involving a 13.4 kg (30 lb) safety wheel falling off a train and hitting the head of a pedestrian walking under the monorail viaduct at Jalan Sultan Ismail. The victim, David Chelliah, a journalist, suffered injuries that required hospitalisation.

On 7 March 2003, Chelliah filed a MYR 5 million negligence suit against the companies involved in the design, installation and operation of the trains, as well as the Director-General of Railways. [33] [34] On 8 April 2003, the High Court ruled that the Monorail company was liable for the incident, but not the Director-General of Railways. Although the monorail company reported that any such accident was "unlikely" as six bolts would have to be removed for it to occur and furthermore, a check of all 23 other safety wheels on the train involved did not turn up any other issues, the high court judgement ruled that the monorail company "failed to provide a reasonable explanation as to how the safety wheel had come off the train and instead relied on the possibility that there had been tampering by unknown persons". [35] [36]

As a result of this accident, the launch of the monorail was postponed.

Burst tyre incident

On 22 January 2005, a pneumatic load tyre suddenly burst and caused two women passengers to be injured. The train, carrying about 30 passengers, was about to move from Chow Kit station to Titiwangsa station when the incident occurred at about 8.50pm. The burst tyre caused a rubber sidewall panel to flip open which then hit the side of a passenger seat and injured a woman's legs and another woman's hands. Train services were suspended for about 30 minutes following the incident. [37]

Breakdown

On 11 August 2012, a train stalled near Tun Sambanthan in Brickfields. The breakdown caused 183 passengers to be trapped for about two hours. The air conditioning system in the carriage stopped functioning when the power supply was cut. As a result, some passengers had to break the windows to allow air in while awaiting rescue. Fire and Rescue Department personnel later used a skylift to rescue passengers trapped in the carriage. [38] Investigation revealed that the issue was due to a power supply disruption at the circuit breaker, causing the auxiliary power system to fail. [39]

Six days later, another breakdown occurred. A train stalled between Imbi and Bukit Bintang for about 30 minutes, trapping around 200 passengers. This time however, there was power in the train and the air-conditioning system was functional. Train services resumed after half an hour. [39]

Titiwangsa station fire

On 30 March 2015, a monorail service was temporarily delayed when a tyre of a two-car train coach caught fire at the Titiwangsa Station. The scene was recovered hours later. [40]

Maharajalela station fire

On 24 December 2020, around 7.30am, when a KL Monorail train bound for KL Sentral was approaching the Maharajalela station, one of its tires burst and caught fire. There's no injuries/casualties in the accident, but the Scomi's 4-car train set 24 has been seriously damaged.

Tyre fire

On 19 December 2023, a coach guide tyre caught fire and fell from the coach onto the road underneath. The incident happened near Titiwangsa Station. The train was halted and passengers evacuated while the fire brigade dealt with the fire. There were no casualties. [41]

Proposed extension

Related Research Articles

<span class="mw-page-title-main">Kuala Lumpur</span> Federal territory and capital city of Malaysia

Kuala Lumpur, officially the Federal Territory of Kuala Lumpur and colloquially referred to as KL, is a federal territory and the capital city of Malaysia. It is one of the fastest-growing cities in Asia and the largest city in Malaysia, covering an area of 243 km2 (94 sq mi) with a census population of 1,982,112 as of 2020. Greater Kuala Lumpur, also known as the Klang Valley, is an urban agglomeration of 7.564 million people as of 2018. It is among the fastest growing metropolitan regions in Southeast Asia, both in population and economic development.

Keretapi Tanah Melayu Berhad (KTMB) or Malayan Railways Limited, colloquially referred to simply as KTM, is the main rail operator in Peninsular Malaysia. The railway system dates back to the British colonial era, when it was first built to transport tin. Previously known as the Federated Malay States Railways (FMSR) and the Malayan Railway Administration (MRA), Keretapi Tanah Melayu acquired its current name in 1962. The organisation was corporatised in 1992, but remains wholly owned by the Malaysian government.

<span class="mw-page-title-main">Kuala Lumpur Sentral station</span> Railway station

Kuala Lumpur Sentral Station is a transit-oriented development that houses the main railway station of Kuala Lumpur, the capital of Malaysia. Opened on 16 April 2001, KL Sentral replaced the old Kuala Lumpur railway station as the city's main intercity railway station. KL Sentral is the largest railway station in Malaysia, and the second largest in Southeast Asia, behind Krung Thep Aphiwat Central Terminal in Bangkok, Thailand.

<span class="mw-page-title-main">Rapid KL</span> Public transportation system in Malaysia

Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. With its coverage throughout Kuala Lumpur and Klang Valley areas, it was followed by a federal government restructuring of public transport systems in Kuala Lumpur after the bankruptcy of STAR and PUTRA Light Rapid Transit operators, the precursors to the Ampang/Sri Petaling Lines and Kelana Jaya Line respectively. In 2003, it had inherited bus services and assets formerly operated and owned by Intrakota and Cityliner after being bailed out. Four years later, the Malaysian government had bailed out KL Infrastructure Group, the owner and operation concession holder for the Kuala Lumpur monorail, and had placed it under ownership of Prasarana.

Prasarana Malaysia Berhad (Prasarana) (English: Malaysian Infrastructure Limited) is a 100% government-owned company which was set up by Ministry of Finance (Malaysia) as a corporate body established under the Minister of Finance (Incorporation) Act 1957 to own the assets of multi-modal public transport operator in Malaysia, under the government's move to restructure the city's public transport system. It is one of the largest public-transport companies in Malaysia other than Konsortium Transnasional Berhad. As a government-owned company since 1998, it operates stage bus and light metro services via several wholly owned subsidiaries.

<span class="mw-page-title-main">Rail transport in Malaysia</span>

Rail transport in Malaysia consists of heavy rail, light rapid transit (LRT), mass rapid transit (MRT), monorails, airport rail links and a funicular railway line. Heavy rail is mostly used for intercity services and freight transport as well as some urban public transport, while rapid transit rails are used for intracity urban public transport in the capital city of Kuala Lumpur and the surrounding Klang Valley region. There are two airport rail link systems linking Kuala Lumpur with the Kuala Lumpur International Airport and Sultan Abdul Aziz Shah Airport. The longest monorail line in the country is also used for public transport in Kuala Lumpur, while the only funicular railway line is available in Penang.

<span class="mw-page-title-main">Titiwangsa station</span> LRT, MRT and monorail interchange in Kuala Lumpur, Malaysia

Titiwangsa station is a rapid transit interchange station in Kuala Lumpur, Malaysia. The station is served by the LRT Ampang and Sri Petaling Lines, the KL Monorail Line and the MRT Putrajaya Line. The station allows seamless physical and fare integration between the four train lines.

Transport in Greater Kuala Lumpur includes a road network, a railway network, airports, and other modes of public transport. The Klang Valley is an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.

<span class="mw-page-title-main">BBCC-Hang Tuah station</span> LRT, MRT and monorail integrate in Kuala Lumpur, Malaysia

Hang Tuah station, also known as BBCC - Hang Tuahstation due to the new transit hub, is an interchange station in the Pudu district of Kuala Lumpur, Malaysia, between the Ampang and Sri Petaling Lines and the KL Monorail. Seamless physical and fare integration was achieved on 1 March 2012 when the "paid-up" or restricted areas of both the LRT and monorail stations, which previously operated as two separate stations, were linked up, allowing passengers to transfer without needing to buy new tickets for the first time since the monorail became operational in 2003.

<span class="mw-page-title-main">Imbi Monorail station</span> Monorail station Kuala Lumpur, Malaysia

Imbi Monorail station is a Malaysian elevated train station on the monorail line that serves as a part of the Kuala Lumpur Monorail, located in Kuala Lumpur and opened alongside the rest of the train service on August 31, 2003. The station's similar location and proximity to a shopping district as the Bukit Bintang station means that the Imbi station is also one of the most heavily used stations along the KL Monorail line.

<span class="mw-page-title-main">Tun Sambanthan Monorail station</span> Monorail station in Kuala Lumpur, Malaysia

Tun Sambanthan Monorail station, is a Malaysian elevated monorail station that forms a part of the Kuala Lumpur Monorail line located in Kuala Lumpur and opened alongside the rest of the line and other adjoining monorail stations on August 31, 2003.

<span class="mw-page-title-main">Raja Chulan Monorail station</span> Monorail station in Kuala Lumpur, Malaysia

Raja Chulan Monorail station is a Malaysian elevated monorail train station that serves as a part of the Kuala Lumpur Monorail, located in Kuala Lumpur and opened alongside the rest of the monorail service on August 31, 2003.

<span class="mw-page-title-main">Chow Kit Monorail station</span> Monorail station in Kuala Lumpur, Malaysia

Chow Kit Monorail station is a Malaysian elevated monorail train station that serves as a part of the Kuala Lumpur Monorail, located in Kuala Lumpur and opened alongside the rest of the train service on August 31, 2003.

<span class="mw-page-title-main">Segambut Komuter station</span>

The Segambut KTM Komuter station is a Malaysian commuter train station located in the northern area of Kuala Lumpur along the Port Klang Line.

<span class="mw-page-title-main">Kajang line</span> Railway line in the Klang Valley, Malaysia

The MRT Kajang line (KGL), previously known as the Sungai Buloh–Kajang line (SBK), is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

<span class="mw-page-title-main">Klang Valley Integrated Transit System</span> Rail transportation network in the Klang Valley

The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the area of Klang Valley and Greater Kuala Lumpur. The system currently consists of 12 fully operating rail lines; two commuter rail lines, six rapid transit lines, one bus rapid transit line and two airport rail links to the Kuala Lumpur International Airport's (KLIA) Terminal 1 and Terminal 2, and another one to the Sultan Abdul Aziz Shah Airport.

<span class="mw-page-title-main">Muzium Negara MRT station</span> MRT station in Kuala Lumpur, Malaysia

The Muzium Negara station is an underground mass rapid transit (MRT) station in Kuala Lumpur, Malaysia on the Kajang Line. It is located beneath Jalan Damansara in front of the Muzium Negara, which gave the station its name.

<span class="mw-page-title-main">Bukit Bintang MRT station</span> MRT station Kuala Lumpur, Malaysia

The Bukit Bintang MRT station, otherwise known as Pavilion Kuala Lumpur–Bukit Bintang MRT station due to sponsorship reasons, is a Mass Rapid Transit (MRT) underground station in Kuala Lumpur, Malaysia. Construction started around 2012 and opened on 17 July 2017. It served as one of the stations on the Klang Valley Mass Rapid Transit (KVMRT) Kajang Line, formerly known as Sungai Buloh–Kajang Line. The station has 5 walkways and entrances that are connected to iconic buildings and malls in the Bukit Bintang locality, including the Pavilion KL, Starhill Gallery and Fahrenheit 88 shopping malls. The main theme of the MRT station is Dynamic Pulse of Colour.

<span class="mw-page-title-main">Bukit Bintang Monorail station</span> Monorail station Kuala Lumpur, Malaysia

Bukit Bintang is a Monorail station located in Bukit Bintang, Kuala Lumpur. As part of the KL Monorail line, it opened alongside the rest of the train service on August 31, 2003.

References

  1. 1 2 Ming, Ong Kian (5 October 2017). "Public transport ridership falling, despite the billions spent". Malaysiakini. Retrieved 17 March 2023.
  2. "Statistik Tahunan Pengangkutan" (PDF). Retrieved 17 March 2023.
  3. "8 painful things only KL monorail users will understand". The Rakyat Post . 7 November 2019. Retrieved 19 April 2023.
  4. "KL Monorail may have other roles to play". The Malaysian Reserve. 9 July 2019. Retrieved 19 April 2023.
  5. "RapidKL Monorail". Official Portal Visit Kuala Lumpur. Tourism Unit, Kuala Lumpur City Hall. Retrieved 21 September 2019.[ dead link ]
  6. 1 2 Doug, Tsuruoka (26 September 1991). "Off the Rails: Kuala Lumpur's Monorail Project Becomes Bogged Down". Far Eastern Economic Review .
  7. "KLTransit" . Retrieved 6 March 2017.
  8. "Transit System Map (1998)" . Retrieved 16 January 2018.
  9. 1 2 3 "Monorails of Asia - Kuala Lumpur, Malaysia". The Monorail Society. Retrieved 2 September 2014.
  10. "KL Infrastructure Group". 10 April 2005. Archived from the original on 10 April 2005. Retrieved 14 July 2023.
  11. Azliana Ahmad (1999). Peranan Sistem Transit Aliran Ringan (STAR) dalam mengatasi masalah pengangkutan awam di bandar Kuala Lumpur (in Malay). Universiti Malaya: Jabatan Antropologi dan Sosiologi, Fakulti Sastera dan Sains Sosial, Universiti Malaya, 1998/99. pp. Lampiran 2.
  12. 1 2 3 "KLIG in talks to exit monorail business". New Straits Times (Business Times). Kuala Lumpur. 25 April 2007. Retrieved 25 April 2007.[ dead link ]
  13. Abu Bakar, Dalila (24 September 2004). "MTrans upbeat on mass transit project in W. Asia". New Straits Times (Business Times). Kuala Lumpur. Archived from the original on 13 February 2007. Retrieved 2 September 2014.
  14. "Syarikat Prasarana Negara in talks to take over KL monorail". The Edge . Kuala Lumpur. 24 April 2007. Archived from the original on 27 April 2007. Retrieved 25 April 2007.
  15. 1 2 "Bursa Malaysia General Announcement: Default in Payment Pursuant to Practice Note No. 1/2001 of the Listing Requirements of Bursa Malaysia Securities Berhad". 30 April 2007. Archived from the original on 7 February 2012.
  16. "Bursa Malaysia General Announcement: Appointment of Receivers and Managers for KL Monorail System Sdn Bhd (KLMS)". 14 May 2007. Archived from the original on 4 March 2016.
  17. Lim Ai Leen (21 May 2007). "Corporate: Puzzle over bank's move on KL Monorail". The Edge . Kuala Lumpur. Archived from the original on 28 September 2007. Retrieved 23 May 2007.
  18. "Bursa Malaysia General Announcement: KL Infra - Suspension of trading". 15 May 2007. Archived from the original on 3 March 2016.
  19. "Bursa Malaysia Announcement: Default in Payment Pursuant to Practice Note No. 1/2001 of the Listing Requirements of Bursa Malaysia Securities Berhad". 15 May 2007. Archived from the original on 3 March 2016.
  20. Prasarana: First Pair Of New 4-Car Monorail In Operations In Third Quarter 2014 Archived 28 May 2014 at the Wayback Machine [sic]; Malaysia Industry-Government group for High Technology; 9 April 2014. URL last accessed 3 December 2014.
  21. "First Look: Nu Sentral Mall at KL Sentral, Brickfields Review". Venusbuzz.com. 1 April 2014. Archived from the original on 21 February 2015. Retrieved 15 March 2015.
  22. "New Wing Of Bukit Bintang Monorail Station Opens Today" (Press release). MyRapid. Archived from the original on 9 January 2015. Retrieved 15 March 2015.
  23. "Kosmo! Online - Terkini". Kosmo.com.my. 20 September 2014. Archived from the original on 21 February 2015. Retrieved 15 March 2015.
  24. "Passengers Give Thumbs Up For New Four-Car Train | MyRapid". 2 April 2015. Archived from the original on 2 April 2015. Retrieved 16 July 2023.
  25. Nair, Vijenthi (16 August 2014). "New four-car monorail trains operating from next month". The Star. Kuala Lumpur. Retrieved 15 March 2015.
  26. "Passengers Give Thumbs Up For New Four-Car Train" (Press release). MyRapid. Archived from the original on 2 April 2015. Retrieved 15 March 2015.
  27. "Kuala Lumpur Monorail - a Photo Essay (page 1/13)". The Monorail Society. Archived from the original on 8 March 2007. Retrieved 25 April 2007.
  28. 1 2 3 4 5 "Four-car trains make debut". New Straits Times. Kuala Lumpur. 22 December 2014. Retrieved 22 December 2014.
  29. Mahpar, M. Hafidz (8 June 2017). "Monorail trains built for Prasarana are 'fit for operation' - Scomi". The Star. Kuala Lumpur. Retrieved 27 June 2017.
  30. Loheswar, R. (20 August 2019). "KL monorail rolls out four-carriage trains on 16th anniversary". Malay Mail. Kuala Lumpur.
  31. "Prasarana's Ridership". 14 January 2023. Archived from the original on 14 January 2023. Retrieved 14 January 2023.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  32. "Statistic of Rail Transport". Ministry of Transport (Malaysia). Archived from the original on 9 January 2022. Retrieved 12 February 2022.
  33. "Long-drawn monorail case to be decided on 8 April". Archived from the original on 5 April 2009. Retrieved 30 July 2009.
  34. "David Chelliah vs Monorail Malaysia Technology Sdn Bhd". Archived from the original on 5 May 2006. Retrieved 30 July 2009.
  35. "Bernama journalist to be awarded damages". The Star. Kuala Lumpur. 9 March 2009. Archived from the original on 10 May 2017. Retrieved 2 September 2014.
  36. Raj, Reena. "Chelliah finally wins it". Malaysian Bar Council. Archived from the original on 20 December 2012. Retrieved 2 September 2014.
  37. "Burst tyre cause of monorail explosion" (PDF). Archived from the original (PDF) on 7 December 2008. Retrieved 30 July 2009.
  38. http://www.thesundaily.my/news/461509 [ dead link ]
  39. 1 2 Liyana Mokhtar, Ily. "KL monorail stalls again". New Straits Times. Kuala Lumpur. Archived from the original on 21 August 2012. Retrieved 2 September 2014.
  40. "Fire reported at Titiwangsa monorail". Archived from the original on 8 December 2015.
  41. "Monorail guide tyre catches fire near Titiwangsa station" . Retrieved 19 December 2023.

Route maps